Novel climbing frame for building
By designing protective and connecting devices on the building climbing scaffold, the problems of workers falling and cumbersome installation were solved, thus improving both safety and efficiency.
Patent Information
- Application Number
- CN202520117176.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-18
- Publication Date
- 2025-12-30
- Estimated Expiration
- 2035-01-18
AI Technical Summary
During the use of existing building climbing scaffolds, construction workers are prone to falling between the connecting columns, posing a safety hazard. In addition, the installation process is cumbersome and inefficient.
A novel building climbing formwork was designed, comprising a protective device and a connecting device. The protective device, through the cooperation of a protective rod, a limiting rod, and a spring, prevents construction workers from falling. The connecting device, through the cooperation of a slide rail, an adjusting rod, and a spring, enables rapid installation and positioning.
It improved the safety of construction workers, simplified the equipment installation process, and increased installation efficiency.
Smart Images

Figure CN223738950U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building climbing frame technical field especially relates to a new building climbing frame. BACKGROUND
[0002] Building is the general term of building and structure, when building, when building wall outer surface, generally needs construction personnel to construct, construction personnel will erect some shelves, and construction personnel stands on the shelf and constructs the wall outer surface, and the climbing frame facilitates construction personnel construction.
[0003] The prior art such as the patent with the announcement number CN212130378U discloses a new safety type high-rise building climbing frame for building, the patent adopts the climbing frame body and winch, the footrest is welded between the climbing frame body, and the footrest top surface is pasted with the antiskid pad, the fixed block is arranged on the top of the climbing frame body, the clamping groove is formed in the surface of the fixed block, the winch is arranged on the side of the fixed block and located on the top surface of the climbing frame body, and the winch is connected with the hook through the rope, the climbing frame body is rotatably connected with the base through the climbing frame body rotating support, the base rotating support is welded on the top surface of the base and located on the side of the climbing frame body rotating support, the rotating support is welded on the surface of the side of the climbing frame body, and the rotating support is rotatably connected with the base rotating support through the hydraulic rod, the handle is welded on the top surface of the base, the climbing ladder wheel is arranged on the bottom surface of the base, and the universal wheel is arranged below the handle and located on the other end of the bottom surface of the base;The utility model equipment solves that when the existing equipment is used, the maintenance ladder will slip along the lower part of the vertical rod when the maintenance worker climbs on the maintenance ladder, accidents are caused, and the safety hazard problem is brought to the maintenance personnel.
[0004] In daily work, in the process of using the equipment, the construction personnel stands on the surface of the placing plate and constructs, is easy to fall between the second connecting column, causes the problem of the casualties of construction personnel. Utility model content
[0005] The utility model discloses a new building climbing frame to solve the shortcoming that construction personnel is easy to fall from the equipment and cause casualties in the prior art.
[0006] In order to achieve the above object, the utility model discloses the following technical scheme: A novel building climbing frame, first connecting column, second connecting column, connecting arm, placing plate and mounting head, the connecting arm is fixedly connected between first connecting column and second connecting column, the placing plate is arranged between first connecting column and second connecting column, the mounting head is arranged on the surface of first connecting column, the surface of second connecting column is provided with a protection device, the protection device includes a protection rod and a baffle, the inner side of the protection rod and second connecting column is arranged, the baffle is fixedly connected with the surface of second connecting column, the side of second connecting column close to the protection rod is provided with a limiting groove, the surface of one end of the protection rod close to second connecting column is provided with a pull hole, the inside of the pull hole is slidably connected with a limiting rod.
[0007] Further, one end of the limiting rod is clamped with the inside of the limiting groove, by setting the limiting rod, the protection rod can be positioned, and the situation that the protection rod is easy to separate from the side of the second connecting column when the equipment is used, causing the equipment to be difficult to protect the construction personnel is reduced.
[0008] Further, the end of the limiting rod away from the limiting groove is fixedly connected with a first spring, and the end of the first spring away from the limiting rod is fixedly connected with the inside of the pull hole. The first spring is arranged to facilitate the application of reset elastic force to the limiting rod.
[0009] Further, the side of the end of the limiting rod close to the first spring is fixedly connected with a pull block, and the pull block is slidably connected with the inside of the pull hole. The pull block is arranged to facilitate the movement of the limiting rod.
[0010] Further, the end of the mounting head close to the first connecting column is provided with a connecting device, the connecting device includes a sliding rail and a connecting hole, the connecting hole is arranged at the end of the mounting head close to the first connecting column, the sliding rail is fixedly connected with the side of the first connecting column close to the mounting head, the side of the end of the mounting head close to the first connecting column is fixedly connected with a sliding block, the sliding block is slidably connected with the inside of the sliding rail, the inside of the sliding rail is provided with an adjusting groove, the inside of the connecting hole is slidably connected with an adjusting rod, the adjusting rod is clamped with the inside of the adjusting groove, by setting the sliding rail and the sliding block, the limiting movement of the mounting head can be realized, and the situation that the mounting head is easy to separate from the surface of the first connecting column when the equipment is used is reduced.
[0011] Further, the end of the adjusting rod away from the adjusting groove is fixedly connected with a second spring, and the end of the second spring away from the adjusting rod is fixedly connected with the inside of the connecting hole. The second spring is arranged to facilitate the application of reset elastic force to the adjusting rod.
[0012] Further, the surface of the end of the adjusting rod close to the second spring is fixedly connected with a moving rod, and the moving rod is slidably connected with the inside of the connecting hole. The moving rod is arranged to facilitate the movement of the adjusting rod.
[0013] Compared with the prior art, the utility model has the advantages and positive effects that:
[0014] 1、 the utility model discloses, through setting up the protection device, equipment when disassembling, user removes the pull block, when the pull block removes and drives the spacing rod to remove, when the spacing rod removes and drives the first spring displacement shape change and produces the elastic force, immediately the spacing rod removes and separates from the inside of the limiting slot, immediately the protection rod loses the restraint, removes the mounting panel's surface and separates from the protection device, effectively blocks the equipment, plays the role of protecting the construction personnel's safety, when using, the construction personnel stands on the surface of the placing plate and carries out the construction, and it is easy to fall between the second connecting column, causes the construction personnel to appear the casualty situation, this protection device, the mutual cooperation between the protection rod, the spacing rod, the baffle and the first spring etc. parts blocks the larger spacing between the second connecting column, improves the safety of construction personnel.
[0015] 2、 the utility model discloses, through setting up the connecting device, equipment when installing, user connects the mounting head with the wall surface, immediately pulls the moving rod and drives the adjusting rod to remove, when the adjusting rod removes and drives the second spring displacement shape change and produces the elastic force, immediately the mounting head loses the restraint, and the first connecting column moves in the mounting head one end and adjusts the whole equipment, effectively installs the equipment through setting up the connecting device, plays the role of the convenient installation equipment, reduces the equipment when using, equipment when installing, generally uses the bolt and fixes one by one, and the installation of bolt needs to use the tool to cause, and the use of tool is too cumbersome, causes the low efficiency of equipment installation, this connecting device, the mutual cooperation between the adjusting rod, the sliding rail, the moving rod and the second spring etc. parts realizes the quick installation positioning of equipment, improves the practicability of equipment. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 A three-dimensional structure schematic view of the novel building climbing frame is provided for the utility model;
[0017] Figure 2 A side view structure schematic view of the novel building climbing frame is provided for the utility model;
[0018] Figure 3 A partial structure schematic view of the novel building climbing frame is provided for the utility model;
[0019] Figure 4 A structure schematic view of the novel building climbing frame is provided for the utility model; Figure 3 A structure schematic view of the novel building climbing frame is provided for the utility model;
[0020] Figure 5 A structure schematic view of the novel building climbing frame is provided for the utility model;Figure 3 Structure diagram of the device at B.
[0021] Legend: 1, first connecting column; 2, second connecting column; 3, connecting arm; 4, placing plate; 5, mounting head; 6, protection device; 61, protection rod; 62, baffle; 63, limiting groove; 64, pull hole; 65, limiting rod; 66, pull block; 67, first spring; 7, connecting device; 71, sliding rail; 72, sliding block; 73, adjusting groove; 74, connecting hole; 75, adjusting rod; 76, moving rod; 77, second spring. DETAILED DESCRIPTION
[0022] Please refer to Figures 1-5 The utility model provides a technical scheme: a novel building climbing frame, including first connecting column 1, second connecting column 2, connecting arm 3, placing plate 4 and mounting head 5, connecting arm 3 and first connecting column 1 and second connecting column 2 between fixed connection, placing plate 4 sets up between first connecting column 1 and second connecting column 2, and mounting head 5 sets up at the surface of first connecting column 1.
[0023] The specific setting and function of the protection device 6 and the connecting device 7 will be described below.
[0024] In this embodiment: the surface of the second connecting column 2 is provided with a protection device 6, the protection device 6 includes a protection rod 61 and a baffle 62, the protection rod 61 is arranged on the inner side of the second connecting column 2, the baffle 62 is fixedly connected with the surface of the second connecting column 2, a limiting groove 63 is formed on the side of the second connecting column 2 close to the protection rod 61, a pull hole 64 is formed on the surface of one end of the protection rod 61 close to the second connecting column 2, and a limiting rod 65 is slidably connected in the pull hole 64.
[0025] Specifically, one end of the limiting rod 65 is clamped with the inside of the limiting groove 63.
[0026] In this embodiment: by setting the limiting rod 65, the protection rod 61 can be positioned, which reduces the situation that the protection rod 61 easily separates from the side surface of the second connecting column 2 when the equipment is used, causing the equipment to be difficult to protect the construction personnel.
[0027] Specifically, the end of the limiting rod 65 away from the limiting groove 63 is fixedly connected with a first spring 67, and the end of the first spring 67 away from the limiting rod 65 is fixedly connected with the inside of the pull hole 64. By setting the first spring 67, it is convenient to exert a reset spring force on the limiting rod 65.
[0028] Specifically, the side surface of the end of the limiting rod 65 close to the first spring 67 is fixedly connected with a pull block 66, and the pull block 66 is slidably connected with the inside of the pull hole 64. By setting the pull block 66, it is convenient to move the limiting rod 65.
[0029] In the embodiment, the end of the mounting head 5 close to the first connecting column 1 is provided with a connecting device 7, the connecting device 7 comprises a sliding rail 71 and a connecting hole 74, the connecting hole 74 is arranged at the end of the mounting head 5 close to the first connecting column 1, the sliding rail 71 is fixedly connected to the side of the first connecting column 1 close to the mounting head 5, the side of the end of the mounting head 5 close to the first connecting column 1 is fixedly connected with a sliding block 72, the sliding block 72 is slidably connected to the inside of the sliding rail 71, the inside of the sliding rail 71 is provided with an adjusting groove 73, the inside of the connecting hole 74 is slidably connected with an adjusting rod 75, and the adjusting rod 75 is clamped to the inside of the adjusting groove 73.
[0030] In the embodiment, the sliding rail 71 and the sliding block 72 can be arranged to limit the movement of the mounting head 5, so that the mounting head 5 is less likely to be separated from the surface of the first connecting column 1 when the device is in use.
[0031] Specifically, the end of the adjusting rod 75 away from the adjusting groove 73 is fixedly connected with a second spring 77, and the end of the second spring 77 away from the adjusting rod 75 is fixedly connected to the inside of the connecting hole 74. The second spring 77 is arranged to facilitate the application of a reset elastic force to the adjusting rod 75.
[0032] Specifically, the surface of the end of the adjusting rod 75 close to the second spring 77 is fixedly connected with a moving rod 76, and the moving rod 76 is slidably connected to the inside of the connecting hole 74. The moving rod 76 is arranged to facilitate the movement of the adjusting rod 75.
[0033] Working principle: when the device is disassembled, the user moves the pull block 66, which drives the limiting rod 65 to move, and when the limiting rod 65 moves, the first spring 67 is displaced and deformed to generate an elastic force. Then the limiting rod 65 moves out of the inside of the limiting groove 63, and the protective rod 61 is no longer restricted, and moves out of the surface of the mounting plate. The protective device 6 effectively blocks the device and protects the safety of the construction personnel. When the device is in use, the construction personnel usually stand on the surface of the placing plate 4 to work, and are easy to fall between the second connecting columns 2, which may cause injury to the construction personnel. The protective device 6 blocks the large space between the second connecting columns 2 by the cooperation of the protective rod 61, the limiting rod 65, the baffle 62 and the first spring 67, thereby improving the safety of the construction personnel.
[0034] The device is installed, the user connects the mounting head 5 with the wall surface, and then pulls the moving rod 76 to drive the adjusting rod 75 to move, when the adjusting rod 75 moves, the second spring 77 is displaced and deformed to generate elastic force, then the mounting head 5 loses the restraint, moves the first connecting column 1 at one end of the mounting head 5 to adjust the whole device, through the setting of the connecting device 7, the device is effectively installed and connected, which plays a role in facilitating the installation of the device, and reduces the installation efficiency of the device in use. When the device is installed, the bolts are generally used to fix one by one, the installation of the bolts needs to use tools, which causes the use of the tools to be too cumbersome, and causes the low efficiency of the device installation. The connecting device 7 realizes the quick installation and positioning of the device through the cooperation between the adjusting rod 75, the sliding rail 71, the moving rod 76 and the second spring 77, and improves the practicability of the device.
Claims
1. A new type of building climbing frame, comprising a first connecting column (1), a second connecting column (2), a connecting arm (3), a placing plate (4) and a mounting head (5), characterized in that: The connecting arm (3) is fixedly connected between the first connecting column (1) and the second connecting column (2), the placing plate (4) is arranged between the first connecting column (1) and the second connecting column (2), the mounting head (5) is arranged on the surface of the first connecting column (1), the surface of the second connecting column (2) is provided with a protection device (6), the protection device (6) comprises a protection rod (61) and a baffle (62), the protection rod (61) is arranged on the inner side of the second connecting column (2), the baffle (62) is fixedly connected with the surface of the second connecting column (2), the side of the second connecting column (2) close to the protection rod (61) is provided with a limiting groove (63), the surface of one end of the protection rod (61) close to the second connecting column (2) is provided with a pulling hole (64), and the limiting rod (65) is slidably connected in the pulling hole (64).
2. The new type of building climbing frame according to claim 1, characterized in that: One end of the limiting rod (65) is clamped in the limiting groove (63).
3. The new type of building climbing frame according to claim 2, characterized in that: The first spring (67) is fixedly connected to the end of the limiting rod (65) away from the limiting groove (63), and the end of the first spring (67) away from the limiting rod (65) is fixedly connected to the inside of the pulling hole (64).
4. The new type of building climbing frame according to claim 3, characterized in that: The side of the limiting rod (65) close to the first spring (67) is fixedly connected with a pulling block (66), and the pulling block (66) is slidably connected with the inside of the pulling hole (64).
5. The new type of building climbing frame according to claim 1, characterized in that: The end of the mounting head (5) close to the first connecting column (1) is provided with a connecting device (7), the connecting device (7) comprises a sliding rail (71) and a connecting hole (74), the connecting hole (74) is arranged in the end of the mounting head (5) close to the first connecting column (1), the sliding rail (71) is fixedly connected with the side of the first connecting column (1) close to the mounting head (5), the side of the mounting head (5) close to the first connecting column (1) is fixedly connected with a sliding block (72), the sliding block (72) is slidably connected with the inside of the sliding rail (71), the inside of the sliding rail (71) is provided with an adjusting groove (73), the inside of the connecting hole (74) is slidably connected with an adjusting rod (75), and the adjusting rod (75) is clamped in the inside of the adjusting groove (73).
6. The new type of building climbing frame according to claim 5, characterized in that: The second spring (77) is fixedly connected to the end of the adjusting rod (75) away from the adjusting groove (73), and the end of the second spring (77) away from the adjusting rod (75) is fixedly connected to the inside of the connecting hole (74).
7. The new type of building climbing frame according to claim 6, characterized in that: The surface of the adjusting rod (75) close to the second spring (77) is fixedly connected with a moving rod (76), and the moving rod (76) is slidably connected with the inside of the connecting hole (74).