Fire engineering construction pipeline hoisting device
By introducing support and clamping mechanisms into the pipeline hoisting device for fire protection engineering construction, the problem of time-consuming and labor-intensive pipeline loading and unloading has been solved, achieving efficient and stable pipeline hoisting.
Patent Information
- Application Number
- CN202520411862.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-10
- Publication Date
- 2025-12-30
- Estimated Expiration
- 2035-03-10
AI Technical Summary
Existing fire protection engineering construction pipeline hoisting equipment has high friction during loading and unloading, which requires workers to lift the pipeline to pick it up and put it down, which is time-consuming, labor-intensive and has low hoisting efficiency.
The system employs a support mechanism and a clamping mechanism. The support mechanism lifts the pipe using a rectangular frame and support rollers, while the clamping mechanism securely holds the pipe using hydraulic rods and clamping plates. Combined with an electric hoist and lifting ropes, the system enables the sliding placement and removal of the pipe.
It enables time-saving and labor-saving pipe loading and unloading, improves hoisting efficiency and stability, reduces manpower consumption, and enhances the practicality and stability of the equipment.
Smart Images

Figure CN223737595U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to fire engineering construction technical field especially relates to a fire engineering construction pipeline hoisting device. BACKGROUND
[0002] The utility model discloses a kind of fire pipeline hoisting devices, including hoisting device main body, support frame and placing rack, support frame is provided at the top of hoisting device main body, one side of support frame is provided with placing rack, one side of placing rack is provided with clamping structure, motor is provided at the middle position of the top of hoisting device main body, the output end of motor is provided with steel wire rope, one end of steel wire rope is fixed with the top of placing rack, support structure is provided at the both sides of hoisting device main body, universal wheel is provided at the bottom of hoisting device main body, clamping structure includes fixed plate, rotating rod, movable slot and clamping plate, by being provided with clamping structure, to make fire pipeline more stable when hoisting, thus by the cooperation of fixed plate, rotating rod and clamping plate, fire pipeline can be clamped, so that fire pipeline does not fall during hoisting, to improve the fixing effect.
[0003] But the above-mentioned device when feeding and discharging on pipeline, since pipeline is heavy, the friction between it and device is larger, so that staff can only lift pipeline to take and place on device, time-consuming and labor-consuming, pipeline hoisting efficiency is low, for this purpose, we propose a kind of fire engineering construction pipeline hoisting device. UTILITY MODEL CONTENTS
[0004] The utility model aims at providing a kind of fire engineering construction pipeline hoisting device, can solve the problem of time-consuming and labor-consuming of feeding and discharging on the device of part of existing.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a kind of fire engineering construction pipeline hoisting device, including:
[0006] Trolley, its top is fixedly installed with two groups of slide rods, two groups of slide rods are commonly movably sleeved with movable plate, the front side outer surface of movable plate is fixedly installed with hoisting plate;
[0007] Clamping mechanism, it is set up at the top of hoisting plate, and clamping mechanism is used to clamp pipeline;
[0008] Support mechanism, it is set up on hoisting plate, and support mechanism includes rectangular frame and supporting roller, rectangular slot is passed through and is set up on hoisting plate, rectangular frame is set up in rectangular slot, at least two groups of supporting rollers are rotatably installed between the front and rear side inner walls of rectangular frame.
[0009] Preferably, the supporting mechanism further comprises a U-shaped fixing plate and a first hydraulic rod, the bottom of the hoisting plate is fixedly provided with the U-shaped fixing plate, the bottom of the U-shaped fixing plate is fixedly provided with two groups of first hydraulic rods, and the free ends of the two groups of first hydraulic rods are penetrated through the U-shaped fixing plate and fixedly connected with the bottom of the rectangular frame.
[0010] Preferably, the clamping mechanism comprises a vertical plate, a second hydraulic rod, a clamping plate and a rubber pad, the top of the hoisting plate is fixedly provided with two groups of vertical plates, the front outer surfaces of the two groups of vertical plates are fixedly provided with a group of second hydraulic rods, the free ends of the two groups of second hydraulic rods are penetrated through the corresponding vertical plates and fixedly provided with a group of clamping plates, and the rear outer surfaces of the two groups of clamping plates are fixedly provided with a group of rubber pads.
[0011] Preferably, the top of the hoisting plate is fixedly provided with two groups of resisting plates, and the front outer surfaces of the two groups of resisting plates are fixedly provided with at least two groups of rubber strips.
[0012] Preferably, the two groups of sliding rods are fixedly provided with a group of connecting plates, and an electric hoist is fixedly arranged between the two groups of connecting plates, the electric hoist is provided with a lifting rope, and one end of the lifting rope is fixedly connected with the top of the movable plate.
[0013] Preferably, the top of the trolley is fixedly provided with two groups of reinforcing plates, and the two groups of reinforcing plates are fixedly connected with the outer surfaces of the corresponding sliding rods.
[0014] Preferably, the top of the trolley is fixedly provided with a handle.
[0015] Compared with the prior art, the device has the advantages that:
[0016] (1) The fire engineering construction pipeline hoisting device can make the supporting rollers support the pipeline when the pipeline is fed or discharged, and the user can directly slide the pipeline to realize taking and placing, thereby saving time and effort, solving the problem that the existing device can only lift the pipeline to place it on the device due to the large friction between the pipeline and the device when the pipeline is fed or discharged, and improving the practicability of the device.
[0017] (2) The fire engineering construction pipeline hoisting device can stably clamp the pipeline through the cooperation of the clamping mechanism and the resisting plate, prevent the pipeline from sliding during hoisting, improve the stability of the device, ensure the use effect of the device, and is conducive to the promotion and use of the device. BRIEF DESCRIPTION OF DRAWINGS
[0018] The utility model will be further explained in connection with the drawings and embodiments:
[0019] Fig. 1 It is a front view of the utility model;
[0020] Fig. 2 Figure 1 is a front perspective view of the hoisting plate and its associated components of the utility model;
[0021] Fig. 3 Figure 2 is a bottom perspective view of the hoisting plate and its associated components of the utility model.
[0022] The drawings show: 1, trolley; 2, slide bar; 3, movable plate; 4, hoisting plate; 5, supporting mechanism; 51, U-shaped fixed plate; 52, first hydraulic rod; 53, rectangular frame; 54, supporting roller; 6, clamping mechanism; 61, vertical plate; 62, second hydraulic rod; 63, clamping plate; 64, rubber pad; 7, abutting plate; 8, rubber strip; 9, connecting plate; 10, electric hoist; 11, lifting rope; 12, reinforcing plate; 13, handle. DETAILED DESCRIPTION
[0023] This part will describe the specific embodiments of the utility model in detail, the preferred embodiments of the utility model are shown in the drawings, the role of the drawings is to supplement the description of the text part with graphics, so that people can intuitively and visually understand each technical feature and the overall technical scheme of the utility model, but it cannot be understood as the limitation of the protection scope of the utility model.
[0024] Please refer to Figs. 1-3 The utility model provides a kind of technical scheme: a fire engineering construction pipeline hoisting device, including trolley 1, clamping mechanism 6 and supporting mechanism 5, the top of trolley 1 is fixedly installed with two groups of slide bars 2, two groups of slide bars 2 are commonly movably sleeved with movable plate 3, the front side outer surface of movable plate 3 is fixedly installed with hoisting plate 4, clamping mechanism 6 is set to the top of hoisting plate 4, clamping mechanism 6 is used to pipe clamping, the top of hoisting plate 4 is fixedly installed with two groups of abutting plate 7, the front side outer surface of two groups of abutting plate 7 is fixedly installed with at least two groups of rubber strips 8, one group of connecting plate 9 is fixedly installed on two groups of slide bars 2, two groups of connecting plate 9 are fixedly installed with electric hoist 10, electric hoist 10 is provided with lifting rope 11, one end of lifting rope 11 is fixedly connected with the top of movable plate 3, the top of trolley 1 is fixedly installed with two groups of reinforcing plate 12, two groups of reinforcing plate 12 are fixedly connected with the outer surface of corresponding slide bar 2, the top of trolley 1 is fixedly installed with handle 13;
[0025] Supporting mechanism 5 is set to hoisting plate 4, and supporting mechanism 5 includes rectangular frame 53 and supporting roller 54.
[0026] The supporting mechanism 5 further comprises a U-shaped fixed plate 51 and a first hydraulic rod 52, the bottom of the hoisting plate 4 is fixedly provided with the U-shaped fixed plate 51, the bottom of the U-shaped fixed plate 51 is fixedly provided with two groups of first hydraulic rods 52, the free ends of the two groups of first hydraulic rods 52 are both penetrated through the U-shaped fixed plate 51 and fixedly connected with the bottom of the rectangular frame 53, through the supporting mechanism 5, when the pipes are fed or discharged, each supporting roller 54 can support the pipes, and the user can directly slide the pipes to realize taking and placing, time and labor are saved, the problem that, in the prior art, when the pipes are fed or discharged, the friction between the pipes and the device is large due to the heavy weight of the pipes, so that the workers can only lift the pipes to take and place on the device, time and labor are consumed, and the pipe hoisting efficiency is low is solved, and the practicability of the device is improved.
[0027] The clamping mechanism 6 comprises a vertical plate 61, a second hydraulic rod 62, a clamping plate 63 and a rubber pad 64, the top of the hoisting plate 4 is fixedly provided with two groups of vertical plates 61, the front outer surfaces of the two groups of vertical plates 61 are both fixedly provided with a group of second hydraulic rods 62, the free ends of the two groups of second hydraulic rods 62 are both penetrated through the corresponding vertical plates 61 and fixedly provided with a group of clamping plates 63, the rear outer surfaces of the two groups of clamping plates 63 are both fixedly provided with a group of rubber pads 64, through the cooperation of the clamping mechanism 6 and the resisting plate 7, the pipes can be stably clamped, and the pipes are prevented from sliding in the hoisting process, the stability of the device is improved, the use effect of the device is ensured, and the popularization and use of the device are facilitated.
[0028] Working principle: when feeding, the electric hoist 10 drives the movable plate 3 to slide down through the lifting rope 11, drives the hoisting plate 4 to descend, controls the free ends of the two groups of first hydraulic rods 52 to synchronously elongate, drives the supporting rollers 54 on the rectangular frame 53 to rise and exceed the top of the hoisting plate 4, the user puts one end of the pipe on the supporting rollers 54 and directly slides the whole pipe on the supporting rollers 54, controls the rectangular frame 53 to descend and reset, the pipe contacts the hoisting plate 4, then controls the free ends of the two groups of second hydraulic rods 62 to elongate, drives the two groups of clamping plates 63 to clamp the pipe in cooperation with the rubber strip 8, and then the electric hoist 10 drives the movable plate 3 to rise through the lifting rope 11, hoists and shifts the position of the device to the hoisting position, when discharging, the clamping of the clamping mechanism 6 is released, the supporting mechanism 5 drives the pipe to rise again, and the user directly pulls and slides the pipe to discharge.
[0029] The embodiments of the utility model are explained in detail above in combination with the drawings, but the utility model is not limited to the above-mentioned embodiments, within the knowledge range of ordinary skilled in the art, various changes can be made without departing from the purpose of the utility model.
Claims
1. A fire protection engineering construction pipe hoisting device, characterized by, The utility model relates to a pipe lifting device, including: Trolley (1), its top fixed installation has two groups of slide bar (2), two groups of slide bar (2) are collectively active and set up and have movable plate (3), the front side outer surface of movable plate (3) is fixedly installed with hoisting plate (4); Clamping mechanism (6) is set up in the top of hoisting plate (4), and clamping mechanism (6) is used for clamping pipe; Supporting mechanism (5) is set up on hoisting plate (4), and supporting mechanism (5) includes rectangular frame (53) and supporting roller (54), rectangular slot is set up in hoisting plate (4) and is penetrated, rectangular frame (53) is set up in rectangular slot, at least two groups of supporting roller (54) are rotatably installed between the front and rear side inner walls of rectangular frame (53).
2. A fire protection installation pipe hoisting device according to claim 1, characterized in that: The supporting mechanism (5) further includes a U-shaped fixed plate (51) and a first hydraulic rod (52), the bottom of the hoisting plate (4) is fixedly installed with the U-shaped fixed plate (51), the bottom of the U-shaped fixed plate (51) is fixedly installed with two groups of first hydraulic rods (52), the free ends of the two groups of first hydraulic rods (52) are penetrated through the U-shaped fixed plate (51) and are fixedly connected with the bottom of the rectangular frame (53).
3. A fire protection installation pipe hoisting device according to claim 2, characterized in that: The clamping mechanism (6) includes a vertical plate (61), a second hydraulic rod (62), a clamping plate (63), and a rubber pad (64), the top of the hoisting plate (4) is fixedly installed with two groups of vertical plates (61), the front side outer surfaces of the two groups of vertical plates (61) are fixedly installed with a group of second hydraulic rods (62), the free ends of the two groups of second hydraulic rods (62) are penetrated through the corresponding vertical plates (61) and are fixedly installed with a group of clamping plates (63), the rear side outer surfaces of the two groups of clamping plates (63) are fixedly installed with a group of rubber pads (64).
4. A fire protection installation pipe hoisting device according to claim 3, characterized in that: The top of the hoisting plate (4) is fixedly installed with two groups of resisting plates (7), and the front side outer surfaces of the two groups of resisting plates (7) are fixedly installed with at least two groups of rubber strips (8).
5. A fire protection installation pipe hoisting device according to claim 4, characterised in that: A group of connecting plates (9) are fixedly installed on the two groups of slide bars (2), an electric hoist (10) is fixedly installed between the two groups of connecting plates (9), a lifting rope (11) is arranged on the electric hoist (10), and one end of the lifting rope (11) is fixedly connected with the top of the movable plate (3).
6. A fire protection installation pipe hoisting device according to claim 5, characterised in that: The top of the trolley (1) is fixedly installed with two groups of reinforcing plates (12), and the two groups of reinforcing plates (12) are fixedly connected with the outer surfaces of the corresponding slide bars (2).
7. A fire protection installation pipe hoisting device according to claim 6, characterised in that: The top of the trolley (1) is fixedly installed with a handle (13).
Citation Information
Patent Citations
Fire-fighting pipeline hoisting device
CN219751781U