Tower crane stabilizing mechanism for engineering construction
By designing a triangular support structure consisting of a fixed base, a base, and reinforcing rods for the stabilizing mechanism, the problems of long construction cycles and complex installation of traditional tower crane stabilizing mechanisms are solved, achieving rapid installation and high stability, and improving the flexibility and safety of construction.
Patent Information
- Application Number
- CN202520390569.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-07
- Publication Date
- 2026-01-02
- Estimated Expiration
- 2035-03-07
AI Technical Summary
Traditional tower crane stabilization mechanisms have long construction cycles, complex installations, and high requirements for the site environment, which limits the flexibility of construction.
The design employs two fixed bases, a base, and stabilizing components, including a U-shaped fastener and an X-shaped reinforcing bar, which are connected and welded to form a stable triangular support structure. The stepped design of the base facilitates connection and enhances stability and load-bearing capacity.
It enables rapid installation, enhances the stability and overall rigidity of the tower crane, and improves the flexibility and safety of construction.
Smart Images

Figure CN223752293U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to engineering construction technical field, concretely is a tower crane stable mechanism for engineering construction. BACKGROUND
[0002] The tower crane stable mechanism is a kind of equipment assembly, which is crucial in engineering construction, and it is used to ensure the stability and safety of the tower crane during operation.
[0003] The conventional tower crane stable mechanism is commonly used to realize the stable effect by pouring concrete and reinforcing bar fixation, and this conventional stable mode can provide necessary support to a certain extent, but the construction cycle is long, and the requirement for on-site environment is higher, and it needs to wait for the solidification of concrete to achieve the expected stable effect. This not only increases the time cost of construction, but also limits the flexibility of construction, so a tower crane stable mechanism for engineering construction is proposed to solve the above problems. SUMMARY
[0004] (I) technical problem solved
[0005] In view of the deficiencies of the prior art, the utility model provides a tower crane stable mechanism for engineering construction, which has the advantages of stable structure, convenient installation and the like, and solves the problem of complex installation of the conventional stable mechanism.
[0006] (II) technical scheme
[0007] To achieve the above purpose, the utility model provides the following technical scheme:
[0008] A tower crane stable mechanism for engineering construction, comprising two fixed seats, two bases and a stable assembly, the two fixed seats are a first fixed seat and a second fixed seat, the two fixed seats are in contact with each other, and the two bases are arranged at the bottom of the two fixed seats;
[0009] The stable assembly comprises four fixing members and four reinforcing rods, the two fixed seats are both open on one side, and the openings are arranged on the side close to each other, the four fixing members are fixedly installed at the corner of the inner wall of the two fixed seats, and the four reinforcing rods are fixedly installed between adjacent two fixing members.
[0010] As a preferred technical scheme of the utility model, the two bases are both ladder-shaped, and the top of the outer side ladder is provided with a fixing hole, and a group of reinforcing columns are arranged at the top of the two bases and close to the outer corner of the two fixed seats.
[0011] As a preferred technical scheme of the utility model, two fixing bases are integrally formed with two pedestals and two groups of reinforcing columns, the two fixing bases are respectively provided with protrusions and grooves on the sides close to each other, the protrusions and the grooves are inserted into each other, and the two are bolted after being inserted.
[0012] As a preferred technical scheme of the utility model, the two pedestals are welded and fixed, and the bottom surfaces of the two fixing bases and the two pedestals after being connected are all square.
[0013] As a preferred technical scheme of the utility model, each fixing member is composed of two horizontal plates and a right-angle plate, the two horizontal plates are perpendicular to each other and are tightly attached to the two end surfaces of the inner wall corner of a fixing base.
[0014] As a preferred technical scheme of the utility model, each horizontal plate is provided with a threaded through hole, the fixing base is also provided with a threaded hole at the position corresponding to the threaded through hole, and a screw rod is threadedly connected between the threaded through hole and the threaded hole.
[0015] As a preferred technical scheme of the utility model, the reinforcing rod is X-shaped, and the two sides of the reinforcing rod are welded to the right-angle plates on the two fixing members.
[0016] (Three) beneficial effects
[0017] Compared with the prior art, the utility model provides a tower crane stable mechanism for engineering construction, which has the following beneficial effects:
[0018] The tower crane stable mechanism for engineering construction, by the first fixing base and the second fixing base which are inserted into each other and abut against each other, and the pedestals arranged at the bottom of the two fixing bases, realizes stable basic support, the stepped design and the reserved fixing holes of the pedestals facilitate connection with the ground or other fixed structures, thereby enhancing the overall stability, the setting of the reinforcing columns further improves the strength of the connection between the fixing base and the pedestal, and the welding and fixing of the two pedestals and the design of the overall square bottom surface enhance the carrying capacity and stability of the stable mechanism, in addition, the M-shaped fixing member composed of two horizontal plates and a right-angle plate is threadedly connected with a screw rod through the threaded through hole and the threaded hole at the corner of the fixing base, which not only facilitates installation, but also can tightly fit the inner wall of the fixing base, thereby improving stability, and the X-shaped reinforcing rod is connected with the right-angle plates on the two fixing members through welding, thereby forming a stable triangular support structure, which greatly enhances the overall rigidity and stability of the stable mechanism. BRIEF DESCRIPTION OF DRAWINGS
[0019] Fig. 1 It is a structural schematic view of the utility model;
[0020] Fig. 2 It is the structure schematic drawing of the utility model;
[0021] Fig. 3 It is the structure schematic drawing of the utility model fixing part.
[0022] In the figure: 1, first fixed seat; 2, second fixed seat; 3, base; 4, fixed hole; 5, reinforcing column; 6, lug; 7, recess; 8, fixing part; 801, horizontal plate; 802, right-angle plate; 803, threaded hole; 804, fixed hole; 9, reinforcing rod. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor belong to the protection scope of the utility model.
[0024] In the description of the utility model, it is understood that the orientation or position relationship indicated by the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer" and the like is the orientation or position relationship shown in the drawings, and is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the utility model.
[0025] In the description of the utility model, it should be explained that, unless otherwise explicitly specified and limited, the terms "mounting", "connection", "connection" should be understood broadly, for example, it can be fixed connection, or detachable connection, or integrally connected, it can be directly connected, or indirectly connected through intermediate medium, it can be the communication inside two elements. For those skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.
[0026] Please refer to Figs. 1-3 A tower crane stabilizing mechanism for engineering construction, comprising two fixed seats, two bases 3 and a stabilizing assembly, the two fixed seats are respectively a first fixed seat 1 and a second fixed seat 2, the two fixed seats are inserted and abutted with each other through lugs 6 and recesses 7, and the two bases 3 are respectively arranged at the bottom of the two fixed seats.
[0027] The stable assembly comprises four fixing members 8 and four reinforcing rods 9, each of the two fixing bases is a Chinese character "D" type with one side open, and the openings are arranged on the sides close to each other, the four fixing members 8 are respectively bolted on the inner wall corners of the two fixing bases, and the four reinforcing rods 9 are respectively welded between the adjacent two fixing members 8.
[0028] In the embodiment, the two bases 3 are both stepped, and the top of the outer side step of each base 3 is reserved with a fixing hole 4, and a set of reinforcing columns 5 is arranged on the top of each base 3 and close to the outer side corner of the two fixing bases.
[0029] In the embodiment, the two fixing bases are integrally formed with the two bases 3 and the two sets of reinforcing columns 5, and the side close to each other of the two fixing bases is respectively provided with a lug 6 and a groove 7, and the lug 6 and the groove 7 are inserted with each other, and bolted after being inserted.
[0030] In the embodiment, the two bases 3 are welded and fixed, and the bottom surface shape of the two fixing bases and the two bases 3 after being connected is a square.
[0031] In the embodiment, each fixing member 8 is composed of two horizontal plates 801 and a right-angle plate 802 to form an M-shaped plate, the two horizontal plates 801 are perpendicular to each other and tightly close to the two end faces perpendicular to each other at the inner wall corner of each fixing base.
[0032] In the embodiment, each horizontal plate 801 is reserved with a threaded through hole 803, and the fixing base corner is also provided with a threaded hole corresponding to the threaded through hole 803, and a threaded rod is threadedly connected between the threaded through hole 803 and the threaded hole, and the right-angle plate 802 is provided with two sets of fixing through holes 804 perpendicular to each other, and the fixing through holes 804 are used to fix the fixing member 8 with the support leg of the tower crane.
[0033] In the embodiment, the reinforcing rod 9 is X-shaped, and the two sides of the reinforcing rod 9 are respectively welded with the right-angle plates 802 on the two fixing members 8.
[0034] Beneficial effects:
[0035] The tower crane stable mechanism for engineering construction, through two first fixed seats 1 and second fixed seats 2 that are inserted against each other, and the base 3 arranged at the bottom of the two fixed seats, realizes stable base support, the stepped design and the reserved fixed hole 4 of the base 3 facilitate connection with the ground or other fixed structures, enhance the overall stability, the setting of the strengthening column 5 further improves the strength of the connection between the fixed seat and the base 3, and the welding of the two bases 3 and the design of the overall square bottom surface enhance the carrying capacity and stability of the stable mechanism, in addition, the M-shaped fixing piece 8 composed of two horizontal plates 801 and a right-angle plate 802 is threadedly connected with the threaded hole of the corner of the fixed seat through the threaded hole 803, which not only is convenient to install, but also can tightly fit the inner wall of the fixed seat, improves the stability, and the X-shaped reinforcing rod 9 is connected with the right-angle plate 802 on the two fixing pieces 8 through welding, forming a stable triangular support structure, greatly enhancing the overall rigidity and stability of the stable mechanism.
[0036] Working principle:
[0037] First, the support feet of the tower crane are fixed to the ground, then the four fixing pieces 8 are moved to the four support feet of the tower crane, and the fixing holes 804 on the fixing pieces 8 are preliminarily fixed with the support feet of the tower crane through steel wires, but not locked, the two fixed seats are moved to wrap the tower crane, and the positions of the fixing pieces 8 are adjusted, so that the two horizontal plates 801 on the fixing pieces 8 are fitted with the inner wall of the fixed seat, and are fixed through the screw rod, then the steel wires are locked, the two fixed seats are inserted through the convex blocks 6 and the grooves 7, and are also fixed through the screw rod, then the two bases 3 are welded, and the four reinforcing rods 9 are welded between the four fixing pieces 8.
[0038] Although the embodiments of the present application have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and modifications can be made to these embodiments without departing from the principles and spirits of the present application, and the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A tower crane stabilizing mechanism for engineering construction, comprising two fixed seats, two bases and a stabilizing assembly, the two fixed seats being a first fixed seat and a second fixed seat, the two fixed seats abutting each other, and the two bases being arranged at the bottom of the two fixed seats. characterized in that The stabilizing assembly comprises four fixed members and four reinforcing rods, the two fixed seats are both open at one side, and the openings are arranged at the side close to each other, the four fixed members are fixedly installed at the inner wall corners of the two fixed seats, and the four reinforcing rods are fixedly installed between adjacent two fixed members.
2. The tower crane stabilizing mechanism for use in construction work according to claim 1, characterized in that: The two bases are both ladder-shaped, and the top of the outer side ladder is provided with a fixing hole, the top of the two bases and the outer side corner close to the two fixed seats are both provided with a set of reinforcing columns.
3. The tower crane stabilizing mechanism for use in construction work according to claim 2, characterized in that: The two fixed seats are integrally formed with the two bases and the two sets of reinforcing columns, the side close to each other of the two fixed seats is respectively provided with a protrusion and a groove, and the protrusion and the groove are inserted into each other, and the two are bolted after being inserted.
4. The tower crane stabilizing mechanism for use in construction work according to claim 3, wherein: The two bases are welded and fixed, and the bottom surface shape of the two fixed seats and the two bases after being connected is a square.
5. The tower crane stabilizing mechanism for use in construction work according to claim 1, characterized in that: Each fixed member is composed of two horizontal plates and a right-angle plate, which is an M-shaped plate, the two horizontal plates are perpendicular to each other, and are tightly attached to the two end faces perpendicular to each other at the inner wall corner of a fixed seat.
6. The tower crane stabilizing mechanism for use in construction work according to claim 5, wherein: Each horizontal plate is provided with a threaded hole, the corner of the fixed seat is also provided with a threaded hole corresponding to the threaded hole, and a threaded rod is threadedly connected between the threaded hole and the threaded hole.
7. The tower crane stabilizing mechanism for use in construction engineering according to claim 5, characterized in that: The right-angle plate is provided with two sets of fixed holes perpendicular to each other. The reinforcing rod is X-shaped, and its two sides are welded with the right-angle plates on the two fixed members.