Tower crane standard section top penetrating structure

By fixing the hidden beams and the main beams together, the structural stability of the opening in the top plate is enhanced, the problem of back support when the tower crane section passes through the top is solved, the construction efficiency and cost are saved, and the safety and civility of the construction site are improved.

CN223752285UActive Publication Date: 2026-01-02SICHUAN HUAXI NINTH CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520119583.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2026-01-02
Estimated Expiration
2035-01-17

AI Technical Summary

Technical Problem

When tower crane sections pass through the roof slab, a back-support frame needs to be erected, which occupies basement space and affects construction progress and cost.

Method used

The structure employs a combination of concealed beams and main beams. The concealed beams are fixedly connected around the opening in the top slab and are fixed to the main surface of the top slab by concrete pouring, which enhances the structural stability of the opening and avoids the need for back support.

Benefits of technology

Reduce backfilling work, save costs, keep the roof slab clean, and improve construction safety and civility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223752285U_ABST
    Figure CN223752285U_ABST
Patent Text Reader

Abstract

The utility model discloses a tower crane standard section top penetrating structure, and relates to the technical field of building structures. The tower crane standard section top penetrating structure comprises a top plate large face, a main beam is arranged on the outer side of the top plate large face, an opening allowing a tower crane standard section to penetrate through is formed in the center of the top plate large face, the top plate large face is provided with a hidden beam connected with the main beam, and the hidden beam is connected with the side wall of the opening. The tower crane standard section top penetrating structure has the beneficial effects that back-jacking construction is reduced, back-jacking cost is saved, and the top plate is kept clean and tidy.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building structure technical field, concretely relates to a tower crane standard section top penetrating structure. BACKGROUND

[0002] Tower crane is a kind of hoisting equipment most commonly used on construction site, also known as tower crane, and is used for hoisting steel bars, wood batten, concrete, steel pipe and other materials for construction, is an indispensable equipment on site.In the traditional tower crane installation, a reinforced concrete foundation platform needs to be cast in situ on the basement ground, and the tower crane standard section is assembled and increased in height in turn, and penetrates the opening reserved in the basement roof.

[0003] Because the tower crane standard section is prone to sway during use, the tower crane standard section does not contact the roof of the ground.However, in order to ensure safety, a backstop support is generally installed around the roof and the tower crane standard section, and after the tower crane standard section is removed, steel bars are installed and concrete is poured at the opening.The backstop support occupies part of the basement space, affecting the construction of the basement.

[0004] Therefore, the prior art needs to be improved. CONTENT OF THE UTILITY MODEL

[0005] The technical problem to be solved by the utility model is that the roof penetrated by the tower crane standard section needs to be supported by a backstop frame in the prior art, and the purpose is to provide a tower crane standard section top penetrating structure, which uses corresponding technical means to reduce backstop construction, save backstop cost, maintain the safety of the roof structure and provide visual value, and is beneficial to the standardization of the construction site and the creation of excellent works and cup winning.

[0006] The utility model is implemented by the following technical solutions:

[0007] The utility model provides a tower crane standard section top penetrating structure, which comprises a roof large surface, the outer side of the roof large surface is provided with a structure main beam, the center of the roof large surface is provided with an opening for the tower crane standard section to penetrate, the roof large surface is provided with a hidden beam connected with the main beam, and the hidden beam is connected with the side wall of the opening.

[0008] In the above technical solution, the tower crane standard section penetrates from the opening position of the roof large surface, the outer side of the roof large surface has a structure main beam, the opening position of the roof large surface is provided with a hidden beam, and the hidden beam surrounds the opening.The hidden beam is fixedly connected with the main beam.Due to the arrangement of the hidden beam, the hidden beam reinforces the opening edge of the roof large surface, and also makes the vicinity of the opening neat, avoiding the conventional method of reserving and erecting steel bars.Meanwhile, the hidden beam is fixedly connected with the main beam, the main beam is fixed to the outer side of the roof large surface by concrete pouring, so that the main beam and the hidden beam share the stress, and have good stress effect.The roof large surface does not need to use a backstop frame to enhance the stress, and has the advantages of avoiding backstop construction and saving backstop cost.

[0009] Further, in the utility model, the side wall of the opening is provided with a water stop steel plate towards the water surface.

[0010] Further, in the utility model, the opening is square.

[0011] Further, in the utility model, the four dark beams are crisscrossed.

[0012] Further, in the utility model, the dark beam comprises an upper rib and a lower rib.

[0013] Further, in the utility model, the distance between the dark beam and the tower crane marker section is not less than 20 cm.

[0014] Further, in the utility model, the top plate large surface is provided with a guardrail surrounding the opening.

[0015] Further, in the utility model, the dark beam after the tower crane marker section is removed is provided with a steel bar covering the opening.

[0016] Further, in the utility model, the opening is poured with concrete.

[0017] Compared with the prior art, the utility model has the following advantages and beneficial effects:

[0018] 1. The construction of back jacking support is omitted: the side wall of the opening of the dark beam connecting the top plate large surface surrounds the opening. The end of the dark beam is fixedly connected with the main beam. Since the dark beam is fixedly connected with the main beam and is fixed in the top plate large surface by pouring concrete, the main beam and the dark beam share the stress, thereby enhancing the structural stability of the opening position of the top plate large surface. Further, the back jacking support is not needed, thereby reducing the back jacking construction, saving the back jacking cost, avoiding the occupation of a part of the basement space by the support and affecting the construction of the basement.

[0019] 2. The top plate is kept neat: since the dark beam covers the opening edge of the top plate large surface, the steel bars in the interior of the top plate large surface are not exposed at the opening, so that the opening vicinity is kept neat, which is beneficial to the on-site safety and civilized construction inspection and the evaluation of the standardized construction site. DETAILED DESCRIPTION

[0020] The drawings described herein are used to provide further understanding of the embodiments of the utility model and form a part of the present application, and do not constitute a limitation to the embodiments of the utility model. In the drawings:

[0021] Figure 1 It is a top surface schematic view of the tower crane marker section top penetrating structure of the utility model.

[0022] Marked and corresponding component name in the drawing: 1-large face of roof, 101-opening, 2-tower crane marker section, 3-main beam, 4-concealed beam, 5-guardrail. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical scheme and advantages of the utility model clearer and more understandable, the utility model will be further described in detail below in combination with examples and drawings, the schematic implementation mode of the utility model and its description are only used to explain the utility model and not as the limitation of the utility model. The following detailed description of the examples of the utility model provided in the drawings is not intended to limit the scope of the claimed utility model, but only represents selected examples of the utility model. Based on the examples in the utility model, all other examples obtained by those skilled in the art without creative labor belong to the scope of protection of the utility model.

[0024] It should be noted that: similar signs and letters represent similar items in the following drawings, therefore, once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. In the description of the examples of the utility model, it should also be explained that, unless otherwise explicitly specified and limited, if the terms "set", "install", "connect" appear, they should be understood broadly, for example, it can be fixed connection, or detachable connection, or integrally connected; it can be mechanical connection, or electrical connection; it can be directly connected, or indirectly connected through intermediate medium, or the connection between two elements inside. For those skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.

[0025] EXAMPLE

[0026] Example 1 provides a tower crane marker section top-penetrating structure, as shown in Figure 1 The specific structure is described as follows.

[0027] The tower crane marker section top-penetrating structure of the utility model example mainly includes three parts of the large face of roof 1, the main beam 3 and the concealed beam 4. In combination with Figure 1 The large face of roof 1 is the roof above the basement, generally using concrete pouring, sometimes also installing reinforcing steel bars before concrete pouring in order to increase the strength.

[0028] Further, in combination with Figure 1 As shown in the drawing, the opening 101 is square in shape, and other examples can also be other shapes, for example, pentagon, etc. When the tower crane is installed, the tower crane marker section 2 penetrates through the opening 101. In order to avoid the influence of the vibration of the tower crane marker section 2 on the large face of roof 1 during work, the distance between the side wall of the opening 101 and the tower crane marker section 2 is greater than 20 cm, and the preferred distance is 25 cm.

[0029] In some embodiments of the present embodiment, the main beam 3 is installed around the outer side of the roof slab 1, and the four corners of the main beam 3 are supported by reinforced concrete columns.

[0030] Further, as shown in Figure 1 , the four hidden beams 4 include two longitudinal and two transverse beams arranged in a crisscross manner, and the ends of the hidden beams 4 are fixedly connected with the main beam 3. The four hidden beams 4 are also installed on the side walls of the opening 101. The hidden beams 4 and the main beam 3 cooperate to increase the strength of the position of the opening 101, so that the back support at the opening 101 is not needed.

[0031] In some embodiments of the present embodiment, in combination with Figure 1 , the hidden beam 4 includes an upper part and a lower part. Two upper parts and three lower parts are arranged and installed along the roof slab 1, and after the concrete is poured, the hidden beam 4 is located inside the roof slab 1, which can increase the strength and does not affect the appearance.

[0032] Further, in combination with Figure 1 , a water stop steel plate 5 is installed on the side wall of the opening 101, one side of the water stop steel plate 5 is embedded into the inside of the roof slab 1, and the other side of the water stop steel plate 5 extends and is located inside the hidden beam 4. And the water stop steel plate 5 faces the water side, which plays a good waterproof role.

[0033] When the tower crane marker section 2 is removed, the steel bars are directly placed on the hidden beam 4, the steel bars cover the opening 101, and then the concrete is poured to close the opening 101. Due to the cooperation of the main beam 3 and the hidden beam 4, the force is large, and the back support is not needed, which saves the cost of back support.

[0034] The working principle of the tower crane marker section top structure of the present application is as follows:

[0035] The hidden beam 4 connects the side wall of the opening 101 of the roof slab 1, and the hidden beam 4 surrounds the opening 101 to form a circle. The end of the hidden beam 4 is fixedly connected with the main beam 3. Since the hidden beam 4 and the main beam 3 are fixedly connected, and the hidden beam 4 is fixedly connected in the roof slab 1 by pouring concrete, the main beam 3 and the hidden beam 4 share the stress, which enhances the structural stability of the position of the opening 101 of the roof slab 1. Further, the back support is not needed, which reduces the back construction and saves the back cost, and also avoids that the support occupies a part of the basement space and affects the construction of the basement. Due to the arrangement of the hidden beam 4, the hidden beam 4 covers the edge of the opening 101 of the roof slab 1, avoids that the steel bars inside the roof slab 1 are exposed at the opening 101, and keeps the vicinity of the opening 101 neat, which is beneficial to the on-site safety and civilized construction inspection and the evaluation of the standardized construction site.

[0036] The utility model provides a tower crane mark section 2 wears top structure, it includes roof large surface 1, the outside of roof large surface 1 is provided with main beam 3, the center of roof large surface 1 is provided with the opening 101 for tower crane mark section 2 to pass, and roof large surface 1 is provided with the hidden beam 4 of being connected with main beam 3, and the side wall of hidden beam 4 connects opening 101. The side wall of opening 101 is provided with the water stop steel sheet 5 towards the water face. Opening 101 is square. Four hidden beams 4 crisscross. Hidden beam 4 includes upper part muscle and lower part muscle. The spacing of hidden beam 4 from tower crane mark section 2 is not less than 20 centimeters. Roof large surface 1 is provided with the guardrail of enclosing opening 101. Hidden beam 4 after tower crane mark section 2 dismantles is provided with the steel bar of covering opening 101. Pouring concrete at opening 101. Therefore, the tower crane mark section wears top structure of the utility model has the beneficial effect of reducing back top construction, saving back top cost, keeping the roof neat.

[0037] The above detailed description is further detailed to the purpose, technical scheme and beneficial effect of the utility model, and it should be understood that the above description is only the specific embodiment of the utility model, and is not used to limit the protection scope of the utility model, and any modification, equivalent replacement, improvement etc. within the spirit and principle of the utility model should be included in the protection scope of the utility model.

Claims

1. A tower crane marking band top penetration structure, characterized by, The roof panel (1) is provided with a main beam (3) on the outer side, and an opening (101) is formed in the center of the roof panel (1) for passing a tower crane marker section (2), and the roof panel (1) is provided with a hidden beam (4) connected with the main beam (3), and the hidden beam (4) is connected with the side wall of the opening (101).

2. The tower tag station top penetration structure according to claim 1, characterized in that, The side wall of the opening (101) is provided with a water stop steel plate facing the water surface.

3. The tower tag station top penetration structure according to claim 1, characterized in that, The opening (101) is square.

4. The tower tag station top penetration structure according to claim 3, characterized in that, The four hidden beams (4) are staggered longitudinally and transversely.

5. The tower tag station top penetration structure according to claim 1, characterized in that, The hidden beam (4) comprises an upper rib and a lower rib.

6. The tower tag station top penetration structure according to claim 1, characterized in that, The distance between the hidden beam (4) and the tower crane marker section (2) is not less than 20 cm.

7. The tower tag station top penetration structure according to claim 1, characterized in that, The roof panel (1) is provided with a guardrail (5) surrounding the opening (101).

8. The tower tag station top penetration structure according to claim 1, characterized in that, The hidden beam (4) after the tower crane marker section (2) is removed is provided with a steel bar covering the opening (101).

9. A tower tag station top penetration structure according to claim 8, characterised in that The opening (101) is poured with concrete.