Waste cotton stacking and storing device

By designing a waste cotton palletizing and storage device, and utilizing a transition roller conveyor and palletizer, double-layer palletizing and efficient handling of waste cotton bales are achieved. This solves the problem of low storage efficiency caused by the high number of transport trips by roller forklifts in existing technologies, and improves the production efficiency of enterprises.

CN223879016UActive Publication Date: 2026-02-06ANHUI LINGKUN INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520113509.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2026-02-06
Estimated Expiration
2035-01-17

AI Technical Summary

Technical Problem

In the current waste cotton processing, the frequent transport by roller forklifts and bagging trucks results in low storage efficiency and fails to meet the production needs of enterprises.

Method used

Design a waste cotton palletizing and storage device, including a transition roller line, an end roller line and a palletizer. Through the cooperation of the transition roller line and the palletizer, double-layer palletizing and efficient handling of waste cotton bales can be achieved, reducing the waiting time of roller forklifts.

Benefits of technology

This improved the efficiency of handling waste cotton bales, reduced waiting time, and increased the company's production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223879016U_ABST
    Figure CN223879016U_ABST
Patent Text Reader

Abstract

The utility model relates to a waste cotton stacking and storing device which comprises a packing machine and a front-end roller line which are correspondingly arranged, a transition roller line and a tail-end roller line are sequentially arranged at the conveying tail end of the front-end roller line, the tail-end roller line corresponds to a roller forklift, and a stacking machine is arranged on one side of the transition roller line. The bale clamping vehicles are arranged in the storage warehouse and used for stacking, the temporary storage roller line is used for placing waste cotton bales, and the bale clamping vehicles and the roller forklifts uniformly correspond to the temporary storage roller line. The waste cotton bale conveying device has the advantages that the transition roller line, the tail end roller line and the stacker crane are additionally arranged on the basis of an existing waste cotton bale conveying device, existing single waste cotton bale conveying is added into simultaneous conveying of two waste cotton bales, the conveying efficiency is improved, meanwhile, the packed waste cotton bales can be buffered through the multiple roller lines at the same time, and the packing efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to cotton spinning technical field, concretely is a kind of waste cotton stacking storage device. BACKGROUND

[0002] Textile cotton waste is the waste generated in the process of textile production, including waste yarn, waste cloth and the like. With the improvement of people's environmental awareness, how to effectively handle these waste products and reduce environmental pollution has become the focus of the industry.

[0003] Textile cotton waste can be divided into two categories: reusable and non-reusable. Reusable waste mainly includes waste yarn, waste cloth and the like, which can be reused in textile production after treatment. Non-reusable waste needs to be treated for environmental protection to prevent pollution to the environment.

[0004] Recycling is the first step in handling textile cotton waste. By establishing a perfect recycling system, waste products are collected from the source for subsequent processing. During the recycling process, the waste products also need to be pretreated, such as cleaning and disinfection, to ensure their quality and hygiene standards.

[0005] At present, the waste cotton handling process is that the packed waste cotton bundles are placed on the roller line 1 by the packing machine, the waste cotton bundles are conveyed to the tines of the roller forklift 4 by the roller line, the waste cotton bundles are transported to the designated position by the roller forklift 4, and then transported to the storage warehouse by the clamp truck 6 for stacking and storage. The storage process requires multiple transportation of the roller forklift 4 and the clamp truck 7, and the packing machine also needs to wait for the roller forklift 4 for a long time, which is low in efficiency and cannot keep up with the needs of the current enterprise development. Therefore, there is an urgent need for a device to improve the storage efficiency at present. UTILITY MODEL CONTENT

[0006] In order to solve the above technical problems, the utility model provides a waste cotton stacking storage device.

[0007] In order to achieve the above purpose, the utility model provides the following technical scheme:

[0008] A waste cotton stacking storage device, comprising a packing machine and a front-end roller line arranged correspondingly, characterized in that a transition roller line is arranged correspondingly at the conveying end of the front-end roller line, an end roller line is arranged correspondingly at the conveying end of the transition roller line, the conveying end of the end roller line is correspondingly matched with a roller forklift, and a stacking machine is also arranged correspondingly on one side of the transition roller line.

[0009] It also includes a clamp truck and a buffer roller line for placing waste cotton bundles arranged in the storage warehouse for stacking, and the clamp truck and the roller forklift are correspondingly matched with the buffer roller line.

[0010] On the basis of the above scheme, the following technical scheme can also be adopted:

[0011] The transition roller line comprises a transition roller frame, a set of transition transmission rollers are installed in the transition roller frame, support feet are arranged on the lower side of the transition roller frame, and two parallel arrangement accommodation grooves are arranged on one side of the transition roller frame.

[0012] The stacker comprises a fixed support, a guide support is connected to the fixed support through a vertically arranged guide assembly, the guide support is connected to a guide support plate through a sliding rail, and a fork tooth is arranged on the guide support plate.

[0013] A first driving member is installed on the fixed support, the first driving member is drivingly connected to the guide support through a first transmission assembly, a second driving member is installed on the guide support, and the second driving member is drivingly connected to the guide support plate through a second transmission assembly.

[0014] The guide assembly comprises two guide plates fixedly connected to the fixed support, the two guide plates are vertically and parallel arranged, each guide plate is connected to a connecting plate through a guide wheel, and each connecting plate is fixedly connected to the guide support.

[0015] The first transmission assembly comprises a rotating shaft, corresponding first transmission wheels are installed on the upper side and the lower side of the fixed support, a first transmission belt is connected between the corresponding first transmission wheels, and the first transmission belt is fixedly connected to the guide support.

[0016] The second transmission assembly comprises two second transmission wheels and a second transmission belt, the two second transmission wheels are respectively connected to the second driving member and the guide support, a connecting plate is further installed on the guide support plate, and the connecting plate is connected to fix the second transmission belt.

[0017] A guardrail is further arranged on the outer side of the stacker, and a baffle for limiting the waste cotton bale is further arranged on the outer side of the guide support.

[0018] The device has the advantages that: the device adds a transition roller line, a terminal roller line and a stacking machine on the basis of the prior art, the baled waste cotton is conveyed to the transition roller line through the front-end roller line, the stacking machine lifts the baled waste cotton, when the next baled waste cotton is conveyed to the position, the stacking machine stacks the previous baled waste cotton on the baled waste cotton, and the stacking of two layers of baled waste cotton is completed, when the stacked baled waste cotton is conveyed to the terminal roller line which is connected with the roller forklift, the roller forklift is connected with the terminal roller line, and then the stacked baled waste cotton is conveyed to the buffer roller line in the storage room, and the baled waste cotton is conveyed to the appropriate storage position in the storage warehouse by the bale clamping vehicle.

[0019] The stacking machine realizes the up-down movement by the first driving element and the first transmission assembly, completes the stacking of the baled waste cotton, and adjusts the front-rear position of the fork teeth by the second driving element and the second transmission assembly, so that the baled waste cotton is lifted to a suitable position. BRIEF DESCRIPTION OF DRAWINGS

[0020] Figure 1 It is a structure schematic view of the cooperation of the roller forklift, the stacking machine and the roller line in the utility model;

[0021] Figure 2 It is a structure schematic view of the cooperation of the roller forklift, the bale clamping vehicle and the buffer roller line in the utility model;

[0022] Figure 3 It is a structure schematic view of the transition roller line;

[0023] Figure 4 It is a structure schematic view of the stacking machine;

[0024] Figure 5 It is a structure schematic view of the transmission assembly of the stacking machine. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.

[0026] In the description of the utility model, it is understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise" and the like indicate the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the utility model.

[0027] As shown in Figure 1 The utility model relates to a kind of waste cotton stacking storage devices, including corresponding setting packing machine and front end cylinder line 1, packing machine and front end cylinder line are all prior art, packing machine uses automatic packing machine or semi-automatic packing machine, since packing machine is prior art, not the innovative point of difficulty, not drawn in the figure.In the transmission end of front end cylinder line 1 corresponding cooperation setting transition cylinder line 2, in the transmission end of transition cylinder line 2 corresponding cooperation setting end cylinder line 3.The structure of front end cylinder line 1 and end cylinder line 3 is identical, they all include cylinder frame, install a group of parallelly arranged roll shaft on cylinder frame, one end of one roll shaft is connected drive motor, this structure can be placed on its upper side waste cotton bundle 8 from front end to end.

[0028] As shown in Figure 3 The transition cylinder line 2 includes square transition cylinder frame 2.1, a group of transition transmission rollers 2.2 capable of freely rotating are installed in the transition cylinder frame 2.1, support feet 2.3 are provided on the lower side of the transition cylinder frame 2.1, the structure of the support feet 2.3 is prior art, a conventional support foot on the cylinder line is used to adjust the height of the transition cylinder line 2 and play a stabilizing role, and under the action of the support feet 2.3, the height of the transition cylinder line 2 can be kept consistent with that of the front end cylinder line 1 and the end cylinder line 3, facilitating the transmission of the waste cotton bundle 8. Two parallelly arranged notching grooves 2.4 are provided on one side of the transition cylinder frame 2.1, and no transition transmission roller 2.2 is provided on the inner side of the transition cylinder frame 2.1 corresponding to the notching groove 2.4. In use, the tines 13 of the stacking machine 5 are arranged in the corresponding notching groove 2.4.

[0029] As shown in Figure 2 In the transmission end of end cylinder line 3 and cylinder fork truck 4 corresponding cooperation, stacking machine 5 is also arranged corresponding to one side of transition cylinder line 2. It also includes clamping vehicle 6 for stacking arranged in storage warehouse and buffer cylinder line 7 for placing waste cotton bundle 8, and clamping vehicle 6 and cylinder fork truck 4 are arranged corresponding to buffer cylinder line 7. The clamping vehicle 6 is prior art, and a conventional clamping vehicle for carrying waste cotton bundle 8 is used. The buffer cylinder line 7 is also prior art, and a conventional cylinder line is used.

[0030] Combining Figure 4 And Figure 5 As shown in the figure, the stacker 5 includes a fixed support 9, which is an L-shaped frame, and a support leg 26 is installed at each of the four corners of the lower side of the fixed support 9. A guide frame 10 is connected to the upright frame 9.1 on the fixed support 9 through a vertically arranged guide assembly. The guide frame 10 is connected to a guide support plate 12 through a sliding rail 11. The guide support plate 12 is a square plate, and two prongs 13 are provided on the outer side of the guide support plate 12. The two prongs 13 are arranged in parallel in the same horizontal plane, and in use, the two prongs 13 are respectively arranged in the corresponding clearance groove 2.4 to lift the waste cotton bale 8 on the transfer roller line 2 to make room for the next waste cotton bale 8.

[0031] The guide assembly includes two guide plates 16, and each connecting plate 18 is fixedly connected to the guide frame 10. The guide frame 10 is also an L-shaped frame, and two connecting plates 18 are respectively welded on both sides of the portal upright frame of the guide frame 10. Two guide plates 16 are respectively fixedly connected to both sides of the upright frame 9.1 of the fixed support 9, and the two guide plates 16 are vertically arranged in parallel. A vertically arranged U-shaped groove 16.1 is provided on the outer side of the guide plate 16. Two guide wheels 17 are installed in each U-shaped groove 16.1, and a connecting plate 18 is connected between the two guide wheels 17 in each U-shaped groove 16.1. The connecting plate 18 is an L-shaped plate, and each guide wheel 17 is connected to the connecting plate 18 through an axle. The axle is connected to the connecting plate 18 through a bearing. This structure can ensure that the guide wheels 17 can freely roll in the U-shaped groove 16.1.

[0032] A first driving member 14 is installed at the top end of the upright frame 9.1, and the first driving member 14 is a servo motor. The first driving member 14 drives two first transmission assemblies through a reducer. The two first transmission assemblies are respectively arranged on both sides of the reducer and connected to the output end of the reducer. Each first transmission assembly drives the guide frame 10, and the two first transmission assemblies can realize synchronous transmission, and the stability during transmission is ensured because the two first transmission assemblies are arranged on both sides of the upright frame 9.1.

[0033] The first transmission assembly includes a rotating shaft 19 and two first transmission wheels 20 installed at the top and lower end of the upright frame 9.1. The first transmission wheel 20 is a chain wheel, and the two chain wheels are arranged in the same vertical plane. A first transmission belt 21 is connected between the first transmission wheels 20. The first transmission belt 21 is a chain. The first transmission belt 21 is fixedly connected to the guide frame 10. Specifically, two fixed plates 27 are welded on the portal upright frame of the guide frame 10, and through holes are provided on the fixed plates 27. The first transmission belt 21 passes through the through holes and is connected to the fixed plates 27 by lacing or welding. After connection and fixation, the guide frame 10 can move up and down with the first transmission wheel 20.

[0034] The second driving member 15 is installed on the guide frame 10, and the second driving member 15 also adopts a servo motor. The output end of the second driving member 15 is connected with a second driving assembly through a speed reducer, and the second driving assembly is connected with the guide support plate 12.

[0035] The second driving assembly comprises two second driving wheels 22 and a second driving belt 23 which are matched with each other. One of the second driving wheels 22 is connected with the speed reducer of the second driving member 15, and the other second driving wheel 22 is connected with the portal frame of the guide frame 10. A connecting plate 24 is welded on the upper side of the guide support plate 12. The connecting plate 24 is a rectangular plate, and the connecting plate 24 is inserted into the second driving belt 23. The upper end of the connecting plate 24 is higher than the second driving belt 23. When the transmission is placed, the connecting plate 24 is detached from the second driving belt 23, so that the guide support plate 12 can move together with the second driving belt 23.

[0036] A guardrail 25 is arranged outside the stacker 5 for protection. The guardrail 25 is a U-shaped structure which is arranged with an opening facing the transition drum line 2. The guardrail 25 comprises a group of stand columns, and a rectangular guard net is connected between any two stand columns. A baffle 29 is arranged outside the portal frame of the guide frame 10 for limiting the waste cotton bale 8.

[0037] The basic principle, main features and advantages of the present application are shown and described above. It should be understood by those skilled in the art that the present application is not limited by the above embodiments. The above embodiments and descriptions in the specification are only preferred examples of the present application, and are not intended to limit the present application. Without departing from the spirit and scope of the present application, various changes and improvements can be made to the present application. These changes and improvements all fall within the scope of the present application. The scope of protection of the present application is defined by the appended claims and their equivalents.

Claims

1. A waste cotton stacking and storing device, comprising a baling machine and a front-end drum line (1) arranged correspondingly, characterized in that: A transition roller line (2) is correspondingly arranged at the conveying end of the front-end roller line (1), and an end roller line (3) is correspondingly arranged at the conveying end of the transition roller line (2), and the conveying end of the end roller line (3) is correspondingly arranged with a roller forklift (4), and a stacking machine (5) is correspondingly arranged on one side of the transition roller line (2); The storage warehouse is also provided with a bale clamping vehicle (6) for stacking and a buffer roller line (7) for placing waste cotton bales (8), and the bale clamping vehicle (6) and the roller forklift (4) are correspondingly arranged with the buffer roller line (7).

2. A waste cotton stacking and storing device according to claim 1, characterized in that: The transition roller line (2) comprises a transition roller frame (2.1), a group of transition transmission rollers (2.2) are installed in the transition roller frame (2.1), support feet (2.3) are arranged on the lower side of the transition roller frame (2.1), and two parallel arrangement of the transition roller frame (2.1) are arranged on one side of the transition roller frame (2.1).

3. The waste cotton stacking and storing device according to claim 1, characterized in that: The stacking machine (5) comprises a fixed support (9), a guide frame (10) is connected to the fixed support (9) through a vertical guide assembly, the guide frame (10) is connected to a guide support plate (12) through a slide rail (11), and a fork tooth (13) is arranged on the guide support plate (12). A first driving member (14) is installed on the fixed support (9), the first driving member (14) is drivenly connected to the guide frame (10) through a first transmission assembly, a second driving member (15) is installed on the guide frame (10), and the second driving member (15) is drivenly connected to the guide support plate (12) through a second transmission assembly.

4. A waste cotton stacking and storing device according to claim 3, characterized in that: The guide assembly comprises two guide plates (16) fixedly connected to the fixed support (9), the two guide plates (16) are vertically and parallelly arranged, each guide plate (16) is connected to a connecting plate (18) through a guide wheel (17), and each connecting plate (18) is fixedly connected to the guide frame (10).

5. A waste cotton stacking and storing device according to claim 3, characterized in that: The first transmission assembly comprises a rotating shaft (19), corresponding first transmission wheels (20) are installed on the upper side and the lower side of the fixed support (9), a first transmission belt (21) is connected between the corresponding first transmission wheels (20), and the first transmission belt (21) is fixedly connected to the guide frame (10).

6. A waste cotton stacking and storing device according to claim 3, characterized in that: The second transmission assembly comprises two second transmission wheels (22) and a second transmission belt (23) that are correspondingly arranged, the two second transmission wheels (22) are respectively connected to the second driving member (15) and the guide frame (10), a connecting plate (24) is further installed on the guide support plate (12), and the connecting plate (24) is connected to the second transmission belt (23).

7. The waste cotton stacking and storing device according to claim 1 or 3, characterized in that: A guardrail (25) is further arranged on the outer side of the stacking machine (5), and a baffle (29) for limiting the waste cotton bales (8) is further arranged on the outer side of the guide frame (10).