Fabricated prestressed capping beam cantilever platform

By designing a prefabricated prestressed cap beam cantilever platform, and utilizing the cooperation of components such as the support platform, protective frame, and reinforcing rods, the problem of poor balance of the assembled parts during hoisting was solved, thereby improving safety and transportation efficiency.

CN223824020UActive Publication Date: 2026-01-23ROAD & BRIDGE INT CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423307417.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2026-01-23
Estimated Expiration
2034-12-31

AI Technical Summary

Technical Problem

In existing technologies, the long length of the components during hoisting leads to poor balance, posing safety risks and increasing transportation difficulties, as well as raising transportation costs.

Method used

An assembled prestressed cap beam cantilever platform was designed, including components such as a support operating platform, protective frame plate, reinforcing rod and arc-shaped limit buckle. Through the cooperation of these components, a stable cantilever platform structure is formed, which improves the balance and safety during the hoisting process.

Benefits of technology

It improves the balance and safety of the components during hoisting, and reduces transportation difficulty and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223824020U_ABST
    Figure CN223824020U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type prestress cover beam overhanging platform which comprises a supporting operation table and a protection frame plate, a mounting groove is formed in the supporting operation table, a welding bottom plate is fixedly connected to the bottom of the protection frame plate, the welding bottom plate is welded in the mounting groove, a mounting base is fixedly connected to the top of the protection frame plate, and the welding bottom plate is welded in the mounting groove. An arc-shaped limiting buckle is hinged to the top of the mounting seat, and a reinforcing rod is arranged in the arc-shaped limiting buckle; the overhanging platform is formed through the supporting operation table under the mutual cooperation of the protection frame plates, the reinforcing rods, the arc-shaped limiting buckles, the welding bottom plate and the mounting grooves, and a protection assembly of the overhanging platform is formed by the multiple split protection frame plates, so that on one hand, workers can conveniently carry out transportation work when transferring accessories; and on the other hand, the danger and the working difficulty caused by poor balance in the lifting process due to the fact that the workpiece is long in the process that the whole protective assembly assembly part is conveyed to the high position through a crane and other devices can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of bridge construction technology, specifically to a prefabricated prestressed cap beam cantilever platform. Background Technology

[0002] A cantilever platform for bridge caps is a commonly used auxiliary facility in bridge construction. It primarily provides operational space for cap beam construction, facilitating tasks such as rebar tying, formwork installation, and concrete pouring. It extends the construction area outwards, making construction more convenient and safer. During construction operations on the cantilever platform, the components need to be hoisted to the construction site one by one. Throughout this process, the length of the components often leads to slippage during transport after hoisting, potentially causing imbalance and endangering materials or workers below. Furthermore, the long length of all components increases transportation costs and difficulty. Utility Model Content

[0003] (a) Technical problems to be solved

[0004] In view of the shortcomings of the existing technology, the purpose of this utility model is to provide a prefabricated prestressed cap beam cantilever platform to solve the problems mentioned in the background art, such as the danger and difficulty of the work caused by the poor balance during the hoisting process due to the long workpiece.

[0005] (II) Technical Solution

[0006] To achieve the above objectives, this utility model provides the following technical solution: a prefabricated prestressed cap beam cantilever platform, comprising a supporting operating platform and a protective frame plate. The supporting operating platform has an installation groove inside. A welded base plate is fixedly connected to the bottom of the protective frame plate. The welded base plate is welded inside the installation groove. An installation seat is fixedly connected to the top of the protective frame plate. An arc-shaped limiting buckle is hinged to the top of the installation seat. A reinforcing rod is provided inside the arc-shaped limiting buckle.

[0007] The inner side of the support operating table is provided with several welding side grooves, which are connected to the mounting grooves. The bottom of the welding base plate is located below the bottom of the welding side grooves, and the inner edge of the welding side grooves is welded to the side of the welding base plate by welding strips.

[0008] As a preferred embodiment of this utility model, the protective frame plate is provided with several evenly spaced and equidistantly distributed on the top of the supporting operating table.

[0009] As a preferred embodiment of this utility model, the reinforcing rod is fitted with a plurality of rubber anti-slip sleeves, and the rubber anti-slip sleeves are fixed in position inside the arc-shaped limiting buckle.

[0010] As a preferred embodiment of this utility model, a connecting seat is fixedly connected to the side of the arc-shaped limiting buckle away from the mounting seat, and a limiting steel cable is fixedly connected to the bottom of the connecting seat. The bottom of the limiting steel cable is fixedly connected to the protective frame plate wall by a fixing bolt.

[0011] As a preferred embodiment of this utility model, the protective frame plate is fixedly connected with cross-arranged support columns, and a protective net is fixedly connected between the support columns and the protective frame plate.

[0012] As a preferred embodiment of this utility model, the bottom of the supporting operating platform is fixedly connected with a plurality of connecting columns, and the bottom of the connecting columns is fixedly connected with reinforcing steel bars.

[0013] As a preferred embodiment of this utility model, the bottom of the reinforcing steel bar is symmetrically provided with connecting steel bar columns, and both ends of the connecting steel bar columns are fixedly connected with welding plates, one of the welding plates being fixedly connected to the bottom of the reinforcing steel bar.

[0014] Compared with the prior art, the beneficial effects of this utility model are as follows:

[0015] In this utility model, the supporting operating platform, with the cooperation of the protective frame plate, reinforcing rod, arc-shaped limit buckle, welded base plate, and mounting groove, forms the entire cantilever platform. The protective component of the cantilever platform, which is formed by several separate protective frame plates, can facilitate the transportation of parts by workers. On the other hand, it can reduce the danger and difficulty of the entire protective component assembly when the parts are transported to a high place by cranes or other devices due to the poor balance caused by the long workpiece. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the main cross-sectional structure of this utility model;

[0017] Figure 2 This utility model Figure 1 Enlarged structural diagram of section A in the middle;

[0018] Figure 3 This utility model Figure 1 Enlarged structural diagram of section B in the middle.

[0019] In the diagram: 1. Supporting operating platform; 11. Mounting groove; 111. Welding side groove; 12. Connecting column; 13. Reinforcing steel bar; 14. Connecting steel bar column; 141. Welding plate; 2. Protective frame plate; 21. Supporting column; 22. Protective net; 23. Welding base plate; 3. Reinforcing rod; 31. Arc-shaped limit buckle; 311. Mounting seat; 32. Limiting steel cable; 321. Connecting seat; 33. Rubber anti-slip sleeve. Detailed Implementation

[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0021] like Figures 1 to 3 As shown, this utility model provides a prefabricated prestressed cap beam cantilever platform, including a supporting operating platform 1 and a protective frame plate 2. The supporting operating platform 1 has an installation groove 11 inside. The bottom of the protective frame plate 2 is fixedly connected to a welded base plate 23, which is welded inside the installation groove 11. The top of the protective frame plate 2 is fixedly connected to an installation seat 311, and the top of the installation seat 311 is hinged with an arc-shaped limit buckle 31. A reinforcing rod 3 is provided inside the arc-shaped limit buckle 31.

[0022] refer to Figure 1-3 The inner side of the support operating table 1 is provided with several welding side grooves 111. The welding side grooves 111 are connected to the mounting groove 11. The bottom of the welding base plate 23 is located below the bottom of the welding side grooves 111, and the inner edge of the welding side grooves 111 is welded to the side of the welding base plate 23 by welding strips.

[0023] Using the supporting operating platform 1 as the basic support platform for the entire cantilever platform, several protective frame plates 2 form the edge protection components of the entire cantilever platform at the top edge of the supporting operating platform 1. The reinforcing rod 3 and the protective frame plate 2 are fastened together by the arc-shaped limiting buckle 31 to form an integral unit. Several welding side grooves 111 are opened on the inner side of the supporting operating platform 1. The welding side groove 111 on one side of the mounting groove 11 is used to provide welding space between one side of the welding base plate 23 and one side of the mounting groove 11, so that the lower end area of ​​the welding base plate 23, which was originally inserted into the mounting groove 11, can be welded to the inner space of the welding side groove 111. The welded connection between the base plate 23 and the side wall of the support platform 1 helps to further improve the stability of the welded base plate 23 inside the mounting groove 11. This allows the entire cantilever platform's basic frame to be assembled with the cooperation of the support platform 1, protective frame plate 2, reinforcing rod 3, arc-shaped limit buckle 31, welded base plate 23, and mounting groove 11. On the one hand, this facilitates the transportation of parts by workers. On the other hand, it reduces the danger and difficulty of the entire protective assembly assembly due to the poor balance caused by the long workpiece during hoisting when the assembly is transported to a high place by cranes or other devices.

[0024] How to use

[0025] The working principle and usage process of this utility model are as follows: During construction, when a cantilever platform needs to be installed, the supporting operating platform 1 is first hoisted to the installation position using a hoisting tool. Then, a fixing rod is used to install the supporting operating platform 1 to the installation surface. After the supporting operating platform 1 is installed, the welding base plate 23 is inserted into the installation groove 11. A welding machine is then used to weld the welding base plate 23 to the installation groove 11, completing the initial fixation between the protective frame plate 2 and the supporting operating platform 1. Subsequently, the welding machine is used to weld one side of the welding base plate 23 to the inner edge of the welding side groove 111, completing the fixation between the protective frame plate 2 and the supporting operating platform 1. After completing one... After the protective frame plate 2 is installed and fixed to the supporting operating platform 1, the second protective frame plate 2 can be installed and fixed to the supporting operating platform 1. When installing the subsequent protective frame plates 2, the two adjacent protective frame plates 2 are placed and fixed together. After all the protective frame plates 2 are installed, the reinforcing rod 3 is fastened to the top of the protective frame plate 2 by the arc-shaped limiting buckle 31. After the initial limiting of the reinforcing rod 3 is completed, one end of the limiting steel cable 32 is fixed to one side of the protective frame plate 2. When installing the supporting operating platform 1 to the mounting surface, the connecting steel bar column 14, the reinforcing steel bar 13, and the pier column are fixed by the welding plate 141.

[0026] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0027] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A prefabricated prestressed cap beam cantilever platform, comprising a supporting operating platform (1) and a protective frame plate (2), characterized in that: The support operating table (1) has an installation groove (11) inside. The bottom of the protective frame plate (2) is fixedly connected to a welding base plate (23). The welding base plate (23) is welded inside the installation groove (11). The top of the protective frame plate (2) is fixedly connected to a mounting seat (311). The top of the mounting seat (311) is hinged with an arc-shaped limit buckle (31). A reinforcing rod (3) is provided inside the arc-shaped limit buckle (31). The inner side of the support operating table (1) is provided with several welding side grooves (111). The welding side grooves (111) are connected to the mounting groove (11). The bottom of the welding base plate (23) is located below the bottom of the welding side grooves (111), and the inner edge of the welding side grooves (111) is welded to the side of the welding base plate (23) by welding strips.

2. The prefabricated prestressed cap beam cantilever platform according to claim 1, characterized in that: The protective frame plate (2) is provided with several evenly spaced and distributed on the top of the supporting operating table (1).

3. The prefabricated prestressed cap beam cantilever platform according to claim 1, characterized in that: The reinforcing rod (3) is fitted with several rubber anti-slip sleeves (33), and the rubber anti-slip sleeves (33) are fixed inside the arc-shaped limiting buckle (31).

4. The prefabricated prestressed cap beam cantilever platform according to claim 1, characterized in that: The arc-shaped limiting buckle (31) is fixedly connected to a connecting seat (321) on the side away from the mounting seat (311). The bottom of the connecting seat (321) is fixedly connected to a limiting steel cable (32). The bottom of the limiting steel cable (32) is fixedly connected to the side wall of the protective frame plate (2) by a fixing bolt.

5. The prefabricated prestressed cap beam cantilever platform according to claim 1, characterized in that: The protective frame plate (2) is fixedly connected to cross-arranged support columns (21), and a protective net (22) is fixedly connected between the support columns (21) and the protective frame plate (2).

6. The prefabricated prestressed cap beam cantilever platform according to claim 1, characterized in that: The bottom of the supporting operating platform (1) is fixedly connected to several connecting columns (12), and the bottom of the connecting columns (12) is fixedly connected to reinforcing steel bars (13).

7. The prefabricated prestressed cap beam cantilever platform according to claim 6, characterized in that: The bottom of the reinforcing steel bar (13) is symmetrically provided with connecting steel bar columns (14), and both ends of the connecting steel bar columns (14) are fixedly connected with welding plates (141), one of which is fixedly connected to the bottom of the reinforcing steel bar (13).