Building construction safety management blocking device

By setting a locking component between the upright and the baffle, the problem of inconvenient installation of the existing device is solved, and the upright and the baffle are quickly fixed and bolted through, thus improving the assembly efficiency of the construction safety management barrier device.

CN223838785UActive Publication Date: 2026-01-27杨真 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520559678.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-27
Publication Date
2026-01-27
Estimated Expiration
2035-03-27

AI Technical Summary

Technical Problem

Existing construction safety management barriers have installation difficulties when installing the poles and baffles. In particular, due to the lack of a locking structure, the poles and baffles need to be manually fixed after they are attached, which affects the efficiency of bolt penetration.

Method used

An installation mechanism was designed, including locking component A and locking component B. Through the cooperation of the locking block and the locking slot, the upright and the baffle are initially fixed during the installation process, simplifying the bolt penetration operation.

Benefits of technology

It improves the assembly efficiency of the uprights and baffles, simplifies the installation process, increases the ease of bolt penetration, and enhances construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223838785U_ABST
    Figure CN223838785U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction safety management blocking device which comprises a baffle, vertical rods arranged on the two sides of the baffle and a bottom plate arranged at the bottom of the baffle and located between the vertical rods which are symmetrically arranged, and the baffle is composed of transverse rods and a plate body which are symmetrically arranged. By means of the designed installation mechanism, the situation that in the original building construction safety management process, when the blocking device is used and the vertical rod and the baffle are installed, the vertical rod and the baffle are fixed in a bolt penetrating mode, and due to the fact that no clamping structure exists between the vertical rod and the baffle, after the vertical rod and the baffle are attached, the vertical rod and the baffle are fixed is improved. In order to solve the problem of inconvenience in subsequent bolt penetration due to the fact that a mounting mechanism is arranged at the joint of the vertical rod and the baffle, the vertical rod and the baffle are preliminarily mounted through the mounting mechanism in the mounting process, so that subsequent bolt penetration operation is facilitated, and the assembly efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of construction safety management technology, and specifically relates to a building construction safety management barrier device. Background Technology

[0002] Construction safety management barriers are used to effectively isolate construction sites, prevent unauthorized personnel from entering, and thus avoid safety accidents. By setting up safety warning lines and signs, they remind passersby to pay attention to safety, prevent dangerous situations such as falls from heights and falling objects, and ensure construction safety. They can also shield the messy scene of the construction site, maintain the cleanliness and beauty of the city, and protect the urban landscape. The barriers can reduce the impact of construction noise and dust on the outside world, protecting the quality of life of surrounding residents. They reduce noise and dust pollution, prevent theft or damage to materials and equipment at the construction site, ensure the smooth progress of construction, and help to effectively manage and plan the construction area, providing necessary protection and order maintenance for the construction site.

[0003] In the existing construction safety management barrier devices, when assembling the barrier and the uprights, they are fixed together by bolts. After assembling the horizontal bars and the plate that make up the barrier, the end of the horizontal bar is attached to the side of the upright, and then the bolts are inserted. However, during the bolt insertion process, the position of the attachment point between the upright and the horizontal bar needs to be fixed by hand, which is inconvenient for installation. Therefore, this utility model proposes a construction safety management barrier device. Utility Model Content

[0004] The purpose of this utility model is to provide a safety management barrier device for building construction, so as to solve the problem of inconvenient installation when installing horizontal bars and vertical bars as mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a construction safety management barrier device, comprising a barrier, uprights on both sides of the barrier, and a base plate located at the bottom of the barrier and between the symmetrically arranged uprights. The barrier is composed of symmetrically arranged horizontal bars and a plate body. The horizontal bars are respectively located at the top and bottom of the plate body. Installation mechanisms are provided at the connection points between the plate body and the sides of the symmetrically arranged horizontal bars and the sides of the symmetrically arranged uprights. The installation mechanisms are composed of locking components A and locking components B. Locking components A are located at the connection points between the ends of the horizontal bars and the sides of the symmetrically arranged uprights, and locking components B are located at the connection points between the sides of the plate body and the sides of the symmetrically arranged uprights.

[0006] Preferably, the locking assembly A consists of a locking block A and a locking groove A. The locking groove A is opened on the side of the upright, the locking block A is fixed to the end of the crossbar, and the locking block A is engaged with the inner side of the locking groove A.

[0007] Preferably, the surface of the card block A is in contact with the inner wall of the card slot A.

[0008] Preferably, the engaging component B consists of a locking block B and a locking groove B. The locking block B is located on the side of the upright, and the locking groove B is fixed to the side of the plate. The locking groove B and the locking block B are in an engaging state.

[0009] Preferably, a fixing component is provided between the card block A and the card slot A. The fixing component consists of a fixing groove, a fixing block, a sliding groove, and a limiting component. The fixing groove is opened at the top of the card block A, the sliding groove is opened on the side of the upright, the fixing block is located inside the sliding groove and the fixing groove, and the limiting component is located on the side of the upright.

[0010] Preferably, the limiting component consists of a limiting groove and a limiting slider. The limiting groove is formed on the side of the upright, and the limiting slider is disposed inside the limiting groove and fixed to the side of the fixing block.

[0011] Preferably, the fixing block has a cylindrical structure.

[0012] Compared with the prior art, the beneficial effects of this utility model are:

[0013] The designed installation mechanism improves upon the previous construction safety management process, where the use of partition devices and the installation of uprights and baffles involved bolting them together. Because there was no interlocking structure between them, after the uprights and baffles were attached, one hand was needed to hold them in place, hindering subsequent bolt insertion. By incorporating an installation mechanism at the connection point between the uprights and baffles, the initial installation of the uprights and baffles is achieved, facilitating subsequent bolt insertion and increasing assembly efficiency. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the structure of this utility model;

[0015] Figure 2 This is a partial installation diagram of the pole and baffle of this utility model;

[0016] Figure 3 This is a cross-sectional view of the installation location of the upright and baffle of this utility model;

[0017] Figure 4 This utility model Figure 3 Enlarged schematic diagram of region A in the image;

[0018] In the diagram: 1. Upright pole; 2. Baffle; 21. Horizontal bar; 22. Plate; 3. Base plate; 4. Mounting mechanism; 41. Engaging component A; 411. Engaging block A; 412. Engaging slot A; 42. Engaging component B; 421. Engaging block B; 422. Engaging slot B; 43. Fixing component; 431. Fixing groove; 432. Fixing block; 433. Slide groove; 434. Limiting component; 4341. Limiting slide groove; 4342. Limiting slider. Detailed Implementation

[0019] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0020] Please see Figures 1 to 4This utility model provides a technical solution: a construction safety management barrier device, including a barrier 2, uprights 1 on both sides of the barrier 2, and a base plate 3 located at the bottom of the barrier 2 and between the symmetrically arranged uprights 1. The barrier 2 is composed of symmetrically arranged horizontal bars 21 and a plate body 22. The horizontal bars 21 are respectively located at the top and bottom of the plate body 22. Installation mechanisms 4 are provided at the connection points between the plate body 22 and the symmetrically arranged uprights 1 on both sides of the plate body 22 and the symmetrically arranged horizontal bars 21. The installation mechanisms 4 are composed of engaging components A41 and B42. Engaging components A41 are located at the connection points between the two ends of the horizontal bars 21 and the symmetrically arranged uprights 1, and engaging components B42 are located at the connection points between the two sides of the plate body 22 and the symmetrically arranged uprights 1. Through the designed installation mechanism 4, the previous construction safety management method, where the uprights 1 and barrier 2 were fixed by bolts, resulted in a lack of engaging structure between them, causing the uprights 1 and barrier 2 to be unable to engage properly. After the baffle 2 is attached, one hand is needed to fix the position of the attached upright 1 and the baffle 2, which makes it difficult to insert bolts later. By setting an installation mechanism 4 at the connection between the upright 1 and the baffle 2, the upright 1 and the baffle 2 can be initially installed during the installation process through the installation mechanism 4, which facilitates the subsequent bolt insertion operation and increases assembly efficiency. The locking component A41 consists of a locking block A411 and a locking groove A412. The locking groove A412 is opened on the side of the upright 1, and the locking block A411 is fixed to the crossbar 21. At the end, the locking block A411 is inserted into the inner side of the locking groove A412. The surface of the locking block A411 is in a close fit with the inner wall of the locking groove A412. The horizontal bar 21 and the vertical bar 1 are spliced ​​together by the locking assembly A41. The locking assembly B42 consists of the locking block B421 and the locking groove B422. The locking block B421 is opened on the side of the vertical bar 1, and the locking groove B422 is fixed to the side of the plate 22. The locking groove B422 and the locking block B421 are in a locked state. The plate 22 and the vertical bar 1 are spliced ​​together by the locking assembly B42.

[0021] In this embodiment, preferably, a fixing component 43 is provided between the locking block A411 and the locking groove A412. The fixing component 43 consists of a fixing groove 431, a fixing block 432, a sliding groove 433, and a limiting component 434. After the crossbar 21 and the plate 22 are spliced ​​with the upright 1 through the locking component A41 and the locking component B42, they are fixed by the fixing component 43, so that the upright 1 and the baffle 2 are initially locked together. This facilitates the subsequent bolt penetration process without having to manually fix the position of the upright 1 and the baffle 2, increasing the bolt penetration speed. To improve efficiency and ease of assembly, a fixing groove 431 is provided at the top of the locking block A411, a sliding groove 433 is provided on the side of the upright 1, a fixing block 432 is provided on the inner side of the sliding groove 433 and the inner side of the fixing groove 431, and a limiting component 434 is provided on the side of the upright 1. The limiting component 434 consists of a limiting sliding groove 4341 and a limiting slider 4342. The limiting sliding groove 4341 is provided on the side of the upright 1, and the limiting slider 4342 is provided on the inner side of the limiting sliding groove 4341 and fixed to the side of the fixing block 432. The fixing block 432 has a cylindrical structure.

[0022] The working principle and usage process of this utility model are as follows: During the construction process, the partition device ensures construction safety, maintains the city's appearance, reduces noise and dust pollution, protects materials and equipment, and manages the environment and construction area, thereby achieving safety management. When it is necessary to assemble the upright 1 and the baffle 2, the crossbar 21 is fixed to the plate 22, and then the baffle 2 is attached to the side of the upright 1. During the attachment process, the limiting slider 4342 is pulled upward, so that the limiting slider 4342 is in... The limiting slide 4341 slides inside the limiting slide 433, and the fixing block 432 slides inside the slide 433, so that the locking block A411 at the end of the crossbar 21 is locked into the inside of the locking groove A412, and the locking groove B422 is locked into the inside of the locking block B421. Then the limiting slide 4342 is released, and under the action of gravity, the end of the fixing block 432 is locked into the inside of the fixing groove 431, limiting the crossbar 21, so that the upright 1 and the baffle 2 are initially spliced. Then the bolt is passed through to complete the assembly operation of the partition device.

[0023] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A construction safety management barrier device, comprising a barrier (2), uprights (1) disposed on both sides of the barrier (2), and a base plate (3) disposed at the bottom of the barrier (2) and located between the symmetrically disposed uprights (1), characterized in that: The baffle (2) is composed of symmetrically arranged crossbars (21) and plate (22). The crossbars (21) are respectively arranged at the top and bottom of the plate (22). The two sides of the plate (22) and the two sides of the symmetrically arranged crossbars (21) are respectively provided with installation mechanisms (4) at the connection points with the sides of the symmetrically arranged uprights (1). The installation mechanism (4) is composed of locking component A (41) and locking component B (42). The locking component A (41) is arranged at the two ends of the crossbars (21) at the connection points with the sides of the symmetrically arranged uprights (1). The locking component B (42) is arranged at the two sides of the plate (22) at the connection points with the sides of the symmetrically arranged uprights (1).

2. The construction safety management barrier device according to claim 1, characterized in that: The locking assembly A (41) consists of a locking block A (411) and a locking groove A (412). The locking groove A (412) is opened on the side of the upright (1). The locking block A (411) is fixed to the end of the crossbar (21). The locking block A (411) is inserted into the inside of the locking groove A (412).

3. The construction safety management barrier device according to claim 2, characterized in that: The surface of the card block A (411) is in contact with the inner wall of the card slot A (412).

4. The construction safety management barrier device according to claim 1, characterized in that: The engaging component B (42) consists of a locking block B (421) and a locking groove B (422). The locking block B (421) is located on the side of the upright (1), and the locking groove B (422) is fixed to the side of the plate (22). The locking groove B (422) and the locking block B (421) are engaged.

5. A construction safety management barrier device according to claim 2, characterized in that: A fixing component (43) is provided between the card block A (411) and the card slot A (412). The fixing component (43) consists of a fixing groove (431), a fixing block (432), a sliding groove (433), and a limiting component (434). The fixing groove (431) is opened at the top of the card block A (411), the sliding groove (433) is opened on the side of the upright (1), the fixing block (432) is located inside the sliding groove (433) and inside the fixing groove (431), and the limiting component (434) is located on the side of the upright (1).

6. A construction safety management barrier device according to claim 5, characterized in that: The limiting component (434) consists of a limiting groove (4341) and a limiting slider (4342). The limiting groove (4341) is opened on the side of the upright (1), and the limiting slider (4342) is set inside the limiting groove (4341) and fixed to the side of the fixing block (432).

7. A construction safety management barrier device according to claim 6, characterized in that: The fixing block (432) has a cylindrical structure.