Installation tool for wallboard drag hook rib

By designing an installation tool for wall panel tie rods, and utilizing the cross-design of hand-held force transmission rods and kit fitting holes, the problem of traditional manual installation in narrow spaces was solved, achieving efficient and precise tie rod installation, reducing labor intensity and improving construction quality.

CN223753712UActive Publication Date: 2026-01-02CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520038017.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2026-01-02
Estimated Expiration
2035-01-08

AI Technical Summary

Technical Problem

Traditional manual installation of tie rods is difficult to do accurately in narrow spaces, resulting in low construction efficiency, poor results, and high labor intensity.

Method used

Design an installation tool for wall panel tie rods, including a hand-held force transmission rod and a tie rod kit. The kit has a kit mating hole formed by the extension of the center line of the kit mating hole. The extension direction of the center line of the kit intersects with the extension direction of the hand-held force transmission rod. This tool replaces the worker's arm in working in narrow spaces, reducing the difficulty of installation.

Benefits of technology

It improves the efficiency and accuracy of hook reinforcement installation, reduces labor intensity, ensures construction quality, and is easy to carry and maintain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223753712U_ABST
    Figure CN223753712U_ABST
Patent Text Reader

Abstract

An installation tool for a wallboard draw hook rib comprises a handheld dowel bar and a draw hook rib sleeve piece fixed to one end of the handheld dowel bar, the draw hook rib sleeve piece is provided with a sleeve piece matching hole for the draw hook rib to penetrate through, and the extension direction of the center line of the sleeve piece matching hole intersects with the length extension direction of the handheld dowel bar. A constructor replaces an arm of the constructor to work in a long and narrow space by means of the installation tool for the wall plate drag hook rib, the drag hook rib sleeve piece is arranged in a hook of the drag hook rib in a sleeved mode, force is applied to the handheld dowel bar, the hook of the drag hook rib can be rapidly and accurately bent to a proper angle position, and the installation work of the drag hook rib is completed. Therefore, the installation efficiency and precision of the draw hook rib are effectively improved, the installation difficulty is reduced, and the procedure is completed and passes acceptance. And the installation tool for the wallboard drag hook rib is convenient to carry, simple in structure and durable.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to installation auxiliary tool for building construction, specifically relates to a kind of installation tool for wallboard hooking muscle. BACKGROUND

[0002] In subway station construction, the installation qualification rate of hooking muscle in wallboard component is the key to ensure structural safety and construction quality.

[0003] In traditional method, hooking muscle is installed by manual direct hand-pulling operation, and the operator directly inserts arm into steel reinforcement framework, and directly bends the angle of hooking muscle hook with hand, so that it is hung on the node of framework, and the framework spacing of wallboard component is often in the range of 400-1100mm, in this range, the arm of construction personnel is difficult to work in narrow space, and it is also difficult to accurately install hooking muscle in place. Moreover, based on the high standard requirement of installation and acceptance of hooking muscle in subway station wallboard component construction, the operator works hard with the traditional steel bar installation method, and the installation efficiency is relatively low, and the installation effect is also relatively unguaranteed.

[0004] Therefore, considering the complex construction site, it is necessary to provide a kind of installation tool for wallboard hooking muscle, which is convenient to carry, simple in structure, durable, can assist the operator to complete the installation work of hooking muscle more simply, so as to help improve the installation effect. UTILITY MODEL CONTENT

[0005] The utility model solves the technical problem to provide a kind of installation tool for wallboard hooking muscle.

[0006] In order to solve the above technical problem, the utility model adopts the technical scheme that a kind of installation tool for wallboard hooking muscle, including hand-held force transmission rod, the hooking muscle sleeve kit fixed in the one end of hand-held force transmission rod, the sleeve kit cooperation hole for the hooking muscle to be set is set up on the hooking muscle sleeve kit, the center line extension direction of sleeve kit cooperation hole and the length extension direction of hand-held force transmission rod intersect. Hand-held force transmission rod replaces the arm of construction personnel to work in narrow space, reduces installation difficulty.

[0007] In some embodiments, the sleeve kit cooperation hole is hexagonal perforation formed by linear extension along the center line direction with hexagonal section.

[0008] In some embodiments, the hooking muscle sleeve kit is sleeve, and the length is 4cm-15cm.

[0009] In some embodiments, the installation tool further comprises at least one sleeve connector capable of matching the sleeve fitting hole and being inserted therein, the sleeve connector being provided with a hexagonal connector hole capable of coinciding with the center line of the sleeve fitting hole, and the sleeve connector being further provided with a mounting portion provided with a through hole, and the pull hook sleeve being provided with a mounting seat provided with an internally threaded hole and protruding outwardly from the surface, and the mounting portion and the mounting seat being connected through a bolt.

[0010] In some embodiments, the hexagonal connector hole is formed by a hexagonal cross-section hole extending linearly along the center line direction.

[0011] In some embodiments, the center line extension direction of the sleeve fitting hole is perpendicular to the length extension direction of the handheld force transmission rod.

[0012] In some embodiments, the middle part of the pull hook sleeve is welded with one end of the handheld force transmission rod.

[0013] In some embodiments, the handheld force transmission rod comprises a force transmission rod body fixedly connected with the pull hook sleeve at one end, and a soft handle rubber sleeve sleeved at the other end of the force transmission rod body.

[0014] In some embodiments, the length of the force transmission rod body is 40-100 cm, and the length of the soft handle rubber sleeve is 10-25 cm.

[0015] In some embodiments, the handheld force transmission rod and the pull hook sleeve are made of carbon steel.

[0016] The scope of the present application is not limited to the technical solutions formed by the specific combinations of the above technical features, and should also cover other technical solutions formed by any combination of the above technical features or their equivalent features. For example, the technical solutions formed by the mutual replacement of the above features and the technical features disclosed in the present application (but not limited to) having similar functions.

[0017] Thanks to the above technical solutions, the present application has the following advantages compared with the prior art: the present application provides a kind of installation tool for wallboard pull hook sleeve, which is used for wallboard pull hook sleeve installation, and the pull hook sleeve is sleeved into pull hook steel bar hook, and force is applied to handheld force transmission rod, so that pull hook steel bar hook can be quickly and accurately bent to appropriate angle position, and pull hook sleeve installation work is completed, thereby effectively improving pull hook sleeve installation efficiency and precision, ensuring process completion and passing acceptance. BRIEF DESCRIPTION OF DRAWINGS

[0018] ATTACHMENT Figure 1 It is a three-dimensional schematic view of the present application (example one);

[0019] Appendix Figure 2 This is a side view of the present invention (Embodiment 1);

[0020] Appendix Figure 3 This is a front view of the present invention (Embodiment 2);

[0021] The components are: 1. Handheld force transmission rod; 11. Force transmission rod body; 12. Handle rubber sleeve; 2. Hook rib kit; 2a. Kit mating hole; 21. Mounting base; 3. Kit connector; 3a. Hexagonal connector hole; 31. Mounting part. Detailed Implementation

[0022] Example 1: As shown in the attached document Figure 1 , 2 As shown, an installation tool for wall panel tie rods is provided to replace the worker's arm in working within the narrow space of a wall panel structure. It includes a hand-held force transmission rod 1 and a tie rod assembly 2 welded and fixed to one end of the hand-held force transmission rod 1. Both the hand-held force transmission rod 1 and the tie rod assembly 2 are made of carbon steel.

[0023] The hook reinforcement kit 2 is a 6-8cm long sleeve with a fitting hole 2a for the hook reinforcement to pass through. The centerline of the fitting hole 2a extends perpendicularly to the length of the hand-held force transmission rod 1. The fitting hole 2a is a hexagonal through hole with a hexagonal cross-section extending linearly along the centerline, with an inner diameter of 20mm-42mm. The hexagonal through hole can also be used for the installation of hexagonal bolts during wall panel formwork construction. Its versatility and efficiency can save on-site manpower and material resources, resulting in significant economic benefits.

[0024] The handheld force transmission rod 1 comprises a solid round steel body, one end of which is welded to the middle of the hook rib kit 2. The other end of the force transmission rod body 11 is fitted with a soft handle sleeve 12. The force transmission rod body 11 is 50cm-100cm long, and the soft handle sleeve 12 is 20cm long.

[0025] An installation tool for wall panel tie rods has the following characteristics:

[0026] Easy to operate: The extended handheld force transmission rod replaces manual labor in confined spaces, reducing the difficulty of installing the hook reinforcement. Even in unfavorable working conditions where manual labor cannot reach the inside of the frame, the extended handheld force transmission rod can replace manual labor to ensure the completion of the process.

[0027] Easy to carry: The integrated pole tooling is lightweight and easy to carry and move on the construction site.

[0028] Durability: Made of high-strength carbon steel, it improves wear resistance and corrosion resistance, ensuring that it will not deform or be damaged during long-term use.

[0029] Application of installation tool in steel bar installation construction operation:

[0030] Step one, during construction, the operating personnel first place the 90° hooked bar in the steel bar framework inside node;

[0031] Step two, after the placement of the hook bar is completed, the operating personnel hold the soft handle rubber sleeve of the installation tool, and insert one end of the hook bar sleeve into the framework;

[0032] Step three, the operating personnel insert the hook bar sleeve into the hook of the hook bar, and increase the force with the hands to bend the hook angle to 135°, and the hook bar installation is completed;

[0033] Step four, repeat the operation until all the hook bars of the entire construction component are installed;

[0034] Step five, device maintenance: after the installation device is used, the rust and ash of the steel bar at the mouth of the hook bar sleeve are cleaned, the surface silver paint of the force rod is checked whether it is peeled off, and if the paint surface is damaged, the self-spraying paint is sprayed for rust prevention and maintenance in time.

[0035] The effect of the installation tool for wall plate hook bar in hook bar construction:

[0036] 1. Improve construction efficiency: the mechanized operation of the lengthened force rod greatly shortens the construction time and reduces the labor cost;

[0037] 2. Ensure construction quality: through the accurate control of the hook bar sleeve, the qualified rate of the installation of the wall plate hook bar of the subway station is ensured;

[0038] 3. Reduce labor intensity: reduce the physical labor burden of the construction personnel, improve the construction safety and comfort;

[0039] 4. Easy to maintain and maintain: the device structure is simple, durable, and easy to maintain and maintain daily.

[0040] Example two: as shown in the accompanying Figure 3 Figure, the difference between example two and example one is that the installation tool further comprises at least one sleeve joint 3 capable of matching the sleeve fitting hole 2a and being inserted therein. A hexagonal joint hole 3a capable of coinciding with the center line of the sleeve fitting hole 2a is formed on the sleeve joint 3. The hexagonal joint hole 3a is consistent in shape with the sleeve fitting hole 2a, and is also a hexagonal perforation formed by a hexagonal cross-section hole extending linearly along the center line. The inner diameter of the hexagonal joint hole 3a is smaller than the inner diameter of the sleeve fitting hole 2a, which is more suitable for the installation of small diameter hook bars and the fixation of small size hexagonal nuts.

[0041] The hook sleeve assembly 2 has a mounting seat 21 with at least one internally threaded hole outwardly protruding from the surface, and the sleeve joint 3 also has a mounting part 31 with a corresponding number of through holes, so that the mounting part 31 and the mounting seat 21 are connected through bolts.

[0042] The above examples are only for illustrating the technical concept and characteristics of the present application, and the purpose is to enable those skilled in the art to understand the content of the present application and to implement it, and cannot limit the protection scope of the present application. Any equivalent changes or modifications made in accordance with the spirit and essence of the present application shall be covered within the protection scope of the present application.

Claims

1. An installation tool for wall panel tie rods, characterized in that: The installation tool comprises a handheld force transmission rod (1), a draw hook sleeve (2) fixed to one end of the handheld force transmission rod (1), the draw hook sleeve (2) is a sleeve, the draw hook sleeve (2) is provided with a sleeve matching hole (2a) for the draw hook sleeve (2), the sleeve matching hole (2a) is a hexagonal hole formed by linearly extending along the center line direction, and the center line direction of the sleeve matching hole (2a) is perpendicular to the length direction of the handheld force transmission rod (1), the middle part of the draw hook sleeve (2) is welded to one end of the handheld force transmission rod (1), the installation tool further comprises at least one sleeve joint (3) capable of matching the sleeve matching hole (2a) and being inserted therein, the sleeve joint (3) is provided with a hexagonal joint hole (3a) capable of coinciding with the center line of the sleeve matching hole (2a), the sleeve joint (3) is further provided with a mounting portion (31) provided with a hole, and the draw hook sleeve (2) is provided with a mounting seat (21) outwardly protruding from the surface and provided with an internally threaded hole, the mounting portion (31) and the mounting seat (21) are connected through bolts, and the hexagonal joint hole (3a) is a hexagonal hole formed by linearly extending along the center line direction.

2. A tool for installing a wallboard pull hook according to claim 1, wherein: The length of the draw hook sleeve (2) is 4-15 cm.

3. A tool for installing a wallboard pull hook according to claim 1, wherein: The handheld force transmission rod (1) comprises a force transmission rod body (11) fixedly connected to one end of the draw hook sleeve (2) and a soft handle rubber sleeve (12) sleeved on the other end of the force transmission rod body (11).

4. A tool for installing a wallboard pull hook according to claim 3, wherein: The length of the force transmission rod body (11) is 40-100 cm, and the length of the soft handle rubber sleeve (12) is 10-25 cm.

5. The tool of claim 1 wherein: The handheld force transmission rod (1) and the draw hook sleeve (2) are made of carbon steel.