Gas transmission device for dredger

By designing an air supply device for the drain cleaner, the problem that the existing high-pressure air drain cleaner cannot be inflated is solved, the inflation needs of items with different air pressures are met, and the air tightness and inflation efficiency are improved.

CN223410266UActive Publication Date: 2025-10-03佛山市南海区利永本五金有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422832270.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-19
Publication Date
2025-10-03
Estimated Expiration
2034-11-19

AI Technical Summary

Technical Problem

The existing Yipaotong high-pressure air dredge has a single function and cannot be used to inflate balls or bicycle tires waiting to be inflated.

Method used

A gas supply device for a plumber is designed, which includes a gas pipe head, a gas pipe threaded part, a gas pipe middle part and a gas pipe bottom part. By setting multiple gas supply holes and sealing rings, connection with the plumber and controllable gas delivery are achieved.

Benefits of technology

The air supply device for the dredge can be used to inflate items with different air pressure requirements, thereby improving the air tightness and inflation efficiency and solving the problem of single function.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223410266U_ABST
    Figure CN223410266U_ABST
Patent Text Reader

Abstract

The utility model discloses a gas transmission device for a dredger. The gas transmission device comprises a gas transmission pipe head, a gas transmission pipe thread part, a gas transmission pipe middle part and a gas transmission pipe bottom, one end of the air delivery pipe head is fixedly connected with one end of the air delivery pipe thread part, and the other end of the air delivery pipe head is provided with a first air inlet hole. The gas conveying pipe thread part is of a circular tubular structure, external threads are arranged on the outer side of the gas conveying pipe thread part, and the end, opposite to the gas conveying pipe head, of the gas conveying pipe thread part is fixedly connected with the gas conveying pipe middle. A second gas transmission through hole is formed in the middle of the end, away from the middle of the gas transmission pipe, of the bottom of the gas transmission pipe and communicates with the interior and the exterior of the bottom of the gas transmission pipe. Therefore, the inflating device of the to-be-inflated article is connected into the first air transmission through hole and / or the second air transmission through hole to inflate the to-be-inflated article, and the problems that an existing one-gun high-pressure air dredging device is single in function and cannot be used for inflating the to-be-inflated articles such as balls or bicycle tires are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of dredges, and particularly relates to an air transmission device for dredges. Background Art

[0002] There are many ways to unclog household pipes, such as using steel wire, using dredging fluid, and using a high-pressure gas dredging device. The principle of this high-pressure gas dredging device is to pump air first. This process is similar to using an air pump to inflate a ball or bicycle wheel. The difference is that the dredging device stores the gas in the gas storage and transmission device of the dredging device itself. The current gas storage and transmission device has a two-layer structure. The first layer is used to store compressed gas, and the second layer is used to transport the compressed gas to the outside of the dredging device. There is a valve between the first and second layers. The valve cooperates with the firing device. After the firing device is fired by the user, the valve will connect the first and second layers, so that the compressed gas is transported from the second layer to the outside of the dredging device at one time, which is used to dredge the pipes and dredge the pipes through other pressures.

[0003] Some of these high-pressure air dredges require assembly for ease of transportation, with the main components connected primarily by threads. While the gas storage and transmission devices of these high-pressure air dredges can be disassembled, their general purpose is limited to clearing pipes and cannot be used for other purposes, such as inflating balls or bicycle tires. Utility Model Content

[0004] The utility model aims to provide an air delivery device for a pipe cleaner, so as to solve the problem that the existing high-pressure air pipe cleaner has a single function and cannot be used to inflate objects such as balls or bicycle tires that are waiting to be inflated.

[0005] In order to solve the above technical problems, the utility model provides an air delivery device for a dredge, comprising an air delivery pipe head, a threaded portion of the air delivery pipe, a middle portion of the air delivery pipe and a bottom portion of the air delivery pipe.

[0006] The gas pipe head is a circular tubular shape, and one end of the gas pipe head is fixedly connected to one end of the threaded part of the gas pipe; the threaded part of the gas pipe is a circular tubular structure, and an external thread is provided on the outside of the threaded part of the gas pipe, and the end of the threaded part of the gas pipe opposite to the gas pipe head is fixedly connected to the middle part of the gas pipe; the middle part of the gas pipe is a circular tubular structure, and a circular first gas through hole is provided on the outside of the middle part of the gas pipe, and the end of the middle part of the gas pipe away from the threaded part of the gas pipe is fixedly connected to the bottom of the gas pipe, and a second gas through hole is provided in the middle position of the bottom of the gas pipe away from the end of the middle part of the gas pipe, and the second gas through hole connects the inside and outside of the bottom of the gas pipe.

[0007] The outer diameter of the gas pipe head is smaller than the inner diameter of the clearing device gas pipe, and the outer diameter of the gas pipe head is smaller than the outer diameter of the threaded part of the gas pipe; the threaded part of the gas pipe is used for threaded connection with the threaded connection part of the clearing device; the outer diameter of the threaded part of the gas pipe is smaller than the outer diameter of the middle part of the gas pipe, and the outer diameter of the middle part of the gas pipe is smaller than the outer diameter of the bottom of the gas pipe.

[0008] The second gas transmission through hole is a threaded hole, and the second gas transmission through hole is also threadedly connected to the threaded plug. A bolt groove is also provided at the end of the threaded plug facing the bottom of the gas pipe. The bolt groove is used to fix a screwdriver to rotate the threaded plug. When the second gas transmission through hole is not in use, the threaded plug is installed into the second gas transmission through hole.

[0009] A middle plug is provided in the first gas transmission through hole, and the middle plug is detachably connected to the first gas transmission through hole. When the first gas transmission through hole is not in use, the middle plug is installed in the first gas transmission through hole.

[0010] Furthermore, a sealing ring is provided on the outer side of one end where the gas pipe head is fixedly connected to the threaded portion of the gas pipe.

[0011] Furthermore, the sealing ring is fixedly connected to the head of the gas pipe, and the sealing ring is fixedly connected to the threaded portion of the gas pipe.

[0012] Furthermore, the threaded connection part of the dredge is fixedly connected to the air supply pipe of the dredge, and the threaded connection part of the dredge is arranged inside the middle section of the dredge.

[0013] A connecting cavity is provided inside the middle section of the dredge. After the threaded portion of the gas pipe is threadedly connected to the threaded connecting portion of the dredge, the end of the gas pipe head away from the bottom of the threaded portion of the gas pipe is accommodated in the connecting cavity.

[0014] Furthermore, an end of the middle section of the dredge opposite to the threaded connection portion of the dredge is also connected to a dredge air pump assembly.

[0015] Furthermore, the clearer airing assembly includes a clearer airing pipe, which is connected to the middle section of the clearer. An airing hole is provided at one end of the clearer airing pipe connected to the middle section of the clearer, and the airing hole is connected to the connecting cavity.

[0016] Furthermore, a compression pumping part is provided on the side of the dredge aeration assembly away from the middle section of the dredge, one end of which is provided inside the dredge aeration pipe, and the compression pumping part is slidably connected to the dredge aeration pipe.

[0017] The beneficial effect of the air supply device for a pipe cleaner provided by the present invention is that, compared with the prior art, an air supply pipe head, an air supply pipe threaded portion, an air supply pipe middle portion, and an air supply pipe bottom portion are provided; wherein the air supply pipe threaded portion can be connected to the thread of the air supply pipe middle portion. A first air inlet is provided at one end of the air supply pipe head away from the air supply pipe threaded portion. A first air supply through hole is provided in the middle portion of the air supply pipe, and a second air supply through hole is provided at the bottom portion of the air supply pipe. Therefore, by connecting an object to be inflated to the first air supply through hole and / or the second air supply through hole, the object to be inflated can be inflated, thereby solving the problem that the current "Yipaotong" high-pressure air pipe cleaner has a single function and cannot be used to inflate balls or bicycle tires. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A side view of the air delivery device for the dredge without the middle plug and threaded plug;

[0019] Figure 2 A side view schematic diagram of the middle plug and threaded plug provided for the air delivery device for the dredge;

[0020] Figure 3 A side view of a gas delivery device for a dredge;

[0021] Figure 4 A partial cross-sectional view of a gas delivery device for a dredge equipped with a sealing ring and installed on the dredge;

[0022] Figure 5 This is a cross-sectional view of the air delivery device for the dredge being installed on the dredge without a sealing ring;

[0023] Figure 6 Schematic diagram of installing the air supply device for the plumbing pipe onto the plumbing pipe. DETAILED DESCRIPTION

[0024] In order to better understand the purpose, structure and function of this utility model, Figures 1 to 6 , the utility model is further described in detail about the gas transmission device for the dredge.

[0025] like Figure 1 and Figure 6 As shown, an air delivery device for a dredge according to an embodiment of the present invention includes an air delivery pipe head 100 , an air delivery pipe threaded portion 200 , an air delivery pipe middle portion 300 and an air delivery pipe bottom portion 400 .

[0026] In the present invention, the gas pipe head 100 is a circular tube, one end of which is fixedly connected to one end of the threaded portion 200 of the gas pipe. A first air inlet 110 is provided on the end of the gas pipe head 100, away from the threaded portion 200. When the clearing device is installed, the gas pipe head 100 lifts the rubber pad in the middle portion 300 of the gas pipe, allowing gas to enter the clearing device through the first air inlet 110.

[0027] The threaded portion 200 of the gas pipe is a circular tubular structure with an external thread provided on the outside. The end of the threaded portion 200 opposite the gas pipe head 100 is fixedly connected to the middle portion 300 of the gas pipe. The interior of the threaded portion 200 is connected to the interior of the middle portion 300. The middle portion 300 is a circular tubular structure with a first circular gas through-hole 310 provided on the outside. The end of the middle portion 300 away from the threaded portion 200 is fixedly connected to the gas pipe bottom 400, and the interior of the middle portion 300 is connected to the interior of the gas pipe bottom 400. A second gas through-hole 410 is provided in the middle of the end of the gas pipe bottom 400 away from the middle portion 300. The second gas through-hole 410 connects the interior and exterior of the gas pipe bottom 400.

[0028] When inflating items that require low air pressure, such as balloons and balls, you can use the second air supply hole 410 to inflate them with a handheld high-pressure air dredge. When inflating items that require higher air pressure, such as bicycle tires, you can use the first air supply hole 310 to inflate them. In this case, you can place the bottom of the air supply pipe 400 on the ground and inflate with both hands.

[0029] It can be understood that the outer diameter of the gas pipe head 100 is smaller than the inner diameter of the clearing device gas pipe 610, and the outer diameter of the gas pipe head 100 is smaller than the outer diameter of the gas pipe threaded portion 200; the gas pipe threaded portion 200 is used for threaded connection with the clearing device threaded connection portion 620; the outer diameter of the gas pipe threaded portion 200 is smaller than the outer diameter of the gas pipe middle portion 300, and the outer diameter of the gas pipe middle portion 300 is smaller than the outer diameter of the gas pipe bottom portion 400.

[0030] A second air inlet 120 is provided on the side of the gas pipe head 100, and the second air inlet 120 is used to connect the inside and outside of the gas pipe head 100. When inflating, gas can also enter the gas pipe head 100 through the second air inlet 120, thereby improving the efficiency of air intake.

[0031] A sealing ring 500 is also provided on the outside of one end where the gas pipe head 100 is fixedly connected to the gas pipe threaded portion 200. After using the sealing ring and installing the gas supply device for the clearing device, the air tightness of the entire clearing device can be further improved.

[0032] like Figure 3 and Figure 4 As shown, in some embodiments, the sealing ring 500 is fixedly connected to the gas pipe head 100 , and the sealing ring 500 is fixedly connected to the gas pipe threaded portion 200 .

[0033] The second gas supply hole 410 is a threaded hole that is also threadedly connected to a threaded plug 411. The end of the threaded plug 411 that faces the outside of the gas pipe bottom 400 is also provided with a bolt slot for securing a screwdriver to rotate the threaded plug 411. The provision of the screw hole enables the installation of a ball inflation needle, most of which are connected via threads, into the second gas supply hole 410. When the second gas supply hole 410 is not used and only the first gas supply hole 310 is used, the threaded plug 411 can be installed, and inflation can be performed only through the first gas supply hole 310.

[0034] A middle plug 311 is provided in the first gas transmission hole 310, and the middle plug 311 is detachably connected to the first gas transmission hole 310. When the first gas transmission hole 310 is not used and only the second gas transmission hole 410 is used, the middle plug 311 can be installed and air can be pumped only through the second gas transmission hole 410.

[0035] The threaded connection part 620 of the dredge is fixedly connected to the dredge gas pipe 610 , and the threaded connection part 620 of the dredge is arranged inside the middle section 600 of the dredge.

[0036] The middle section 600 of the clearing tool has a connecting cavity 630. After the air pipe threaded portion 200 is threadedly connected to the clearing tool's threaded connection portion 620, the end of the air pipe head 100, away from the bottom of the air pipe threaded portion 200, is accommodated in the connecting cavity 630. The end of the middle section 600 of the clearing tool opposite the threaded connection portion 620 is also connected to the clearing tool's air pump assembly.

[0037] In the present invention, the dredge aeration assembly includes a dredge aeration pipe 710, which is connected to the dredge middle section 600. An aeration hole is provided at one end of the dredge aeration pipe 710 connected to the dredge middle section 600, and the aeration hole is communicated with the connecting cavity 630. A compression aeration unit 720 is also provided on the side of the dredge aeration assembly away from the dredge middle section 600. One end of the compression aeration unit 720 is disposed inside the dredge aeration pipe 710, and the compression aeration unit 720 is slidably connected to the dredge aeration pipe 710.

[0038] During use, after removing the gas storage and delivery device threaded onto the threaded connection 620 of the dredge, the dredge gas delivery device is installed. By threading the gas delivery pipe threaded portion 200 into the dredge threaded connection 620, the dredge gas delivery device is mounted onto the dredge midsection 600. At this point, the gas delivery pipe head 100 extends into the connecting cavity 630 of the dredge midsection 600. Furthermore, the dredge gas delivery pipe 710 in the dredge gas delivery assembly is also connected to the connecting cavity 630, allowing gas pumped from the dredge gas delivery assembly to directly enter the dredge gas delivery device. The air supply device for the clearing tool is hollow inside and no other air storage layer is set. After the air pumped by the clearing tool's inflation component enters the air supply device for the clearing tool from the air supply pipe head 100, it enters the object to be inflated through the first air supply hole 310 and / or the second air supply hole 410. It does not involve a one-time inflation after firing. This process is consistent with using an air pump to inflate the object to be inflated, and will not cause damage to the object to be inflated due to the excessive pressure of the one-time input gas.

[0039] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of protection of the present invention.

Claims

1. A gas delivery device for a dredge, characterized in that: It comprises a gas pipe head (100), a gas pipe threaded portion (200), a gas pipe middle portion (300) and a gas pipe bottom portion (400); The gas pipe head (100) is a circular tubular structure, one end of the gas pipe head (100) is fixedly connected to one end of the gas pipe threaded portion (200); the gas pipe threaded portion (200) is a circular tubular structure, an external thread is provided on the outside of the gas pipe threaded portion (200), and the end of the gas pipe threaded portion (200) opposite to the gas pipe head (100) is fixedly connected to the gas pipe middle portion (300); the gas pipe middle portion (300) is a circular tubular structure. The gas transmission pipe has a structure in which a first circular gas transmission through hole (310) is provided on the outside of the middle portion (300) of the gas transmission pipe, an end of the middle portion (300) of the gas transmission pipe away from the threaded portion (200) of the gas transmission pipe is fixedly connected to the bottom portion (400) of the gas transmission pipe, and a second gas transmission through hole (410) is provided at an intermediate position of the end of the bottom portion (400) of the gas transmission pipe away from the middle portion (300) of the gas transmission pipe, and the second gas transmission through hole (410) communicates with the inside and outside of the bottom portion (400) of the gas transmission pipe; The outer diameter of the gas pipe head (100) is smaller than the inner diameter of the clearing device gas pipe (610), and the outer diameter of the gas pipe head (100) is smaller than the outer diameter of the gas pipe threaded portion (200); the gas pipe threaded portion (200) is used for threaded connection with the clearing device threaded connection portion (620); the outer diameter of the gas pipe threaded portion (200) is smaller than the outer diameter of the gas pipe middle portion (300), and the outer diameter of the gas pipe middle portion (300) is smaller than the outer diameter of the gas pipe bottom portion (400); The second gas transmission through hole (410) is a threaded hole, and the second gas transmission through hole (410) is also threadedly connected to a threaded plug (411). The threaded plug (411) is further provided with a bolt groove at one end facing the outside of the bottom (400) of the gas transmission pipe. The bolt groove is used to fix a screwdriver to rotate the threaded plug (411). When the second gas transmission through hole (410) is not in use, the threaded plug (411) is installed in the second gas transmission through hole (410); A middle plug (311) is provided in the first gas transmission through hole (310), and the middle plug (311) is detachably connected to the first gas transmission through hole (310). When the first gas transmission through hole (310) is not in use, the middle plug (311) is installed in the first gas transmission through hole (310).

2. The air delivery device for dredge according to claim 1, characterized in that: A sealing ring (500) is further provided on the outer side of one end of the gas pipe head (100) fixedly connected to the gas pipe threaded portion (200).

3. The air delivery device for dredge according to claim 2, characterized in that: The sealing ring (500) is fixedly connected to the gas pipe head (100), and the sealing ring (500) is fixedly connected to the gas pipe threaded portion (200).

4. The air delivery device for dredge according to claim 1, characterized in that: The threaded connection part (620) of the dredge is fixedly connected to the air supply pipe (610) of the dredge, and the threaded connection part (620) of the dredge is arranged inside the middle section (600) of the dredge; A connecting cavity (630) is provided inside the middle section (600) of the dredge. After the gas pipe threaded portion (200) is threadedly connected to the dredge threaded connection portion (620), the end of the gas pipe head (100) away from the bottom of the gas pipe threaded portion (200) is accommodated in the connecting cavity (630).

5. The air delivery device for a dredge according to claim 4, characterized in that: The end of the middle section (600) of the dredge opposite to the threaded connection portion (620) of the dredge is also connected to a dredge air pump assembly.

6. The air delivery device for a dredge according to claim 5, characterized in that: The dredge airing assembly includes a dredge airing pipe (710), which is connected to the dredge middle section (600). An airing hole is provided at one end of the dredge airing pipe (710) connected to the dredge middle section (600), and the airing hole is communicated with the connecting cavity (630).

7. The air delivery device for a dredge according to claim 6, characterized in that: A compression pumping part (720) is further provided on the side of the dredge aeration assembly away from the dredge middle section (600), one end of the compression pumping part (720) is provided inside the dredge aeration pipe (710), and the compression pumping part (720) is slidably connected to the dredge aeration pipe (710).