Power construction pay-off guiding device
By using the threaded connection structure between the arc plate sleeve and the main pole frame, and the design of the limiting ring, the problem of insufficient adjustment flexibility and stability of existing power construction stringing devices is solved, achieving high efficiency, safety and accuracy in the stringing process.
Patent Information
- Application Number
- CN202520222545.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-12
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2035-02-12
AI Technical Summary
Existing power construction cable laying devices lack sufficient adjustment flexibility, cannot meet the diverse needs of different construction scenarios, and have poor stability, easily shaking or misaligning, affecting construction efficiency and safety.
A threaded connection structure between the arc plate sleeve and the main rod frame was designed, allowing for flexible angle adjustment. The design of the limit ring and mounting base enhances stability, ensuring the accuracy and safety of the device during the line laying process.
It improves the efficiency and flexibility of line laying, avoids line crossing and tangling, enhances the stability and reliability of the device, and ensures the safety and quality of construction.
Smart Images

Figure CN223687809U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to guiding device technical field especially relates to a power construction pay off guiding device. BACKGROUND
[0002] In the power construction process, pay off operation is a vital link. The power construction pay off mode often depends on manual operation, which is not only inefficient, but also prone to problems such as line crossing and winding, causing inconvenience and safety hazards to construction. In order to solve these problems, people began to explore the use of power construction pay off guiding device to assist pay off operation.
[0003] The existing power construction pay off guiding device still has some technical problems in actual application. First, the adjustment flexibility of the device is insufficient, which cannot meet the diversified needs of pay off angle and position in different construction scenes. This leads to the fact that construction personnel often need to spend a lot of time and effort to manually adjust when facing complex terrain or special pay off requirements, which seriously affects the construction efficiency. Secondly, the stability of the device is also one of the key factors restricting its application effect. During the pay off process, if the device shakes or misplaces, it will not only affect the accuracy of the pay off, but also may cause safety hazards to construction personnel and equipment. Therefore, how to enhance the stability of the device and ensure that it always maintains the correct position and angle during use has become a technical problem to be solved.
[0004] Therefore, in view of the problem, the utility model provides a power construction pay off guiding device. UTILITY MODEL CONTENTS
[0005] The utility model aims at solving the problems in the prior art and provides a power construction pay off guiding device.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a power construction pay off guiding device, including main rod frame, the surface of main rod frame is sequentially connected with circular arc plate sleeve one, circular arc plate sleeve two and circular arc plate sleeve three respectively, four extension rods are arranged at equal distance on the side surface of circular arc plate sleeve three, the one end of extension rod is provided with first line wheel frame, four fixed rods are arranged at equal distance on the side surface of circular arc plate sleeve three, the one end of fixed rod is fixedly connected with second line wheel frame, circular arc plate sleeve two is located on the side surface of circular arc plate sleeve three.
[0007] Preferably, the side surface of the circular arc plate sleeve one is provided with a telescopic rod, and the one end of the telescopic rod is fixedly connected with an adjusting wheel frame, which is used for adjusting the line.
[0008] Preferably, the surface of the main rod frame is connected with a limiting ring through threads, and the two limiting rings are respectively located on the side surface of the circular arc plate sleeve three and the circular arc plate sleeve one.
[0009] Preferably, the two ends of the main rod frame are respectively clamped with mounting seats, and the side surface of the mounting seat is provided with a mounting hole for installation.
[0010] Preferably, the side surface of the mounting seat is provided with a threaded sleeve which is threadedly connected with the main rod frame.
[0011] Preferably, the first arc plate sleeve is located on the side surface of the second arc plate sleeve, and the first arc plate sleeve is not in contact with the second arc plate sleeve.
[0012] Compared with the prior art, the power construction pay-off guiding device has the following beneficial effects:
[0013] 1. The power construction pay-off guiding device, through the threaded connection structure of the arc plate sleeve and the main rod frame, can flexibly adjust the position angle between the arc plate sleeves. This design allows workers to easily adjust the positions of the first line wheel frame and the second line wheel frame according to the actual number of lines and construction requirements, so that they are in a staggered state, thereby avoiding the crossing and entanglement of the lines. This not only improves the efficiency of power construction pay-off, but also greatly enhances the flexibility of construction, so that the device can adapt to various complex pay-off scenes.
[0014] 2. The power construction pay-off guiding device, through the design of the limiting ring on the surface of the main rod frame, provides additional support and stability for the arc plate sleeve. At the same time, the threaded sleeve on the side surface of the mounting seat is threadedly connected with the main rod frame, ensuring the firm connection between the mounting seat and the main rod frame. These designs collectively enhance the stability and reliability of the entire device, preventing malfunctions caused by shaking or misalignment during pay-off. BRIEF DESCRIPTION OF DRAWINGS
[0015] Figure 1 A structural schematic view of the power construction pay-off guiding device is provided for the utility model;
[0016] Figure 2 A structural side view of the power construction pay-off guiding device is provided for the utility model;
[0017] Figure 3 A structural side view of the power construction pay-off guiding device is provided for the utility model; Figure 1 A zoomed-in view of area A.
[0018] In the figure: 1, main rod frame; 2, first arc plate sleeve; 3, second arc plate sleeve; 4, third arc plate sleeve; 5, extension rod; 6, first line wheel frame; 7, fixed rod; 8, second line wheel frame; 9, telescopic rod; 10, limiting ring; 11, mounting seat; 1101, threaded sleeve; 12, mounting hole; 13, adjusting wheel frame. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments.
[0020] In the description of the utility model, it needs to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer" and the like indicate the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the utility model.
[0021] Referring to Figures 1-3 A power construction wire laying guide device, its main structure includes the main rod frame 1. On the surface of the main rod frame 1, three key components are sequentially screwed: the arc plate sleeve one 2, the arc plate sleeve two 3 and the arc plate sleeve three 4. Four extension rods 5 are designed at equal intervals on the side surface of the arc plate sleeve three 4, and a first wire wheel frame 6 is mounted at the end of each extension rod 5 for supporting and guiding the power line. At the same time, four fixed rods 7 are also arranged at equal intervals on the side surface of the arc plate sleeve three 4, and a second wire wheel frame 8 is fixedly connected at the end of each fixed rod 7 for additional support and guidance of the power line. The arc plate sleeve two 3 is located on one side of the arc plate sleeve three 4, and by rotating the arc plate sleeve three 4, it can be easily screwed with the main rod frame 1, so as to adjust the position angle between the arc plate sleeve two 3 and the arc plate sleeve three 4. This design allows the first wire wheel frame 6 and the second wire wheel frame 8 to be in a staggered state, facilitating the staff to flexibly adjust and use according to the actual number of lines. The device realizes the angle adjustment between the first wire wheel frame 6 and the second wire wheel frame 8 by rotating the arc plate sleeve three 4, improves the flexibility and adaptability in the power construction wire laying process, and effectively improves the work efficiency.
[0022] Among them, a telescopic rod 9 is designed on the side surface of the arc plate sleeve one 2, and an adjusting wheel frame 13 is fixedly connected to one end of the telescopic rod 9. This adjusting wheel frame 13 can be used to adjust the line to ensure that the power line remains neat and does not entangle during the wire laying process. The introduction of the adjusting wheel frame 13 enables better control and adjustment of the power line during the wire laying process, effectively avoiding entanglement and chaos of the line, and improving the construction quality and safety.
[0023] Two limiting rings 10 are symmetrically connected to the surface of the main rod support 1 through threads. These two limiting rings 10 are located on the side of the arc plate sleeve three 4 and the arc plate sleeve one 2 respectively. The limiting ring 10 is designed to provide additional support and stability when adjusting the arc plate sleeve, preventing the arc plate sleeve from shaking or misplacing during rotation. The introduction of the limiting ring 10 enhances the stability and reliability of the entire device, ensuring the accuracy and safety of the arc plate sleeve during adjustment.
[0024] Two mounting seats 11 are respectively clamped at both ends of the main rod support 1. Each mounting seat 11 has a mounting hole 12 on the side, which is used to install the entire device on the power construction site. The design of the mounting seat 11 and the mounting hole 12 makes it easy to install the device on the power construction site, providing necessary support and guiding function for the pay-off work.
[0025] A threaded sleeve 1101 is designed on the side of each mounting seat 11. This threaded sleeve 1101 is threadedly connected with the main rod support 1, thereby achieving a firm connection between the mounting seat 11 and the main rod support 1. The introduction of the threaded sleeve 1101 makes the connection between the mounting seat 11 and the main rod support 1 more firm and reliable, improving the stability and service life of the entire device.
[0026] The arc plate sleeve one 2 is located on the side of the arc plate sleeve two 3 and does not contact each other. This design makes the arc plate sleeve one 2 and the arc plate sleeve two 3 not interfere with each other during rotation, thereby ensuring the accuracy and flexibility of adjustment. The non-contact design between the arc plate sleeve one 2 and the arc plate sleeve two 3 improves the adjustment performance and reliability of the entire device, providing better support and protection for the power construction pay-off work.
[0027] The above is only the preferred specific implementation of the present application, but the protection scope of the present application is not limited to this. Any skilled person in the technical field according to the technical solution and the inventive concept of the present application can make equivalent replacement or change within the technical range disclosed by the present application, which should be covered within the protection scope of the present application.
Claims
1. A power construction stringing guide comprising a main pole (1), characterized in that, The surface of the main rod frame (1) is sequentially screwed with a circular arc sleeve one (2), a circular arc sleeve two (3) and a circular arc sleeve three (4), the side of the circular arc sleeve three (4) is provided with four extension rods (5) at equal distances, one end of the extension rod (5) is provided with a first line wheel frame (6), the side of the circular arc sleeve three (4) is provided with four fixed rods (7) at equal distances, one end of the fixed rod (7) is fixedly connected with a second line wheel frame (8), the circular arc sleeve two (3) is located on the side of the circular arc sleeve three (4).
2. A power construction stringing guide according to claim 1, wherein, The side of the circular arc sleeve one (2) is provided with a telescopic rod (9), one end of the telescopic rod (9) is fixedly connected with an adjusting wheel frame (13), the adjusting wheel frame (13) is used for adjusting the line.
3. A power construction stringing guide according to claim 1, wherein, The surface of the main rod frame (1) is symmetrically connected with a limiting ring (10) through screwing, two limiting rings (10) are respectively located on the side of the circular arc sleeve three (4) and the circular arc sleeve one (2).
4. A power construction stringing guide according to claim 1, wherein, Both ends of the main rod frame (1) are respectively clamped with a mounting seat (11), the side of the mounting seat (11) is provided with a mounting hole (12), the mounting hole (12) is used for mounting.
5. A power construction stringing guide according to claim 4, wherein, The side of the mounting seat (11) is provided with a threaded sleeve (1101), the threaded sleeve (1101) is screwed with the main rod frame (1).
6. A power construction stringing guide according to claim 1 wherein, The circular arc sleeve one (2) is located on the side of the circular arc sleeve two (3), the circular arc sleeve one (2) is not in contact with the circular arc sleeve two (3).