Project cost consultation management progress monitoring device
By improving the structure of the engineering cost monitoring device, the problems of difficult device disassembly and long camera maintenance time in harsh construction environments have been solved, enabling rapid installation and maintenance and ensuring the accuracy of construction progress and cost calculation.
Patent Information
- Application Number
- CN202520240644.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-17
- Publication Date
- 2025-11-25
- Estimated Expiration
- 2035-02-17
AI Technical Summary
Existing construction cost monitoring devices are difficult to disassemble and install quickly in harsh construction environments. Cameras are easily damaged and require long repair times, resulting in discontinuous construction progress recording and affecting the accuracy of cost calculation.
An engineering cost consulting management progress monitoring device was designed, which includes a mounting plate, a fixing frame, a sliding clamp, and an adjusting threaded rod. The device enables quick disassembly and installation through components such as slots, fixing frames, and fastening threaded rods, facilitating camera inspection and replacement and reducing maintenance time.
The installation and dismantling efficiency of the device was improved in harsh construction environments, camera maintenance time was reduced, the continuity of construction progress records was ensured, and cost calculation errors were avoided.
Smart Images

Figure CN223595513U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to engineering cost technical field, concretely relates to a kind of engineering cost consultation management progress monitoring devices. BACKGROUND
[0002] Engineering cost refers to the total sum of all fees required for completing entire engineering construction in construction engineering, infrastructure construction and other projects.It includes various types of direct and indirect fees generated from project design, construction to completion, engineering cost is not only an important indicator to measure project cost, but also the basis of project management and decision-making, covering fees of labor, materials, mechanical equipment, management, design, supervision and other aspects, by optimizing design scheme, unnecessary cost expenditure is reduced, for example, more economical material and construction method are selected, management efficiency of construction site is improved, resource waste and time delay are reduced, material procurement is reasonably planned, more cost-effective material is selected, and the time and quantity of material procurement are reasonably ensured, by using advanced construction technology and equipment, construction efficiency is improved, time delay and material waste are reduced.
[0003] In order to better carry out progress management and cost accounting, monitoring device will be set in engineering construction process, in order to facilitate construction and ensure the clarity of monitoring device, the installation position of monitoring device needs to be changed many times in the whole construction process, general monitoring device is not easy to disassemble and install, when installation position is replaced in poor construction environment, more time is spent, work efficiency is reduced, in poor construction environment, camera is easily damaged, general monitoring device is not easy to repair and replace camera, camera repair time is long, construction progress is easy to appear long blank record, deviation is easy to appear in later cost calculation, in view of the above problems, the present application provides a kind of engineering cost consultation management progress monitoring device to solve. UTILITY MODEL CONTENT
[0004] To solve the above technical problems, provide a kind of engineering cost consultation management progress monitoring device, solve the above current in order to better carry out progress management and cost accounting, monitoring device will be set in engineering construction process, in order to facilitate construction and ensure the clarity of monitoring device, the installation position of monitoring device needs to be changed many times in the whole construction process, general monitoring device is not easy to disassemble and install, when installation position is replaced in poor construction environment, more time is spent, work efficiency is reduced, in poor construction environment, camera is easily damaged, general monitoring device is not easy to repair and replace camera, camera repair time is long, construction progress is easy to appear long blank record, deviation is easy to appear in later cost calculation.
[0005] The utility model discloses an engineering cost consultation management progress monitoring device, including the mounting plate, the lower side left and right two ends of mounting plate are all seted up with the clamping slot, the inside of two groups clamping slot is slidably connected with the fixed frame, the front side left and right two ends of fixed frame are all fixedly connected with the first fixed plate, the left and right two ends surface of fixed frame are all slidably connected with the sliding clamping plate, the front side outer end of first fixed plate is screwd with the adjusting screw rod, the front side fixed connection of adjusting screw rod has the knob, the front side of adjusting screw rod is through first fixed plate and is rotatably connected with the front side of sliding clamping plate, the left and right sides of fixed frame are all seted up with a plurality of threaded holes, the inside screw of threaded hole is connected with the fastening screw rod, the end of fastening screw rod is through the inside of threaded hole and is rotatably connected with the arc clamping plate, the outer end of fastening screw rod is through the inside of threaded hole and is fixedly connected with the connecting rod, the upper side outer end of connecting rod is clamped with the rotating rod, the left and right sides middle position of mounting plate are all slidably connected with the first slide.
[0006] Preferably, the outer side of the first slide is fixedly connected with a handle, the upper side outer end of the first slide is through seted up with a fixed hole, the left and right sides upper end of the mounting plate are all fixedly connected with the second fixed plate, the lower side center position of the second fixed plate is fixedly connected with the second telescopic rod, the lower side of the second telescopic rod is fixedly connected with the second slide, the surface of the second telescopic rod is sleeved with a spring, the upper side of the spring is fixedly connected with the lower side of the second fixed plate, the lower side of the spring is fixedly connected with the upper side of the second slide, the lower side center position of the second slide is fixedly connected with a fixed rod, and the inside of the fixed hole is slidably connected with the fixed rod.
[0007] Preferably, the end of the first slide is through the outer side of the mounting plate and is clamped with the inside of the clamping slot, and the lower side of the fixed frame is slidably connected with the upper side of the first slide.
[0008] Preferably, the front side lower end of the mounting plate is fixedly connected with a connecting plate, the lower side center position of the connecting plate is fixedly installed with a rotating motor, the output end of the rotating motor is through the lower side of the connecting plate and is fixedly connected with a mounting frame, and the inside of the mounting frame is fixedly installed with a camera main body.
[0009] Preferably, the front side of the sliding clamping plate is fixedly connected with a first telescopic rod away from one end of the adjusting screw rod, and the front side of the first telescopic rod is fixedly connected with the rear side of the first fixed plate.
[0010] Preferably, the inside rear side center position of the fixed frame is fixedly connected with a rear clamping plate.
[0011] Preferably, the front and rear sides of the arc clamping plate are both fixedly connected with a rectangular clamping plate.
[0012] Compared with the prior art, the utility model has the advantages that the utility model discloses a card slot, a fixing frame, a first fixed plate, a sliding clamping plate, an adjusting screw rod, an arc clamping plate, a rectangular clamping plate and a fastening screw rod can be conveniently disassembled and installed under poor construction environment, avoid spending more time, effectively improve work efficiency, through setting up the mounting plate, the first sliding plate, the handle, the fixed hole, the second fixed plate, the second telescopic rod, the second sliding plate, the spring and the fixed rod, can conveniently overhaul and replace the camera part, reduce the maintenance time of camera, avoid the long blank record of construction progress, prevent the deviation when calculating the cost in the later period. BRIEF DESCRIPTION OF DRAWINGS
[0013] Figure 1 It is the three-dimensional structure schematic diagram of the utility model;
[0014] Figure 2 It is the utility model Figure 1 The partial enlarged schematic diagram of A place in the utility model.
[0015] The figure mark is:
[0016] 1, mounting plate;2, connecting plate;3, rotating motor;4, mounting frame;5, camera main part;6, card slot;7, fixed frame;8, first fixed plate;9, sliding clamping plate;10, adjusting screw rod;11, knob;12, first telescopic rod;13, rear clamping plate;14, screw hole;15, fastening screw rod;16, arc clamping plate;17, rectangular clamping plate;18, connecting rod;19, rotating rod;20, first sliding plate;21, handle;22, fixed hole;23, second fixed plate;24, second telescopic rod;25, second sliding plate;26, spring;27, fixed rod. SPECIFIC EMBODIMENT
[0017] The following description is used to disclose the utility model to enable the person skilled in the art to realize the utility model. The preferred embodiment in the following description is only as an example, and other obvious variants can be thought of by the person skilled in the art.
[0018] Referring to Figures 1-2 As shown in the figure, an engineering cost consultation management progress monitoring device, including mounting plate 1, the front side lower end fixed connection of mounting plate 1 has connecting plate 2, the lower side center position of connecting plate 2 is fixedly installed with rotating motor 3, the output of rotating motor 3 is through the lower side of connecting plate 2 and is fixedly connected with mounting frame 4, and the inside of mounting frame 4 is fixedly installed with camera main part 5.
[0019] Specific, the lower side of the mounting plate 1 both ends are provided with clamping groove 6, two groups of clamping groove 6 inside the sliding connection has a fixed frame 7, the front side of the fixed frame 7 both ends are fixedly connected with the first fixed plate 8, the left and right ends of the fixed frame 7 surface are slidably connected with the sliding clamping plate 9, the front side of the first fixed plate 8 outer end is threadedly connected with the adjusting screw rod 10, the front side of the adjusting screw rod 10 is fixedly connected with the knob 11, the end of the adjusting screw rod 10 penetrates the front side of the first fixed plate 8 and is rotatably connected with the front side of the sliding clamping plate 9, which can effectively fix the device in the front and rear direction, the front side of the sliding clamping plate 9 away from the end of the adjusting screw rod 10 is fixedly connected with the first telescopic rod 12, the front side of the first telescopic rod 12 is fixedly connected with the rear side of the first fixed plate 8, the rear side of the fixed frame 7 is fixedly connected with the rear clamping plate 13, the left and right sides of the fixed frame 7 are provided with a plurality of threaded holes 14, the threaded holes 14 are threadedly connected with the fastening screw rod 15, the end of the fastening screw rod 15 penetrates the inside of the threaded hole 14 and is rotatably connected with the arc clamping plate 16, which facilitates the device to be fixed on the cylinder, the front and rear sides of the arc clamping plate 16 are fixedly connected with the rectangular clamping plate 17, which facilitates the device to be fixed on the position with flat surface, the outer end of the fastening screw rod 15 penetrates the inside of the threaded hole 14 and is fixedly connected with the connecting rod 18, the upper side of the connecting rod 18 is clamped with the rotating rod 19, which can effectively fix the device in the left and right directions.
[0020] Specific, the left and right sides of the mounting plate 1 are slidably connected with the first sliding plate 20, the end of the first sliding plate 20 penetrates the outside of the mounting plate 1 and is clamped with the inner side of the clamping groove 6, the lower side of the fixed frame 7 is slidably connected with the upper side of the first sliding plate 20, the outer side of the first sliding plate 20 is fixedly connected with the handle 21, the upper side of the first sliding plate 20 is provided with a fixed hole 22, the left and right sides of the mounting plate 1 are fixedly connected with the second fixed plate 23, the lower side of the second fixed plate 23 is fixedly connected with the second telescopic rod 24, the lower side of the second telescopic rod 24 is fixedly connected with the second sliding plate 25, the surface of the second telescopic rod 24 is sleeved with the spring 26, the upper side of the spring 26 is fixedly connected with the lower side of the second fixed plate 23, the lower side of the spring 26 is fixedly connected with the upper side of the second sliding plate 25, the lower side of the second sliding plate 25 is fixedly connected with the fixed rod 27, the fixed rod 27 is slidably connected with the inside of the fixed hole 22, which facilitates the camera body 5 to be separated for maintenance and replacement, reducing the maintenance time.
[0021] Working principle: after determining the installation position, place the installation plate 1 in front of the installation position, place the fixing frame 7 behind the installation position and install it in the clamping groove 6, make the front side of the rear clamping plate 13 abut against the installation position, insert the first sliding plate 20, under the elastic force of the spring 26, the second sliding plate 25 and the fixing rod 27 move downward, the fixing rod 27 is inserted into the fixing hole 22, the connection of the installation plate 1 and the fixing frame 7 is completed, rotate the knob 11, adjust the threaded rod 10 to drive the sliding clamping plate 9 to move backward and apply backward pressure on the installation plate 1, the device is fixed between the installation plate 1 and the fixing frame 7, before installing the fixing frame 7, select the appropriate threaded hole 14 and install the fastening threaded rod 15, after the rotation of the knob 11 is completed, rotate the rotating rod 19 on both sides to make the fastening threaded rod 15 rotate, the arc-shaped clamping plate 16 and the rectangular clamping plate 17 move inward to apply a certain lateral fixing force on the installation position, so that the device is effectively fixed, if the camera main body 5 needs to be disassembled for maintenance and replacement, pull the second sliding plate 25 upward, take out the first sliding plate 20 through the handle 21, rotate the knob 11 to make the sliding clamping plate 9 move forward by a certain distance, and finally slide the installation plate 1 upward to take down the camera main body 5, if the installation position needs to be replaced, after taking down the installation plate 1, the fixing frame 7 is fixed by the lateral fixing force applied by the arc-shaped clamping plate 16 and the rectangular clamping plate 17 on both sides, rotate the rotating rod 19 on both sides to make the fastening threaded rod 15 rotate, the arc-shaped clamping plate 16 and the rectangular clamping plate 17 move outward, take down the fixing frame 7 and move to the corresponding installation position.
[0022] The basic principle, main features and advantages of the present application are shown and described above. Those skilled in the art should understand that the present application is not limited by the above embodiments, and the above embodiments and descriptions in the specification are only the principles of the present application. Without departing from the spirit and scope of the present application, various changes and improvements can be made to the present application, and these changes and improvements all fall within the scope of the claimed present application. The scope of protection required by the present application is defined by the appended claims and their equivalents.
Claims
1. An engineering cost consulting management progress monitoring device comprising a mounting plate (1), characterized in that: The lower side of the mounting plate (1) is provided with a clamping groove (6) at both ends, and the inside of the two groups of clamping grooves (6) is slidably connected with a fixing frame (7), the left and right ends of the front side of the fixing frame (7) are fixedly connected with a first fixed plate (8), the left and right ends of the surface of the fixing frame (7) are slidably connected with a sliding clamping plate (9), the outer end of the front side of the first fixed plate (8) is threadedly connected with an adjusting threaded rod (10), the front side of the adjusting threaded rod (10) is fixedly connected with a knob (11), the end of the adjusting threaded rod (10) penetrates the front side of the first fixed plate (8) and is rotatably connected with the front side of the sliding clamping plate (9), the left and right sides of the fixing frame (7) are provided with a plurality of threaded holes (14), the inside of the threaded hole (14) is threadedly connected with a fastening threaded rod (15), the end of the fastening threaded rod (15) penetrates the inside of the threaded hole (14) and is rotatably connected with an arc-shaped clamping plate (16), the outer end of the fastening threaded rod (15) penetrates the inside of the threaded hole (14) and is fixedly connected with a connecting rod (18), the upper side of the outer end of the connecting rod (18) is clamped with a rotating rod (19), and the left and right sides of the mounting plate (1) are slidably connected with a first sliding plate (20).
2. The project cost consulting management progress monitoring device according to claim 1, characterized in that: The outer side of the first sliding plate (20) is fixedly connected with a handle (21), the upper side of the outer end of the first sliding plate (20) is provided with a fixed hole (22), the left and right sides of the upper end of the mounting plate (1) are fixedly connected with a second fixed plate (23), the lower side of the central position of the second fixed plate (23) is fixedly connected with a second telescopic rod (24), the lower side of the second telescopic rod (24) is fixedly connected with a second sliding plate (25), the surface of the second telescopic rod (24) is sleeved with a spring (26), the upper side of the spring (26) is fixedly connected with the lower side of the second fixed plate (23), the lower side of the spring (26) is fixedly connected with the upper side of the second sliding plate (25), and the lower side of the central position of the second sliding plate (25) is fixedly connected with a fixed rod (27). The inside of the fixed hole (22) is slidably connected with the fixed rod (27).
3. The project cost consulting management progress monitoring device according to claim 1, characterized in that: The end of the first sliding plate (20) penetrates the outside of the mounting plate (1) and is clamped with the inside of the clamping groove (6), and the lower side of the fixing frame (7) is slidably connected with the upper side of the first sliding plate (20).
4. The project cost consulting management progress monitoring device according to claim 1, characterized in that: The lower end of the front side of the mounting plate (1) is fixedly connected with a connecting plate (2), the central position of the lower side of the connecting plate (2) is fixedly installed with a rotating motor (3), the output end of the rotating motor (3) penetrates the lower side of the connecting plate (2) and is fixedly connected with a mounting frame (4), and the inside of the mounting frame (4) is fixedly installed with a camera body (5).
5. The project cost consulting management progress monitoring device according to claim 1, characterized in that: The front side of the sliding clamping plate (9) is fixedly connected with a first telescopic rod (12) away from one end of the adjusting threaded rod (10), and the front side of the first telescopic rod (12) is fixedly connected with the rear side of the first fixed plate (8).
6. The project cost consulting management progress monitoring device according to claim 1, characterized in that: The inside of the rear side of the fixing frame (7) is fixedly connected with a rear clamping plate (13).
7. The project cost consulting management progress monitoring device according to claim 1, characterized in that: The front and rear sides of the arc-shaped clamping plate (16) are fixedly connected with a rectangular clamping plate (17).