Efficient piling device for road engineering

By designing an efficient piling device, utilizing components such as stepper motors, hydraulic cylinders, and water tanks for dust suppression, the problem of dust pollution during piling was solved, achieving stable piling and environmental protection.

CN223675326UActive Publication Date: 2025-12-16南宁远西贸易有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423100712.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-12-16
Estimated Expiration
2034-12-16

AI Technical Summary

Technical Problem

Existing road construction piling equipment generates a large amount of dust during the piling process, causing pollution.

Method used

A high-efficiency piling device was designed, comprising a piling assembly, a support assembly, and a dust removal assembly. The device uses a stepper motor to drive a screw to adjust the height, a vibrating motor to drive the pile, a hydraulic cylinder for support, a water tank to spray water to reduce dust, and a shock-absorbing rod to dampen vibrations, thereby achieving stable driving of the pile and reducing dust.

Benefits of technology

It effectively prevents the pile driving device from collapsing, reduces dust pollution, reduces noise, and improves pile driving efficiency and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223675326U_ABST
    Figure CN223675326U_ABST
Patent Text Reader

Abstract

The utility model discloses an efficient piling device for road engineering, which comprises a device main body, and the device main body is provided with a piling assembly, a support assembly for fixing the piling device and a dust removal assembly for dust removal. The pile rod is installed on the connecting base, the stepping motor drives the screw to rotate, the height of the sliding base is adjusted, the end of the pile rod is attached to the ground, then the vibration motor drives the pile rod to vibrate, the sliding base presses the sliding base during vibration, the pile rod is attached to the ground continuously, and the pile rod is driven into the ground. The piling device is supported through the supporting assembly, collapse of the piling device is prevented, dust falling treatment is conducted on a construction area through the dust removal assembly, and dust pollution is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to road construction technical field especially relates to a high -efficient piling device for road engineering. BACKGROUND

[0002] In road engineering, piling is an important basic engineering, mainly used for reinforcing foundation, improving the bearing capacity and stability of foundation, and piling device is a kind of equipment used in construction engineering, mainly used for driving pile body (such as wood pile, concrete pile etc.) into the ground to increase the stability and bearing capacity of building.

[0003] Through the retrieval, the patent of china patent application no.202228118448.3 discloses a kind of high -efficient piling device for road engineering, including fixed mounting plate, the surface of the fixed mounting plate is triangular, the surface of the fixed mounting plate is rotationally connected with adjusting screw through bearing, three adjusting screws are distributed in ring array with the shaft center of fixed mounting plate as center.The piling device in the above patent has the following shortcomings: the device is easy to produce a lot of dust in the process of piling, thereby easily causing pollution. UTILITY MODEL CONTENT

[0004] The utility model aims at the device further setting to solve the shortcomings existing in prior art, and proposes a kind of high -efficient piling device for road engineering.

[0005] The device further sets to realize the above-mentioned purpose, and the utility model adopts the following technical scheme:

[0006] A kind of high -efficient piling device for road engineering, including device main body, the device main body is provided with piling assembly, and the support assembly for fixing piling device, there is dust removal assembly for dust fall, the piling assembly includes slide rail, the slide rail is installed in the top of the device main body, the structure of the device main body is U type structure, screw rod is rotationally installed in slide rail, the end of the slide rail is installed with step motor, the output end of the step motor is connected with screw rod, guide rod is installed on device main body, the guide rod is symmetrically arranged, screw rod and guide rod are slidably installed with slide seat, vibration motor is installed in the bottom of slide seat, the output end of the vibration motor is installed with connecting seat, the end of the connecting seat is installed with pile by a plurality of bolts.

[0007] As the further scheme of the utility model: the support assembly includes support two, the support two is installed in the bottom of the device main body, hydraulic cylinder is installed on the two sides of support two, the output end of the hydraulic cylinder penetrates support two, support seat is installed on the output end of the hydraulic cylinder.

[0008] As a further scheme of the utility model: the supporting assembly further includes a shock absorbing rod, the supporting seat is divided into two parts, and a plurality of shock absorbing rods are installed between the supporting seats.

[0009] As a further scheme of the utility model: the dust removal assembly includes a water tank, the water tank is installed on the device main body, water inlets and a plurality of water outlets are arranged on the water tank, a water pump is installed on the water outlet through a pipeline, a plurality of spray heads are installed on the both sides of the bottom of the device main body, and the spray heads are connected with the water pump through a pipeline.

[0010] As a further scheme of the utility model: the piling device further includes a traction rope, a plurality of traction ropes are arranged on the end of the device main body away from the sliding seat, the traction ropes are symmetrically arranged, one end of the traction rope is connected with the device main body, and the other end is connected with the sliding rail.

[0011] As a further scheme of the utility model: the piling device further includes a support one, a plurality of support ones are arranged on the left and right sides of the device main body, the support ones are symmetrically arranged, and wheels are rotatably installed in the support ones.

[0012] As a further scheme of the utility model: the piling device further includes a traction rod, the traction rod is installed on the outer wall of the device main body close to the water tank.

[0013] The utility model discloses the beneficial effects are:

[0014] 1. install the pile rod on the connecting seat, drive the screw rod to rotate through the stepping motor, make the sliding seat adjust height, make the end of the pile rod stick to the ground, then use the vibration motor to drive the pile rod to vibrate, while vibrating, the sliding seat is pressed, makes the pile rod stick to the ground continuously, and the pile rod is driven into the ground, before piling, the piling device is supported through the use of the supporting assembly, prevents the piling device from collapsing, and the construction area is handled through the use of the dust removal assembly, and dust pollution is reduced.

[0015] 2. the supporting seat is stuck to the ground through the use of the hydraulic cylinder, and the piling device is supported, and the shock absorbing rod can be set to reduce the noise when the supporting assembly supports the piling device. DRAWINGS

[0016] Figure 1 The utility model proposes a kind of high-efficiency piling device for road engineering whole three-dimensional structure schematic diagram;

[0017] Figure 2 The utility model proposes a kind of high-efficiency piling device for road engineering piling assembly structure schematic diagram;

[0018] Figure 3The utility model provides a kind of road engineering with efficient piling device bottom structure schematic diagram;

[0019] Figure 4 The utility model provides the structure schematic diagram of partial amplification of support assembly.

[0020] In the drawing: 1-device main body, 2-support one, 3-wheel, 4-tow bar, 5-slideway, 6-tow rope, 7-step motor, 8-screw rod, 9-guide rod, 10-sliding seat, 11-vibration motor, 12-connection seat, 13-pile rod, 14-water tank, 15-water pump, 16-hydraulic cylinder, 17-support two, 18-supporting seat, 19-cushioning rod, 20-sprinkler. DETAILED DESCRIPTION

[0021] The technical scheme of the utility model will be further explained in detail in combination with specific implementation manners.

[0022] The embodiments of the utility model are described in detail below, and examples of the embodiments are shown in the drawings, wherein the same or similar reference signs represent the same or similar elements or elements with the same or similar functions throughout. The embodiments described below by referring to the drawings are exemplary, only for explaining the utility model, and cannot be understood as limiting the utility model.

[0023] A kind of road engineering with efficient piling device, as Figure 1 As shown in the drawing, it includes device main body 1, the device main body 1 is provided with piling assembly, and the support assembly for fixing piling device, there is also dust removal assembly for dust fall, the piling assembly includes slideway 5, the slideway 5 is installed in the top of the device main body 1, the structure of the device main body 1 is U type structure, screw rod 8 is rotatably installed in slideway 5, step motor 7 is installed at the end of slideway 5, guide rod 9 is installed on device main body 1, the guide rod 9 is symmetrically arranged, the screw rod 8 and the guide rod 9 are slidably installed with sliding seat 10, vibration motor 11 is installed at the bottom of sliding seat 10, the output end of vibration motor 11 is installed with connection seat 12, the end of connection seat 12 is installed with pile rod 13 by a plurality of bolts.

[0024] Pile rod 13 is installed on connection seat 12, step motor 7 is driven screw rod 8 to rotate, so that sliding seat 10 adjusts height, so that the end of pile rod 13 is attached to ground, then vibration motor 11 is used to drive pile rod 13 to vibrate, while vibrating, sliding seat 10 is pressed sliding seat 10, so that pile rod 13 continuously attaches to ground, pile rod 13 is driven into ground, before piling, support assembly is used to support piling device, to prevent piling device from collapsing, dust fall treatment is carried out on construction area by using dust removal assembly, to reduce dust pollution.

[0025] The device is further provided as shown in the drawings, the support assembly includes support two 17, the support two 17 is installed on the bottom of the device body 1, hydraulic cylinder 16 is installed on both sides of support two 17, the output end of the hydraulic cylinder 16 penetrates the support two 17, and the support seat 18 is installed on the output end of the hydraulic cylinder 16. Figures 1-4

[0026] The device is further provided as shown in the drawings, the support assembly includes support two 17, the support two 17 is installed on the bottom of the device body 1, hydraulic cylinder 16 is installed on both sides of support two 17, the output end of the hydraulic cylinder 16 penetrates the support two 17, and the support seat 18 is installed on the output end of the hydraulic cylinder 16. Figure 4 The device is further provided as shown in the drawings, the support assembly further includes shock absorbing rod 19, the support seat 18 is divided into two parts, and a plurality of shock absorbing rods 19 are installed between the support seat 18. By using the hydraulic cylinder 16 to stick the support seat 18 to the ground, the pile driving device is supported, and the shock absorbing rod 19 is arranged to reduce the noise when the support assembly supports the pile driving device.

[0027] Figures 1-3 The device is further provided as shown in the drawings, the dust removal assembly includes a water tank 14, the water tank 14 is installed on the device body 1, the water tank 14 is provided with a water inlet and a plurality of water outlets, a water pump 15 is connected and installed at the water outlet through a pipeline, a plurality of spray heads 20 are installed on both sides of the bottom of the device body 1, and the spray heads 20 are connected with the water pump 15 through a pipeline. The water in the water tank 14 is pumped into the spray head 20 by using the water pump 15, the spray head 20 sprays water into water mist to spray the construction area, and dust pollution is prevented.

[0028] The device is further provided as shown in the drawings, the dust removal assembly includes a water tank 14, the water tank 14 is installed on the device body 1, the water tank 14 is provided with a water inlet and a plurality of water outlets, a water pump 15 is connected and installed at the water outlet through a pipeline, a plurality of spray heads 20 are installed on both sides of the bottom of the device body 1, and the spray heads 20 are connected with the water pump 15 through a pipeline. The water in the water tank 14 is pumped into the spray head 20 by using the water pump 15, the spray head 20 sprays water into water mist to spray the construction area, and dust pollution is prevented. Figure 1 The device is further provided as shown in the drawings, the dust removal assembly includes a water tank 14, the water tank 14 is installed on the device body 1, the water tank 14 is provided with a water inlet and a plurality of water outlets, a water pump 15 is connected and installed at the water outlet through a pipeline, a plurality of spray heads 20 are installed on both sides of the bottom of the device body 1, and the spray heads 20 are connected with the water pump 15 through a pipeline. The water in the water tank 14 is pumped into the spray head 20 by using the water pump 15, the spray head 20 sprays water into water mist to spray the construction area, and dust pollution is prevented.

[0029] Figure 1 The device is further provided as shown in the drawings, the dust removal assembly includes a water tank 14, the water tank 14 is installed on the device body 1, the water tank 14 is provided with a water inlet and a plurality of water outlets, a water pump 15 is connected and installed at the water outlet through a pipeline, a plurality of spray heads 20 are installed on both sides of the bottom of the device body 1, and the spray heads 20 are connected with the water pump 15 through a pipeline. The water in the water tank 14 is pumped into the spray head 20 by using the water pump 15, the spray head 20 sprays water into water mist to spray the construction area, and dust pollution is prevented.

[0030] The device is further provided as shown in the drawings, the dust removal assembly includes a water tank 14, the water tank 14 is installed on the device body 1, the water tank 14 is provided with a water inlet and a plurality of water outlets, a water pump 15 is connected and installed at the water outlet through a pipeline, a plurality of spray heads 20 are installed on both sides of the bottom of the device body 1, and the spray heads 20 are connected with the water pump 15 through a pipeline. The water in the water tank 14 is pumped into the spray head 20 by using the water pump 15, the spray head 20 sprays water into water mist to spray the construction area, and dust pollution is prevented. Figure 1 The device is further provided as shown in the drawings, the dust removal assembly includes a water tank 14, the water tank 14 is installed on the device body 1, the water tank 14 is provided with a water inlet and a plurality of water outlets, a water pump 15 is connected and installed at the water outlet through a pipeline, a plurality of spray heads 20 are installed on both sides of the bottom of the device body 1, and the spray heads 20 are connected with the water pump 15 through a pipeline. The water in the water tank 14 is pumped into the spray head 20 by using the water pump 15, the spray head 20 sprays water into water mist to spray the construction area, and dust pollution is prevented.

[0031] ​​​Working principle: through the use of hydraulic cylinder 16 will support seat 18 paste ground, will pile device prop up, support pile device, install pile rod 13 on connecting seat 12, through step motor 7 drive screw rod 8 rotation, make slide seat 10 adjust height, make the end of pile rod 13 paste ground, then use vibration motor 11 drive pile rod 13 vibration, while vibrating slide seat 10 press slide seat 10, make pile rod 13 continuously paste ground, drive pile rod 13 into ground, through the use of water pump 15 pump water in water tank 14 into shower head 20, shower head 20 will water spray into water mist and spray water on construction area.

[0032] The above is only the preferred embodiment of the present application, and the part without creative labor such as circuit control and signal control transmission can refer to the prior art, but the protection scope of the present application is not limited to this, any person skilled in the art within the technical range disclosed by the present application, according to the technical scheme and the inventive concept of the present application, can be replaced or changed equivalently, which should be covered in the protection scope of the present application.

Claims

1. A high efficiency piling device for road engineering, comprising a device main body (1), a piling assembly arranged on the device main body (1), a supporting assembly for fixing the piling device, and a dust removal assembly for dust reduction, characterized in that, The piling assembly comprises a slide rail (5) installed above the device body (1), the device body (1) is in a U-shaped structure, a screw rod (8) is rotatably installed in the slide rail (5), a stepping motor (7) is installed at the end of the slide rail (5), the output end of the stepping motor (7) is connected with the screw rod (8), a guide rod (9) is installed on the device body (1), the guide rod (9) is symmetrically arranged, a sliding seat (10) is slidably installed on the screw rod (8) and the guide rod (9), a vibration motor (11) is installed at the bottom of the sliding seat (10), a connecting seat (12) is installed at the output end of the vibration motor (11), a pile rod (13) is installed at the end of the connecting seat (12) through a plurality of bolts.

2. A high efficiency piling device for road engineering according to claim 1, characterized in that, The supporting assembly comprises a bracket two (17) installed at the bottom of the device body (1), a hydraulic cylinder (16) is installed on both sides of the bracket two (17), the output end of the hydraulic cylinder (16) penetrates the bracket two (17), and a supporting seat (18) is installed at the output end of the hydraulic cylinder (16).

3. A high efficiency piling device for road engineering as claimed in claim 2, wherein, The supporting assembly further comprises a shock absorbing rod (19), the supporting seat (18) is divided into two parts, and a plurality of shock absorbing rods (19) are installed between the supporting seats (18).

4. A high efficiency piling device for road engineering according to claim 3, wherein, The dust removal assembly comprises a water tank (14) installed on the device body (1), the water tank (14) is provided with a water inlet and a plurality of water outlets, a water pump (15) is connected and installed at the water outlet through a pipeline, a plurality of spray heads (20) are installed on both sides of the bottom of the device body (1), and the spray heads (20) are connected with the water pump (15) through a pipeline.

5. A high efficiency piling device for road engineering according to claim 4, wherein, The piling device further comprises a traction rope (6), a plurality of traction ropes (6) are arranged at one end of the device body (1) away from the sliding seat (10), the traction ropes (6) are symmetrically arranged, one end of the traction rope (6) is connected with the device body (1), and the other end is connected with the slide rail (5).

6. A high efficiency piling device for road engineering according to claim 5, wherein, The piling device further comprises a bracket one (2), a plurality of bracket ones (2) are arranged on the left and right sides of the device body (1), the bracket ones (2) are symmetrically arranged, and a wheel (3) is rotatably installed in the bracket one (2).

7. A high efficiency piling device for road engineering according to claim 6, wherein The piling device further comprises a traction rod (4) installed on the outer wall of the device body (1) close to the water tank (14).