UHPC (Ultra High Performance Concrete) light laminated slab seam sealing treatment tool
By using sealing tools during the installation of UHPC lightweight composite panels and using roller covers and tape to seal the gaps in the composite panels, the problem of slurry leakage caused by the gaps in the composite panels was solved, achieving efficient and convenient construction.
Patent Information
- Application Number
- CN202422525343.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2025-10-10
- Estimated Expiration
- 2034-10-17
AI Technical Summary
During the installation process of UHPC lightweight composite panels, due to insufficient factory processing precision, the gaps between the composite panels are too large or uneven, resulting in leakage when pouring concrete and increasing the cost of subsequent polishing treatment.
A UHPC lightweight composite panel sealing tool is used, which includes a roller cover and tape wrapped around the outer wall of the roller. The roller is driven by a handle to move along the gap, so that the tape is attached to the gap of the composite panel, sealing the gap to prevent leakage.
It effectively reduces the leakage of concrete during pouring, simplifies the subsequent leakage polishing work, and improves construction efficiency and the convenience of construction workers.
Smart Images

Figure CN223423649U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of seam sealing processing tools, and in particular to a seam sealing processing tool for UHPC lightweight composite panels. Background Art
[0002] UHPC lightweight composite panels are a new building material whose application has expanded from bridges to the construction sector in recent years. UHPC lightweight composite panels boast high strength, toughness, durability, and low maintenance. In prefabricated buildings, they can help reduce material consumption, improve facade effects, and enhance overall benefits over the entire lifecycle.
[0003] UHPC lightweight composite panels are used in the field of building industrialization. UHPC lightweight composite panels are often used in places where concrete cast-in-place is required, such as cast-in-place roofs of building floors, post-cast joints in basements, foundations, retaining walls, etc. UHPC lightweight composite panels are prefabricated, so they can improve the efficiency of the entire project construction, greatly saving construction time and labor costs, as well as saving project costs.
[0004] However, due to the insufficient processing precision of the current UHPC lightweight composite panels in the factory, the gaps between the composite panels are too large or uneven during on-site installation, resulting in frequent leakage when pouring concrete, which increases the cost of subsequent polishing treatment. Summary of the Invention
[0005] In order to reduce the occurrence of slurry leakage during concrete pouring, the present application provides a UHPC lightweight composite panel sealing tool.
[0006] This application provides a UHPC lightweight composite panel sealing tool, which adopts the following technical solutions:
[0007] A UHPC lightweight composite panel sealing tool includes a roller cover, wherein both side walls of the roller cover are respectively penetrated with connection holes, a roller is provided in the roller cover, a roller shaft is fixedly inserted into the roller, and both ends of the roller shaft are movably inserted into the connection holes adjacent thereto, an outer wall of the roller is wrapped with adhesive tape, and the adhesive tape is used to seal the gap between two adjacent composite panels, and a handle is provided on the top of the roller cover.
[0008] By adopting the above technical solution, during the installation process of the composite panels, a gap is formed between two adjacent composite panels. The construction workers place the roller wrapped with tape between the two adjacent composite panels so that the tape is aligned with the gap. The construction workers then apply force to the handle to drive the roller cover to move along the long side of the gap, thereby driving the roller to roll along the long side of the gap, and then sticking the tape on the top of the gap, covering the gap between the two adjacent composite panels with the tape, thereby reducing the leakage of concrete when pouring concrete on the top surfaces of multiple assembled composite panels, thereby reducing the subsequent leakage polishing work. Under the action of the handle, the construction workers can complete the sticking of the tape while standing, making the construction work of the construction workers easier.
[0009] Preferably, the roller passes through the side wall of the roller cover to form a mounting hole, and a latch is provided at one end of the roller, and one end of the latch is adapted to be inserted into the mounting hole.
[0010] By adopting the above technical solution, under the action of the latch, the latch can increase the width of one end of the roller, so that the latch is stuck on the outside of the connecting hole, thereby limiting the roller, reducing the situation where the two ends of the roller slip out of the connecting hole, and further reducing the situation where the roller falls off from the roller cover.
[0011] Preferably, the connecting hole is an elliptical hole, and the long side of the connecting hole is vertically arranged.
[0012] By adopting the above technical solution, when the roller is in working state, after the tape is wrapped around the outer wall of the roller, the roller is located at the top of the connecting hole. After a part of the tape is used, the diameter of the tape will become smaller. As the diameter of the tape becomes smaller, the roller will move downward along the long side of the connecting hole. When the tape is used up, the roller is located at the bottom of the connecting hole. Therefore, the connecting hole is an elliptical hole. After a part of the tape is used, the influence of the roller on the continued use of the tape can be reduced. At the same time, when the roller needs to be removed from the roller cover, the connecting hole is an elliptical hole, so that the position of the roller in the connecting hole can be more flexible, thereby facilitating the construction personnel to disassemble the roller.
[0013] Preferably, a mounting plate is fixed to the top surface of the roller cover, and there are two mounting plates, which are arranged opposite to each other. The handle includes a connecting rod and a gripping rod, and the two ends of the connecting rod are respectively connected to the mounting plates close to them, and the bottom end of the gripping rod is fixed to the outer wall of the top of the connecting rod.
[0014] By adopting the above technical solution, there are two mounting plates, and the connecting rod is connected between the two mounting plates, thereby improving the connection stability between the connecting plate and the roller cover, and reducing the shaking and instability of the holding rod when the construction workers apply force to the holding rod.
[0015] Preferably, one end of the connecting rod is detachably connected to the mounting plate, and the holding rod is fixed to the middle of the connecting rod.
[0016] By adopting the above technical solution, the connecting rod and the mounting plate are detachably connected, thereby improving the convenience of disassembly and assembly between the handle and the roller cover. When the angle of the handle needs to be adjusted, the handle can be conveniently removed and then installed. At the same time, the holding rod is fixed to the middle part of the connecting rod, so that the force applied to the holding rod can be evenly distributed on the two mounting plates, so that the roller cover can maintain balance during the movement.
[0017] Preferably, one end of the connecting rod passes through the outer wall of the mounting plate, the connecting rod passes through the outer wall of the mounting plate and is threaded, and a nut is provided at one end of the connecting rod, and the nut is threadedly connected to the portion of the connecting rod extending out of the mounting plate.
[0018] By adopting the above technical solution, the connecting rod extends out of the mounting plate and is threadedly connected to the nut. When the connecting rod needs to be disassembled, the construction worker loosens the nut and moves the nut away from the connecting rod, and then pulls the connecting rod out of the mounting plate to complete the disassembly of the connecting rod. Correspondingly, when the connecting rod and the mounting plate need to be installed, one end of the connecting rod is passed through the mounting plate, and the nut is tightened to the connecting rod to complete the installation of the connecting rod, thereby improving the convenience of disassembly and assembly of the connecting rod and the mounting plate, and thereby improving the convenience of disassembly and assembly between the handle and the roller cover.
[0019] Preferably, the holding rod is arranged to be tilted, and the holding rod is tilted in the opposite direction of movement.
[0020] By adopting the above technical solution, the holding rod is tilted and tilted in the opposite direction of movement, so that construction workers can save more effort when pushing the holding rod to drive the roller cover to move.
[0021] Preferably, the latch includes a plug rod and a handle, the handle is fixed to one end of the plug rod, the diameter of the handle is larger than the diameter of the mounting hole, and the end of the plug rod away from the handle is adapted to be inserted into the mounting hole.
[0022] By adopting the above technical solution, the plug-in rod can be conveniently inserted into or pulled out of the mounting hole under the action of the handle.
[0023] In summary, this application includes at least one of the following beneficial technical effects:
[0024] 1. During the installation process of the composite slabs, a gap is formed between two adjacent composite slabs. The construction workers place a roller wrapped with tape between the two adjacent composite slabs so that the tape is aligned with the gap. The construction workers then apply force to the handle to drive the roller cover to move along the long side of the gap, thereby driving the roller to roll along the long side of the gap, and then stick the tape on the top of the gap. The gap between the two adjacent composite slabs is covered with the tape, thereby reducing the leakage of concrete when pouring concrete on the top surface of multiple assembled composite slabs, thereby reducing the subsequent leakage polishing work. With the help of the handle, the construction workers can complete the sticking of the tape while standing, making the construction work easier for the construction workers.
[0025] 2. When the roller is in working condition, after the tape is wrapped around the outer wall of the roller, the roller is located at the top of the connecting hole. After a part of the tape is used, the diameter of the tape will become smaller. As the diameter of the tape becomes smaller, the roller will move downward along the long side of the connecting hole. When the tape is used up, the roller is located at the bottom of the connecting hole. Therefore, the connecting hole is an elliptical hole. After a part of the tape is used, the influence of the roller on the continued use of the tape can be reduced. At the same time, when the roller needs to be removed from the roller cover, the connecting hole is an elliptical hole, which makes the position of the roller in the connecting hole more flexible, thereby facilitating the construction personnel to disassemble the roller. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0027] Explanation of the accompanying reference numerals: 1. roller cover; 11. connecting hole; 12. mounting plate; 2. roller; 3. roller; 4. latch; 41. plug-in rod; 42. handle; 5. handle; 51. connecting rod; 52. holding rod; 53. nut; 6. tape. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1 This application is described in further detail.
[0029] The embodiment of the present application discloses a UHPC lightweight composite panel sealing processing tool.
[0030] Reference Figure 1 A UHPC lightweight composite panel sealing processing tool includes a roller cover 1. In the embodiment of the present application, the roller cover 1 is a "冂"-shaped cover. A roller 2 is arranged in the roller cover 1. A roller shaft 3 is fixedly inserted into the roller 2. Both ends of the roller shaft 3 extend out of the side walls of the roller 2. Connecting holes 11 are respectively opened through the two side walls of the roller cover 1. Both ends of the roller shaft 3 are movably inserted into the connecting holes 11 adjacent thereto, so that the roller 2 and the roller cover 1 are rotatably connected. The outer wall of the roller 2 is wrapped with adhesive tape 6. The bottom of the roller 2 is lower than the bottom of the roller cover 1, thereby reducing the influence of the roller cover 1 on the rolling of the roller 2.
[0031] The roller 3 is provided with mounting holes at both ends through the side wall of the roller cover 1. The long side of the mounting hole is perpendicular to the long side of the roller 3. A latch 4 is provided at both ends of the roller 3. The latch 4 includes a plug rod 41 and a handle 42. The handle 42 is fixed to one end of the plug rod 41. The diameter of the handle 42 is larger than the diameter of the mounting hole. The end of the plug rod 41 away from the handle 42 is adapted to be inserted into the mounting hole. The handle 42 is located outside the mounting hole. Under the action of the handle 42, it is convenient to insert the plug rod 41 into or withdraw it from the mounting hole. The length of the latch 4 is greater than the width of the connecting hole 11. Under the action of the latch 4, the latch 4 is stuck on the outside of the connecting hole 11, thereby limiting the roller 3, reducing the situation where the two ends of the roller 3 slip out of the connecting hole 11, and thereby reducing the situation where the roller 2 falls off from the roller cover 1.
[0032] During the installation process of the composite slabs, a gap is formed between two adjacent composite slabs. The construction workers place the roller 2 wrapped with tape 6 between the two adjacent composite slabs, aligning the tape 6 with the gap, and driving the roller cover 1 to move along the long side of the gap, thereby driving the roller 2 to roll along the long side of the gap, and then sticking the tape 6 on the top of the gap, covering the gap between the two adjacent composite slabs with the tape 6, thereby reducing the leakage of concrete when pouring concrete on the top surface of multiple assembled composite slabs, thereby reducing the subsequent leakage polishing treatment work.
[0033] Reference Figure 1 In the embodiment of the present application, the connecting hole 11 is an elliptical hole, and the long side of the connecting hole 11 is arranged vertically. When the roller 2 is in working state, after the tape 6 is wrapped around the outer wall of the roller 2, the roller 3 is located at the top of the connecting hole 11. After a part of the tape 6 is used, the diameter of the tape 6 will become smaller. As the diameter of the tape 6 becomes smaller, the roller 3 will move downward along the long side of the connecting hole 11. When the tape 6 is used up, the roller 3 is located at the bottom of the connecting hole 11. Therefore, the connecting hole 11 is an elliptical hole. After a part of the tape 6 is used, the influence of the roller 3 on the continued use of the tape 6 can be reduced. At the same time, when the roller 2 needs to be removed from the roller cover 1, the connecting hole 11 is an elliptical hole, so that the position of the roller 3 in the connecting hole 11 can be more flexible, thereby facilitating the construction personnel to disassemble the roller 2.
[0034] The top surface of the roller cover 1 is fixed with a mounting plate 12. There are two mounting plates 12. The two mounting plates 12 are arranged relatively parallel. The line between the two mounting plates 12 is parallel to the long side of the roller 3. The top surface of the roller cover 1 is provided with a handle 5. The construction worker pushes the handle 5 to drive the roller cover 1 to move. Under the action of the handle 5, the construction worker can stand to complete the pasting of the tape 6, making the construction of the construction worker easier. The handle 5 includes a connecting rod 51 and a gripping rod 52. The two ends of the connecting rod 51 pass through the connecting rod 51 close to the roller 3. The side walls of the mounting plate 12, the outer walls at both ends of the connecting rod 51 are respectively provided with threads, and nuts 53 are respectively provided at both ends of the connecting rod 51. The nuts 53 are threadedly connected to the portion of the connecting rod 51 extending out of the mounting plate 12, thereby fixing the connecting rod 51 between the two mounting plates 12, and the bottom end of the holding rod 52 is fixed to the outer wall of the middle top of the connecting rod 51. The holding rod 52 is tilted and tilted in the opposite direction of movement, so that the construction workers can save more effort when pushing the holding rod 52 to drive the roller cover 1 to move.
[0035] The above are all preferred embodiments of the present application. These embodiments are only explanations of the present application and are not intended to limit the scope of protection of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be covered within the scope of protection of the present application.
Claims
1. A UHPC lightweight composite panel sealing tool, characterized in that: The invention comprises a roller cover (1), wherein connecting holes (11) are respectively formed through the two side walls of the roller cover (1), a roller (2) is arranged in the roller cover (1), a roller shaft (3) is fixedly inserted into the roller (2), and both ends of the roller shaft (3) are movably inserted into the connecting holes (11) adjacent to the roller (2), an adhesive tape (6) is wrapped around the outer wall of the roller (2), and the adhesive tape (6) is used to stick the gap between two adjacent laminated plates, and a handle (5) is arranged on the top of the roller cover (1).
2. A UHPC lightweight composite panel sealing tool according to claim 1, characterized in that: The roller (3) passes through the side wall of the roller cover (1) and is provided with a mounting hole. A latch (4) is provided at one end of the roller (3), and one end of the latch (4) is adapted to be inserted into the mounting hole.
3. The UHPC lightweight composite panel sealing tool according to claim 1, characterized in that: The connecting hole (11) is an elliptical hole, and the long side of the connecting hole (11) is arranged vertically.
4. The UHPC lightweight composite panel sealing tool according to claim 1, characterized in that: A mounting plate (12) is fixed on the top surface of the roller cover (1), and there are two mounting plates (12). The two mounting plates (12) are arranged opposite to each other. The handle (5) includes a connecting rod (51) and a gripping rod (52). Both ends of the connecting rod (51) are respectively connected to the mounting plates (12) adjacent thereto, and the bottom end of the gripping rod (52) is fixed to the outer wall of the top of the connecting rod (51).
5. A UHPC lightweight composite panel sealing tool according to claim 4, characterized in that: One end of the connecting rod (51) is detachably connected to the mounting plate (12), and the holding rod (52) is fixed to the middle of the connecting rod (51).
6. The UHPC lightweight composite panel sealing tool according to claim 4, characterized in that: One end of the connecting rod (51) passes through the outer wall of the mounting plate (12), and the connecting rod (51) is threaded through the outer wall of the mounting plate (12). A nut (53) is provided at one end of the connecting rod (51), and the nut (53) is threadedly connected to the portion of the connecting rod (51) extending from the mounting plate (12).
7. The UHPC lightweight composite panel sealing tool according to claim 4, characterized in that: The holding rod (52) is tilted, and the holding rod (52) is tilted in the opposite direction of movement.
8. The UHPC lightweight composite panel sealing tool according to claim 2, characterized in that: The latch (4) comprises a plug rod (41) and a handle (42), wherein the handle (42) is fixed to one end of the plug rod (41), the diameter of the handle (42) is larger than the diameter of the mounting hole, and the end of the plug rod (41) away from the handle (42) is adapted to be inserted into the mounting hole.