Platform elevator shaft top structure

By combining structural tops, decorative tops, connectors, and quick-release components, the installation process of the shaft top is simplified, solving the problems of complex and unsightly existing shaft top structures, and achieving convenient installation and aesthetically pleasing results.

CN223592191UActive Publication Date: 2025-11-25MAROHN THYSSENKRUPP ELEVATOR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520059832.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-10
Publication Date
2025-11-25
Estimated Expiration
2035-01-10

AI Technical Summary

Technical Problem

The existing shaft top structure is complex, which is not conducive to installation and disassembly, and is also unsightly.

Method used

The design adopts a combination of structural top, decorative top, first connector, second connector and quick-release component. The first and second hanging ring parts are connected by quick-release component, which simplifies the installation process, and the structural top is fixed to the shaft frame by snap-fit ​​component.

Benefits of technology

The structure of the shaft top is simple, easy to install, and has high strength. In addition, the decorative top can cover the connecting components and improve the aesthetics.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223592191U_ABST
    Figure CN223592191U_ABST
Patent Text Reader

Abstract

The utility model discloses a platform elevator shaft top structure which comprises a structural top, a decorative top, a first connecting piece, a second connecting piece and a quick release piece. The structural top is used for being installed in the top end opening, the decorative top is located in the top end opening and located below the structural top, the first connecting piece is connected with the structural top and comprises a first hanging ring part, the second connecting piece is connected with the decorative top and comprises a second hanging ring part, and the quick release piece is detachably connected to the first hanging ring part and the second hanging ring part. The connecting structure is simple in structure, convenient to install, high in structural strength, capable of shielding the connecting component through the decorative top and very attractive.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to platform elevator technical field, concretely relates to a platform elevator shaft top structure. BACKGROUND

[0002] With the improvement of home environment and the richness of people's life, the household elevators begin to equip in the resident house in large quantities, and for the multi-storey villa, the household elevators are essential. The elevator needs certain installation space, and the space inside the resident house is limited, so the household platform elevator becomes the first choice of the household elevator. The shaft top is the top component of the platform elevator, and its role is to seal the top end of the shaft frame, but the current shaft top has many parts, and the structure is complex, which is not conducive to installation and disassembly, and is also not beautiful.

[0003] The information disclosed in this BACKGROUND section is only for the purpose of increasing the understanding of the background of the present utility model and should not be regarded as an acknowledgement or any form of suggestion that this information forms prior art that is publicly known. CONTENT OF THE UTILITY MODEL

[0004] The utility model aims at providing a platform elevator shaft top structure, which is used to solve the problems of the complex structure of the current shaft top, the inconvenience of installation and disassembly and the unattractive appearance.

[0005] In order to achieve the above-mentioned purpose, one specific embodiment of the utility model provides a platform elevator shaft top structure for sealing the top opening of the shaft frame, which comprises a structure top, a decorative top, a first connecting piece, a second connecting piece and a quick release piece. The structure top is used to be installed into the top opening, the decorative top is located in the top opening and below the structure top, the first connecting piece is connected with the structure top, the first connecting piece comprises a first hanging ring part, the second connecting piece is connected with the decorative top, the second connecting piece comprises a second hanging ring part, and the quick release piece is detachably connected with the first hanging ring part and the second hanging ring part.

[0006] In one or more embodiments of the utility model, the first hanging ring part extends towards the decorative top.

[0007] In one or more embodiments of the utility model, the second hanging ring part extends towards the structure top.

[0008] In one or more embodiments of the utility model, the structure top comprises a main part connected with the inner wall of the shaft frame and a first extension part extending inward from the main part, and the first connecting piece further comprises a first plate part connected with the first extension part.

[0009] In one or more embodiments of the utility model, the second connecting piece further comprises a second plate part connected with the top surface of the decorative top.

[0010] In one or more embodiments of the present application, the platform elevator shaft top structure comprises four first connecting pieces, four second connecting pieces and four quick release pieces distributed in a rectangular shape.

[0011] In one or more embodiments of the present application, the quick release piece is a quick release buckle.

[0012] In one or more embodiments of the present application, the shaft frame comprises a clamping groove recessed from the inner wall thereof in the horizontal direction.

[0013] In one or more embodiments of the present application, the platform elevator shaft top structure further comprises a clamping assembly connected with the structure top and clamped in the clamping groove.

[0014] In one or more embodiments of the present application, the clamping assembly comprises a clamping portion clamped in the clamping groove and a rod portion penetrating the structure top in the horizontal direction from the clamping portion.

[0015] In one or more embodiments of the present application, the clamping assembly further comprises a nut located on the side of the structure top away from the clamping portion and threadedly connected with the rod portion.

[0016] In one or more embodiments of the present application, the clamping assembly further comprises a gasket sleeved on the rod portion, which is clamped between the nut and the structure top.

[0017] In one or more embodiments of the present application, the structure top comprises a waist hole for the rod portion to pass through, and the length of the waist hole in the horizontal direction is greater than the length thereof in the vertical direction.

[0018] In one or more embodiments of the present application, the platform elevator shaft top structure comprises a plurality of clamping assemblies arranged circumferentially along the structure top.

[0019] Compared with the prior art, the platform elevator shaft top structure of the present application has simple structure, convenient installation, strong structural strength, and can also use the decorative top to shield the connecting member, which is very beautiful. BRIEF DESCRIPTION OF DRAWINGS

[0020] In order to more clearly illustrate the technical scheme in the embodiments of the present application or the prior art, the drawings needed to be used in the following embodiment or prior art description will be briefly introduced. Obviously, the drawings in the following description are only some embodiments of the present application, and those skilled in the art can also obtain other drawings according to these drawings without creating any creative labor.

[0021] Figure 1 is a perspective view of the platform elevator shaft top structure in an embodiment of the present application;

[0022] Figure 2 isFigure 1 Partial enlarged view of part A;

[0023] Figure 3 It is an explosion structure view of the platform elevator shaft top structure in an embodiment of the utility model;

[0024] Figure 4 It is Figure 3 Partial enlarged view of part B;

[0025] Figure 5 It is an installation schematic view of the platform elevator shaft top structure in an embodiment of the utility model;

[0026] Figure 6 It is another installation schematic view of the platform elevator shaft top structure in an embodiment of the utility model.

[0027] Main figure mark explanation: 1, shaft frame, 11, clamping groove, 2, structure top, 21, main body part, 211, waist hole, 22, first extension part, 23, second extension part, 3, decorative top, 4, first connecting piece, 41, first hanging ring part, 42, first plate part, 5, second connecting piece, 51, second hanging ring part, 52, second plate part, 6, quick release piece, 7, clamping assembly, 71, T-shaped bolt, 711, clamping part, 712, rod part, 72, nut, 73, gasket. DETAILED DESCRIPTION

[0028] In order for those skilled in the art to better understand the technical solutions in the utility model, the technical solutions in the embodiments of the utility model will be clearly and completely described below in combination with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor should belong to the protection scope of the utility model.

[0029] In the description of the utility model, it is understood that the orientation or position relationship indicated by the terms "top", "bottom", "upper", "lower" and the like is the orientation or position relationship shown based on the drawings, and is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the utility model.

[0030] The terms "first", "second", "third", etc. are used only for descriptive purposes and should not be construed as implying or suggesting relative importance or an indicated number of technical features. Thus, features defined with "first", "second", etc. can explicitly or implicitly include one or more of the features. In the description of the present application, the meaning of "multiple" is two or more, unless otherwise explicitly specified.

[0031] In an embodiment, referring to Figures 1 to 6 The platform elevator shaft top structure is used for closing the top opening of the shaft frame 1, and comprises a structure top 2, a decorative top 3, a first connecting piece 4, a second connecting piece 5 and a quick release piece 6.

[0032] Further, the structure top 2 is a frame structure which is installed into the top opening, and the decorative top 3 is a plate structure which is located in the top opening and also below the structure top 2. The first connecting piece 4 is installed on the structure top 2 and comprises a first hanging ring part 41 and a first plate part 42 which are integrally connected, the first plate part 42 is connected with the structure top 2 and mutually adheres, and the first hanging ring part 41 is bent at a certain angle from the periphery of the first plate part 42. The second connecting piece 5 is installed on the decorative top 3 and comprises a second hanging ring part 51 and a second plate part 52 which are integrally connected, the second plate part 52 is connected with the decorative top 3 and mutually adheres, and the second hanging ring part 51 is bent at a certain angle from the periphery of the second plate part 52. The quick release piece 6 is detachably connected with the first hanging ring part 41 and the second hanging ring part 51, and the connection relationship between the quick release piece 6 and the first hanging ring part 41 and the second hanging ring part 51 is independent of each other, that is, during the assembly process of the platform elevator shaft top structure, the quick release piece 6 can be connected with only the first hanging ring part 41 within a certain time, or can be connected with only the second hanging ring part 51 within a certain time.

[0033] In an embodiment, referring to Figure 2 Further, the structure top 2 is a frame structure which is installed into the top opening, and the decorative top 3 is a plate structure which is located in the top opening and also below the structure top 2. The first connecting piece 4 is installed on the structure top 2 and comprises a first hanging ring part 41 and a first plate part 42 which are integrally connected, the first plate part 42 is connected with the structure top 2 and mutually adheres, and the first hanging ring part 41 is bent at a certain angle from the periphery of the first plate part 42. The second connecting piece 5 is installed on the decorative top 3 and comprises a second hanging ring part 51 and a second plate part 52 which are integrally connected, the second plate part 52 is connected with the decorative top 3 and mutually adheres, and the second hanging ring part 51 is bent at a certain angle from the periphery of the second plate part 52. The quick release piece 6 is detachably connected with the first hanging ring part 41 and the second hanging ring part 51, and the connection relationship between the quick release piece 6 and the first hanging ring part 41 and the second hanging ring part 51 is independent of each other, that is, during the assembly process of the platform elevator shaft top structure, the quick release piece 6 can be connected with only the first hanging ring part 41 within a certain time, or can be connected with only the second hanging ring part 51 within a certain time.

[0034] Further, the structure top 2 comprises four first extension parts 22 and four second extension parts 23, the four first extension parts 22 are respectively arranged on the four edges of the bottom of the main body part 21, and the four second extension parts 23 are respectively arranged on the four edges of the top of the main body part 21.

[0035] In other embodiments, the positions of the first extension part 22 and the second extension part 23 can also be interchanged.

[0036] In an embodiment, referring to Figure 2 The first plate part 42 of the first connecting piece 4 is connected to the top surface of the first extending part 22 and closely adheres to the top surface of the first extending part 22. The first hanging ring part 41 of the first connecting piece 4 extends downward from the edge of the first plate part 42 away from the main body part 21, i.e. the first hanging ring part 41 extends toward the decorative top 3. The extending direction of the first hanging ring part 41 is substantially parallel to the vertical direction, i.e. the included angle between the plane where the first plate part 42 is located and the plane where the first hanging ring part 41 is located is substantially 90°.

[0037] Further, the first plate part 42 of one first connecting piece 4 can be connected to two adjacent first extending parts 22 at the same time, which enhances the connecting strength of the first connecting piece 4 and the structural top 2.

[0038] Similarly, referring to Figure 2 The second plate part 52 of the second connecting piece 5 is connected to the top surface of the decorative top 3 and closely adheres to the top surface of the decorative top 3. The second hanging ring part 51 of the second connecting piece 5 extends upward from the edge of the second plate part 52, i.e. the second hanging ring part 51 extends toward the structural top 2. The extending direction of the second hanging ring part 51 is substantially parallel to the vertical direction, i.e. the included angle between the plane where the second plate part 52 is located and the plane where the second hanging ring part 51 is located is substantially 90°.

[0039] Further, in the assembled state, the first plate part 42 and the second hanging ring part 51 connected with the same quick release piece 6 are substantially located on the same vertical line.

[0040] In an embodiment, referring to Figure 2 The platform elevator shaft top structure includes four first connecting pieces 4, four second connecting pieces 5 and four quick release pieces 6 distributed in a rectangular manner and located at the four corners of the structural top 2 and the decorative top 3 respectively.

[0041] In an embodiment, referring to Figure 2 The quick release piece 6 is a quick release buckle.

[0042] In an embodiment, referring to Figure 3 and Figure 4 The shaft frame 1 includes a clamping groove 11 recessed from the inner wall of the shaft frame 1 in the horizontal direction. The platform elevator shaft top structure further includes a clamping assembly 7 connected with the structural top 2 and clamped in the clamping groove 11, and the structural top 2 is fixed to the inside of the shaft frame 1 through the clamping relationship between the clamping assembly 7 and the clamping groove 11.

[0043] Further, the clamping assembly 7 comprises a T-shaped bolt 71, a nut 73 and a washer 73. The head of the T-shaped bolt 71 forms a clamping portion 711 clamped in the clamping groove 11. The shank 712 of the T-shaped bolt 71 penetrates the main body 21 from the outside of the main body 21 of the structure top 2. The nut 73 is threadedly connected to the shank 712 from the inside of the structure top 2. The washer 73 is sleeved on the shank 712 and clamped between the nut 73 and the structure top 2.

[0044] Further, the shank 712 of the T-shaped bolt 71 penetrates the main body 21 of the structure top 2 in the horizontal direction.

[0045] Further, the nut 73 is a long strip-shaped nut.

[0046] Further, the main body 21 of the structure top 2 is provided with a waist hole 211 for the shank 712 to penetrate. The length of the waist hole 211 in the horizontal direction is greater than that in the vertical direction, so as to facilitate the adjustment of the position of the shank 712 of the T-shaped bolt 71 in the waist hole 211 in the horizontal direction.

[0047] In an embodiment, the platform elevator shaft top structure comprises a plurality of clamping assemblies 7 arranged circumferentially on the structure top 2. The plurality of clamping assemblies 7 are distributed at the four corners of the structure top 2. Each side of the structure top 2 can be provided with two clamping assemblies 7.

[0048] According to the above structure design, as shown in Figure 5 and Figure 6 When the platform elevator shaft top structure is installed, four first connecting members 4 are first installed at the designated positions of the structure top 2, and four second connecting members 5 are installed at the designated positions of the decorative top 3.

[0049] Then, the structure top 2 is installed in the shaft frame 1. Adjacent two first connecting members 4 are connected together with their corresponding two second connecting members 5 through two quick release members 6, and the decorative top 3 is temporarily hung.

[0050] Then, the decorative top 3 is driven to rotate around the above two second connecting members 5, so that the remaining two second connecting members 5 on the decorative top 3 are close to the structure top 2. Then, the remaining two first connecting members 4 and the two second connecting members 5 are connected together through the quick release members 6.

[0051] After the installation of the decorative top 3 is completed, when the decorative top 3 is viewed from the inside of the shaft, the hanging member cannot be seen from the gap of the side edge of the decorative top 3, which ensures the aesthetic appearance of the decorative top 3.

[0052] It is apparent for a person skilled in the art that the present application is not limited to the details of the above-described exemplary embodiments, but that it can be implemented in other concrete forms without departing from the spirit or the essential characteristics of the present application. Therefore, the embodiments should be considered as exemplary and non-limiting, the scope of the present application being defined by the claims appended hereto rather than by the above description, and all the changes which fall within the meaning and the scope of the equivalent elements of the claims are intended to be embraced therein. Any reference signs in the claims should not be construed as limiting the claims to the figures in which the reference signs are used.

[0053] Furthermore, it should be understood that, although the present specification is described according to the embodiments, not every embodiment contains only one independent technical solution, and the description manner of the specification is only for the sake of clarity, and a person skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be combined appropriately to form other embodiments which can be understood by a person skilled in the art.

Claims

1. A platform elevator shaft top structure for closing a top end opening of a shaft frame (1), characterized in that, The platform elevator shaft top structure comprises: a structure top (2) for being mounted into the top opening; a decorative top (3) located in the top opening and below the structure top (2); a first connecting piece (4) connected with the structure top (2), the first connecting piece (4) comprising a first hanging ring part (41); a second connecting piece (5) connected with the decorative top (3), the second connecting piece (5) comprising a second hanging ring part (51); a quick release piece (6) detachably connected with the first hanging ring part (41) and the second hanging ring part (51).

2. A platform elevator shaft top structure according to claim 1, characterized in that The first hanging ring part (41) extends towards the decorative top (3); and / or, The second hanging ring part (51) extends towards the structure top (2).

3. The platform elevator shaft top structure according to claim 1, characterized in that The structure top (2) comprises a main body part (21) connected with the inner wall of the shaft frame (1) and a first extension part (22) extending inwardly from the main body part (21), the first connecting piece (4) further comprising a first plate part (42) connected with the first extension part (22); and / or, The second connecting piece (5) further comprises a second plate part (52) connected with the top surface of the decorative top (3).

4. The platform elevator shaft top structure according to claim 1, characterized in that The platform elevator shaft top structure comprises four first connecting pieces (4), four second connecting pieces (5) and four quick release pieces (6) distributed in a rectangular manner.

5. The platform elevator shaft top structure according to claim 1, characterized in that The quick release piece (6) is a quick release buckle.

6. The platform elevator shaft top structure according to claim 1, characterized in that The shaft frame (1) comprises a clamping groove (11) recessed in the horizontal direction from the inner wall thereof; The platform elevator shaft top structure further comprises a clamping assembly (7) connected with the structure top (2) and clamped in the clamping groove (11).

7. A platform elevator shaft top structure according to claim 6, characterized in that The clamping assembly (7) comprises a clamping part (711) clamped in the clamping groove (11) and a rod part (712) extending through the structure top (2) in the horizontal direction from the clamping part (711).

8. A platform elevator shaft top structure according to claim 7, characterized in that The clamping assembly (7) further comprises a nut (72) located on the side of the structure top (2) away from the clamping part (711) and threadedly connected with the rod part (712).

9. A platform elevator shaft top structure according to claim 8, characterized in that The clamping assembly (7) further comprises a gasket (73) sleeved on the rod part (712), the gasket (73) being clamped between the nut (72) and the structure top (2).

10. The platform elevator shaft top structure according to claim 7, characterized in that The structure top (2) comprises a waist hole (211) for the rod part (712) to pass through, the waist hole (211) having a length in the horizontal direction greater than a length in the vertical direction; and / or, The platform elevator shaft top structure comprises a plurality of clamping assemblies (7) arranged circumferentially along the structure top (2).