Pressing plate type elastic gap filling construction device
Through the pressure plate type elastic caulking construction device, the deformation sealing of bolts and rubber blocks is combined with the telescopic rod support structure to solve the density and stability problems in caulking construction and improve construction efficiency and quality.
Patent Information
- Application Number
- CN202422856740.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-10-10
- Estimated Expiration
- 2034-11-22
AI Technical Summary
The existing caulking construction devices easily lead to loose caulking, severe cracking and easy falling of mortar, poor turnover, unstable reinforcement system and low plasticity, which increase the difficulty of construction and easily lead to leakage risks.
A pressure plate type elastic caulking construction device is used. The holes on the top of the first fixed plate and the second fixed plate are used to insert the upper and lower layers of nuts for fixing. The rubber block is deformed by force to seal the gap, and the density is ensured by installing the pressure template of the rubber block. The support structure of the telescopic rod and the fixed frame is combined to provide stable support.
The plugging has high density, simple and fast operation, good plugging quality, reusable materials, stable supporting structure and reduced leakage risk.
Smart Images

Figure CN223423627U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of seam sealing construction, in particular to a pressure plate type elastic seam sealing construction device. Background Art
[0002] Aluminum formwork concrete pouring is a commonly used construction method with the advantages of high efficiency, energy saving, and environmental protection. When pouring aluminum formwork concrete, you first need to build the aluminum formwork bracket according to the design requirements, and then install the aluminum formwork on the bracket to ensure the flatness and firmness of the formwork. Next, pour the concrete into the formwork after mixing it, and vibrate it with a vibrator to ensure the density and uniformity of the concrete. When pouring aluminum formwork concrete, the gaps at the bottom need to be sealed. When pouring aluminum formwork concrete, bottom leakage and root rot caused by aluminum formwork concrete are a common quality problem in the construction industry. Quality and economic disputes caused by leakage of exterior walls occur frequently. Once the bottom leaks, the problem of bottom chiseling and repairing will be faced, which will also cause huge economic losses. Solving the problem of sealing the bottom of the wall is very important in house construction.
[0003] The existing caulking construction device is prone to cause loose caulking, severe cracking of mortar, and easy falling off. At the same time, defects such as poor turnover, unstable reinforcement system, and low plasticity increase the difficulty of construction. Loose caulking can easily lead to leakage risks.
[0004] In order to solve the above problems, a pressure plate type elastic seam sealing construction device is proposed. Utility Model Content
[0005] The purpose of the utility model is to provide a pressure plate type elastic caulking construction device, which solves the problems in the background technology that easily lead to loose caulking, serious cracking and easy falling of mortar, poor turnover, unstable reinforcement system, low plasticity and other defects that increase the difficulty of construction, and loose caulking easily lead to leakage risks.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pressure plate type elastic caulking construction device, comprising a floor and a first aluminum formwork, wherein a first fixing plate is fixedly connected to the bottom of the first aluminum formwork, a second fixing plate is provided at the bottom of the first fixing plate, a second aluminum formwork is fixedly connected to the rear side of the bottom of the second fixing plate, a rubber block is provided at the rear side of the top of the floor, a pressure formwork is provided on the top of the rubber block, bolts are passed through and slidably connected to the left and right sides of the top of the first fixing plate, a second nut is passed through and threadedly connected to the top of the outer ring of the bolt, a first nut is passed through and threadedly connected to the bottom of the outer ring of the bolt, and a support structure is provided on the front side of the first aluminum formwork;
[0007] By adopting the above technical solution, the holes on the top of the first fixing plate and the second fixing plate are used to insert the upper and lower layers of nuts for fixing. The rubber block is deformed by the force to seal, thereby ensuring the density of the seal. The pressure template is installed on the rubber block, so that the force on the rubber block is more uniform and effectively ensures that the rubber block densely fills the concave and convex positions. Finally, the bolts are tightened to complete the installation.
[0008] As a further description of the above technical solution: the support structure includes a first fixed frame, a first rotating shaft passing through and rotatably connected to the left and right sides of the first fixed frame, a telescopic rod fixedly connected to the front side of the first rotating shaft, a second fixed frame is provided at the other end of the telescopic rod, a second rotating shaft passing through and rotatably connected to the left and right sides of the second fixed frame, and the second rotating shaft is fixedly connected to the telescopic rod;
[0009] By adopting the above technical solution, the telescopic rod rotates in the first fixed frame through the first rotating shaft, so that the connecting plate is placed on the top of the positioning block, and then the connecting plate is slid into the positioning block through the fixing bolt, and the second fixed frame is fixed to support the aluminum formwork.
[0010] As a further description of the above technical solution: a connecting plate is fixedly connected to the bottom of the second fixing frame;
[0011] By adopting the above technical solution, the second fixing frame is fixed by the connecting plate.
[0012] As a further description of the above technical solution: fixing bolts are passed through and slidably connected to the left and right sides of the top of the connecting plate;
[0013] By adopting the above technical solution, the fixing bolt is slid into the connecting plate, so that the fixing bolt is screwed into the positioning block.
[0014] As a further description of the above technical solution: a positioning block is provided on the front side of the top of the floor, and the fixing bolt passes through the positioning block and is threadedly connected;
[0015] By adopting the above technical solution, the connecting plate and the second fixing bracket can be fixed by screwing the fixing bolt into the positioning block.
[0016] As a further description of the above technical solution: three holes are opened on the top of the first fixing plate, and the bolts can slide into the holes;
[0017] By adopting the above technical solution, the holes on the top of the first fixing plate and the second fixing plate are used to insert the upper and lower layers of nuts of the bolts for fixing.
[0018] As a further description of the above technical solution: limit rods are provided on both sides of the telescopic rod;
[0019] By adopting the above technical solution, the telescopic rod is fixed by inserting the limiting rod into the telescopic rod.
[0020] As a further description of the above technical solution: fixing holes are opened on the left and right sides of the top of the positioning block, and the fixing bolts can be screwed into the fixing holes.
[0021] By adopting the above technical solution, the connection plate is fixed by screwing the fixing bolt into the limiting hole.
[0022] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0023] 1. The utility model provides a pressure plate type elastic caulking construction device, which first utilizes the holes on the top of the first fixed plate and the second fixed plate to insert the upper and lower layers of nuts for fixing, and seals the rubber block by deforming under force, thereby ensuring the density of the seal. The pressure template is installed on the rubber block, so that the rubber block is more evenly stressed and effectively ensures that the rubber block densely fills the concave and convex positions. Finally, the bolts are tightened to complete the installation. The bottom of the building aluminum mold wall is sealed by a pressure plate type elastic sealing method, which has the characteristics of simple and fast operation, good sealing quality, and reusable materials.
[0024] 2. The utility model provides a pressure plate type elastic caulking construction device, in which the telescopic rod rotates in the first fixed frame through the first rotating shaft, so that the connecting plate is placed on the top of the positioning block, and then the connecting plate is slid into the positioning block through the fixing bolt, and the second fixed frame is fixed to support the aluminum formwork. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0026] Figure 2 It is a right side view of the utility model;
[0027] Figure 3 It is a front view of the utility model;
[0028] Figure 4 This is a schematic diagram of the telescopic rod structure of the present utility model.
[0029] In the figure: 1. Floor; 2. First aluminum formwork; 3. First fixing plate; 4. Second fixing plate; 5. Second aluminum formwork; 6. Bolt; 7. Positioning block; 8. First fixing frame; 9. First rotating shaft; 10. Telescopic rod; 11. Pressure formwork; 12. Rubber block; 13. First nut; 14. Second nut; 15. Connecting plate; 16. Second fixing frame; 17. Hole; 18. Fixing hole; 19. Fixing bolt; 20. Second rotating shaft; 21. Limit rod. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0031] In order to further understand the content of the present invention, the present invention is described in detail with reference to the accompanying drawings.
[0032] Combine Figure 1 and Figure 2 The utility model is a pressure plate type elastic caulking construction device, comprising a floor 1 and a first aluminum template 2, the bottom of the first aluminum template 2 is fixedly connected to a first fixing plate 3, the bottom of the first fixing plate 3 is provided with a second fixing plate 4, the rear side of the bottom of the second fixing plate 4 is fixedly connected to a second aluminum template 5, a rubber block 12 is provided on the rear side of the top of the floor 1, a pressure template 11 is provided on the top of the rubber block 12, bolts 6 are passed through and slidably connected on the left and right sides of the top of the first fixing plate 3, the top of the outer ring of the bolt 6 is passed through and threadedly connected to a second nut 14, and the bottom of the outer ring of the bolt 6 is passed through and threadedly connected to a second nut The thread is connected with a first nut 13, and three holes 17 are opened on the top of the first fixing plate 3, and the bolts 6 can slide into the holes 17. The debris on the floor 1 is cleaned, and then the holes 17 on the top of the first fixing plate 3 and the second fixing plate 4 are used to penetrate the upper and lower layers of nuts of the bolts 6 to fix them. The rubber block 12 is deformed by the force to seal, which ensures the density of the seal. The pressure template 11 is installed on the rubber block 12, so that the rubber block 12 is more evenly stressed and effectively ensures that the rubber block 12 densely fills the concave and convex positions. Finally, the bolts 6 are tightened to complete the installation.
[0033] Combine Figure 3 and Figure 4, a supporting structure is provided on the front side of the first aluminum formwork 2, which includes a first fixing frame 8, which passes through and is rotatably connected to a first rotating shaft 9 on the left and right sides of the first fixing frame 8, and a telescopic rod 10 is fixedly connected to the front side of the first rotating shaft 9, and a second fixing frame 16 is provided at the other end of the telescopic rod 10, and the second fixing frame 16 passes through and is rotatably connected to a second rotating shaft 20 on the left and right sides, and the second rotating shaft 20 is fixedly connected to the telescopic rod 10, and a connecting plate 15 is fixedly connected to the bottom of the second fixing frame 16, and a positioning block 7 is provided on the front side of the top of the floor 1, and a fixing bolt 19 passes through and is threadedly connected to the positioning block 7, and a limiting rod 21 is passed through and is provided on the left and right sides of the telescopic rod 10, and a fixing hole 18 is opened on the left and right sides of the top of the positioning block 7, and the fixing bolt 19 can be screwed into the fixing hole 18, and the telescopic rod 10 rotates in the first fixing frame 8 through the first rotating shaft 9, so that the connecting plate 15 is placed on the top of the positioning block 7, and then slides into the connecting plate 15 through the fixing bolt 19 and is screwed into the positioning block 7, and the second fixing frame 16 is fixed, thereby supporting the aluminum formwork.
[0034] Working principle: When the present invention is in use, first clean up the debris on the floor 1, and then use the holes 17 on the top of the first fixing plate 3 and the second fixing plate 4 to insert the upper and lower layers of nuts of the bolts 6 to fix them, and the rubber block 12 is deformed by the force to seal, thereby ensuring the density of the seal, and the pressure template 11 is installed on the rubber block 12, so that the rubber block 12 is more evenly stressed and effectively ensures that the rubber block 12 densely fills the concave and convex positions, and finally the bolts 6 are tightened to complete the installation, and the telescopic rod 10 is rotated in the first fixing frame 8 through the first rotating shaft 9, so that the connecting plate 15 is placed on the top of the positioning block 7, and then the fixing bolt 19 is slid into the connecting plate 15 and screwed into the positioning block 7, and the second fixing frame 16 is fixed, thereby supporting the aluminum template.
[0035] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.
[0036] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pressure plate type elastic caulking construction device, comprising a floor (1) and a first aluminum template (2), characterized in that: The bottom of the first aluminum template (2) is fixedly connected to a first fixing plate (3), the bottom of the first fixing plate (3) is provided with a second fixing plate (4), the rear side of the bottom of the second fixing plate (4) is fixedly connected to a second aluminum template (5), a rubber block (12) is provided on the rear side of the top of the floor (1), and a pressure template (11) is provided on the top of the rubber block (12), bolts (6) are passed through and slidably connected on the left and right sides of the top of the first fixing plate (3), the top of the outer ring of the bolt (6) is passed through and threadedly connected to a second nut (14), the bottom of the outer ring of the bolt (6) is passed through and threadedly connected to a first nut (13), and a support structure is provided on the front side of the first aluminum template (2).
2. A pressure plate type elastic caulking construction device according to claim 1, characterized in that: The support structure comprises a first fixed frame (8), wherein the first fixed frame (8) is penetrated by a first rotating shaft (9) on both sides and is rotatably connected thereto, a telescopic rod (10) is fixedly connected to the front side of the first rotating shaft (9), a second fixed frame (16) is provided at the other end of the telescopic rod (10), and the second fixed frame (16) is penetrated by a second rotating shaft (20) on both sides and is rotatably connected thereto, and the second rotating shaft (20) is fixedly connected to the telescopic rod (10).
3. A pressure plate type elastic caulking construction device according to claim 2, characterized in that: A connecting plate (15) is fixedly connected to the bottom of the second fixing frame (16).
4. A pressure plate type elastic caulking construction device according to claim 3, characterized in that: Fixing bolts (19) are passed through and slidably connected to the left and right sides of the top of the connecting plate (15).
5. The pressure plate type elastic caulking construction device according to claim 1, characterized in that: A positioning block (7) is provided on the front side of the top of the floor (1), and a fixing bolt (19) penetrates the positioning block (7) and is threadedly connected thereto.
6. The pressure plate type elastic caulking construction device according to claim 1, characterized in that: Three holes (17) are provided on the top of the first fixing plate (3), and the bolts (6) can slide into the holes (17).
7. The pressure plate type elastic caulking construction device according to claim 2, characterized in that: Limiting rods (21) are provided on both left and right sides of the telescopic rod (10).
8. The pressure plate type elastic caulking construction device according to claim 5, characterized in that: The positioning block (7) is provided with fixing holes (18) on both sides of the top, and the fixing bolts (19) can be screwed into the fixing holes (18).