Cable terminal construction frame

The combined design of the side frame, connector and horizontal plate solves the problems of inconvenient portability and high installation cost of the existing cable terminal construction frame, and enables convenient installation and efficient use.

CN223487700UActive Publication Date: 2025-10-28GUANGDONG HUIYING ELECTRIC POWER ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422967858.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-10-28
Estimated Expiration
2034-12-02

AI Technical Summary

Technical Problem

The existing cable terminal construction frame is inconvenient to carry and transport, and the installation process is complicated, resulting in high costs and affecting construction efficiency.

Method used

The structure is assembled with side frames, connectors and horizontal plates. The connectors and movable rods can be quickly assembled and disassembled. The side frames can be recycled and the legs can be disassembled to meet different height requirements.

Benefits of technology

The construction frame can be easily carried and quickly installed, which reduces the erection cost and improves the construction efficiency and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223487700U_ABST
    Figure CN223487700U_ABST
Patent Text Reader

Abstract

A cable terminal construction frame comprises side frames, a connector and a horizontal plate. The side frame is provided with a plurality of fence sub-plates extending transversely, and sub-plate matching grooves are formed in the two ends of each fence sub-plate. The connector is provided with a matching part and a connecting part, the matching part is installed in the split plate matching groove, and the connecting part is provided with a connecting port; the plurality of side frames are respectively fixed on a plurality of adjacent side surfaces of the horizontal plate; and the connecting port of the connector in one fence sub-plate is horizontally aligned with the sub-plate matching groove of the other fence sub-plate, and the connecting part of the other connector penetrates through the connecting port and then is limited in the sub-plate matching groove, so that the adjacent side frames are connected into a whole. The cable terminal construction frame is formed by assembling the side frames, the connectors and the horizontal plates, can be recycled and is convenient to carry, and the problem that the erection cost is high due to the fact that an existing construction frame is inconvenient to install is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of construction frames, and in particular to a cable terminal head construction frame. Background Technology

[0002] With the accelerating pace of urbanization, the number of cable lines and cable terminations is constantly increasing. To ensure the normal operation of circuits and their components, regular inspection and maintenance are necessary. When constructing cable terminations, the construction height should be approximately 2 to 3 meters above the ground. This height facilitates maintenance and inspection while also ensuring safety to a certain extent. However, currently, scaffolding with flat wooden planks is still used to construct the frame structure. This method is inconvenient for carrying and transporting, as the scaffolding occupies too much space and cannot be installed immediately upon use. Furthermore, if the scaffolding is disassembled and transported in parts, the complex structure leads to longer erection times and higher costs. Utility Model Content

[0003] The purpose of this utility model is to propose a cable termination head construction frame, which is assembled from a side frame, a connector and a horizontal plate, and can be used repeatedly and is easy to carry.

[0004] To achieve this objective, the present invention adopts the following technical solution:

[0005] A cable termination construction frame includes: a side frame, a connector, and a horizontal plate;

[0006] The side frame is provided with multiple horizontally extending fence panels, and each fence panel has a panel mating groove at both ends; the connector is provided with a mating part and a connecting part, the mating part is installed in the panel mating groove, and the connecting part is provided with a connecting port; the multiple side frames are respectively fixed to multiple adjacent sides of the horizontal plate;

[0007] The connection port of the connector in one of the fence panels is horizontally aligned with the panel mating groove of the other fence panel, and the connection part of the other connector passes through the connection port and is limited to the panel mating groove, so that the adjacent side frames are connected as one unit.

[0008] Optimally, it may also include: a movable lever;

[0009] The partially unused connection port can be relatively movably installed on the movable rod, allowing the horizontal plate and side frame to move along the length of the movable rod.

[0010] Optimally, some of the side frames are provided with frame passage openings; the frame passage openings and some of the connection openings are located on the same straight line and are respectively installed on the same movable rod.

[0011] Alternatively, some of the side frames may be provided with an inlet.

[0012] Optimally, it may also include: feet;

[0013] Multiple of the aforementioned legs are detachably mounted to the horizontal plate, and the legs extend downward below the horizontal plate.

[0014] Alternatively, the horizontal plate may be provided with a plate base, and the plate base may be provided with a seat slot; the seat slot may be engaged with the lowermost fence panel of the side frame, thereby fixing the side frame to the horizontal plate.

[0015] Optimally, it may also include: fastening screws and fastening nuts;

[0016] The seat slot is an inverted U-shaped structure with the slot opening facing downwards; the seat slot engages with the fence panel from top to bottom, and there are straight-aligned seat holes between the two; the fastening screw passes through the seat slot and the seat holes of both the seat slot and the fence panel, and then engages with the fastening nut.

[0017] Alternatively, the fastening nut can be welded to the plate base or fence panel.

[0018] Alternatively, the plate mating groove may be provided with an internal thread structure, and the mating part may be provided with an external thread structure, with the mating part threadedly engaged with the plate mating groove.

[0019] Compared with the prior art, one of the above technical solutions has the following beneficial effects:

[0020] This solution provides a cable termination construction frame, which is assembled from side frames, connectors and horizontal plates. It is reusable and easy to carry, solving the problem of high erection costs caused by the inconvenience of installation of existing construction frames. Attached Figure Description

[0021] Figure 1 This is a structural schematic diagram of one embodiment of the cable termination head construction frame;

[0022] Figure 2 yes Figure 1 Enlarged view of section A in the middle;

[0023] Figure 3 This is a schematic diagram of one embodiment of the plate base being installed on the fence panel;

[0024] Figure 4 This is a schematic diagram of one embodiment of a cable termination construction frame with legs;

[0025] Figure 5 This is a structural diagram of one embodiment when adjacent side frames are installed.

[0026] in:

[0027] 1. Side frame; 2. Connector; 3. Horizontal plate; 4. Movable rod; 5. Support leg; 6. Fastening screw; 7. Fastening nut;

[0028] 11. Fence panel; 12. Panel mating groove; 13. Frame passageway; 14. Inlet;

[0029] Fitting part 21, connecting part 22; plate base 23; connecting port 221; base slot 231; base hole 232. Detailed Implementation

[0030] The following describes embodiments of the present invention in detail. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended only to explain the present invention and are not to be construed as limiting the present invention.

[0031] In the description of this utility model, it should be understood that the terms "center," "longitudinal," "transverse," "length," "width," "thickness," "upper," "lower," "left," "right," "front," "rear," "vertical," "horizontal," "top," "bottom," "inner," "outer," "inner side," "outer side," "inner end," "outer end," "axial," "radial," and "circumferential," etc., indicating the orientation or positional relationship shown in the accompanying drawings, are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. Furthermore, features defined with "first" and "second" may explicitly or implicitly include one or more of these features, used to distinguish descriptive features, without any order or emphasis. In the description of this utility model, unless otherwise stated, "multiple" means two or more.

[0032] like Figure 1-5 A cable termination construction frame includes: a side frame 1, a connector 2, and a horizontal plate 3;

[0033] The side frame 1 is provided with multiple horizontally extending fence panels 11, and the fence panels 11 are provided with panel mating grooves 12 at both ends; the connector 2 is provided with a mating part 21 and a connecting part 22, the mating part 21 is installed in the panel mating groove 12, and the connecting part 22 is provided with a connecting port 221; the multiple side frames 1 are respectively fixed to multiple adjacent sides of the horizontal plate 3.

[0034] The connection port 221 of the connector 2 in one of the fence panels 11 is horizontally aligned with the panel mating groove 12 of the other fence panel 11. The connection part 22 of the other connector 2 passes through the connection port 221 and is limited to the panel mating groove 12, so that the adjacent side frames 1 are connected as one unit.

[0035] This solution provides a cable termination head construction frame, which is assembled from a side frame 1, a connector 2, and a horizontal plate 3. It can be reused and is easy to carry, solving the problem of high erection costs caused by the inconvenience of installation of existing construction frames.

[0036] Specifically, the side frame 1 of this solution has multiple horizontally extending fence panels 11; the side frame 1 is mainly installed on the outer perimeter of the horizontal plate 3, and can be installed in a known way, such as screw fixing, clamp fixing, snap-fit ​​fixing, etc. After the side frame 1 is installed on the horizontal plate 3, the fence panels 11 of two adjacent side frames 1 are arranged close together. Between two adjacent side frames 1, the partition mating groove 12 of the fence panel 11 of one side frame 1 and the partition mating groove 12 of the fence panel 11 of the other side frame 1 are located on the same horizontal plane. First, a first connector 2 is installed on the partition mating groove 12 of one fence panel 11. The mating part 21 of the first connector 2 is limited to the partition mating groove 12. The connecting part 22 of the first connector 2 is located outside the partition mating groove 12, and the connecting port 221 of the first connector 2 is on the same straight line as the partition mating groove 12 of the other fence panel 11. Then, a second connector 2 is installed on the partition mating groove 12 of the fence panel 11. After the mating part 21 of the second connector 2 passes through the connecting port 221 of the first connector 2, it is limited to the partition mating groove 12 corresponding to the connecting port 221, thereby connecting the fence panels 11 of the two adjacent side frames 1 into one unit. When multiple fence panels 11 of two side frames 1 are connected, the multiple side frames 1 are connected as a whole. In this solution, the side frames 1 and connectors 2 are duplicate components, which can be stacked or stored together during transport. If one duplicate component is damaged, it can be directly replaced, resulting in low operating costs. The side frames 1 are directly connected and installed via connectors 2, simplifying the installation process and effectively reducing labor costs. Thus, this solution solves the problem of high erection costs caused by inconvenient installation of existing construction scaffolding.

[0037] Optimally, it also includes: movable lever 4;

[0038] The partially unused connection port 221 can be relatively movably installed on the movable rod 4, so that the horizontal plate 3 and the side frame 1 can move along the length direction of the movable rod 4.

[0039] For two adjacent side frames 1, the connection port 221 of the connector 2 of one side frame 1 passes through the connector 2 of the other side frame 1. Therefore, at least one connector 2's connection port 221 will be unused. This solution cleverly utilizes this connection port 221, which is installed on the movable rod 4 and can move along the length of the movable rod 4. This allows the horizontal plate 3 and the side frame 1 as a whole to be adjusted horizontally. Simply pushing the horizontal plate 3 and the side frame 1 horizontally allows the cable terminal head construction frame to move horizontally, facilitating lateral maintenance of the cable terminal head. The movable rod 4 can be a single rod or part of another structure.

[0040] Optimally, a portion of the side frame 1 is provided with a frame passage 13; the frame passage 13 and a portion of the connection port 221 are located on the same straight line and are respectively installed on the same movable rod 4.

[0041] To improve the connection stability of the movable rod 4, this solution preferably adds one or more frame passages 13 on some side frames 1. The frame passage 13 is in a straight line with the connection port 221 of part of the connection part 22. In this way, the movable rod 4 can pass through the passage and the connection port 221, thereby confining the connection part 22 and the side frame 1 together. It also increases the contact point of the movable rod 4, thereby enhancing the stability of the movement.

[0042] Alternatively, part of the side frame 1 may be provided with an inlet 14.

[0043] Workers can climb the stairs to the position of the horizontal plate 3, and then enter from the side frame 1 near the horizontal plate 3. Specifically, some of the side frames 1 are equipped with an entrance 14, which allows workers to enter and exit normally.

[0044] Optimally, it also includes: support leg 5;

[0045] Multiple of the support legs 5 are detachably mounted on the horizontal plate 3, and the support legs 5 extend downward to the underside of the horizontal plate 3.

[0046] In some construction sites, it is necessary to inspect the cable termination head when it is off the ground. In this case, it is only necessary to install the support foot 5 on the horizontal plate 3. The installation method can be screw fixing, clamp fixing, or simply upward contact, etc.

[0047] Alternatively, the horizontal plate 3 is provided with a plate base 23, and the plate base 23 is provided with a seat slot 231; the seat slot 231 is engaged with the lowermost fence panel 11 of the side frame 1, so that the side frame 1 is fixed to the horizontal plate 3.

[0048] The plate base 23 is installed on the side frame 1 by means of a slot; specifically, there are multiple fence panels 11. When the side frame 1 is installed vertically on the horizontal plate 3, the multiple fence panels 11 are essentially arranged vertically. Therefore, the slot 231 of the plate base 23 can be engaged with the lowest fence panel 11. Based on the fixing relationship between the side frames 1, the horizontal plate 3 can be fixed to the side frame 1.

[0049] Optimally, it also includes: a fastening screw 6 and a fastening nut 7;

[0050] The seat groove 231 is an inverted U-shaped structure with the groove opening facing downwards; the seat groove 231 is engaged with the fence panel 11 from top to bottom, and there are seat holes 232 aligned in a straight line between the two; the fastening screw 6 passes through the seat holes 232 of both the seat groove 231 and the fence panel 11 and then engages with the fastening nut 7.

[0051] The seat slot 231 is an inverted U-shaped structure with the slot opening facing downwards, while the fence panel 11 is a horizontal plate structure. When the seat slot 231 is engaged with the fence panel 11 from top to bottom, it is equivalent to the seat slot 231 being engaged with the fence panel 11. Since some side panels can be connected to the movable rod 4, the horizontal plate 3 is connected to the fence panel 11 by a snap-fit ​​method, which allows the horizontal plate 3 to be suspended in the air, suitable for high-altitude operations.

[0052] Alternatively, the fastening nut 7 can be welded to the plate base 23 or the fence panel 11.

[0053] The fastening nut 7 is welded to the plate base 23 or the fence panel 11, so that the fastening nut 7 can be fixed to the plate base 23 or the fence panel 11 in one piece, avoiding the need to find the fastening nut 7 during the construction.

[0054] Alternatively, the plate mating groove 12 is provided with an internal thread structure, and the mating part 21 is provided with an external thread structure, and the mating part 21 is threadedly mated to the plate mating groove 12.

[0055] After the mating part 21 passes through the connecting port 221, it is limited to the mating groove 12 of the plate by means of thread engagement. The worker only needs to loosen or tighten the mating part 21 to install or disassemble the side frame 1, which improves the assembly efficiency of the side frame 1.

[0056] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and purpose of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A cable termination head construction frame, characterized in that, include: Side frame, connectors, and level plate; The side frame is provided with multiple horizontally extending fence panels, and each fence panel has a panel mating groove at both ends; the connector is provided with a mating part and a connecting part, the mating part is installed in the panel mating groove, and the connecting part is provided with a connecting port; the multiple side frames are respectively fixed to multiple adjacent sides of the horizontal plate; The connection port of the connector in one of the fence panels is horizontally aligned with the panel mating groove of the other fence panel, and the connection part of the other connector passes through the connection port and is limited to the panel mating groove, so that the adjacent side frames are connected as one unit.

2. The cable termination head construction frame according to claim 1, characterized in that, Also includes: Movable lever; The partially unused connection port can be relatively movably installed on the movable rod, allowing the horizontal plate and side frame to move along the length of the movable rod.

3. The cable termination head construction frame according to claim 2, characterized in that, The side frame is provided with a frame passage; the frame passage and the connection port are located on the same straight line and are respectively installed on the same movable rod.

4. A cable termination head construction frame according to claim 1, characterized in that, The side frame described in part has an access port.

5. A cable termination head construction frame according to claim 1, characterized in that, Also includes: Support legs; Multiple of the aforementioned legs are detachably mounted to the horizontal plate, and the legs extend downward below the horizontal plate.

6. A cable termination head construction frame according to any one of claims 1-5, characterized in that, The horizontal plate is provided with a plate base, and the plate base is provided with a seat slot; the seat slot is engaged with the lowest fence panel of the side frame, so that the side frame is fixed to the horizontal plate.

7. A cable termination head construction frame according to claim 6, characterized in that, Also includes: Fastening screws and nuts; The seat slot is an inverted U-shaped structure with the slot opening facing downwards; the seat slot engages with the fence panel from top to bottom, and there are straight-aligned seat holes between the two; the fastening screw passes through the seat slot and the seat holes of both the seat slot and the fence panel, and then engages with the fastening nut.

8. A cable termination head construction frame according to claim 7, characterized in that, The fastening nut is welded to the plate base or the fence panel.

9. A cable termination head construction frame according to any one of claims 1-5, characterized in that, The plate mating groove has an internal thread structure, and the mating part has an external thread structure. The mating part is threaded into the plate mating groove.