Building wall surface wire duct integrated pouring structure
By integrating aluminum formwork with cable tray formwork, and combining steel mesh and self-tapping bolt components, the problems of high construction noise and dust are solved, achieving efficient and environmentally friendly wall cable tray construction, forming a prefabricated cable tray structure, and improving construction efficiency and safety.
Patent Information
- Application Number
- CN202423287269.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-12-16
- Estimated Expiration
- 2034-12-31
AI Technical Summary
The construction of wall wiring channels in existing building construction is noisy, dusty, time-consuming, and does not meet the requirements of green construction, thus affecting construction efficiency.
The aluminum formwork and cable tray formwork are integrated into one design, combined with steel mesh and self-tapping bolts to form an isosceles trapezoidal cable tray formwork. After demolding, a prefabricated cable tray is formed on the wall and fixed with waterproof rubber plugs to achieve rapid installation and waterproof effect.
It improves construction efficiency, reduces noise and dust, meets green construction requirements, and ensures construction quality and safety.
Smart Images

Figure CN223675824U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building building construction technical field, concretely relates to building wall surface line slot integration pouring structure. BACKGROUND
[0002] The line pipe is usually buried in the building wall surface, in order to the beautiful appearance of building decoration, usually need to take the way of concealed wiring, that is, need to groove to the wall, place the pipeline in the groove and fix, then fill the cement mortar in the groove, restore the wall surface, this construction method is noisy, dusty, does not meet the requirement of green construction, and the groove construction occupies more time, and the technical requirement is higher, thereby affecting the construction efficiency, therefore, the utility model provides a building wall surface line slot integration pouring structure. UTILITY MODEL CONTENTS
[0003] In order to solve the problems in the prior art, the utility model provides a building wall surface line slot integration pouring structure which is reasonable in structure design and meets the requirement of green construction.
[0004] The technical scheme of the utility model is as follows:
[0005] The building wall surface line slot integration pouring structure comprises an aluminum formwork, a pouring space is formed between adjacent aluminum formworks for forming a building wall body, a line slot formwork is fixedly arranged on the aluminum formwork in the vertical direction, the line slot formwork is in the shape of an isosceles trapezoid in cross section, and the bottom surface of the line slot formwork is attached to the surface of the aluminum formwork, and a prefabricated line slot is formed on the wall body after the line slot formwork and the aluminum formwork are jointly removed.
[0006] Further, a steel mesh frame is arranged in the pouring space, the steel mesh frame comprises longitudinal steel bars and transverse steel bars, the transverse steel bars are bent in the region close to the line slot formwork to form a bent section.
[0007] Further, the bent section is provided with two bending points, and the two bending points are located on the left and right sides of the line slot formwork respectively.
[0008] Further, the line slot formwork is fixed to the aluminum formwork through a bolt assembly, the bolt assembly comprises a self-tapping screw and a waterproof rubber plug, and the self-tapping screw is fixedly connected to the line slot formwork after penetrating through the waterproof rubber plug and the aluminum formwork.
[0009] Further, the waterproof rubber plug is in the shape of a circular truncated cone and is deformed after being extruded to play a waterproof role.
[0010] Further, the line slot formwork is made of aluminum, and preferably, the line slot formwork and the aluminum formwork are made of the same material.
[0011] The utility model has the following beneficial effects:
[0012] 1) By setting the wire slot formwork in the wall pouring space, and being integrated with the aluminum formwork, the wall surface structure with prefabricated wire slot is formed after the formwork is removed, the defect of indoor decoration wall slotting is solved, and the overall construction efficiency of the project is improved.
[0013] 2) The steel mesh frame in the pouring space is bent at the wire slot formwork to avoid the horizontal steel bar leaking out of the prefabricated wire slot after the formwork is removed, and affecting the pipeline construction.
[0014] 3) The wire slot formwork is installed by using self-tapping bolts and waterproof rubber plugs, which is convenient and fast, and can play a waterproof and anti-leakage effect.
[0015] 4) The wire slot formwork adopts isosceles trapezoidal structure, which is convenient for demolding and groove sealing construction. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 It is a structural schematic view of the utility model;
[0017] Figure 2 It is a back surface structural schematic view of the aluminum formwork of the utility model;
[0018] Figure 3 It is a wire slot formwork installation structural schematic view of the utility model;
[0019] Figure 4 It is an effect drawing after the formwork is removed of the utility model;
[0020] In the drawing: 1, aluminum formwork; 2, steel mesh frame; 201, horizontal steel bar; 202, vertical steel bar; 203, bending section; 3, wire slot formwork; 4, self-tapping screw; 5, waterproof rubber plug. DETAILED DESCRIPTION
[0021] The utility model is further described below in combination with the drawings of the specification.
[0022] As shown in the drawing, Figure 1 The building wall wire slot integrated pouring structure comprises an aluminum formwork 1, a pouring space is formed between adjacent aluminum formworks 1, and is used for forming a building wall;
[0023] In the embodiment, two groups of wire slot formworks 3 are arranged side by side on the inner side of the aluminum formwork 1, each group of wire slot formworks 3 is arranged in the vertical direction, and each group of wire slot formworks 3 is composed of a plurality of wire slot formworks 3 which are spliced upwards and downwards.
[0024] In the embodiment, the wire slot formwork 3 is in isosceles trapezoidal structure, and the bottom surface (the wider surface) is attached to the surface of the aluminum formwork 1; after the wire slot formwork 3 and the aluminum formwork 1 are removed together, a prefabricated wire slot is formed on the wall
[0025] The pouring space is provided with a reinforcing mesh frame 2, which comprises longitudinal reinforcing bars 202 and transverse reinforcing bars 201, the transverse reinforcing bars 201 being bent near the area of the trunking formwork 3 to form a bent section 203.
[0026] The reinforcing bars can be bent on site by using a bending machine, and the bent section 203 is kept a certain distance from the trunking formwork 3 after bending, so that the transverse reinforcing bars 201 will not be exposed after the formwork is removed, and the appearance and construction safety will not be affected.
[0027] The trunking formwork 3 is fixed to the aluminum formwork 1 by a bolt assembly, which comprises self-tapping screws 4 and waterproof rubber plugs 5, the self-tapping screws 4 being fixed to the trunking formwork 3 after penetrating the waterproof rubber plugs 5 and the aluminum formwork 1, the waterproof rubber plugs 5 in this embodiment adopting a truncated cone structure, being extruded after being contacted with the heads of the self-tapping screws 4, and being able to plug the holes of the aluminum formwork through which the self-tapping screws 4 penetrate, to prevent slurry leakage.
[0028] Note: The self-tapping screws 4 are installed from the outside of the aluminum formwork 1, and the trunking formwork 3 will not be exposed after being fixed.
[0029] The trunking formwork 3 in this embodiment is made of aluminum material of the same material as the aluminum formwork 1, which is light in weight and easy to install.
[0030] The above embodiments are only preferred embodiments of the present application, and are not a limitation on the technical solutions of the present application, and any technical solutions that can be realized on the basis of the above embodiments without creative labor should be considered to fall within the scope of protection of the patent of the present application.
Claims
1. A building wall surface and channel integrated pouring structure, comprising an aluminum formwork (1), characterized in that, The pouring space is formed between the adjacent aluminum formworks (1) and is used for forming a building wall body; a wire slot formwork (3) is fixedly arranged on the aluminum formwork (1) in the vertical direction, the wire slot formwork (3) has an isosceles trapezoidal structure in the cross section, and the bottom surface of the wire slot formwork (3) is attached to the surface of the aluminum formwork (1); the wire slot formwork (3) and the aluminum formwork (1) are jointly removed, and a prefabricated wire slot is formed on the wall body.
2. The building wall and channel integrated pouring structure according to claim 1, wherein, The pouring space is provided with a reinforcing mesh frame (2), the reinforcing mesh frame (2) comprises longitudinal steel bars (202) and transverse steel bars (201), the transverse steel bars (201) are bent in the region close to the wire slot formwork (3) to form bent sections (203).
3. The building wall and channel integrated pouring structure according to claim 2, wherein, The bent section (203) is provided with two bending points, and the two bending points are respectively located on the left side and the right side of the wire slot formwork (3).
4. The building wall and channel integrated pouring structure according to claim 1, wherein, The wire slot formwork (3) is fixed on the aluminum formwork (1) through a bolt assembly, the bolt assembly comprises self-tapping screws (4) and waterproof rubber plugs (5), the self-tapping screws (4) are fixedly connected with the wire slot formwork (3) after penetrating through the waterproof rubber plugs (5) and the aluminum formwork (1).
5. The building wall and channel integrated pouring structure according to claim 4, wherein, The waterproof rubber plug (5) has a circular truncated cone structure.
6. The building wall and channel integrated pouring structure according to claim 1, wherein, The wire slot formwork (3) is made of aluminum.