Leakage-proof tray for double-door concrete hopper
By installing a collection frame and scraping mechanism under the hopper, the problem of concrete flowing out and polluting the plant area during the hopper transfer process was solved, achieving a convenient cleaning effect.
Patent Information
- Application Number
- CN202520055053.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-10
- Publication Date
- 2025-11-25
- Estimated Expiration
- 2035-01-10
AI Technical Summary
Existing double-door concrete hoppers are prone to overflowing when full of concrete during transfer, polluting factory roads. Current technology has not been able to effectively solve this problem.
A collection frame is installed below the hopper, equipped with a scraping mechanism, including an L-shaped plate and a scraper, for collecting and cleaning the spilled concrete.
It effectively collects and cleans up spilled concrete, preventing pollution of factory roads, and is simple and convenient to operate.
Smart Images

Figure CN223591494U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to tray technical field, concretely relates to double -open door concrete hopper is with leak protection tray. BACKGROUND
[0002] The concrete hopper is a hopper equipment for concrete mixing station, construction site and the like, is used for storing and conveying concrete and other building materials, then the material is transported to the designated position and is poured.
[0003] The patent "double -open door concrete hopper" of applicant's application number "202420872699.X", through the double -open door design of first sector plate and second sector plate, avoid the single -open door design in prior art, make the material weight in hopper all concentrate on a face, easy to cause the damage of single -open door, and the pouring of material needs to rotate a large angle, cannot conveniently and quickly pour the material out of material, thereby reduce the operation efficiency, but the hopper appears following problem in actual use process:
[0004] Because the original double -open door concrete hopper is full of concrete transfer, sometimes the hopper mouth can flow out concrete, thereby the hopper can pollute the factory road in the process of rotating, and the utility model increases leak protection tray on the basis of the hopper, collects the concrete that flows out, prevents the pollution of factory road. UTILITY MODEL CONTENTS
[0005] The utility model discloses a leak protection tray for double -open door concrete hopper to solve the shortcomings in the prior art.
[0006] In order to achieve the above object, the utility model adopts the following technical scheme:
[0007] The leak protection tray for double -open door concrete hopper, comprising:
[0008] The hopper body lower end is fixedly connected with four support seats, and two loading hoppers are arranged on the hopper body.
[0009] Two hooks are fixedly connected on the side wall of the hopper body, a hanging rod is arranged between the two hooks on the same side, two ring chains are fixedly connected on the side wall of the two hanging rods, a collecting frame is fixedly connected at the lower end of the four ring chains, the collecting frame is located below the two loading hoppers, and a scraping mechanism for scraping concrete is arranged in the collecting frame.
[0010] Preferably, the scraping mechanism comprises two grooves formed in the upper end of the collecting frame, an L-shaped plate is slidably connected to the inner wall of the two grooves, and a scraper is fixedly connected to the side wall of the two L-shaped plates.
[0011] Preferably, the collecting frame side wall is connected with the two L-shaped plate side walls through two first bolts respectively.
[0012] Preferably, the inner side wall of the collecting frame away from the first bolt is provided with a de-impurity opening, the inner wall of the de-impurity opening is provided with a sealing plate, the side wall of the sealing plate is fixedly connected with a N-shaped plate, and the side wall of the N-shaped plate is connected with the collecting frame side wall through four second bolts.
[0013] Preferably, the side wall of the scraper located above the collecting frame is arranged to be inclined towards the direction close to the first bolt.
[0014] Preferably, the two hanging rod side walls are fixedly connected with N-shaped rods.
[0015] Preferably, the length of the collecting frame is 2600mm, and the width of the collecting frame is 300mm.
[0016] The utility model has the following beneficial effects:
[0017] 1. setting collecting frame, setting collecting frame below two charging hoppers can collect the concrete flowing out of the two charging hoppers, avoid the two charging hoppers sometimes flowing out of concrete, so that the charging hopper can pollute the factory area road in the rotating process.
[0018] 2. setting scraping mechanism, when needing to clean the concrete in the collecting frame, the staff separates the sealing plate from the de-impurity opening by rotating the four second bolts and the collecting frame, and then the staff separates the two L-shaped plates from the two first bolts, and then the staff can push the scraper towards the direction close to the de-impurity opening, at this time, the scraper can scrape and discharge the concrete in the collecting frame through the de-impurity opening, and the operation is simple. BRIEF DESCRIPTION OF DRAWINGS
[0019] Figure 1 It is the structure schematic view of the double-door concrete charging hopper leak-proof tray provided by the utility model;
[0020] Figure 2 It is the right view structure schematic view of the double-door concrete charging hopper leak-proof tray provided by the utility model; Figure 1
[0021] Figure 3 It is the structure schematic view of the collecting frame in the double-door concrete charging hopper leak-proof tray provided by the utility model; Figure 1
[0022] Figure 4 It is the vertical section structure schematic view of the groove in the double-door concrete charging hopper leak-proof tray provided by the utility model; Figure 3
[0023] Figure 5 It is the structure schematic view of the sealing plate and the de-impurity opening in the double-door concrete charging hopper leak-proof tray provided by the utility model after separation. Figure 3
[0024] In the figure: 1, hopper body; 2, support seat; 3, hook; 4, hanging rod; 5, ring chain; 6, collection frame; 7, groove; 8, L-shaped plate; 9, scraper; 10, first bolt; 11, impurity removal port; 12, sealing plate; 13, U-shaped plate; 14, second bolt; 15, U-shaped rod; 16, loading hopper. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments.
[0026] Reference Figures 1-5 , the double-door concrete hopper is provided with four support seats 2 fixedly connected to the lower end of the hopper body 1, and two loading hoppers 16 are arranged on the upper end of the hopper body 1.
[0027] It should be noted that the specific structure of the hopper body 1 and the two loading hoppers 16 has been fully disclosed in the patent "double-door concrete hopper" with the application number "202420872699.X", which is designed to discharge concrete through double doors, and will not be described here.
[0028] The two hooks 3 are fixedly connected to the two side walls of the hopper body 1, the hanging rods 4 are arranged between the two hooks 3 on the same side, the two hanging rods 4 are fixedly connected to the two side walls of the two hanging rods 4, the four ring chains 5 are fixedly connected to the lower end of the four ring chains 5, and the collection frame 6 is arranged below the two loading hoppers 16.
[0029] The two hanging rods 4 are fixedly connected to the two side walls of the two hanging rods 4.
[0030] Specifically, the collection frame 6 is arranged below the two loading hoppers 16, which can collect the concrete flowing out of the two loading hoppers 16, so as to avoid the concrete flowing out of the two loading hoppers 16, so that the hopper can pollute the roads in the factory area during rotation.
[0031] The collection frame 6 is provided with a scraping mechanism for scraping concrete, and the scraping mechanism comprises two grooves 7 arranged on the upper end of the collection frame 6, the two L-shaped plates 8 are slidably connected to the inner walls of the two grooves 7, the two L-shaped plates 8 are fixedly connected to the side walls of the two L-shaped plates 8, and the scraper 9 is sealingly and slidably connected to the inner wall of the collection frame 6.
[0032] The side wall of the collection frame 6 is connected to the side wall of the two L-shaped plates 8 through the two first bolts 10.
[0033] The side wall of the collection frame 6 above the scraper 9 is inclined to the direction of the first bolt 10, so as to avoid the concrete falling outside through the side wall of the scraper 9.
[0034] The collecting frame 6 is provided with a removal opening 11 (as shown in the figure) away from the inner side wall of the first bolt 10. Figure 5 The inner wall of the removal opening 11 is provided with a sealing plate 12, the side wall of the sealing plate 12 is fixedly connected with a N-shaped plate 13, and the side wall of the N-shaped plate 13 is connected with the side wall of the collecting frame 6 through four second bolts 14.
[0035] When it is necessary to clean the concrete in the collecting frame 6, the collecting frame 6 can be taken off from the four hooks 3 through the two hanging rods 4, then the worker rotates the plurality of second bolts 14 to separate the collecting frame 6, and then the worker can take out the sealing plate 12 from the removal opening 11, and then the worker can push the scraper 9 towards the direction close to the removal opening 11, at this time, the scraper 9 can scrape and discharge the concrete in the collecting frame 6 through the removal opening 11, the operation is simple, and after the concrete is treated, only the initial state shown in the figure needs to be restored. Figure 3
[0036] During the transfer process of the hopper body 1, the two hanging rods 4 are first placed on the four hooks 3, and then the collecting frame 6 can be placed below the two charging hoppers 16, at this time, the collecting frame 6 can collect the concrete flowing out of the two charging hoppers 16, so that the concrete flowing out of the two charging hoppers 16 can pollute the roads in the factory area during the rotation of the hopper.
[0037] When it is necessary to clean the concrete in the collecting frame 6, the collecting frame 6 can be taken off from the four hooks 3 through the two hanging rods 4, then the worker rotates the plurality of second bolts 14 to separate the collecting frame 6, and then the worker can take out the sealing plate 12 from the removal opening 11, and then the worker can push the scraper 9 towards the direction close to the removal opening 11, at this time, the scraper 9 can scrape and discharge the concrete in the collecting frame 6 through the removal opening 11, the operation is simple, and after the concrete is treated, only the initial state shown in the figure needs to be restored. Figure 3
[0038] The above is only a preferred specific embodiment of the present application, but the protection scope of the present application is not limited to this, any skilled person in the technical field can make equivalent replacement or change according to the technical scheme and the inventive concept of the present application within the technical range disclosed by the present application, which should be covered in the protection scope of the present application.
Claims
1. A leak-proof tray for a double-door concrete hopper, characterized in that, include: The hopper body (1) has four support seats (2) fixedly connected to its lower end, and two hoppers (16) are provided on the hopper body (1). Two hooks (3) are fixedly connected to both sides of the hopper body (1). A hanging rod (4) is provided between the two hooks (3) on the same side. Two ring chains (5) are fixedly connected to the side walls of the two hanging rods (4). A collection frame (6) is fixedly connected to the lower end of the four ring chains (5). The collection frame (6) is located below the two hoppers (16). A scraping mechanism for scraping concrete is provided inside the collection frame (6).
2. The leak-proof tray for a double-door concrete hopper according to claim 1, characterized in that, The scraping mechanism includes two grooves (7) on the upper end of the collection frame (6). The inner walls of the two grooves (7) are slidably connected with L-shaped plates (8). The side walls of the two L-shaped plates (8) that are close to each other are fixedly connected with scrapers (9). The side walls of the scrapers (9) are slidably and sealed to the inner wall of the collection frame (6).
3. The leak-proof tray for a double-door concrete hopper according to claim 2, characterized in that, The sidewall of the collection frame (6) is connected to the sidewall of the two L-shaped plates (8) by two first bolts (10).
4. The leak-proof tray for a double-door concrete hopper according to claim 3, characterized in that, The collection frame (6) has a cleaning port (11) on its inner sidewall away from the first bolt (10). The cleaning port (11) has a sealing plate (12) on its inner wall. The sealing plate (12) has a U-shaped plate (13) fixedly connected to its sidewall. The U-shaped plate (13) is connected to the sidewall of the collection frame (6) by four second bolts (14).
5. The leak-proof tray for a double-door concrete hopper according to claim 3, characterized in that, The scraper (9) is located on the side wall above the collection frame (6) and is inclined toward the first bolt (10).
6. The leak-proof tray for a double-door concrete hopper according to claim 3, characterized in that, Both of the hanging rods (4) have U-shaped rods (15) fixedly connected to their side walls.
7. The leak-proof tray for a double-door concrete hopper according to claim 1, characterized in that, The length of the collection frame (6) is 2600mm and the width of the collection frame (6) is 300mm.
Citation Information
Patent Citations
Double-door concrete hopper
CN222314605U