Outer frame pulling structure for bare concrete outer wall construction

By constructing internal and external supports and using high-strength threaded rods and nuts for connection, the problem of air leakage and water seepage caused by opening and sealing in the construction of fair-faced concrete exterior walls was solved, achieving a stable connection and low-cost, high-efficiency construction.

CN223813909UActive Publication Date: 2026-01-20CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202520255424.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-18
Publication Date
2026-01-20
Estimated Expiration
2035-02-18

AI Technical Summary

Technical Problem

In the current construction of fair-faced concrete exterior walls, incomplete sealing of openings leads to air leakage and water seepage, increasing construction difficulty and cost, and reducing construction efficiency.

Method used

The system employs internal and external supports, utilizing high-strength threaded rods to penetrate the wall and threaded nuts to form a stable connection structure. This avoids the need for openings and sealing, thereby improving construction efficiency and reducing costs.

Benefits of technology

This achieved a stable external scaffold connection, reduced the risk of air leakage and water seepage, lowered construction costs and difficulties, and improved construction efficiency and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223813909U_ABST
    Figure CN223813909U_ABST
Patent Text Reader

Abstract

The utility model relates to a construction outer erecting and pulling structure, belongs to the technical field of building construction, and particularly relates to a bare concrete outer wall construction outer erecting and pulling structure which comprises a ground of a wall body and an inner support, the wall body is fixedly installed on the surface of the ground, and the inner support is fixedly installed between the wall body and the ground. The outer bracket is fixedly mounted on the other side of the wall body; the utility model achieves the effects of guaranteeing the stability of the wall body with the bracket, being convenient to disassemble and assemble and strong in practicability, and solves the problems of incomplete plugging and air leakage and water seepage due to the fact that the conventional construction method comprises the steps of firstly opening a hole for plugging and then tying a screw rod, and the problems that the construction difficulty is increased, the construction efficiency is reduced and the material cost is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, and in particular to a scaffolding structure for fair-faced concrete exterior wall construction. Background Technology

[0002] There are many requirements for the surface texture effect when designing fair-faced concrete buildings. Currently, there are wood grain veneer, rough veneer, striped veneer, exposed aggregate veneer, translucent veneer and traditional smooth veneer.

[0003] A search revealed Chinese patent CN217175690U, which discloses a tie rod structure for water-stopping in fair-faced concrete exterior walls. The structure includes a wall body, with fair-faced concrete templates fixedly connected to both outer walls. A first back rib and a second back rib are provided on one side of the fair-faced concrete template. Threaded holes are evenly distributed on the outer walls of both the first and second back ribs. A tie rod body is threadedly connected to the inner circumference of each threaded hole, and a small nut is threadedly connected to the outer circumference of the tie rod body. The second back rib is vertically oriented, and the cross-sections of the first and second back ribs are U-shaped. This invention effectively utilizes the advantages of the fair-faced concrete tie rod body and the plastic plug, ensuring a tight fit between the plastic plug and the fair-faced concrete template. This prevents the plastic plug from misaligning with the template and tie rod during vibration, thus avoiding water loss and grout leakage at that location, which would affect the forming effect of the fair-faced concrete.

[0004] Based on the above search results combined with existing technologies, the findings were as follows:

[0005] While the aforementioned patents can guarantee the molding effect of fair-faced concrete, the construction method of opening and sealing the tie rods is not completely sealed, resulting in air leakage and water seepage. In addition, it increases the construction difficulty and reduces the construction efficiency, and the material cost is high, so it has certain limitations. Utility Model Content

[0006] To solve the above-mentioned technical problems, this utility model proposes a scaffolding structure for fair-faced concrete exterior wall construction, which ensures both the scaffolding's connection and the stability of the wall.

[0007] The technical solution to achieve the purpose of this utility model is: a scaffolding structure for fair-faced concrete exterior wall construction, including the ground of the wall, wherein the wall is fixedly installed on the surface of the ground, and further comprising;

[0008] An internal support frame is fixedly installed between the wall and the ground;

[0009] An external support is fixedly installed on the other side of the wall.

[0010] Preferably, the inner wall of the wall body is fixedly provided with a fixed plate, the outer wall of the wall body is fixedly provided with a reinforcing plate, and a pair of ground anchors are fixedly arranged between the inner support and the ground.

[0011] Preferably, a plurality of high-strength wire rods are threadedly arranged between the inner support and the outer support, the high-strength wire rods penetrate the wall body, and nuts are threadedly arranged on both sides of the high-strength wire rods and the wall body.

[0012] Compared with the prior art, the present utility model has the following advantages:

[0013] Firstly, the present utility model solves the problem of too long free end of the outer support, reduces the cost of subsequent hole repair due to the special hole structure, and avoids the risk of leakage.

[0014] Secondly, the present utility model is convenient to install and disassemble, the construction process is simple and fast, the cost of the support is extremely low, the construction cost is reduced, and high economic benefits are achieved.

[0015] The present utility model solves the problem of incomplete plugging, air leakage and water seepage, and reduces the construction difficulty and the construction efficiency, and the material cost is high. BRIEF DESCRIPTION OF DRAWINGS

[0016] The present utility model will be further explained in combination with the drawings and embodiments:

[0017] Fig. 1 is a schematic view of the overall first perspective structure provided by the present utility model;

[0018] Fig. 2 is a schematic view of the plane structure provided by the present utility model;

[0019] Fig. 3 is a schematic view of the cross-sectional structure provided by the present utility model.

[0020] MARKS OF THE DRAWINGS:

[0021] 1, wall body; 2, inner support; 3, outer support; 4, high-strength wire rod; 5, fixed plate; 6, ground; 7, reinforcing plate; 8, nut; 9, ground anchor. DETAILED DESCRIPTION

[0022] The present utility model will be further explained in combination with the drawings and embodiments:

[0023] The utility model discloses an improved water concrete outer wall construction outer frame pull structure makes, and the technical scheme of the utility model is:

[0024] As Figs. 1-3 Shown, a water concrete outer wall construction outer frame pull structure makes, including the ground 6 of wall body 1, wall body 1 is fixedly installed on the surface of ground 6, provides good auxiliary action for the installation of later support, still includes;

[0025] Inner support 2, inner support 2 is fixedly installed between wall body 1 and ground 6, facilitates installation and dismounting, reduces worker intensity of labour;

[0026] Outer support 3, outer support 3 is fixedly installed at the other side of wall body 1, and the cost of installing frame body is lower, can bring higher economic benefits.

[0027] Further, the inner wall of wall body 1 is fixedly installed with fixed plate 5, the outer wall of wall body 1 is fixedly installed with reinforcing plate 7, a pair of ground anchors 9 are fixedly installed between inner support 2 and ground 6, strengthen the firmness of inner support 2 and ground 6, simple structure easy to install.

[0028] Further, a plurality of high-strength silk rods 4 are screw-mounted between inner support 2 and outer support 3, the high-strength silk rod 4 penetrates wall body 1, and the high-strength silk rod 4 is screw-mounted with nut 8 on the two sides of wall body 1, strengthens the compactness of connecting portion, improves the stability of frame body, is favorable to the quick completion of construction task.

[0029] Specific working method is: first, after the erection of inner support 2 and outer support 3 in the determined position, then install fixed plate 5 and reinforcing plate 7 on the two sides of wall body 1 respectively, enhance the safety of wall body 1, second, use the high-strength silk rod 4 of material M16 to pull through the setting of wall body 1, avoid the emergence of the problem of air leakage and water seepage due to the hole, the high-strength silk rod 4 connects two supports and is fixed firmly, finally, install nut 8 between wall body 1 and high-strength silk rod 4, further improve the firmness of support and wall body 1.

[0030] The technical means disclosed by the utility model scheme are not limited to the technical means disclosed by the above technical means, and also include technical solutions composed of the above technical features and equivalent substitutions.The matters not covered by the utility model belong to the common knowledge of those skilled in the art.

Claims

1. A scaffolding structure for constructing a fair-faced concrete exterior wall, comprising a floor (6) of the wall (1), characterized in that: The wall (1) is fixedly installed on the surface of the ground (6), and also includes; An inner support (2) is fixedly installed between the wall (1) and the ground (6); An external support (3) is fixedly installed on the other side of the wall (1).

2. The external scaffolding structure for fair-faced concrete exterior wall construction according to claim 1, characterized in that: A fixing plate (5) is fixedly installed on the inner wall of the wall (1), a reinforcing plate (7) is fixedly installed on the outer wall of the wall (1), and a pair of ground anchors (9) are fixedly installed between the inner support (2) and the ground (6).

3. The external scaffolding structure for fair-faced concrete exterior wall construction according to claim 1, characterized in that: Multiple high-strength screw rods (4) are threaded between the inner support (2) and the outer support (3). The high-strength screw rods (4) penetrate the wall (1). Nuts (8) are threaded onto both sides of the high-strength screw rods (4) and the wall (1).