Indoor and outdoor multi-layer aerial rope net structure

The design of the sleeve and fixing components simplifies the installation process of the aerial rope net, solves the problem of cumbersome installation in the existing technology, improves efficiency and reduces costs.

CN223601924UActive Publication Date: 2025-11-28ZHEJIANG XINYUE AMUSEMENT EQUIPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520303172.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-25
Publication Date
2025-11-28
Estimated Expiration
2035-02-25

AI Technical Summary

Technical Problem

The installation process of existing aerial rope net structures is cumbersome, requiring professional teams and complex tools, resulting in low installation efficiency and high costs.

Method used

The design employs a sleeve and fixing components, and simplifies the installation process through the combination of left mounting rod, right mounting rod and side rod, using connecting and fixing components, including threaded grooves, threaded joints, fastening rings and bolts, to achieve rapid installation.

Benefits of technology

It improved the installation efficiency of aerial rope nets, simplified the operation process, and reduced labor and time costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223601924U_ABST
    Figure CN223601924U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of rope nets, and particularly relates to an indoor and outdoor multi-layer aerial rope net structure which comprises a plurality of supporting rods and a rope net whole, sleeves are arranged on the left side, the right side, the front side and the rear side of the rope net whole, and a left mounting rod and a right mounting rod are arranged in the sleeves on the left side and the right side of the rope net whole in a penetrating mode. Side rods are arranged in the sleeves on the front side and the rear side of the whole rope net in a penetrating mode, and fixing assemblies are arranged at the ends, penetrating out of the sleeves, of the left mounting rod and the right mounting rod. The rope net in the air can be conveniently installed by installing the fixing assembly, firstly, the left installation rod and the right installation rod are arranged in the sleeves in a penetrating mode, then the side rods are arranged in the sleeves on the front side and the rear side of the whole rope net in a penetrating mode, and then the second fastening rings on the left installation rod and the right installation rod are clamped on the supporting rods. And then the side rod is pulled to drive the rope net to integrally stretch on the left mounting rod and the right mounting rod, limiting is conducted through the first fastening ring after stretching is completed, operation is easy and convenient, and the mounting efficiency of the aerial rope net is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of rope net, concretely to an indoor and outdoor multilayer aerial rope net structure. BACKGROUND

[0002] The indoor and outdoor multilayer aerial rope net structure is a facility combining entertainment, sports and education functions, and is usually used to build places such as children's playgrounds, outdoor adventure parks and sports training centers. The rope net uses high-strength ropes and net surface materials, and sets up safety nets, safety belts and other protective measures to ensure the safety of users during use. Meanwhile, the rope net structure is built into multiple levels of space through ropes, net surfaces and support frames, providing a challenging and enjoyable environment for users.

[0003] However, the existing aerial rope net structure often needs professional installation teams and complex tools during installation, which makes the installation process cumbersome and consumes a large amount of manpower and time. This not only leads to low installation efficiency of the aerial rope net structure but also increases installation costs. Therefore, it is necessary to develop an indoor and outdoor multilayer aerial rope net structure to improve the installation efficiency of the aerial rope net. SUMMARY

[0004] The utility model aims to provide an indoor and outdoor multilayer aerial rope net structure to solve the technical problem of low installation efficiency of the aerial rope net mentioned in the background.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: an indoor and outdoor multilayer aerial rope net structure, comprising a plurality of support rods and a rope net whole, sleeve is arranged on the left and right front and back sides of the rope net whole, a left installation rod and a right installation rod are arranged in the sleeves on the left and right sides of the rope net whole, and one end of the left installation rod and the right installation rod penetrates out of the sleeve, a connecting assembly is arranged on the left installation rod and the right installation rod, the left installation rod and the right installation rod are connected through the connecting assembly, a side rod is arranged in the sleeves on the front and back sides of the rope net whole, and both ends of the side rod penetrate out of the sleeve, a fixing assembly is arranged on the end of the left installation rod and the right installation rod penetrating out of the sleeve, the left installation rod and the right installation rod are connected with the adjacent right installation rod through the fixing assembly, and the rope net whole is installed on the frame composed of a plurality of support rods through the fixing assembly.

[0006] Preferably, the connecting assembly comprises a threaded groove and a threaded joint, the threaded groove is arranged at one end of the right installation rod, the threaded joint is screw-mounted in the threaded groove, and one end of the threaded joint is fixedly connected to one end of the left installation rod.

[0007] Preferably, the fixing assembly comprises a first fastening ring, a second fastening ring and a bolt, the first fastening ring is fixedly installed at the bottom end of the left mounting rod and the right mounting rod respectively, and the left mounting rod and the right mounting rod are installed on the adjacent side rod through the first fastening ring, the second fastening ring is fixedly installed at the side of the left mounting rod and the right mounting rod respectively, and the left mounting rod and the right mounting rod are installed on the support rod through the second fastening ring, and the bolt is arranged on the first fastening ring and the second fastening ring respectively, and the first fastening ring and the second fastening ring are fastened through the bolt.

[0008] Preferably, the rope net is provided with a plurality of layers, and the rope net is sequentially installed on the support rod through the retaining assembly.

[0009] Preferably, the rope net is provided with a rope net cylinder, and the rope net cylinders of each layer are connected through the rope net.

[0010] Preferably, the rope net is provided with a notch, and the bottom end of the notch is provided with a slide.

[0011] Compared with the prior art, the utility model has the advantages that:

[0012] 1. The utility model discloses a fixing assembly is installed, and the rope net in the air is installed conveniently, first, the left mounting rod and the right mounting rod are worn in the sleeve of the left and right sides of the rope net, then the left mounting rod and the right mounting rod are connected together through the connecting assembly, then the side rod is worn in the sleeve of the front and rear sides of the rope net, then the second fastening ring on the left mounting rod and the right mounting rod is clamped on the support rod, and the second fastening ring is fastened through the tool bolt, so that the rope net is stably installed on the support rod, then the side rod on both sides is pulled, and the rope net is stretched on the left mounting rod and the right mounting rod through the side rod, after stretching, the first fastening ring is clamped on the adjacent left mounting rod or right mounting rod, then the bolt on the first fastening ring is rotated through the tool, and the first fastening ring is fastened, so that the stretched rope net is fixed, and the installation efficiency of the rope net in the air is further improved. ACCURATE DRAWINGS

[0013] Figure 1 It is the overall structure schematic diagram of the utility model;

[0014] Figure 2 It is the rope net overall structure schematic diagram of the utility model;

[0015] Figure 3 It is Figure 2 It is the enlarged schematic diagram of the structure A;

[0016] Figure 4 It is the connecting pipe partial structure schematic diagram of the utility model.

[0017] In the figure: 1, support rod; 2, rope net whole; 3, sleeve; 4, left mounting rod; 5, right mounting rod; 6, threaded groove; 7, threaded joint; 8, No. 1 fastening ring; 9, No. 2 fastening ring; 10, bolt; 11, rope net cylinder; 12, notch; 13, slide; 14, side rod. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0019] Please refer to Figure 1 - Figure 4The utility model relates to an indoor and outdoor multilayer aerial rope net structure, including a plurality of support pole 1 and rope net whole 2, the left and right front and back sides of rope net whole 2 are provided with sleeve 3, the sleeve 3 of left and right sides of rope net whole 2 is equipped with left installation pole 4 and right installation pole 5, and the one end of left installation pole 4 and right installation pole 5 is all penetrated out of sleeve 3, and left installation pole 4 and right installation pole 5 are provided with connecting assembly, and left installation pole 4 and right installation pole 5 are connected through connecting assembly, the sleeve 3 of front and back sides of rope net whole 2 is equipped with side pole 14, and the both ends of side pole 14 are all penetrated out of sleeve 3, and the one end of left installation pole 4 and right installation pole 5 that penetrates out of sleeve 3 is all provided with fixed assembly, and left installation pole 4 and right installation pole 5 are connected with adjacent right installation pole 5 through fixed assembly, and simultaneously, rope net whole 2 is installed on the frame that a plurality of support pole 1 is formed through fixed assembly, and fixed assembly includes fastening ring 8, fastening ring 9 and bolt 10, fastening ring 8 is fixedly installed at the bottom of left installation pole 4 and right installation pole 5 respectively, and left installation pole 4 and right installation pole 5 are installed on adjacent side pole 14 through fastening ring 8, fastening ring 9 is fixedly installed at the side of left installation pole 4 and right installation pole 5 respectively, and left installation pole 4 and right installation pole 5 are installed on support pole 1 through fastening ring 9, and bolt 10 is arranged on fastening ring 8 and fastening ring 9 respectively, and fastening ring 8 and fastening ring 9 are fastened through bolt 10, and rope net whole 2 is provided with multilayer, and rope net whole 2 is installed on support pole 1 in turn through retaining assembly, and the indoor and outdoor multilayer aerial rope net structure is a facility that combines entertainment, sports and education functions, is usually used to build children's park, outdoor adventure park, sports training center and other places, and the rope net structure is built into multilayer space through rope, net surface, support frame and other materials, provides a challenging and fun environment for users, but the existing aerial rope net structure often needs professional installation team and complex tool when installing, which makes the installation process cumbersome, and also consumes a lot of manpower and time, which not only leads to the low installation efficiency of the aerial rope net structure, but also increases the installation cost, when installing the aerial rope net, first, left installation pole 4 and right installation pole 5 are penetrated in the sleeve 3 of the left and right sides of the rope net whole 2, then left installation pole 4 and right installation pole 5 are connected together through connecting assembly, then side pole 14 is penetrated in the sleeve 3 of the front and back sides of the rope net whole 2, then the fastening ring 9 on left installation pole 4 and right installation pole 5 is clamped on support pole 1, fastening ring 9 is fastened through the tool rotation bolt 10, so that the rope net whole 2 is stably installed on support pole 1, then pull the side pole 14 on both sides, drive the rope net whole 2 to stretch on left installation pole 4 and right installation pole 5 through side pole 14, after stretching, fastening ring 8 is clamped on adjacent left installation pole 4 or right installation pole 5, then the bolt 10 on fastening ring 8 is rotated through the tool, and fastening ring 8 is fastened, so that the stretched rope net whole 2 is shaped and fixed (the same operation is carried out on other layers of rope net whole 2),The operation is simple and convenient, and the installation efficiency of the aerial rope net is further improved.

[0020] Please refer to Figure 4 The connecting assembly comprises a threaded groove 6 and a threaded joint 7, the threaded groove 6 is arranged at one end of the right mounting rod 5, the threaded joint 7 is threadedly mounted in the threaded groove 6, and one end of the threaded joint 7 is fixedly connected to one end of the left mounting rod 4. When the left mounting rod 4 and the right mounting rod 5 are connected, the threaded joint 7 is inserted into the threaded groove 6, and then the left mounting rod 4 is rotated to make the threaded joint 7 enter the threaded groove 6, so that the left mounting rod 4 and the right mounting rod 5 are connected. The left mounting rod 4 and the right mounting rod 5 connected through the connecting assembly make the operation of inserting into the sleeve 3 more convenient.

[0021] Please refer to Figure 1 The rope net body 2 is provided with rope net cylinders 11, and the rope net cylinders 11 of each layer are connected by ropes. The rope net body 2 is provided with a notch 12, and the bottom end of the notch 12 is provided with a slide 13. The rope net cylinders 11 connected by multiple layers of ropes can facilitate tourists to climb from the lower layer or the upper layer to another layer. The slide 13 is used for sliding from the rope net body 2 of the previous layer to the rope net body 2 of the next layer. The notch 12 provides a passage for the slide 13, and the rope net is more interesting through the rope net cylinders 11 and the slide 13.

[0022] When the aerial rope net is installed, first, the left mounting rod 4 and the right mounting rod 5 are inserted into the sleeves 3 on the left and right sides of the rope net body 2, then the left mounting rod 4 and the right mounting rod 5 are connected together through the connecting assembly, then the side rods 14 are inserted into the sleeves 3 on the front and rear sides of the rope net body 2, then the second fastening ring 9 on the left mounting rod 4 and the right mounting rod 5 is clamped on the support rod 1, the bolt 10 is rotated by a tool to fasten the second fastening ring 9, so that the rope net body 2 is stably installed on the support rod 1, then the side rods 14 on both sides are pulled, the rope net body 2 is stretched on the left mounting rod 4 and the right mounting rod 5 by moving the side rods 14, after stretching, the first fastening ring 8 is clamped on the adjacent left mounting rod 4 or right mounting rod 5, then the bolt 10 on the first fastening ring 8 is rotated by a tool to fasten the first fastening ring 8, so that the stretched rope net body 2 is fixed in shape (the same operation is performed on the other layers of rope net bodies 2). The operation is simple and convenient, and the installation efficiency of the aerial rope net is further improved.

[0023] It is apparent for a person skilled in the art that the present application is not restricted to the details of the above exemplary embodiments, but that it can be implemented in other concrete forms without departing from the spirit or the essential characteristics of the present application. Therefore, the embodiments should be considered as exemplary only, and not limiting, the scope of the present application being defined by the appended claims rather than the above description, and all changes coming within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference signs in the claims should not be construed as limiting the claims concerned.

Claims

1. An indoor and outdoor multi-layer aerial net structure comprising a plurality of support poles (1) and a net whole (2), characterized in that: The left and right front and back sides of the rope net whole (2) are provided with sleeves (3), the left and right sleeves (3) of the rope net whole (2) are provided with left mounting rods (4) and right mounting rods (5), one end of the left mounting rod (4) and the right mounting rod (5) penetrates out of the sleeve (3), the left mounting rod (4) and the right mounting rod (5) are provided with connecting assemblies, the left mounting rod (4) and the right mounting rod (5) are connected through the connecting assemblies, the sleeves (3) of the front and back sides of the rope net whole (2) are provided with side rods (14), and both ends of the side rod (14) penetrate out of the sleeve (3), one end of the left mounting rod (4) and the right mounting rod (5) penetrating out of the sleeve (3) is provided with a fixing assembly, the left mounting rod (4) and the right mounting rod (5) are connected with the adjacent right mounting rod (5) through the fixing assembly, and the rope net whole (2) is installed on the frame body composed of a plurality of supporting rods (1) through the fixing assembly.

2. An indoor and outdoor multi-layered aerial rope net structure according to claim 1, characterized in that: The connecting assembly comprises a threaded groove (6) and a threaded joint (7), the threaded groove (6) is arranged at one end of the right mounting rod (5), and the threaded joint (7) is threadedly installed in the threaded groove (6), and one end of the threaded joint (7) is fixedly connected to one end of the left mounting rod (4).

3. An indoor and outdoor multi-layered aerial rope net structure according to claim 1, characterized in that: The fixing assembly comprises a first fastening ring (8), a second fastening ring (9) and a bolt (10), the first fastening ring (8) is fixedly installed at the bottom end of the left mounting rod (4) and the right mounting rod (5) respectively, and the left mounting rod (4) and the right mounting rod (5) are installed on the adjacent side rod (14) through the first fastening ring (8), the second fastening ring (9) is fixedly installed on the side edge of the left mounting rod (4) and the right mounting rod (5) respectively, and the left mounting rod (4) and the right mounting rod (5) are installed on the supporting rod (1) through the second fastening ring (9), and the bolt (10) is arranged on the first fastening ring (8) and the second fastening ring (9) respectively, and the first fastening ring (8) and the second fastening ring (9) are fastened through the bolt (10).

4. An indoor and outdoor multi-layered aerial rope net structure according to claim 1, characterized in that: The rope net whole (2) is provided with multiple layers, and the rope net whole (2) is installed on the supporting rod (1) in sequence through the retaining assembly.

5. The indoor and outdoor multi-layered aerial rope net structure according to claim 1, characterized in that: The rope net whole (2) is provided with a rope net cylinder (11), and each layer of the rope net cylinder (11) is connected through the rope net.

6. An indoor and outdoor multi-layered aerial rope net structure according to claim 1, characterized in that: The rope net whole (2) is provided with a notch (12), and the bottom end of the notch (12) is provided with a slide (13).