Energy-saving steam boiler with preheating system
The combination of float and sealing plate enables automated water supply to the steam boiler. Combined with filter screen to remove impurities, it solves the problem of wasted time when the water supply of existing steam boilers is insufficient, and improves the efficiency and energy saving effect.
Patent Information
- Application Number
- CN202422995610.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-05
- Publication Date
- 2025-11-28
- Estimated Expiration
- 2034-12-05
AI Technical Summary
Existing steam boilers require the electric heating electrodes to be gradually shut off or the external water supply to be restored when the water supply is insufficient, resulting in wasted time and poor performance.
Design an energy-saving steam boiler with a preheating system. The boiler utilizes a combination of a float and a sealing plate to achieve automated water supply. It also filters impurities using a filter screen, automatically replenishes water by moving the float, and preheats the water by installing heating wires in the storage tank.
It achieves automated water supply, avoids scale buildup, improves efficiency and energy saving, and reduces wasted time.
Smart Images

Figure CN223610096U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to steam boiler technical field, concretely is an energy -saving steam boiler with preheating system. BACKGROUND
[0002] Steam boiler is a kind of energy conversion equipment, its main function is to convert the chemical energy, electric energy or other forms of energy into the heat energy in steam, the steam generated by steam boiler can be used for the heating system of building. Steam is transported to radiator or floor heating system through pipeline, releases heat energy, to heat indoor space;
[0003] The existing steam boiler is heated to water, to make water produce hot air after heating, to reach the purpose of temperature rise, but, water in steam boiler will form water vapor after heating and cause loss, so it needs to be regularly considered manually add water, to cause the inconvenience of use;
[0004] To solve the above-mentioned defects, the utility model discloses a one-piece full-automatic electric heating steam boiler with the publication number CN212841490U, which has an upper water tank and a lower water tank in the boiler body, and uses a circulating water supply system to balance the water volume of the upper and lower water tanks. When the external water supply is insufficient, the lower water tank supplies water to the upper water tank for a period of time, and then gradually closes the electric heating electrode or waits for the external water supply to recover. This solves the problem that ordinary steam boilers cannot disconnect the electric heating device in the boiler in time when the water supply is insufficient, which can easily cause the water volume in the steam boiler to decrease rapidly and cause the electric heating electrode to burn out when the water supply is insufficient due to unexpected circumstances.
[0005] In the actual use of the above device, although automatic water supply is possible, the electric heating electrode needs to be gradually closed or the external water supply needs to be completed before it can be restored during water supply, which results in a large amount of time wasted during water supply, thus making the use effect poor.
[0006] Therefore, we propose an energy-saving steam boiler with a preheating system to solve the above problems. Utility model content
[0007] The utility model aims at providing an energy-saving steam boiler with a preheating system to solve the problem that the electric heating electrode needs to be gradually closed or the external water supply needs to be completed before it can be restored during water supply, which results in a large amount of time wasted during water supply, thus making the use effect poor.
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: an energy-saving steam boiler with a preheating system, comprising a steam boiler body, the bottom of the steam boiler body is placed on the ground;
[0009] Also includes:
[0010] The left end of the steam boiler body is fixed with a water storage tank, and the left end flange of the water storage tank is connected with a first water pipe, and the bottom of the first water pipe is connected with the left end of the steam boiler body, a floating ball is slidably connected in the steam boiler body, the top of the floating ball is connected with a first pull rope, and the left end of the first pull rope is connected with the top of the sealing plate, the sealing plate slides in the first water pipe to form a sealing mechanism, the top of the sealing plate is connected with a first spring, and the top of the first spring is connected in the first water pipe.
[0011] Preferably, the bottom of the floating ball is hollow, and the top of the floating ball extends into the steam boiler body.
[0012] Preferably, the middle of the first pull rope is attached with a roller, and the bottom of the roller is rotatably connected to the outside of the left end of the steam boiler body.
[0013] Preferably, the left end of the steam boiler body is connected with a second water pipe, and a filter screen is slidably connected in the second water pipe, and the filter screen is made of bamboo charcoal fiber.
[0014] Preferably, the top of the filter screen is attached with a limiting plate, and the bottom of the limiting plate is slidably connected in the second water pipe.
[0015] Preferably, the inside of the limiting plate is slidably connected with a protrusion, the bottom of the outer end of the protrusion is arc-shaped, and the outer end of the protrusion extends into the inside of the groove to form a clamping mechanism.
[0016] Preferably, the inner end of the protrusion is connected with a second spring, the inner end of the second spring is connected in the inside of the limiting plate, and the inner end of the protrusion is connected with a second pull rope, the top of the second pull rope extends into the inside of the limiting plate to form a sliding mechanism.
[0017] Compared with the prior art, the energy-saving steam boiler with preheating system has good water supply effect and can avoid the generation of water scale, and through the movement of the floating ball, the purpose of automatic water supply can be achieved, so that the water can be automatically replenished during the operation of the steam boiler body, thereby improving the use effect, and through the use of the filter screen, the impurities in the water can be separated, thereby avoiding the generation of water scale, and the specific content is as follows:
[0018] (1) A float ball is provided. When the water volume decreases, the float ball will move downward, which will cause the sealing plate to move. This allows the water in the first water pipe to be automatically replenished into the steam boiler body, thus avoiding the temperature drop caused by a sudden large amount of water injection. It can also automatically replenish water, thereby improving the performance. In addition, the water storage tank contains a heating wire, which will keep the water in the water storage tank in a warm state, thus achieving the function of preheating the water in the water storage tank before water injection.
[0019] (2) A filter screen is provided. The water flow through the filter screen can separate impurities in the water, so that cleaner water can flow into the steam boiler body for heating, thereby preventing impurities from entering the steam boiler body and forming scale.
[0020] (3) A roller is provided, and the roller is attached to the middle of the first pull rope. The bottom of the roller is rotatably connected to the outside of the left end of the steam boiler body. The roller can reduce the wear of the first pull rope sliding, thereby improving the service life of the first pull rope.
[0021] (4) A protrusion is provided, which is slidably connected to the inside of the limiting plate. The bottom of the outer end of the protrusion is arc-shaped, and the outer end of the protrusion extends into the inside of the groove to form a locking mechanism. Then, the position of the limiting plate can be fixed by the locking of the protrusion and the groove, so that the limiting plate can be stably fixed on the second water pipe.
[0022] (5) A second spring is provided, and the inner end of the protrusion is connected to the second spring. The inner end of the second spring is connected to the inside of the limiting plate, and the inner end of the protrusion is connected to the second pull rope. The top of the second pull rope extends out of the inside of the limiting plate to form a sliding mechanism. The protrusion can be limited by the second spring, thereby improving the stability of the protrusion. Attached Figure Description
[0023] Figure 1 This is a front view structural diagram of the present invention;
[0024] Figure 2 This is a side view of the structure of this utility model;
[0025] Figure 3 This is a front view schematic diagram of the float structure of this utility model;
[0026] Figure 4 This is a front view structural diagram of the sealing plate of this utility model;
[0027] Figure 5 This is a front view structural diagram of the filter screen of this utility model;
[0028] Figure 6The utility model discloses a limiting plate positive section structure schematic diagram.
[0029] In the figure: 1, steam boiler body; 2, water storage tank; 3, first water pipe; 4, float ball; 5, first pull rope; 6, roller; 7, sealing plate; 8, first spring; 9, second water pipe; 10, filter screen; 11, limiting plate; 12, lug; 13, recess; 14, second spring; 15, second pull rope. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model and not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.
[0031] Embodiment one: the utility model solves the problem that the existing water supply needs to gradually close the electric heating pole or wait for the completion of external water supply before recovery, so as to cause a large amount of time waste in water supply, thereby making the use effect poor. The automatic water injection purpose can be achieved through the movement of the sealing plate 7, and the utility model discloses:
[0032] The steam boiler body 1 is placed on the ground at the bottom; further includes: the left end of the steam boiler body 1 is fixed with the water storage tank 2, and the left end flange of the water storage tank 2 is connected with the first water pipe 3, and the bottom of the first water pipe 3 is connected with the left end of the steam boiler body 1, the inside of the steam boiler body 1 is slidably connected with the float ball 4, the top of the float ball 4 is connected with the first pull rope 5, and the left end of the first pull rope 5 is connected with the top of the sealing plate 7, the sealing plate 7 is slidably connected in the inside of the first water pipe 3 to form a sealing mechanism, the top of the sealing plate 7 is connected with the first spring 8, and the top of the first spring 8 is connected in the inside of the first water pipe 3, the bottom of the float ball 4 is hollow, the top of the float ball 4 extends into the inside of the steam boiler body 1, the middle of the first pull rope 5 is attached with the roller 6, and the bottom of the roller 6 is rotatably connected to the outside of the left end of the steam boiler body 1.
[0033] REFERENCE Figures 1 to 4, the water source inside the steam boiler body 1 can be heated by the gas, so that water vapor is formed, so that the purpose of heating is achieved, and after the water source is reduced, the water level will be lowered, thereby driving the floating ball 4 to move, thereby driving the first pull rope 5 to move, thereby driving the sealing plate 7 to move through the roller 6, so that the sealing plate 7 moves to extrude the first spring 8, thereby driving the first spring 8 to compress, and the sealing plate 7 moves to be separated from the sealing of the first water pipe 3, so that the water in the water storage tank 2 enters the inside of the steam boiler body 1 through the first water pipe 3, so that the water level in the steam boiler body 1 rises, thereby driving the floating ball 4 to float, thereby making the first pull rope 5 relaxed, so that the first spring 8 drives the sealing plate 7 to extend into the inside of the first water pipe 3 to form a sealing mechanism, thereby stopping water injection, so that the purpose of automatic water replenishment is achieved, thereby improving the use effect, and the water storage tank 2 contains heating wires, thereby enabling the water in the water storage tank 2 to be in a heat preservation state, so that the function of preheating the water in the water storage tank 2 before water injection is achieved, thereby achieving the purpose of energy saving.
[0034] Embodiment two: the utility model solves the problem that the existing steam boiler body 1 is easy to produce scale, the use of filter screen 10 can reduce the production of scale, discloses:
[0035] The left end of the steam boiler body 1 is connected with the second water pipe 9, and the inside of the second water pipe 9 is slidably connected with the filter screen 10, and the filter screen 10 is made of bamboo charcoal fiber;
[0036] Reference Figure 1 And Figure 5 When water flows into the steam boiler body 1, it will pass through the filter screen 10, thereby enabling the filter screen 10 to block the impurities in the water source, so that the impurities are adsorbed on the filter screen 10, so that relatively clean water source enters the inside of the steam boiler body 1 for heating, thereby avoiding the impurities entering the inside of the steam boiler body 1 for heating to form scale, thereby avoiding the scale adsorbed in the inside of the steam boiler body 1 and not convenient to clean, thereby improving the use effect;
[0037] Embodiment three: the utility model solves the problem that the filter screen 10 in embodiment two is blocked and affects the efficiency of water flow, the movement of the limiting plate 11 can facilitate the replacement of the filter screen 10, discloses:
[0038] The top of the filter screen 10 is attached to the limiting plate 11, and the bottom of the limiting plate 11 is slidingly connected inside the second water pipe 9. The limiting plate 11 has a protrusion 12 slidingly connected inside. The bottom of the outer end of the protrusion 12 is arc-shaped. The outer end of the protrusion 12 extends into the recess 13 to form a clamping mechanism. The inner end of the protrusion 12 is connected to the second spring 14, and the inner end of the second spring 14 is connected inside the limiting plate 11. The inner end of the protrusion 12 is connected to the second pull rope 15, and the top of the second pull rope 15 extends out of the inside of the limiting plate 11 to form a sliding mechanism.
[0039] Reference Figure 5 And Figure 6 When the filter screen 10 needs to be replaced, pull the second pull rope 15, then move the second pull rope 15 to drive the protrusion 12 to move, so that the protrusion 12 moves and is accommodated inside the limiting plate 11, then the protrusion 12 moves and is separated from the clamping of the recess 13, then the protrusion 12 moves and presses the second spring 14, then the second spring 14 is compressed under stress, then pull the limiting plate 11, then the limiting plate 11 can be separated from the inside of the second water pipe 9, then the filter screen 10 can be taken out. After replacing the new filter screen 10, reverse the above operation, the second spring 14 can push the protrusion 12 to extend into the recess 13, then the limiting plate 11 can be fixed inside the second water pipe 9, so that the limiting plate 11 can fix the filter screen 10, then the convenience of replacing the filter screen 10 is improved.
[0040] Working principle: when using the energy-saving steam boiler with preheating system, first, Figures 1 to 4 The water source inside the steam boiler body 1 is heated by the gas. When the water source decreases, the water level decreases, then the water level decreases to drive the float ball 4 to move, then the float ball 4 moves to drive the first pull rope 5 to move, then the first spring 8 is compressed under stress, and the sealing plate 7 moves to separate from the sealing of the first water pipe 3, so that the water in the water storage tank 2 enters the inside of the steam boiler body 1 through the first water pipe 3, so that the water level in the steam boiler body 1 rises, so that the water level rises to drive the float ball 4 to float, then the water injection stops, so that the purpose of automatic water replenishment is achieved, so that the use effect is improved;
[0041] Reference Figure 1 And Figure 5 When the water flows into the steam boiler body 1, it will pass through the filter screen 10, then the filter screen 10 can block the impurities in the water source, so that relatively clean water enters the inside of the steam boiler body 1 for heating, so that the scale adsorbed in the inside of the steam boiler body 1 is not convenient to clean, so that the use effect is improved;
[0042] ReferenceFigure 5 And Figure 6 When the filter screen 10 needs to be replaced, the second pull rope 15 is pulled, the second pull rope 15 is moved to drive the protrusion 12 to move, the protrusion 12 is moved to be separated from the clamping of the groove 13, the limiting plate 11 is pulled, the limiting plate 11 can be separated from the inside of the second water pipe 9, the protrusion 12 can be pushed by the second spring 14 to extend into the inside of the groove 13, the limiting plate 11 can be fixed in the inside of the second water pipe 9, so that the limiting plate 11 can fix the filter screen 10, and the convenience of replacing the filter screen 10 is improved.
[0043] The contents not described in detail in the specification belong to the prior art known by the person skilled in the art.
[0044] Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments or make equivalent replacement to part of the technical features, and any modification, equivalent replacement, improvement, etc. within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. An energy-saving steam boiler with a preheating system, comprising a steam boiler body (1), the bottom of the steam boiler body (1) being placed on the ground; characterized in that Further comprising: The left end of the steam boiler body (1) is fixed with a water storage tank (2), and the left end flange of the water storage tank (2) is connected with a first water pipe (3), and the bottom of the first water pipe (3) is connected with the left end of the steam boiler body (1). The inside of the steam boiler body (1) is slidably connected with a floating ball (4), the top of the floating ball (4) is connected with a first pull rope (5), and the left end of the first pull rope (5) is connected with the top of a sealing plate (7). The sealing plate (7) slides in the inside of the first water pipe (3) to form a sealing mechanism, and the top of the sealing plate (7) is connected with a first spring (8), and the top of the first spring (8) is connected in the inside of the first water pipe (3).
2. An energy efficient steam boiler with a preheating system as claimed in claim 1, wherein: The bottom of the floating ball (4) is hollow, and the top of the floating ball (4) extends out of the inside of the steam boiler body (1).
3. An energy efficient steam boiler with a preheating system as claimed in claim 1, wherein: The middle part of the first pull rope (5) is attached with a roller (6), and the bottom of the roller (6) is rotatably connected outside the left end of the steam boiler body (1).
4. An energy efficient steam boiler with a preheating system as claimed in claim 1, wherein: The left end of the steam boiler body (1) is connected with a second water pipe (9), and the inside of the second water pipe (9) is slidably connected with a filter screen (10), and the filter screen (10) is made of bamboo charcoal fiber.
5. An energy efficient steam boiler with a preheating system as claimed in claim 4, wherein: The top of the filter screen (10) is attached with a limiting plate (11), and the bottom of the limiting plate (11) is slidably connected in the inside of the second water pipe (9).
6. An energy efficient steam boiler with a preheating system as claimed in claim 5, wherein: The inside of the limiting plate (11) is slidably connected with a protrusion (12), the bottom of the outer end of the protrusion (12) is arc-shaped, and the outer end of the protrusion (12) extends into the inside of a groove (13) to form a clamping mechanism.
7. An energy efficient steam boiler with a preheating system as claimed in claim 6, wherein: The inner end of the protrusion (12) is connected with a second spring (14), and the inner end of the second spring (14) is connected in the inside of the limiting plate (11), and the inner end of the protrusion (12) is connected with a second pull rope (15), the top of the second pull rope (15) extends out of the inside of the limiting plate (11) to form a sliding mechanism.
Citation Information
Patent Citations
Integrated full-automatic electric heating steam boiler
CN212841490U