Assembled temporary fence for building engineering construction
By introducing a fixing mechanism of fixed nails and movable rings, as well as a connecting mechanism of springs and movable blocks into the construction fence, the problem of difficult quick installation and disassembly of existing construction fences is solved, and the effect of quick installation and disassembly is achieved.
Patent Information
- Application Number
- CN202422981284.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-04
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2034-12-04
AI Technical Summary
The fixing and disassembly operations of existing construction fences are time-consuming and labor-intensive, and are difficult to achieve quick installation and disassembly.
The fixing mechanism and the connecting mechanism are adopted, the fixing nails and the movable ring are used to quickly fix the baffle, and the quick connection and disassembly of the baffle are achieved through the cooperation of the spring and the movable block.
The baffle can be quickly installed and disassembled, which improves construction efficiency and simplifies the operation process.
Smart Images

Figure CN223469122U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of building equipment, concretely is a kind of assembled temporary fence for construction engineering construction. BACKGROUND
[0002] The building fence is the fence or fence built in the construction process to protect the construction safety and the needs of surrounding environment.
[0003] Part of construction needs to temporarily build fence, and after construction, it is dismantled, so the temporarily built fence needs to have the functionality of quick installation and quick disassembly, and most of the existing fences need to be fixed and connected by bolts, which is time-consuming and laborious to operate, and it is also relatively inconvenient to disassemble, so there is an urgent need for a device to solve the above problems. UTILITY MODEL CONTENTS
[0004] The utility model aims at providing a kind of assembled temporary fence for construction engineering construction to solve the problems raised in the above background technology.
[0005] To achieve the above object, the utility model provides the following technical scheme: a kind of assembled temporary fence for construction engineering construction, including baffle, the fixed column is embedded and fixed in the baffle upper end one side, lower end two sides, the fixed mechanism that the baffle one side is provided with for facilitating the fixed baffle, connection component is provided between the baffle, the connection mechanism that the baffle top one side is provided with for facilitating connection, the fixed mechanism includes extension plate, first perforation, fixed nail and movable ring, the extension plate is fixed in baffle one side, the first perforation is opened in extension plate, the fixed nail is movably inserted in first perforation inside, the movable ring is movably installed in fixed nail top end, when using, baffle is fixed in destination position, then fixed nail is inserted through first perforation, then deeply into ground interior, it is convenient to assist fixed baffle in destination position, when disassembling, it can be pulled out by the movable ring to pull fixed nail, it is convenient to disassemble.
[0006] Preferably, the connection component includes a connecting plate and a second perforation, the second perforation is provided on the connecting plate, and the second perforation is provided with two symmetrically on the connecting plate. In use, the connecting plate is inserted through the second perforation outside the lower end fixed column of the adjacent baffle, and the lower end of the adjacent baffle is conveniently connected.
[0007] Preferably, the connecting mechanism comprises a spring, a third perforation, a movable rod, a movable block and a fourth perforation, the third perforation is arranged at the top end of the baffle, the movable rod is movably inserted into the third perforation, the spring is fixed at the movable rod and the bottom end of the third perforation, the movable block is movably sleeved at the outer side of the movable rod, and the fourth perforation is arranged at one side of the movable block.
[0008] Preferably, screw holes are arranged at one side of the baffle, and the screw holes are convenient for installing lighting equipment.
[0009] Preferably, a reflecting plate is inlaidly arranged at one side of the baffle, and the reflecting plate is convenient for reflecting light at night.
[0010] Preferably, the first perforation is provided with two perforations and is symmetrically arranged at both sides of the extension plate.
[0011] Compared with the prior art, the utility model has the advantages that:
[0012] 1. In use, the baffle is fixed at a destination position, then the fixing nails are inserted into the first perforation and then into the ground, so that the baffle is conveniently fixed at the destination position, and when disassembled, the fixing nails can be pulled out by pulling the fixing nails through the movable ring, so that the baffle is conveniently disassembled.
[0013] 2. In use, the connecting plate is inserted into the second perforation and then into the outer side of the fixing column of the adjacent baffle lower end, so that the baffle lower end is conveniently connected; when the baffle lower end is connected, the movable rod is pulled upwards, so that the spring is in a stretched state, then the movable block is rotated, so that the fourth perforation at one side of the movable block is moved to the position above the fixing column of the baffle upper end of the adjacent baffle, then the movable rod is loosened, the spring is reset, the movable block is moved downwards, so that the fourth perforation is sleeved at the outer side of the fixing column, so that the baffle upper end is conveniently connected, and when disassembled, the movable rod is pulled upwards, so that the baffle is conveniently and quickly assembled and disassembled. BRIEF DESCRIPTION OF DRAWINGS
[0014] Figure 1 It is a whole structure schematic view of the assembled temporary baffle for building engineering construction.
[0015] Figure 2 It is a first sectional view of the assembled temporary baffle for building engineering construction.
[0016] Figure 3 The utility model provides a kind of assembled temporary fence for constructional engineering construction second sectional view;
[0017] Figure 4 The utility model provides a kind of assembled temporary fence for constructional engineering construction A enlarged schematic view;
[0018] Figure 5 The utility model provides a kind of assembled temporary fence for constructional engineering construction B enlarged schematic view.
[0019] In the drawing: 1, baffle; 2, connecting plate; 3, second perforation; 4, fixed column; 5, screw hole; 6, reflector; 7, extension plate; 8, fixed nail; 9, movable ring; 10, first perforation; 11, third perforation; 12, movable rod; 13, spring; 14, movable block; 15, fourth perforation. DETAILED DESCRIPTION
[0020] The technical scheme in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor belong to the scope of protection of the utility model.
[0021] Please refer to Figures 1-5 The utility model provides a kind of assembled temporary fence for constructional engineering construction, including baffle 1, baffle 1 side is equipped with screw hole 5, screw hole 5 is convenient to install lighting equipment, baffle 1 side is embedded with reflector 6, reflector 6 is convenient to reflect at night and prompt, baffle 1 upper end side, lower end two sides are embedded with fixed column 4, baffle 1 side has the fixed mechanism of baffle 1 convenient fixed, baffle 1 between having connecting assembly, baffle 1 top side has the connecting mechanism of convenient connection, fixed mechanism includes extension plate 7, first perforation 10, fixed nail 8 and movable ring 9, extension plate 7 is welded fixed in baffle 1 side, first perforation 10 is equipped in extension plate 7, first perforation 10 is equipped with two, symmetrically equipped in extension plate 7 two sides, fixed nail 8 is inserted in first perforation 10 inside, movable ring 9 is installed in fixed nail 8 top end, when using, baffle 1 is fixed in destination position, then fixed nail 8 is inserted through first perforation 10, then is in-depth ground interior, it is convenient to assist fixed baffle 1 in destination position, when disassembling, it can be pulled out by pulling fixed nail 8 through movable ring 9, it is convenient to disassemble.
[0022] The connecting assembly comprises a connecting plate 2 and a second through hole 3, the second through hole 3 is arranged on the connecting plate 2, the second through hole 3 is two, and the second through hole 3 is symmetrically arranged on the connecting plate 2, in use, the connecting plate 2 is fixed outside the lower end fixing column 4 of the adjacent baffle 1 through the second through hole 3, and the lower end of the adjacent baffle 1 is conveniently connected.
[0023] The connecting mechanism comprises a spring 13, a third through hole 11, a movable rod 12, a movable block 14 and a fourth through hole 15, the third through hole 11 is arranged at the top end of the baffle 1, the movable rod 12 is movably inserted into the third through hole 11, the spring 13 is welded and fixed at the bottom end of the movable rod 12 and the third through hole 11, the movable block 14 is movably sleeved outside the movable rod 12, and the fourth through hole 15 is arranged on one side of the movable block 14, in use, when the lower end of the baffle 1 is connected, the movable rod 12 is pulled upwards at this time, so that the spring 13 is in a stretched state, then the movable block 14 is rotated, so that the fourth through hole 15 on one side of the movable block 14 is moved to a position directly above the fixing column 4 at the upper end of the adjacent baffle 1, after that, the movable rod 12 is loosened, the spring 13 is reset, and the movable block 14 is driven to move downwards, so that the fourth through hole 15 is sleeved outside the fixing column 4, so that the upper end of the adjacent baffle 1 is conveniently connected, and when disassembled, the movable rod 12 can be pulled upwards, so that the movable block 14 can be conveniently and quickly installed and dismounted.
[0024] Working principle: in use, the baffle 1 is fixed at the destination position, then the fixing nail 8 is inserted into the first through hole 10, and then is deeply inserted into the ground, so that the baffle 1 is conveniently and secondarily fixed at the destination position, when disassembled, the fixing nail 8 can be pulled out by pulling the fixing nail 8 through the movable ring 9, so that the baffle 1 is conveniently disassembled; in use, the connecting plate 2 is fixed outside the lower end fixing column 4 of the adjacent baffle 1 through the second through hole 3, so that the lower end of the adjacent baffle 1 is conveniently connected; in use, when the lower end of the baffle 1 is connected, the movable rod 12 is pulled upwards at this time, so that the spring 13 is in a stretched state, then the movable block 14 is rotated, so that the fourth through hole 15 on one side of the movable block 14 is moved to a position directly above the fixing column 4 at the upper end of the adjacent baffle 1, after that, the movable rod 12 is loosened, the spring 13 is reset, and the movable block 14 is driven to move downwards, so that the fourth through hole 15 is sleeved outside the fixing column 4, so that the upper end of the adjacent baffle 1 is conveniently connected, and when disassembled, the movable rod 12 can be pulled upwards, so that the movable block 14 can be conveniently and quickly installed and dismounted.
[0025] It is to be noted that, in the present document, relational terms such as first and second and the like can be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can include other elements not expressly listed or inherent to such process, method, article, or apparatus.
[0026] While the embodiments of the present application have been illustrated and described, it will be understood by those skilled in the art that various changes, modifications, substitutions, and alterations can be made therein without departing from the spirit and scope of the application, which is defined by the appended claims and their equivalents.
Claims
1. A modular temporary enclosure for construction site, comprising a panel (1), characterized in that: The upper end of the baffle (1) is provided with a fixed column (4) on one side, the lower end of the baffle (1) is provided with a fixed column (4) on both sides, the baffle (1) is provided with a fixed mechanism on one side, the baffle (1) is provided with a connecting assembly between the baffle (1), the baffle (1) is provided with a connecting mechanism on one side, the fixed mechanism comprises an extension plate (7), a first perforated (10), a fixed nail (8) and a movable ring (9), the extension plate (7) is fixed on one side of the baffle (1), the first perforated (10) is provided on the extension plate (7), the fixed nail (8) is movably inserted into the first perforated (10), and the movable ring (9) is movably installed on the top end of the fixed nail (8).
2. The assembled temporary enclosure for construction work according to claim 1, characterized in that: The connecting assembly comprises a connecting plate (2) and a second perforated (3), the second perforated (3) is provided on the connecting plate (2), and the second perforated (3) is provided with two symmetrical connecting plates (2).
3. A construction site assembly type temporary fence according to claim 2, characterized in that: The connecting mechanism comprises a spring (13), a third perforated (11), a movable rod (12), a movable block (14) and a fourth perforated (15), the third perforated (11) is provided on the top end of the baffle (1), the movable rod (12) is movably inserted into the third perforated (11), the spring (13) is fixed on the movable rod (12) and the bottom end of the third perforated (11), the movable block (14) is movably sleeved on the outer side of the movable rod (12), and the fourth perforated (15) is provided on one side of the movable block (14).
4. The assembled temporary enclosure for construction work according to claim 3, characterized in that: The baffle (1) is provided with a screw hole (5) on one side.
5. A construction site assembly type temporary fence according to claim 4, characterized in that: The baffle (1) is provided with a reflecting plate (6) on one side.
6. A construction site assembly type temporary fence according to claim 5, characterized in that: The first perforated (10) is provided with two symmetrical sides on both sides of the extension plate (7).