Cable bent tower assembly and disassembly transverse connection operation platform
By designing a horizontal connection operation platform for the installation and dismantling of cable towers, and adopting a modular frame structure and reinforcing plate connection, the problem of safety for construction personnel passing between cable tower columns was solved, realizing a safe and reliable construction passage and operation platform, adapting to different cable tower spacings, and improving the flexibility and reusability of the device.
Patent Information
- Application Number
- CN202423285693.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2026-01-30
- Estimated Expiration
- 2034-12-30
AI Technical Summary
There are safety risks for construction workers when passing between the tower columns. The existing construction hoist cannot reach the tower on the upper river side, and the crossbar is a hollow frame structure, which makes passage unsafe.
Design a pylon installation and dismantling horizontal linkage operation platform, which adopts a modular frame structure, including uprights, horizontal bars and steel mesh, which are suspended on the horizontal linkage by hooks. The frame is equipped with reinforcing plates and clamps on both sides to provide a stable passage. The number of frames can be adjusted according to the spacing of the pylon columns to enhance bending and shear resistance.
It provides safe construction access and operating platform, improves the flexibility and safety of the equipment, adapts to different tower column spacings, has high reusability, and ensures the safety of construction personnel.
Smart Images

Figure CN223853210U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to cable tower construction platform technical field, specifically, relate to a cable tower dismantling horizontal connection operation platform. BACKGROUND
[0002] Cable tower refers to the tower structure of cable-stayed bridge or suspension bridge supporting main cable, and the cable tower horizontal connection is arranged between the cable tower columns and plays the role of bearing and connection. At present, when the cable tower is installed and dismantled, the construction elevator can only reach the river side below the cable tower, if the upper river side cable tower needs to be installed and dismantled, the construction personnel need to pass through the horizontal connection, and the horizontal connection is a hollow frame structure assembled by steel pipes, and there is a high safety risk when passing through. SUMMARY
[0003] The utility model discloses a cable tower dismantling horizontal connection operation platform, which solves the problem of the safety of the construction personnel passing through the cable tower columns.
[0004] The utility model discloses the following technical scheme is realized: a cable tower dismantling horizontal connection operation platform, including the frame, the frame includes the stand rod of being arranged at four corners, the adjacent stand rod is connected through the crosspiece, the top and bottom of frame are equipped with the steel sheet net, one side stand rod top is equipped with the hook for hanging on the horizontal connection, the adjacent frame is connected through the clamping block hoop sleeve adjacent stand rod of adjacent frame after the bolt connection reinforcing plate to realize the connection, and the reinforcing plate is arranged along the length direction of frame, and the reinforcing plate length is same with the frame length.
[0005] Further, the stand rod abutting against one side of the horizontal connection is a channel steel or an I-beam, and the crosspiece and the stand rod away from one side of the horizontal connection are steel pipes.
[0006] Further, the adjacent stand column of the adjacent frame is sleeved with a clamp, the clamp is provided with a clamping groove, a plug-in plate is inserted into the clamping groove, the plug-in plate is arranged along the length direction of the frame, and the length of the plug-in plate is same with the length of the frame.
[0007] Preferably, the plug-in plate and the reinforcing plate are arranged on the outer side of the opposite two sides of the frame.
[0008] Preferably, the plug-in plate is provided with a clamp on the upper side and the lower side.
[0009] Further, the reinforcing plate is provided with at least two pieces along the height direction of the frame.
[0010] Further, the side wall of the frame is provided with a ladder.
[0011] The utility model has at least the following advantages and beneficial effects: the frame is welded by the vertical rod, the cross rod and the steel sheet net, stable passageway and operation platform for the construction personnel when the horizontal connection is installed and disassembled, the operation platform is spliced by the modular frame, the frame quantity can be adjusted flexibly according to the cable tower column distance, repeated use is realized, the flexibility of the device is improved, meanwhile, the bending and shearing capacity are provided by the reinforcing plate, the safety is ensured. BRIEF DESCRIPTION OF DRAWINGS
[0012] Figure 1 The utility model provides a kind of assembling schematic view of cable tower horizontal connection operation platform.
[0013] Figure 2 The utility model provides a kind of structure schematic view of frame in cable tower horizontal connection operation platform.
[0014] Figure 3 Another structure schematic view of frame in cable tower horizontal connection operation platform is provided for the utility model.
[0015] Figure 4 The utility model provides a kind of connecting schematic view of clamping block in cable tower horizontal connection operation platform.
[0016] Figure 5 The utility model provides a kind of structure schematic view of clamping hoop in cable tower horizontal connection operation platform.
[0017] Reference signs: 1-frame, 11-vertical rod, 12-cross rod, 13-steel sheet net, 14-hook, 15-crawling ladder, 2-clamping block, 3-reinforcing plate, 4-clamping hoop, 40-clamping slot, 5-insert plate. DETAILED DESCRIPTION
[0018] The specific embodiment is as follows in combination with the drawings.
[0019] Embodiment
[0020] As Figures 1-5As shown, in the embodiment, a cable tower disassembly and assembly horizontal connection operation platform is mainly disclosed, which comprises a frame 1, the frame 1 comprises vertical rods 11 arranged at four corners, the adjacent vertical rods 11 are connected through horizontal rods 12, the top and bottom of the frame 1 are provided with steel plate nets 13, the top end of one side vertical rod 11 is provided with a hook 14 for hanging on the horizontal connection, the adjacent frames 1 are connected through a clamping block 2, a reinforcing plate 3 is bolted to the adjacent vertical rods 11 of the adjacent frames 1 to realize the connection, the reinforcing plate 3 is arranged along the length direction of the frame 1, and the length of the reinforcing plate 3 is the same as the length of the frame 1. Specifically, the frame 1 is welded through the vertical rods 11, the horizontal rods 12 and the steel plate nets 13, and the whole is a rectangular cuboid channel structure, the steel plate net 13 at the bottom provides support for the construction personnel and is convenient for the construction personnel to pass by, and the steel plate net 13 at the top can play a shielding role. The frame 1 is hung on the horizontal rod 12 of the horizontal connection through the hook 14, and one side vertical rod 11 directly abuts against the outer edge of the horizontal connection, so that the stable connection of the operation platform and the horizontal connection is realized. In addition, the operation platform is modularly arranged, the number of frames 1 required can be increased or decreased according to the distance between the cable tower columns (i.e. the length of the horizontal connection), the operation platform is convenient for repeated use, and the flexibility of the device is improved. The clamping block 2 is in the shape of a U, when the frames 1 are assembled, the corresponding faces of the adjacent frames 1 along the width and height directions are overlapped, the adjacent vertical rods 11 of the adjacent frames 1 are clamped together through the clamping block 2, and the reinforcing plate 3 is fastened and connected through bolts, so that the two adjacent vertical rods 11 are limited in the space enclosed by the clamping block 2 and the reinforcing plate 3, the splicing of the adjacent frames 1 is realized, and the reinforcing plate 3 abuts against all the vertical rods 11 on one side, so that certain bending and shearing resistance is provided. It should be noted that, due to the large self-weight of the horizontal connection and the lifting weight limit of the tower crane, when disassembling, the horizontal connection needs to be removed in part, then the whole horizontal connection is lifted, and then is transported to the disassembly site for the second disassembly; when installing, the whole horizontal connection is lifted without complete assembly, the horizontal connection is connected with the column, and then is further assembled. Therefore, the operation platform can be used as a passage for construction personnel and as an operation platform during disassembly and assembly of the horizontal connection.
[0021] Further, in specific implementation, the vertical rod 11 abutting against one side of the horizontal connection in the above-mentioned operation platform provided by the embodiment of the utility model is a channel steel or an I-beam, the horizontal rod 12 and the vertical rod 11 away from one side of the horizontal connection are steel pipes; it should be noted that the vertical rods 11 on both sides of the frame 1 adopt different structural forms, the vertical rod 11 abutting against one side of the horizontal connection adopts a channel steel or an I-beam, which has good compression resistance and bending resistance, and is particularly suitable for bearing large vertical and lateral loads; and the vertical rod 11 away from one side of the horizontal connection adopts a steel pipe, which is light and easy to install, and has certain strength, so as to facilitate the weight reduction of the overall structure.
[0022] Further, in the specific implementation, the adjacent columns of the adjacent frames 1 are sleeved with the clamps 4, the clamps 4 are provided with the clamping grooves 40, the plugboards 5 are inserted into the clamping grooves 40 in a matched mode, the plugboards 5 are arranged along the length direction of the frames 1, and the lengths of the plugboards 5 are same as the lengths of the frames 1. Specifically, the clamps 4 embrace the adjacent columns of the adjacent frames 1 together, the connection of the adjacent frames 1 is realized, meanwhile, the outer walls of the clamps 4 are provided with the outwardly extending bending structures, the clamping grooves 40 for clamping the plugboards 5 are formed, the clamping grooves 40 are upward, and the cooperation of the plugboards 5 and the clamping grooves 40 effectively suppresses the lateral shaking of the structure.
[0023] Preferably, the plugboards 5 and the reinforcing plates 3 are arranged on the outer sides of the opposite two sides of the frames 1. The overall rigidity of the whole platform is increased, and the whole frame 1 is more safe and reliable in use.
[0024] Preferably, the plugboards 5 are respectively clamped with the clamps 4 on the upper side and the lower side. Specifically, the plugboards 5 are simultaneously subjected to the limiting action of the two clamps 4 on the same placement position along the length direction, and the stability of the installation of the plugboards 5 is ensured. In the use process of the platform, the existence of the clamps 4 can prevent the plugboards 5 from loosening due to external force or vibration, and the safety is ensured.
[0025] Further, in the specific implementation, the reinforcing plates 3 are provided at least two along the height direction of the frames 1. The strength and stability of the structure are enhanced, and the failure caused by deformation or stress concentration in the working process is prevented.
[0026] Further, in the specific implementation, the side walls of the frames 1 are provided with the ladders 15. The up and down operation of the construction personnel is facilitated, and the convenience and safety of the operation are improved.
Claims
1. A dismounting and erecting cross-bracing operation platform for a cable tower, characterized in that, The utility model relates to a kind of frame (1), the frame (1) includes erecting pole (11) arranged in four corners, it is connected by cross bar (12) between adjacent erecting pole (11), the top and bottom of the frame (1) are equipped with steel sheet net (13), the top end of one side erecting pole (11) is equipped with the hook (14) for hanging in cross link, adjacent frame (1) is connected by clamp block (2) hoop adjacent erecting pole (11) of adjacent frame (1) after bolt connection reinforcing plate (3) to realize connection, the reinforcing plate (3) is arranged along the length direction of the frame (1), and the reinforcing plate (3) length is same with the length of the frame (1).
2. The operation platform for dismounting and assembling the cross bracing of a cable tower according to claim 1, characterized in that, The erecting pole (11) abutting the cross link side is channel steel or I-beam, and the cross bar (12) and the erecting pole (11) away from the cross link side are steel pipes.
3. The operation platform for dismounting and assembling the cross bracing of a cable tower according to claim 1, characterized in that, Adjacent erecting pole (11) of adjacent frame (1) is equipped with clamp (4), the clamp (4) is equipped with clamping groove (40), the plug-in board (5) is matched and inserted in the clamping groove (40), the plug-in board (5) is arranged along the length direction of the frame (1), and the plug-in board (5) length is same with the length of the frame (1).
4. The operation platform for dismounting and assembling the cross bracing of a cable tower according to claim 3, characterized in that, The plug-in board (5) and the reinforcing plate (3) are arranged on the outer side of opposite two sides of the frame (1).
5. The operation platform of claim 3, wherein, The plug-in board (5) is equipped with the clamp (4) on the upper and lower sides respectively.
6. The operation platform of claim 1, wherein, The reinforcing plate (3) is provided with at least two pieces along the height direction of the frame (1).
7. The operation platform of claim 1, wherein, The side wall of the frame (1) is provided with a ladder (15).