Panel installation construction platform
By setting dividing lines and partition units on the construction platform, the platform is divided into work areas and activity areas, which solves the safety hazards caused by workers' cross-activities and improves construction safety.
Patent Information
- Application Number
- CN202520020594.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-06
- Publication Date
- 2026-01-13
- Estimated Expiration
- 2035-01-06
AI Technical Summary
During panel installation, the overlapping activities of workers can lead to serious safety hazards, especially when working at heights.
The construction platform is divided into a work area and an activity area by dividing lines. The dividing lines are formed by partition units to separate the work area and the activity area. Entrances and exits are set up to allow workers to move independently and reduce cross-activity.
This improved the safety of panel installation, reduced cross-activity among workers, ensured worker safety, and avoided safety risks caused by cross-activity.
Smart Images

Figure CN223793842U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of building construction, in particular to a panel installation construction platform. BACKGROUND
[0002] In order to protect the main structure of the building, improve the use function of the building and beautify the building, panel installation construction is usually needed. During the construction process, a corresponding construction platform needs to be set up so that workers can carry out subsequent construction work.
[0003] At present, in the actual installation process, different workers usually need to cooperate, including panel transportation, material taking, carrying and transferring, and installation at the corresponding point. In this process, the workers on the platform are likely to cross during the activity, which is a dangerous behavior for workers working at high altitudes, and there is a serious construction safety hazard. Therefore, further improvement can be made. CONTENT OF THE UTILITY MODEL
[0004] In order to reduce the cross-activity between different workers and greatly improve the safety of panel installation construction, the present application provides a panel installation construction platform.
[0005] The panel installation construction platform provided by the present application adopts the following technical solution:
[0006] A panel installation construction platform comprises a main steel frame and a bearing plate installed on the top of the main steel frame along the length direction of the main steel frame, the bearing plate forms a construction platform for workers to carry out construction activities; a separation line is arranged on the top of the construction platform along the middle position thereof, so as to divide the construction platform into a work area on the inner side and an activity area on the outer side.
[0007] By adopting the above technical solution, the construction platform is divided into a work area and an activity area by arranging a separation line; the workers in the work area can carry out panel installation work, and the other workers in the activity area can freely move in this area and carry out panel and other material carrying work for the workers in the work area. At this time, the workers in the two areas can independently carry out activities, which can reduce the cross-activity between different workers and greatly improve the safety of panel installation construction.
[0008] Optionally, the separation line comprises a plurality of fence units arranged in sequence along the length direction of the construction platform.
[0009] By adopting the above technical solution, the corresponding work area and activity area are divided by arranging the fence units to form the separation line, and the two areas are further separated by the isolation effect of the fence units, so as to further prevent the workers in the two areas from crossing.
[0010] Optionally, the two adjacent fence units are arranged at intervals to form an entrance for the work area and the activity area to interact.
[0011] By adopting the above technical scheme, the entrance is arranged, so that the workers in the work area can enter and exit the activity area through the entrance in the case of going to work, going off work, shift change and other special cases, and then carry out other activities in the activity area. Otherwise, they can only carry out corresponding walking activities in the work area, which will affect the normal work of other workers in the work area, and even cause personal safety between each other.
[0012] Optionally, the fence unit comprises a middle mesh and mounting rods installed at both ends of the mesh, and the fence unit is detachably mounted on the construction platform through the mounting rods.
[0013] By adopting the above technical scheme, the mesh is used for isolation treatment, which has a relatively light structure and is convenient for actual installation, construction, disassembly and the like.
[0014] Optionally, the bottom of the mounting rod is formed with a plug-in connector, the bearing plate in the construction platform is provided with a plug-in port, and the mounting rod is inserted and mounted into the plug-in port in the bearing plate through the plug-in connector.
[0015] By adopting the above technical scheme, the mounting rod is inserted and mounted through the plug-in connector, which is convenient for installation and disassembly.
[0016] Optionally, the main steel frame comprises vertical rods, horizontal rods and longitudinal rods, and the vertical rods, horizontal rods and longitudinal rods are connected to build a three-dimensional steel frame. The side fences are installed between the two vertical rods on the front and back sides, and the two ends of the side fence are fixedly connected to the corresponding vertical rods.
[0017] By adopting the above technical scheme, the vertical rods, horizontal rods and longitudinal rods are used to build the main frame, and the side fences are used to reinforce the front and back sides to ensure the structural stability of the main steel frame.
[0018] Optionally, the side fence comprises upper horizontal rods, lower horizontal rods, first structure connecting rods and second structure connecting rods installed between the upper horizontal rods and the lower horizontal rods; the first structure connecting rods are vertically arranged and arranged at intervals along the length direction of the upper horizontal rods and the lower horizontal rods; the second structure connecting rods are arranged in the square frame structure formed by the first structure connecting rods, the upper horizontal rods and the lower horizontal rods one by one, the second structure connecting rods are arranged in a wave shape, and the two ends of each second structure connecting rod are fixedly connected to two opposite corners of the corresponding square frame structure.
[0019] By adopting the above technical solution, the upper and lower horizontal bars are connected using the first and second structural connecting rods, forming a triangular structure inside. The stability of a triangle better ensures the overall structural stability of the side fence, thereby guaranteeing the structural stability of the main steel frame. At the same time, it avoids an overly complex and bulky structure, ensuring both lightness and flexibility.
[0020] Optionally, the uprights, horizontal bars, and longitudinal bars in the main steel frame, as well as the upper horizontal bars, lower horizontal bars, first structural connecting rod, and second structural connecting rod in the side fence, are all made of tubular material.
[0021] By adopting the above technical solution and using pipes as the main building material inside the main steel frame, its overall weight can be reduced, making it less prone to deformation or even collapse due to excessive weight. This better reflects the lightness and safety of the main steel frame, and at the same time, it can also greatly reduce its production cost in terms of materials.
[0022] In summary, this application includes at least one of the following beneficial technical effects:
[0023] 1. By setting dividing lines, the construction platform is divided into a work area and an activity area. Workers in the work area can install panels, while other workers in the activity area can move freely within this area and are responsible for carrying panels and other materials to the workers in the work area. At this time, workers in the two areas can carry out independent activities, which can reduce cross-activities between different workers and greatly improve the safety of panel installation.
[0024] 2. By setting up partition units, dividing lines are formed to separate the corresponding work area and activity area. At the same time, the isolation effect of the partition units is used to better separate the two areas, so as to further ensure that workers in the two areas are less likely to cross-activities.
[0025] 3. By setting up entrances and exits, workers in the work area can enter and exit the activity area through the entrances and exits when starting work, finishing work, changing shifts, or in other special circumstances, and then carry out other activities in the activity area. Otherwise, they can only carry out corresponding walking activities in the work area, which will affect the normal work of other workers in the work area and may even cause personal safety issues among them. Attached Figure Description
[0026] Figure 1 This is a front view of a panel installation platform according to this application.
[0027] Figure 2 This is a top view of a panel installation platform according to this application.
[0028] Figure 3 This is a structural schematic diagram of the partition unit in this application.
[0029] Figure 4 This is a structural schematic diagram of the side fence in this application.
[0030] Explanation of reference numerals in the attached figures:
[0031] 1. Main steel frame; 11. Uprights; 12. Horizontal bars; 13. Longitudinal bars; 14. Side railings; 141. Upper horizontal bars; 142. Lower horizontal bars; 143. First structural connecting rod; 144. Second structural connecting rod; 2. Bearing plate; 3. Construction platform; 31. Work area; 32. Activity area; 33. Entrance / exit; 4. Partition unit; 41. Partition net; 42. Mounting rod; 43. Connector. Detailed Implementation
[0032] The following is in conjunction with the appendix Figures 1-4 This application will be described in further detail.
[0033] This application discloses a panel installation platform.
[0034] Reference Figure 1 and Figure 2 A panel installation platform includes a main steel frame 1 and a support plate 2 laid and installed on top of the main steel frame 1 along its length, forming a construction platform 3 for workers to carry out construction activities. Partition units 4 are sequentially arranged along the length of the construction platform 3 at the top center, forming a dividing line along the center to divide the construction platform 3 into an inner working area 31 and an outer activity area 32.
[0035] In this system, workers in work area 31 can install panels, while other workers in activity area 32 can move freely within this area, responsible for transporting panels and other materials to the workers in work area 31. This allows workers in both areas to operate independently, reducing overlap between them and significantly improving the safety of panel installation. Simultaneously, the partition unit 4 effectively separates the two areas, further preventing workers from overlapping between them.
[0036] In other embodiments, corresponding protective railings can also be installed on the outside of the work area 31 and the activity area 32 for safety protection, which will not be elaborated here.
[0037] Reference Figure 1 and Figure 2In this embodiment, adjacent partition units 4 are arranged at intervals to form an entrance 33 for communication between the work area 31 and the activity area 32. This allows workers in the work area 31 to enter and exit the activity area 32 through the entrance 33 when starting or finishing work, changing shifts, or in other special circumstances, and then carry out other activities in the activity area 32. Otherwise, they can only carry out corresponding walking activities within the work area 31, which will affect the normal work of other workers in the work area 31 and may even cause personal safety issues among them.
[0038] Reference Figure 3 Specifically, in this embodiment, the partition unit 4 includes a central partition net 41 and mounting rods 42 installed at both ends of the partition net 41. The partition unit 4 is detachably installed on the construction platform 3 via the mounting rods 42. In this embodiment, the bottom of the mounting rod 42 is formed with a plug 43, which is T-shaped. Correspondingly, the support plate 2 in the construction platform 3 has an insertion interface (not shown in the figure). During installation, the mounting rod 42 is inserted into the insertion interface in the support plate 2 via the plug 43 to achieve plug-and-play installation, which is convenient for installation and disassembly.
[0039] In other embodiments, the mounting rod 42 and the bearing plate 2 can be detachably installed in other ways, such as by connecting with bolts and nuts, or by pre-installing a sleeve on the bearing plate 2 for pluggable installation of the mounting rod 42, etc., which will not be described in detail here.
[0040] Reference Figure 1 Specifically, in this embodiment, the main steel frame 1 includes uprights 11, horizontal bars 12, and vertical bars 13, which are interconnected to form a three-dimensional steel frame. Side railings 14 are also installed between the two uprights 11 on the front and rear sides, with both ends of the side railings 14 fixedly connected to the corresponding uprights 11 to reinforce the front and rear sides and ensure the structural stability of the main steel frame 1.
[0041] Reference Figure 4Specifically, the side fence 14 includes an upper horizontal bar 141, a lower horizontal bar 142, and a first structural connecting rod 143 and a second structural connecting rod 144 installed between the upper horizontal bar 141 and the lower horizontal bar 142. The first structural connecting rod 143 is vertically arranged and is sequentially spaced along the length of the upper horizontal bar 141 and the lower horizontal bar 142 to divide the interior of the upper horizontal bar 141 and the lower horizontal bar 142 into a series of square structures. The second structural connecting rods 144 are sequentially arranged in a wave-like pattern within the square structures formed by the first structural connecting rods 143, the upper horizontal bar 141, and the lower horizontal bar 142, and both ends of each second structural connecting rod 144 are fixedly connected to two opposite corners within the corresponding square structure.
[0042] At this point, the upper horizontal bar 141 and the lower horizontal bar 142 are connected using the first structural connecting rod 143 and the second structural connecting rod 144, forming a triangular structure inside. The triangle's stability better ensures the overall structural stability of the side fence 14, thereby guaranteeing the structural stability of the main steel frame 1. Simultaneously, it avoids an overly complex and bulky structure, ensuring both lightness and flexibility.
[0043] In this embodiment, the uprights 11, horizontal bars 12, and longitudinal bars 13 in the main steel frame 1, as well as the upper horizontal bars 141, lower horizontal bars 142, first structural connecting rods 143, and second structural connecting rods 144 in the side railing 14, are all made of tubular material. This reduces the overall weight of the main steel frame 1, making it less prone to deformation or even collapse due to excessive weight. This better reflects the lightness and safety of the main steel frame 1, and also greatly reduces its production cost in terms of materials.
[0044] The implementation principle of a panel installation platform according to an embodiment of this application is as follows:
[0045] By installing partition units 4 on the top of the construction platform 3 to form a dividing line along its central position, the construction platform 3 is divided into an inner work area 31 and an outer activity area 32. During actual construction, workers in the work area 31 can install panels, while other workers in the activity area 32 can move freely within this area, responsible for transporting panels and other materials to the workers in the work area 31. This allows workers in both areas to operate independently, reducing cross-activities between different workers and significantly improving the safety of panel installation. Simultaneously, the partition units 4 effectively separate the two areas, further ensuring that workers in both areas are less likely to cross-activities.
[0046] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A panelized construction platform, characterized by: The utility model relates to a construction platform, including main body steel frame (1) and the load bearing plate (2) of installing along the length direction of main body steel frame (1) top department of main body steel frame (1) are laid, the load bearing plate (2) forms the construction platform (3) of worker construction activity, the top of construction platform (3) is provided with the division line along the middle position to divide construction platform (3) into the work area (31) of inside one side and the activity area (32) of outside one side.
2. A panelized construction platform according to claim 1, wherein: The division line includes a plurality of fence units (4) arranged in sequence along the length direction of the construction platform (3).
3. A panelized construction platform according to claim 2, wherein: Two adjacent fence units (4) are arranged at intervals to form an entrance (33) for the work area (31) and the activity area (32) to interact.
4. A panelized construction platform according to claim 3, wherein: The fence unit (4) includes a middle mesh (41) and mounting rods (42) mounted at both ends of the mesh (41), and the fence unit (4) is detachably mounted on the construction platform (3) through the mounting rods (42).
5. A panelized construction platform according to claim 4, wherein: The bottom of the mounting rod (42) is formed with a plug (43), and the load bearing plate (2) in the construction platform (3) is provided with a plug-in interface, and the mounting rod (42) is plugged into the plug-in interface of the load bearing plate (2) through the plug (43).
6. A panelized construction platform according to claim 1, wherein: The main body steel frame (1) includes vertical rods (11), horizontal rods (12), and longitudinal horizontal rods (13), and the vertical rods (11), horizontal rods (12), and longitudinal horizontal rods (13) are connected to form a three-dimensional steel frame, and side fences (14) are installed between the two vertical rods (11) on the front and back sides, and the two ends of the side fence (14) are fixedly connected to the corresponding vertical rods (11).
7. A panelized construction platform according to claim 6, wherein: The side fence (14) includes upper horizontal rods (141), lower horizontal rods (142), first structure links (143), and second structure links (144) mounted between the upper horizontal rods (141) and the lower horizontal rods (142); the first structure links (143) are vertically arranged and sequentially and spacedly arranged along the length direction of the upper horizontal rods (141) and the lower horizontal rods (142); the second structure links (144) are sequentially and spacedly arranged in the square frame structure formed by the first structure links (143), the upper horizontal rods (141), and the lower horizontal rods (142), and the second structure links (144) are arranged in a wave shape, and the two ends of each second structure link (144) are fixedly connected to two opposite corners of the corresponding square frame structure.
8. A panelized construction platform according to claim 6, wherein: The vertical rods (11), horizontal rods (12), and longitudinal horizontal rods (13) in the main body steel frame (1), and the upper horizontal rods (141), lower horizontal rods (142), first structure links (143), and second structure links (144) in the side fence (14) are all pipes.