Color plate suspended ceiling structure for plenum chamber layer of clean room of steel structure factory building

By adopting a combined structure of porous C-shaped steel and T-shaped keel ceiling in the static pressure box layer of the clean room of the steel structure factory, the problems of heavy weight and large number of consumables are solved, the stability and airtightness are improved, and the cleanliness is ensured.

CN223459008UActive Publication Date: 2025-10-21CHINA ELECTRONICS WANWEI (HEFEI) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422870819.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-10-21
Estimated Expiration
2034-11-22

AI Technical Summary

Technical Problem

The color steel plate ceiling structure of the static pressure box layer of the clean room in the steel structure factory has problems such as heavy weight, many consumables, and affecting air tightness and stability. It is especially difficult to ensure cleanliness when applying fire retardant paint.

Method used

A combination structure of multiple first C-shaped steels and second C-shaped steels is adopted. The color steel plate is set on the top of the first C-shaped steel. It is connected to the T-shaped keel ceiling through U-shaped clamps and hangers, which reduces the use of profiles. Porous C-shaped steel is used instead of double-pieced C-shaped steel to improve stability and airtightness.

Benefits of technology

It reduces structural load and material cost, improves the stability and air tightness of the ceiling, and ensures the cleanliness of the clean room.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223459008U_ABST
    Figure CN223459008U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of color steel plate installation, and provides a color steel plate ceiling structure for a static pressure box layer of a clean room of a steel structure plant, which comprises a plurality of first C-shaped steel, a plurality of second C-shaped steel and a plurality of second C-shaped steel, the color steel plates are arranged at the top ends of the first C-shaped steels, and meanwhile, the color steel plates are arranged between the adjacent first C-shaped steels; the second C-shaped steel is arranged at the lower end of the first C-shaped steel through a U-shaped hoop; and the T-shaped keel suspended ceiling is hung below the second C-shaped steel through a hanging rod. The influence on the color steel plate caused by the fact that the suspender and the electromechanical pipeline penetrate through the color steel plate is avoided, and the stability of the whole suspended ceiling is improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of color steel plate installation, and particularly relates to a color steel plate suspended ceiling structure for a clean room of a steel structure factory building. BACKGROUND

[0002] The clean room static pressure box layer refers to a stable pressure layer before air flow in the clean room enters an FFU air filter after passing through a return air channel, and the space is used for arranging electromechanical pipelines and air flow pressure stabilization, so the interlayer needs to maintain a clean environment, a clean room suspended ceiling (that is, the bottom closed interface of the static pressure box layer) of a general concrete structure adopts a color steel plate suspended ceiling or a T-shaped keel suspended ceiling, and the upper closed interface of the static pressure box layer is a concrete structure, and the static pressure box layer composed of the T-shaped keel and the epoxy-coated concrete floor can ensure cleanliness.

[0003] However, when a steel structure factory building is encountered, a problem is faced that the plate surface shape of the steel structure floor or roof is irregular, and fireproof paint needs to be brushed, and the cleanliness cannot be ensured by brushing epoxy paint like the concrete structure, as shown in the drawing. Figure 2 The conventional method is to use a U-shaped clamp to connect the original grape trellis C-shaped steel and double-spliced C-shaped steel, and then hang the color steel plate and the T-shaped keel to complete the static pressure box suspended ceiling. However, this method uses double-spliced C-shaped steel, which is heavy, and consumes a large amount of material due to a large site, which may have an impact on the structural load, overall cost and the like of the entire steel structure factory building; secondly, this method has a certain impact on the air tightness of the static pressure box layer, the hanger rod of the color steel plate passes through the middle of the color steel plate, and the electromechanical pipelines in the static pressure box also pass through the middle of the color steel plate, which affects the air tightness and may also be affected by pipeline resonance caused by equipment operation, thereby affecting the stability of the entire suspended ceiling. UTILITY MODEL CONTENTS

[0004] To solve the above problems, the utility model provides a color steel plate suspended ceiling structure for a clean room of a steel structure factory building, and the specific technical scheme is as follows:

[0005] A color steel plate suspended ceiling structure for a clean room of a steel structure factory building comprises:

[0006] A plurality of first C-shaped steels are arranged below the floor of the steel structure factory building;

[0007] A plurality of color steel plates are arranged at the top end of the first C-shaped steels and between adjacent first C-shaped steels;

[0008] A second C-shaped steel is arranged at the lower end of the first C-shaped steels by a U-shaped clamp;

[0009] The T-shaped keel ceiling is hung below the second C-shaped steel through a hanger.

[0010] In a preferred implementation, the plurality of color steel plates are connected through middle-shaped aluminum.

[0011] In a preferred implementation, the second C-shaped steel is a multi-hole C-shaped steel.

[0012] In a preferred implementation, the hanger comprises a full tooth screw and a square adjuster, the upper end of the full tooth screw is threadedly connected with the second C-shaped steel, the bottom end of the full tooth screw is threadedly connected with the square adjuster, and the square adjuster is further bolted with the T-shaped keel ceiling.

[0013] In a preferred implementation, the bolt is fixed on the upper surface of the T-shaped keel through welding.

[0014] In a preferred implementation, the U-shaped hoop is arranged on the periphery of the first C-shaped steel, and both ends of the U-shaped hoop pass through the second C-shaped steel and are fixed on the bottom of the second C-shaped steel.

[0015] The utility model discloses beneficial effects:

[0016] (1) the utility model discloses the color steel plate is arranged above the first C-shaped steel, avoids the influence of hanger and electromechanical pipeline on color steel plate due to passing through color steel plate, improves the stability of whole ceiling.

[0017] (2) the utility model discloses largely reduces the section bar use of secondary conversion layer, reduces the structural load of whole factory building steel structure, makes the double-spliced C-shaped steel be replaced for multi-hole C-shaped steel, satisfies the load requirement, and a large amount of material cost is saved. BRIEF DESCRIPTION OF DRAWINGS

[0018] Figure 1 It is the side surface structure schematic drawing of the utility model steel structure factory building clean room static pressure box layer color steel plate ceiling structure.

[0019] Figure 2 It is the side surface structure schematic drawing of prior art.

[0020] In the drawing: 1, color steel plate;2, first C-shaped steel;3, U-shaped hoop;4, second C-shaped steel;5, hanger;501, full tooth screw;502, square adjuster;6, T-shaped keel ceiling;

[0021] 7, multi-spliced C-shaped steel. DETAILED DESCRIPTION

[0022] The utility model discloses beneficial effects: Figure 1The technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. All other embodiments derived by persons of ordinary skill in the art based on the embodiments of the present invention without creative effort shall fall within the scope of protection of the present invention.

[0023] Such as Figure 1 As shown, a static pressure box layer color steel plate ceiling structure of a clean room in a steel structure factory building includes:

[0024] A plurality of first C-shaped steels 2, wherein the plurality of first C-shaped steels 2 are arranged below the floor slab of the steel structure factory building;

[0025] Specifically, the first C-shaped steel 2 is the original grape rack C-shaped steel, which is part of the steel structure of the factory building and does not need to be hoisted and can be directly installed inside the factory building.

[0026] Multiple color steel plates 1, each of which is arranged at the top of the first C-shaped steel 2 and between adjacent first C-shaped steels 2. The multiple color steel plates 1 are connected by aluminum to ensure sealing and stability between the color steel plates 1;

[0027] The second C-shaped steel 4 is arranged at the lower end of the first C-shaped steel 2 through the U-shaped clamp 3. The second C-shaped steel 4 is a porous C-shaped steel. The porous C-shaped steel not only provides an installation position for the bolt connection, but also greatly reduces its own weight;

[0028] A T-shaped keel ceiling 6 is suspended below the second C-shaped steel 4 through a suspension rod 5 .

[0029] In a preferred implementation, the hanger 5 includes a full-thread screw 501 and a square adjuster 502. The upper end of the full-thread screw 501 is threadedly connected to the second C-shaped steel 4, and the bottom end of the full-thread screw 501 is threadedly connected to the square adjuster 502. The square adjuster 502 is also bolted to the T-shaped keel ceiling 6. The square adjuster 502 can cooperate with the full-thread screw 501 to realize the height adjustment of the T-shaped keel ceiling 6 and ensure the height consistency of the T-shaped keel ceiling 6.

[0030] In a preferred implementation, the bolts are fixed to the upper surface of the T-shaped keel 6 by welding.

[0031] In a preferred implementation, the U-shaped clamp 3 is arranged on the periphery of the first C-shaped steel 2 , and both ends of the U-shaped clamp 3 pass through the second C-shaped steel 4 and are fixed to the bottom of the second C-shaped steel 4 .

[0032] The above merely describes preferred embodiments of the present application, which are relatively specific and detailed, but should not be understood as limiting the scope of the present application patent, and it should be pointed out that, without departing from the concept of the present application, a number of improvements and deformations can be made, which all belong to the protection scope of the present application.

Claims

1. A clean room static pressure box layer color steel plate suspended ceiling structure of a steel structure factory building, characterized in that, The utility model relates to a steel structure factory building floor structure which comprises: a plurality of first C-shaped steels arranged below the steel structure factory building floor; a plurality of color steel plates arranged at the top ends of the first C-shaped steels and between adjacent first C-shaped steels; second C-shaped steels arranged at the lower ends of the first C-shaped steels by U-shaped hoops; T-shaped keel suspended ceilings hung below the second C-shaped steels by hangers.

2. The steel structure plant clean room static pressure box layer color steel plate suspended ceiling structure according to claim 1, characterized in that, The color steel plates are connected by middle-shaped aluminum connectors.

3. The steel structure plant clean room static pressure box layer color steel plate suspended ceiling structure according to claim 1, characterized in that, The second C-shaped steels are porous C-shaped steels.

4. The steel structure plant clean room static pressure box layer color steel plate suspended ceiling structure according to claim 1, characterized in that, The hangers comprise full-toothed screws and square adjusters, the upper ends of the full-toothed screws are screwed to the second C-shaped steels, the bottom ends of the full-toothed screws are screwed to the square adjusters, and the square adjusters are further bolted to the T-shaped keel suspended ceilings.

5. The steel structure plant clean room static pressure box layer color steel plate suspended ceiling structure according to claim 4, characterized in that, The bolts are welded to the upper surfaces of the T-shaped keels.

6. The steel structure plant clean room static pressure box layer color steel plate suspended ceiling structure according to claim 1, characterized in that, The U-shaped hoops are arranged at the peripheries of the first C-shaped steels, and the two ends of the U-shaped hoops pass through the second C-shaped steels and are fixed to the bottoms of the second C-shaped steels.