Fabricated water conservancy embankment gabion construction device

By using a prefabricated gabion construction device for water conservancy embankments, the coordinated operation of tracks and various components enables precise grabbing and placement of gabions under complex terrain and harsh weather conditions, solving the problems of construction errors and risks, and improving construction efficiency and stability.

CN223468762UActive Publication Date: 2025-10-24四川路航建设工程有限责任公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521560419.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-07-25
Publication Date
2025-10-24
Estimated Expiration
2035-07-25

AI Technical Summary

Technical Problem

The hoisting and placement of gabion cages in complex terrain or harsh weather conditions require high technical skills and may result in errors or instability, increasing construction risks.

Method used

A prefabricated gabion construction device for water conservancy embankments is adopted, including a track, a mobile vehicle, a support frame, a counterweight assembly, a placement assembly, a support rod, a moving assembly, a moving plate, a lifting assembly, and a grabbing assembly. The precise grabbing and placement of gabions is achieved through the coordinated work of these components.

Benefits of technology

It improves construction accuracy, reduces installation errors, lowers equipment requirements and operating costs, increases construction efficiency, and is suitable for construction in narrow or confined environments, reducing labor intensity and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223468762U_ABST
    Figure CN223468762U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of gabion cage construction, and particularly relates to an assembly type water conservancy embankment gabion construction device which comprises a rail and further comprises a moving trolley, a gabion cage, a gabion cage and a gabion cage, the supporting frame is fixed to the top of the moving trolley; the counterweight assembly is arranged outside one side of the supporting frame; the placing assembly is arranged at the top of the middle support frame section; the supporting rod is fixed on the inner side of the top of the supporting frame; the moving assembly is arranged on the inner side of the supporting rod; the moving plate is arranged at the moving end of the moving assembly; the lifting assembly is arranged on the moving plate; according to the assembly type water conservancy embankment gabion construction device, the grabbing assembly is driven by the moving assembly to grab and convey gabion gabions, the operation precision is higher, the gabion gabions can be accurately grabbed and placed, the installation error is reduced, the equipment requirement and the operation cost are lower, the construction efficiency is higher, and the construction efficiency is higher. And tasks can be completed in a shorter time, and working hours and energy are saved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to gabion construction technical field, especially a kind of assembly type water conservancy embankment gabion construction device. BACKGROUND

[0002] Assembly type water conservancy embankment gabion construction device is a kind of efficient engineering equipment for protection, reinforcement and soil and water conservation in water conservancy embankment construction, gabion is wrapped by steel wire mesh stone or filler, with good water permeability and flexibility, can effectively prevent soil erosion, reduce scouring damage to embankment, and have strong compressive strength and stability, assembly type construction mode uses prefabricated gabion unit to carry out on-site assembly, significantly improve construction efficiency, reduce cost, and ensure the controllability and consistency of quality, the technology is particularly suitable for complex hydrology and geology conditions, and has good ecological adaptability, promotes the growth of aquatic plants, despite this, assembly type construction still faces the challenges of transportation and installation complexity, structural stability and adaptability design, in the future, with the progress of science and technology, combined with unmanned aerial vehicle, sensor and other intelligent technologies, assembly type gabion construction device is expected to realize higher automation, precision and ecological benefits, further improve its application value in water conservancy engineering.

[0003] But in the actual use process of prior art scheme, gabion is usually hoisted by crane, then placed beside embankment, but despite the use of crane and other equipment, hoisting and placing gabion still have high technical requirements in complex terrain or adverse weather conditions, may have error or instability, increase construction risk.

[0004] Therefore, the utility model provides a kind of assembly type water conservancy embankment gabion construction device. UTILITY MODEL CONTENTS

[0005] The utility model aims at solving the problems of prior art in complex terrain or adverse weather conditions, hoisting and placing gabion still have high technical requirements, may have error or instability, increase construction risk, and provides a kind of assembly type water conservancy embankment gabion construction device.

[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme:

[0007] A kind of assembly type water conservancy embankment gabion construction device, including track, still include:

[0008] Movable vehicle is slidably connected to the top of track;

[0009] Support frame is fixed to the top of movable vehicle;

[0010] Counterweight assembly is arranged on the outside of one side of support frame;

[0011] The placing assembly is arranged on the top of the middle section of the support frame.

[0012] The support rod is fixed to the inner side of the top of the support frame.

[0013] The moving assembly is arranged on the inner side of the support rod.

[0014] The moving plate is arranged on the moving end of the moving assembly.

[0015] The lifting assembly is arranged on the moving plate.

[0016] The grabbing assembly is arranged on the lifting end of the lifting assembly.

[0017] As a preferred technical scheme of the present application, the counterweight assembly comprises a storage rack fixed to the outer side of the support frame, and the storage rack is connected with uniformly distributed counterweight blocks on the inner side.

[0018] As a preferred technical scheme of the present application, the placing assembly is a placing table fixed to the top of the middle section of the support frame, and the outer wall of the placing table is provided with uniformly distributed grooves.

[0019] As a preferred technical scheme of the present application, the moving assembly comprises a sliding rail fixed to the outer wall of one side of the support rod, and a motor fixed to the bottom of one side of the support rod, the outer side of the sliding rail is connected with uniformly distributed sliding blocks, the sliding blocks are fixedly connected with the outer wall of the moving plate, the output end of the motor is provided with a belt pulley, the belt pulley is rotatably connected with the support rod, a plurality of connecting racks are fixedly connected in the middle section of the belt pulley, and the connecting racks are fixedly connected with the top wall of the moving plate.

[0020] As a preferred technical scheme of the present application, the lifting assembly comprises a winch fixed to the top of the middle section of the moving plate, and a plurality of sliding rods slidably connected to the inner side of the moving plate, the output end of the winch is fixedly connected with a hook, and the bottom of the hook is connected with a stress hook.

[0021] As a preferred technical scheme of the present application, the grabbing assembly comprises a top plate fixed to the bottom of the stress hook, the top plate is fixedly connected with the bottom of the sliding rod, the bottom of the top plate is fixedly connected with a fixing rack in a symmetrical manner, a hydraulic rod is rotatably connected in the middle section of the fixing rack, the output end of the hydraulic rod is rotatably connected with a transmission rod, the middle section of the transmission rod is rotatably connected with the fixing rack, the bottom of the transmission rod is fixedly connected with a clamping arm, and the outer side of the bottom of the fixing rack is fixedly connected with a guard plate.

[0022] Compared with the prior art, the present application provides an assembled water conservancy embankment gabion construction device, which has the following beneficial effects:

[0023] 1. The utility model relates to a kind of assembly type water conservancy embankment gabion construction device, by mobile subassembly and be grabbed to gabion with fetching subassembly, higher operation precision, can accurately grab and place gabion, reduce installation error, and equipment demand and operating cost are lower, and construction efficiency is higher, can complete task in shorter time, save working hours and energy.

[0024] 2. The utility model relates to a kind of assembly type water conservancy embankment gabion construction device, by mobile car and drive top equipment moves on track top, so that gabion can be continuously laid without stopping, equipment does not need to be moved according to the auxiliary construction position of equipment, avoid the position of traditional construction equipment frequently adjusted, improve construction efficiency.Equipment does not need to be moved according to the auxiliary construction position, reduce manual operation, reduce labor intensity, and effectively save work space, especially suitable for narrow or restricted environment.At the same time, the high automation degree and stability of equipment guarantee construction precision, reduce error.Because equipment does not need to be frequently adjusted, reduce wear and tear and maintenance frequency, reduce maintenance cost.Continuous operation in construction process also avoids waiting time, improves overall efficiency. BRIEF DESCRIPTION OF DRAWINGS

[0025] Figure 1 It is the three-dimensional structure schematic diagram in the utility model;

[0026] Figure 2 It is the local three-dimensional structure schematic diagram and enlargement of support rod in the utility model Figure 1 And enlargement Figure 2 ;

[0027] Figure 3 It is Figure 2 Local enlarged view in A place;

[0028] Figure 4 It is the local three-dimensional structure schematic diagram of support frame in the utility model;

[0029] Figure 5 It is Figure 4 Local enlarged view in B place;

[0030] Figure 6 It is the local three-dimensional structure schematic diagram of moving plate in the utility model;

[0031] Figure 7 It is the local three-dimensional structure schematic diagram of hydraulic rod in the utility model.

[0032] In the figure:

[0033] 1, track; 11, mobile car; 2, support frame; 21, placing table; 22, groove; 23, storage rack; 24, counterweight; 3, support rod; 31, motor; 32, pulley; 33, slide rail; 34, sliding block; 35, connecting frame; 4, moving plate; 41, winch; 42, hook; 43, slide rod; 44, stress hook; 5, top plate; 51, fixing frame; 52, hydraulic rod; 53, transmission rod; 54, clamping arm; 55, guard plate. DETAILED DESCRIPTION

[0034] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0035] Embodiment:

[0036] Referring to Figures 1-7 A fabricated water conservancy embankment gabion construction device, comprising a track 1, further comprising:

[0037] The mobile car 11 is slidably connected to the top of the track 1 and is supported by the track 1.

[0038] The support frame 2 is fixed to the top of the mobile car 11 and is supported and fixed by the mobile car 11, and the support frame 2 is driven by the mobile car 11 to move synchronously.

[0039] The counterweight assembly is arranged on one side of the support frame 2 and is supported by the support frame 2.

[0040] The placing assembly is arranged on the top of the middle section of the support frame 2 and is supported by the support frame 2.

[0041] The support rod 3 is fixed to the inner side of the top of the support frame 2 and is supported and fixed by the support frame 2.

[0042] The moving assembly is arranged on the inner side of the support rod 3 and is supported by the support rod 3.

[0043] The moving plate 4 is arranged on the moving end of the moving assembly and is moved by the moving assembly.

[0044] The lifting assembly is arranged on the moving plate 4 and is limited by the moving plate 4.

[0045] The grabbing assembly is arranged on the lifting end of the lifting assembly and is lifted by the lifting end of the lifting assembly.

[0046] The counterweight assembly comprises a storage rack 23 fixed to the outer side of the support frame 2, the storage rack 23 is supported and fixed by the support frame 2, the inner side of the storage rack 23 is clamped and connected with uniformly distributed counterweight blocks 24, the counterweight blocks 24 are supported and limited by the storage rack 23, and the center of gravity of the equipment is balanced by the counterweight blocks 24.

[0047] The placing assembly is fixed to the placing table 21 at the top of the middle section of the support frame 2, the placing table 21 is supported and fixed by the support frame 2, and the outer wall of the placing table 21 is provided with uniformly distributed grooves 22.

[0048] The moving assembly comprises a sliding rail 33 fixed to the outer wall of one side of the support rod 3, the sliding rail 33 is supported and fixed by the support rod 3, a motor 31 fixed to the bottom of one side of the support rod 3, the motor 31 is supported and fixed by one side of the support rod 3, uniformly distributed sliding blocks 34 slidingly connected to the outer side of the sliding rail 33, the sliding blocks 34 are limited by the sliding rail 33 and slide on the outer side of the sliding rail 33, the sliding blocks 34 are fixedly connected to the outer wall of the moving plate 4 and support and fix the moving plate 4, a belt pulley 32 is arranged at the output end of the motor 31, the belt pulley 32 is rotationally connected to the support rod 3, the belt pulley 32 is limited by the support rod 3 and one side of the rotating wheel of the belt pulley 32 is fixed by the support rod 3, so that the belt pulley 32 is driven by the motor 31 to rotate on the top of the support rod 3, a plurality of connecting frames 35 are fixedly connected to the middle section of the belt pulley 32 and support and fix the connecting frames 35, the connecting frames 35 are fixedly connected to the top wall of the moving plate 4 and connect the belt pulley 32 and the moving plate 4 by the connecting frames 35, so that the moving plate 4 is driven by the belt pulley 32 to move by the connecting frames 35.

[0049] The lifting assembly comprises a winch 41 fixed to the top middle section of the moving plate 4, a plurality of sliding rods 43 slidingly connected to the inner side of the moving plate 4, a hook 42 fixedly connected to the output end of the winch 41, the hook 42 is supported and fixed by the winch 41 and is lifted by the winch 41, and a stress hook 44 is clamped and connected to the bottom of the hook 42.

[0050] The grabbing assembly comprises a top plate 5 fixed at the bottom of the stress hook 44, the top plate 5 is supported and fixed by the stress hook 44, meanwhile the hook 42 and the stress hook 44 are clamped with each other, so that the top plate 5 is lifted and lowered by the hook 42 through the winch 41, the top plate 5 is fixedly connected with the bottom of the slide rod 43, the slide rod 43 is supported and fixed by the top plate 5, so that the slide rod 43 and the moving plate 4 slide with each other during the lifting and lowering of the top plate 5, thereby limiting the moving plate 4 and the top plate 5, and the top plate 5 is straight up and down at the bottom of the moving plate 4, the fixed frame 51 is fixedly connected with the bottom of the top plate 5 in a symmetrical manner, the fixed frame 51 is supported and fixed by the top plate 5, the hydraulic rod 52 is rotatably connected to the middle of the fixed frame 51, the hydraulic rod 52 is limited by the fixed frame 51, the transmission rod 53 is rotatably connected to the output end of the hydraulic rod 52, the transmission rod 53 is limited by the hydraulic rod 52, the transmission rod 53 is rotatably connected with the middle of the fixed frame 51, the transmission rod 53 is limited by the fixed frame 51, the clamping arm 54 is fixedly connected to the bottom of the transmission rod 53, the clamping arm 54 is supported and fixed by the transmission rod 53, the guard plate 55 is fixedly connected to the outside of the bottom of the fixed frame 51, and the guard plate 55 is supported and fixed by the fixed frame 51.

[0051] Specifically, the assembled water conservancy embankment gabion construction device works as follows:

[0052] Firstly, the mobile vehicle 11 moves on the top of the track 1 to move the equipment to the construction position, then the gabion is placed on the top of the placing table 21 by external equipment, then the belt pulley 32 is driven to rotate by the motor 31, in the process, the moving plate 4 is moved to one side of the placing table 21 by the belt pulley 32 through the connecting frame 35;

[0053] When the clamping arm 54 moves to the top of the gabion, the hook 42 is moved to the bottom by the winch 41, meanwhile the bottom grabbing assembly is moved to the bottom by the cooperation of the hook 42 and the stress hook 44, and the top plate 5 is limited by the slide rod 43 through the moving plate 4;

[0054] During the movement of the grabbing assembly to the bottom, the transmission rod 53 is rotated around the connection point of the transmission rod 53 and the fixed frame 51 by the hydraulic rod 52 taking the fixed frame 51 as the stress point, so that the clamping arms 54 are moved towards each other by the two transmission rods 53, thereby opening the bottom, then the clamping arms 54 are aligned with the grooves 22, and the two clamping arms 54 are wrapped inside the clamping arm 54, then the transmission rod 53 is rotated around the connection point of the transmission rod 53 and the fixed frame 51 by the hydraulic rod 52 taking the fixed frame 51 as the stress point, and the clamping arm 54 is driven to grab the gabion;

[0055] Afterwards the grabbing assembly is moved to the top by the winch 41, and the moving plate 4 is moved to the side away from the support frame 2 by the motor 31 through the belt pulley 32 and the connecting frame 35, and then when the grabbing assembly moves to the top of the embankment, the grabbing assembly and the embankment are moved to the bottom by the winch 41, and then the clamping arm 54 is opened, and the gabion is placed on the embankment, and the gabion is accurately placed.

[0056] The above merely describes a preferred specific embodiment of the present application, but the protection scope of the present application is not limited to this. Any person skilled in the art, according to the technical scheme and the inventive concept of the present application, can make equivalent replacement or change within the technical range disclosed by the present application, and all of them should be covered within the protection scope of the present application.

Claims

1. A prefabricated water conservancy embankment gabion construction device, comprising a track (1), characterized in that, Also include: The mobile car (11) is slidingly connected to the top of the track (1); Support frame (2), fixed to the top of the mobile car (11); Counterweight assembly, provided on one side of the support frame (2) outside; Placing assembly, provided on the top of the middle of the support frame (2); Supporting rod (3), fixed to the top of the inside of the support frame (2); Moving assembly, provided inside the support rod (3); Moving plate (4), provided on the moving end of the moving assembly; Lifting assembly, provided on the moving plate (4); Grabbing assembly, provided on the lifting end of the lifting assembly.

2. The assembled water conservancy embankment gabion construction device according to claim 1, characterized in that, The counterweight assembly includes a storage rack (23) fixed to the outside of the support frame (2), and the inside of the storage rack (23) is clamped and connected with uniformly distributed counterweight blocks (24).

3. The assembled water conservancy embankment gabion construction device according to claim 2, characterized in that, The placing assembly is fixed to the placing table (21) on the top of the middle of the support frame (2), and the outer wall of the placing table (21) is provided with uniformly distributed grooves (22).

4. The assembled water conservancy embankment gabion construction device according to claim 3, characterized in that, The moving assembly includes a slide rail (33) fixed to the outer wall of one side of the support rod (3), and a motor (31) fixed to the bottom of the support rod (3), the outside of the slide rail (33) is slidingly connected with uniformly distributed sliding blocks (34), the sliding blocks (34) are fixedly connected with the outer wall of the moving plate (4), the output end of the motor (31) is provided with a pulley (32), the pulley (32) is rotatably connected with the support rod (3), a plurality of connecting frames (35) are fixedly connected in the middle of the pulley (32), and the connecting frames (35) are fixedly connected with the top wall of the moving plate (4).

5. The assembled water conservancy embankment gabion construction device according to claim 1, characterized in that, The lifting assembly includes a winch (41) fixed to the top of the middle of the moving plate (4), and a plurality of slide rods (43) slidingly connected to the inside of the moving plate (4), the output end of the winch (41) is fixedly connected with a hook (42), and the bottom of the hook (42) is clamped and connected with a stress hook (44).

6. The assembled water conservancy embankment gabion construction device according to claim 5, characterized in that, The grabbing assembly includes a top plate (5) fixed to the bottom of the stress hook (44), the top plate (5) is fixedly connected with the bottom of the slide rod (43), the bottom of the top plate (5) is fixedly connected with a fixed frame (51) symmetrically, the middle of the fixed frame (51) is rotatably connected with a hydraulic rod (52), the output end of the hydraulic rod (52) is rotatably connected with a transmission rod (53), the middle of the transmission rod (53) is rotatably connected with the fixed frame (51), the bottom of the transmission rod (53) is fixedly connected with a clamping arm (54), and the bottom of the fixed frame (51) is fixedly connected with a guard plate (55).