Sludge cleaning device for hydraulic engineering construction

By designing a mobile positioning device and a collection device, the efficient movement of the sludge cleaning device and the rapid treatment of sludge were achieved, solving the inconvenience of existing devices in terms of movement and transportation, improving cleaning efficiency and avoiding environmental pollution.

CN223660922UActive Publication Date: 2025-12-12SHANDONG HENGHAO WATER CONSERVANCY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423309168.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-12-12
Estimated Expiration
2034-12-31

AI Technical Summary

Technical Problem

Existing silt removal equipment used in water conservancy projects is inconvenient in terms of movement and silt transportation, affecting removal efficiency and easily causing secondary pollution to the environment.

Method used

A sludge cleaning device was designed, which includes a mobile positioning device and a collection device. The device is easy to move and position using universal positioning wheels and a push handle. It achieves efficient collection and transportation of sludge through a sludge pump and a conveying pipeline, and achieves rapid treatment of sludge through a sealing plate and a discharge trough.

Benefits of technology

It improved the efficiency of sludge removal, solved the problem of inconvenient sludge transportation, and avoided secondary environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223660922U_ABST
    Figure CN223660922U_ABST
Patent Text Reader

Abstract

The utility model discloses a silt cleaning device for hydraulic engineering construction, and relates to the technical field of silt cleaning, and the silt cleaning device comprises a mobile positioning device, the mobile positioning device comprises a positioning frame, a collecting device is installed in one side of the positioning frame, a silt discharging pump is arranged on one side of the positioning frame, and the collecting device is connected with the silt discharging pump. A conveying pipeline is installed at the output end of the sludge discharging pump, under the cooperation of universal positioning wheels and a push handle in the movable positioning device, the movable positioning device can be conveniently moved to an area where sludge needs to be cleaned for sludge cleaning and collecting work, and the two collecting devices are matched with the movable positioning device for sludge cleaning work. The sludge cleaning efficiency is improved, the collecting box for collecting the sludge is moved to a designated treatment area through moving wheels and a handle, a sealing plate is opened, the sludge collected in the collecting box is discharged through a discharging groove, and the cleaned sludge is conveniently conveyed to a designated place to be treated.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of sludge cleaning, in particular to a sludge cleaning device for water conservancy construction. BACKGROUND

[0002] Water conservancy engineering is the general term of various engineering constructions for controlling, utilizing and protecting surface and underground water resources and environment, in water conservancy engineering, sludge cleaning is an important link, which is directly related to engineering progress and water quality safety.

[0003] However, the existing sludge cleaning device for water conservancy construction is inconvenient to move and transfer the sludge cleaning device according to the dredging position when cleaning the sludge, which affects the cleaning efficiency of the sludge, and after the sludge is collected, it is inconvenient to transport the cleaned sludge to the designated place for treatment, which is easy to cause secondary pollution to the environment. UTILITY MODEL CONTENT

[0004] In order to solve the problems of inconvenient movement and transfer of the existing sludge cleaning device for water conservancy construction, affecting the cleaning efficiency of the sludge, and inconvenient transportation of the cleaned sludge to the designated place for treatment, which is easy to cause secondary pollution to the environment, the purpose of the utility model is to provide a sludge cleaning device for water conservancy construction.

[0005] In order to solve the above technical problems, the utility model adopts the following technical scheme: a sludge cleaning device for water conservancy construction, comprising a mobile positioning device, the mobile positioning device comprises a positioning frame, a collecting device is installed on one side of the positioning frame, a sludge pump is arranged on one side of the positioning frame, a conveying pipeline is installed on the output end of the sludge pump, the conveying pipeline is fixedly installed in the middle of the top surface of the positioning frame away from the sludge pump, universal positioning wheels are installed on the bottom surface of the positioning frame, a push handle is fixedly installed on one side of the positioning frame, the collecting device comprises a collecting box, mobile wheels are installed on the bottom surface of the collecting box, a handle is fixedly installed on one side of the collecting box.

[0006] Preferably, a discharge groove is formed on one side of the collecting box, a sealing plate is installed in the discharge groove, the sealing plate is slidingly installed in the discharge groove, and the sealing plate and the discharge groove cooperate with each other.

[0007] Preferably, a fixing piece is fixedly installed on one side of the positioning frame, a positioning pin is inserted in the fixing piece, a positioning piece is fixedly installed on one side of the collecting box, the positioning pin penetrates through the fixing piece and is inserted in the positioning piece, a pull buckle is fixedly installed in the middle of one side of the sealing plate, and the pull buckle and the sealing plate cooperate with each other.

[0008] Compared with the prior art, the utility model has the beneficial effects that:

[0009] 1、the utility model discloses, under the cooperation of universal positioning wheel and push handle in mobile positioning device, it is convenient to move to the area that needs to clean silt with mobile positioning device and carry out the cleaning collection work of silt, and through the cooperation of two collection devices mobile positioning device carries out the cleaning work of silt, improves the cleaning efficiency of silt;

[0010] 2、the utility model discloses, when the collection box of one collection device is collected, the collection box of silt that collection is completed is moved to the designated processing area through movable wheel and handle, opens the sealing plate, and the silt collected in the collection box is discharged through the discharge groove, convenient and fast, solve the inconvenient silt after the collection of silt is transported to the designated place and is handled after the cleaning, and the problem of easy secondary pollution to the environment. BRIEF DESCRIPTION OF DRAWINGS

[0011] In order to more clearly illustrate the technical scheme in the embodiment of the utility model or prior art, the drawings needed to be used in the embodiment or prior art description will be briefly introduced below, and obviously, the drawings in the following description are only some embodiments of the utility model, and for those skilled in the art, other drawings can be obtained according to these drawings without creative labor.

[0012] Figure 1 It is the whole structure schematic diagram of the utility model,

[0013] Figure 2 It is the structure schematic diagram of mobile positioning device of the utility model,

[0014] Figure 3 It is the structure schematic diagram of collection device of the utility model,

[0015] Figure 4 It is the utility model Figure 3 The structure enlarged view of A in the utility model.

[0016] In the drawing: 1, mobile positioning device;11, positioning frame;12, universal positioning wheel;13, push handle;14, storage groove;15, support seat;2, collection device;21, collection box;211, auxiliary groove;22, movable wheel;23, handle;24, discharge groove;25, sealing plate;251, pull buckle;26, positioning piece;3, sludge pump;31, conveying pipeline;4, fixed part;41, positioning bolt. DETAILED DESCRIPTION

[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0018] Example: Figures 1-4 As shown, this utility model provides a silt cleaning device for water conservancy engineering construction, including a mobile positioning device 1. The mobile positioning device 1 includes a positioning frame 11. A collection device 2 is installed inside one side of the positioning frame 11. A sludge discharge pump 3 is provided on one side of the positioning frame 11. A conveying pipe 31 is installed at the output end of the sludge discharge pump 3. The end of the conveying pipe 31 away from the sludge discharge pump 3 is fixedly installed in the middle of the top surface of the positioning frame 11. Universal positioning wheels 12 are installed at the four corners of the bottom surface of the positioning frame 11. A push handle 13 is fixedly installed on one side of the positioning frame 11. The collection device 2 includes a collection box 21. A moving wheel 22 is installed at the four corners of the bottom surface of the collection box 21. A handle 23 is fixedly installed on one side of the collection box 21.

[0019] The sludge is cleaned by using two collection devices 2 in conjunction with a mobile positioning device 1. With the help of the universal positioning wheels 12 and the push handle 13 in the mobile positioning device 1, the mobile positioning device 1 is moved to the area where the sludge needs to be cleaned and positioned. After positioning, the collection box 21 of one collection device 2 is moved into the positioning frame 11 for limiting and fixing. After the collection box 21 is fixed, the sludge pump 3 is placed into the sludge that needs to be cleaned and the switch of the sludge pump 3 is turned on. Under the operation of the sludge pump 3, the sludge is transported to the collection box 21 through the conveying pipe 31 for storage. When one collection box 21 has finished collecting, the other collection device 2 is replaced to continue the sludge collection work, and so on, until the sludge cleaning work is completed.

[0020] A discharge trough 24 is provided on one side of the collection box 21. A sealing plate 25 is installed in the discharge trough 24. The sealing plate 25 is slidably installed in the discharge trough 24. The sealing plate 25 and the discharge trough 24 cooperate with each other. When the collection box 21 of a collection device 2 has finished collecting, the collection box 21 with collected sludge is moved to the designated processing area by the moving wheels 22 and the handle 23. The sealing plate 25 is opened, and the sludge collected in the collection box 21 is discharged through the discharge trough 24, which is convenient and quick.

[0021] The side of the positioning frame 11 is fixedly provided with a fixing piece 4, the fixing piece 4 is provided with a positioning bolt 41, the side of the collecting box 21 is fixedly provided with a positioning piece 26, the positioning bolt 41 penetrates through the fixing piece 4 and is inserted into the positioning piece 26, the positioning of the collecting box 21 in the positioning frame 11 is completed through the cooperation of the positioning bolt 41 fixedly arranged in the fixing piece 4 and the positioning piece 26, the side of the sealing plate 25 is fixedly provided with a pull buckle 251, the pull buckle 251 cooperates with the sealing plate 25, and the opening and closing of the sealing plate 25 is conveniently controlled through the pull buckle 251.

[0022] The side of the top surface of the positioning frame 11 is fixedly provided with a supporting seat 15, the supporting seat 15 cooperates with the conveying pipeline 31, the conveying pipeline 31 is clamped and positioned through the supporting seat 15, the storage groove 14 is arranged below the push handle 13, the mud pump 3 and the conveying pipeline 31 are stored through the storage groove 14, the auxiliary groove 211 is arranged above the side of the collecting box 21, the pull buckle 251 is slidingly arranged in the auxiliary groove 211, the opening and closing of the sealing plate 25 is assisted through the auxiliary groove 211, the pull buckle 251 is protected, and the pull buckle 251 is prevented from being damaged.

[0023] Working principle: the two collecting devices 2 cooperate with the moving positioning device 1 to clean the sludge, under the cooperation of the universal positioning wheel 12 and the push handle 13, the moving positioning device 1 is moved to the area to be cleaned and positioned, after positioning, the collecting box 21 of one collecting device 2 is moved into the positioning frame 11 and is fixedly positioned, after the fixing of the collecting box 21, the mud pump 3 is placed in the sludge to be cleaned, the switch of the mud pump 3 is turned on, and the sludge is conveyed into the collecting box 21 through the conveying pipeline 31 under the working of the mud pump 3;

[0024] When the collecting of the sludge of one collecting device 2 is completed, another collecting device 2 is replaced to continue the collecting of the sludge, the collecting box 21 containing the sludge is moved to the designated processing area through the moving wheel 22 and the handle 23, the sealing plate 25 is opened, the sludge in the collecting box 21 is discharged through the discharge groove 24, and the collecting device 2 is conveniently used, and the above steps are repeated, and the collecting of the sludge is completed through the replacement of the two collecting devices 2.

[0025] Obviously, those skilled in the art can make various modifications and variations to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application belong to the scope of the claims of the present application and the equivalent technologies thereof, the present application also intends to include these modifications and variations.

Claims

1. A silt removal device for water conservancy engineering construction, comprising a mobile positioning device (1), characterized in that: The mobile positioning device (1) includes a positioning frame (11), a collection device (2) is installed in one side of the positioning frame (11), a mud pump (3) is provided on one side of the positioning frame (11), a conveying pipe (31) is installed at the output end of the mud pump (3), the end of the conveying pipe (31) away from the mud pump (3) is fixedly installed in the middle of the top surface of the positioning frame (11), universal positioning wheels (12) are installed at the four corners of the bottom surface of the positioning frame (11), a push handle (13) is fixedly installed on one side of the positioning frame (11), the collection device (2) includes a collection box (21), a moving wheel (22) is installed at the four corners of the bottom surface of the collection box (21), and a handle (23) is fixedly installed on one side of the collection box (21).

2. The silt removal device for water conservancy engineering construction as described in claim 1, characterized in that, The collection box (21) has a discharge trough (24) on one side. A sealing plate (25) is installed in the discharge trough (24). The sealing plate (25) is slidably installed in the discharge trough (24). The sealing plate (25) and the discharge trough (24) cooperate with each other.

3. The silt removal device for water conservancy engineering construction as described in claim 1, characterized in that, A fixing member (4) is fixedly installed on one side of the positioning frame (11), and a positioning pin (41) is inserted into the fixing member (4). A positioning member (26) is fixedly installed on one side of the collection box (21), and the positioning pin (41) passes through the fixing member (4) and is inserted into the positioning member (26).

4. The silt removal device for water conservancy engineering construction as described in claim 2, characterized in that, A pull buckle (251) is fixedly installed in the middle of one side of the sealing plate (25), and the pull buckle (251) cooperates with the sealing plate (25).

5. A silt removal device for water conservancy engineering construction as described in claim 1, characterized in that, A support base (15) is fixedly installed on one side of the top surface of the positioning frame (11), and the support base (15) cooperates with the conveying pipe (31).

6. The silt removal device for water conservancy engineering construction as described in claim 1, characterized in that, The positioning frame (11) is located below the push handle (13) and has a storage slot (14).

7. A silt removal device for water conservancy engineering construction as described in claim 4, characterized in that, The collection box (21) is located above the discharge trough (24) and has an auxiliary groove (211) above it. The lifting buckle (251) is slidably installed in the auxiliary groove (211).