Lifting platform for exterior wall painting in building construction
By designing a tilting mechanism and a placement mechanism on the lifting platform, the problems of limited functionality and fixed working area of existing platforms are solved, thereby improving stability and construction efficiency and facilitating continuous painting operations.
Patent Information
- Application Number
- CN202520221909.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-12
- Publication Date
- 2025-12-12
- Estimated Expiration
- 2035-02-12
AI Technical Summary
Existing building construction and exterior wall painting lifting platforms have limited functions, increase the labor intensity of workers, and are prone to safety accidents when working at heights. In addition, the fixed working area of the platform makes construction inconvenient.
A lifting platform including a scissor lift, a tilting mechanism, and a loading mechanism was designed. The tilting plate is connected to the worktable by bolts to extend the worktable area, and the pallet is fixed by guide blocks to facilitate worker operation.
It reduces the labor intensity of workers, improves the stability and construction efficiency of the platform, reduces safety hazards, expands the working area, and facilitates continuous painting operations.
Smart Images

Figure CN223661319U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a powdering equipment technical field, specifically is a kind of building construction outer wall powdering is used to lift platform. BACKGROUND
[0002] Powdering refers to the tool for cleaning or painting made of bundled hair brown etc.: brush, brush and flat brush etc. are used to specify the tool of makeup powder or protective layer painted on the surface of building, and outer wall powdering refers to the cement mortar, mixed mortar, whitewash mortar surface layer engineering painted on wall surface.
[0003] When the outer wall of building is powdering, the existing powdering lift platform has the following defects due to single function:
[0004] 1, staff constantly bend to pick up powdering paint, and staff also need to hold powdering tool with one hand, and the other hand takes paint to powder wall, which increases labor intensity, and in the state of high-altitude operation, constantly bending, the action range is larger, and safety accident is prone to occur in powdering process;
[0005] 2, the working area of lift platform is fixed, when worker places paint bucket etc. on lift platform, it will occupy a lot of working space, and then it will bring inconvenience to worker's construction, and affect worker's construction efficiency, in view of the above situation, technical innovation is carried out on the basis of existing building construction outer wall powdering lift platform. INVENTION CONTENTS
[0006] The utility model aims at providing a kind of building construction outer wall powdering lift platform to solve the problems raised in the above background.
[0007] To achieve the above object, the utility model provides the following technical scheme: a kind of building construction outer wall powdering lift platform, including scissor lift, the upper portion of the scissor lift is placed with turnover mechanism and storage mechanism, the turnover mechanism includes workbench, the front and rear sides of the workbench are evenly provided with two groups of connecting frames, and the turnover plate is placed between the two groups of connecting frames, the front side of the turnover plate is provided with through hole, the connecting shaft is arranged in the through hole, the connecting shaft is arranged between the two groups of connecting frames, the top of the workbench is evenly provided with threaded sleeve, the top of the turnover plate is evenly provided with two groups of support sleeve, the inner chamber of the support sleeve is provided with bolt, the bolt is screwed with threaded sleeve, and the storage mechanism is located above the workbench.
[0008] Preferably, the storage mechanism includes a supporting plate, and the rear side of the supporting plate is evenly provided with two groups of guide blocks.
[0009] Preferably, the workbench is arranged at the top of the scissor lift, the top of the workbench is uniformly provided with two groups of first guardrails, and the top of the flap is provided with second guardrails.
[0010] Preferably, the top of the second guardrail located at the rear side of the two groups of second guardrails is uniformly provided with two groups of guide grooves, the guide block is arranged in the guide groove, and the rear side of the supporting plate is attached to the front side of the second guardrail located at the rear side of the two groups of second guardrails.
[0011] Preferably, the front side of the second guardrail located at the front side of the two groups of second guardrails is provided with a mounting groove, and the third guardrail is arranged in the mounting groove through a rotating shaft.
[0012] Preferably, the top of the third guardrail is provided with a latch, and the right side of the inner side wall of the mounting groove is provided with a slot, and the latch corresponds to the slot.
[0013] Compared with the prior art, the utility model has the advantages that:
[0014] The utility model discloses a lifting platform for building construction outer wall painting, the supporting sleeve and the threaded sleeve are connected and fixed together through the bolt, then the flap butts the workbench together, thereby realizing the working area effect of lengthening the workbench, and after the bolt is disassembled, the flap can be turned down, so that the gravity center of the whole turnover mechanism can be reduced, and when the scissor lift moves, the scissor lift can be more stable, and the practicability of the device is improved.
[0015] The supporting plate is fixed on the second guardrail through the guide block, and workers can place paint buckets on the supporting plate, so that workers can conveniently perform continuous painting work. DRAWINGS
[0016] Figure 1 It is a structural schematic view of the utility model discloses a lifting platform for building construction outer wall painting.
[0017] Figure 2 It is a front view of the utility model discloses a lifting platform for building construction outer wall painting.
[0018] Figure 3 It is the utility model discloses a lifting platform for building construction outer wall painting Figure 2 The A part enlarged view of the utility model.
[0019] In the drawing: 1, workbench;11, flap;12, connecting frame;13, connecting shaft;14, threaded sleeve;15, supporting sleeve;16, bolt;2, supporting plate;21, guide block;3, scissor lift;4, first guardrail;41, second guardrail;5, third guardrail;51, latch. CONCRETE EMBODIMENT
[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0021] Please see Figures 1-3 A lifting platform for exterior wall painting in building construction includes a scissor lift 3. A tilting mechanism and a placement mechanism are mounted above the scissor lift 3. The tilting mechanism includes a worktable 1. Two sets of connecting frames 12 are evenly fixedly arranged on the front and rear sides of the worktable 1. A flap 11 is placed between the two sets of connecting frames 12. A through hole is opened on the front side of the flap 11, and a connecting shaft 13 is rotatably arranged within the through hole. The connecting shaft 13 is fixedly arranged between the two sets of connecting frames 12, and the flap 11 rotates by means of the connecting shaft 13. Threaded sleeves 14 are evenly fixedly arranged on the top of the worktable 1. Two sets of support sleeves 15 are evenly fixed at the top. Bolts 16 are rotatably installed inside the support sleeves 15. The bolts 16 are screwed into the threaded sleeves 14, and the support sleeves 15 and threaded sleeves 14 are connected and fixed together by the bolts 16. This allows the flip plate 11 to connect with the worktable 1, thereby extending the working area of the worktable 1. After removing the bolts 16, the flip plate 11 can be flipped downwards, thereby lowering the center of gravity of the entire flipping mechanism. This makes the scissor lift 3 more stable when moving. The storage mechanism is located above the worktable 1 and includes a tray 2. Two sets of guide blocks 21 are evenly fixedly installed on the rear side of the worktable 1. The worktable 1 is fixedly installed on the top of the scissor lift 3. The scissor lift 3 drives the worktable 1 to move up and down and left and right. Two sets of first guardrails 4 are evenly fixedly installed on the top of the worktable 1. A second guardrail 41 is fixedly installed on the top of the flip plate 11. Two sets of guide grooves are evenly opened on the top of the second guardrail 41 located on the rear side of the two sets of second guardrails 41. The guide blocks 21 are slidably installed in the guide grooves. The rear side of the pallet 2 is in contact with the front side of the second guardrail 41 located on the rear side of the two sets of second guardrails 41. The pallet 2 relies on the guide blocks 21. Fixed to the second guardrail 41, the worker can place the paint bucket on the tray 2, which facilitates continuous painting operations. The front guardrail 41 of the two sets of second guardrails 41 has a through-hole on its front side. The third guardrail 5 is rotatably installed in the installation groove through a pivot. The top of the third guardrail 5 is fixedly installed with a pin 51. The inner side wall of the installation groove has a slot on the right side. The pin 51 corresponds to the slot. The third guardrail 5 is fixed to the second guardrail 41 by the pin 51. After separating the pin 51 from the slot, the third guardrail 5 can be opened, which makes it easier for the worker to climb onto the workbench 1.
[0022] Working principle: the third guardrail 5 is fixed on the second guardrail 41 through the bolt 51, after separating the bolt 51 from the slot, the third guardrail 5 can be opened, then the workers can get on the workbench 1, the workbench 1 is driven by the scissor lift 3 to move up and down and left and right, the supporting sleeve 15 and the threaded sleeve 14 are connected and fixed together through the bolt 16, then the flap 11 connects the workbench 1 together, so as to realize the effect of extending the working area of the workbench 1, after disassembling the bolt 16, the flap 11 can be turned down, so as to reduce the gravity center of the whole turnover mechanism, then the scissor lift 3 can move more stably, the supporting plate 2 is fixed on the second guardrail 41 through the guide block 21, the workers can put the paint bucket on the supporting plate 2, so as to facilitate the workers to carry out continuous painting work.
[0023] It should be noted that the relational terms herein such as first and second and the like are used solely to distinguish one from another entity or action, without necessarily requiring or implying that there is any such relationship or order between such entities or actions. Also, the terms "comprises", "comprising", or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can also include other elements not expressly listed or inherent to such process, method, article, or apparatus.
[0024] Although the embodiments of the present application have been shown and described, it is to be understood that for the purpose of the present application, the embodiments change, modify, replace, and vary in many ways without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A lifting platform for painting the outer wall of a building construction, comprising a scissor lift (3), characterized in that: The upper part of the scissor lift (3) is provided with a turnover mechanism and a storage mechanism, the turnover mechanism comprises a workbench (1), two groups of connecting frames (12) are uniformly arranged on the front and back sides of the workbench (1), respectively, a turnover plate (11) is arranged between the two groups of connecting frames (12), a through hole is formed in the front side of the turnover plate (11), a connecting shaft (13) is arranged in the through hole, the connecting shaft (13) is arranged between the two groups of connecting frames (12), threaded sleeves (14) are uniformly arranged on the top of the workbench (1), two groups of supporting sleeves (15) are uniformly arranged on the top of the turnover plate (11), bolts (16) are arranged in the inner cavities of the supporting sleeves (15), the bolts (16) are screwed with the threaded sleeves (14), and the storage mechanism is located above the workbench (1).
2. The lifting platform for painting the outer wall of a building construction according to claim 1, wherein: The storage mechanism comprises a supporting plate (2), and two groups of guide blocks (21) are uniformly arranged on the rear side of the supporting plate (2).
3. The lifting platform for painting the outer wall of a building construction according to claim 2, characterized in that: The workbench (1) is arranged on the top of the scissor lift (3), two groups of first guardrails (4) are uniformly arranged on the top of the workbench (1), and a second guardrail (41) is arranged on the top of the turnover plate (11).
4. The elevating platform for painting the exterior wall of a building construction according to claim 3, wherein: The top of the second guardrail (41) located at the rear side of the two groups of second guardrails (41) is uniformly provided with two groups of guide grooves, the guide blocks (21) are arranged in the guide grooves, and the rear side of the supporting plate (2) is attached to the front side of the second guardrail (41) located at the rear side of the two groups of second guardrails (41).
5. The elevating platform for painting the exterior wall of a building construction according to claim 4, wherein: The front side of the second guardrail (41) located at the front side of the two groups of second guardrails (41) is provided with a mounting groove, and a third guardrail (5) is arranged in the mounting groove through a rotating shaft.
6. The elevating platform for painting the exterior wall of a building construction as defined in claim 5, wherein: The top of the third guardrail (5) is provided with a latch (51), a slot is formed in the right side of the inner side wall of the mounting groove, and the latch (51) corresponds to the slot.