Building construction drainage device

By introducing water flow sensors and mechanical structures into the building construction drainage system, the problems of untimely filter replacement and difficulty in detecting leaks in traditional devices have been solved, enabling real-time monitoring and convenient maintenance of the device and improving its operational stability.

CN223880468UActive Publication Date: 2026-02-06SHAANXI QINYUAN ENGINEERING PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520018700.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-06
Publication Date
2026-02-06
Estimated Expiration
2035-01-06

AI Technical Summary

Technical Problem

Traditional building construction drainage systems make it difficult to monitor filtration status in a timely manner, replace filters promptly, and detect leaks in drainage pipes, thus affecting the stable operation of the system.

Method used

By combining components such as water flow sensors, audible and visual alarms, contact sensors, and threaded rods, the system enables real-time monitoring and alarm of the internal condition of the drainage device. The mechanical structure allows for easy replacement of filter plates and clamping and limiting of the drainage pipe, thus promptly addressing leaks.

Benefits of technology

It enables real-time monitoring and alarm of the internal condition of the drainage device, ensuring timely cleaning and replacement of filter plates, timely detection of leaks, and improving the stability and efficiency of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223880468U_ABST
    Figure CN223880468U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction drainage, and discloses a building construction drainage device which comprises a drainage device body, a water flow sensor is fixedly assembled on the side face of the drainage device body, a sleeve is fixedly connected to a water outlet of the water flow sensor in a sleeved mode, and a first lantern ring is slidably connected to the outer edge of the sleeve in a sleeved mode. An arc-shaped plate is fixedly assembled on the side face of the first lantern ring, a second lantern ring is fixedly assembled at the end, away from the first lantern ring, of the arc-shaped plate, and a water storage bag is fixedly assembled on the side face of the second lantern ring. Through cooperative use of a water flow sensor and a filter plate, the water flow sensor is used for detecting the drainage condition in the drainage device body, so that an audible and visual alarm gives an alarm about the drainage condition, then an adjusting rod is moved, and the adjusting rod is used for driving a baffle to move until the side face of the baffle is away from the side face of the filter plate; and then the filter plate is moved in the direction away from the drainage device body, so that the filter plate is conveniently cleaned and replaced in time.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building construction drainage technical field, concretely is a building construction drainage device. BACKGROUND

[0002] Building construction drainage refers to in the building construction process, through reasonable drainage system, the rainwater, waste water, sewage etc.

[0003] The traditional building construction drainage device in the use process, most of building construction waste water is discharged to the inside of drainage device, after using the inside auxiliary silt of drainage device to stand to the bottom of drainage device, and then the water of auxiliary device top is discharged to the outside of device through the inner wall of drainage device top and filter screen, but the traditional device in the use process, the inside sewage filtration condition is difficult to assist timely understanding, and the filter screen is replaced in time, and the traditional device is difficult to find the inside leakage of drainage pipe in time, thereby affecting the stable use of device. UTILITY MODEL CONTENT

[0004] In view of the deficiencies of prior art, the utility model provides a building construction drainage device to solve the problems in the prior art.

[0005] The utility model provides the following technical scheme: a building construction drainage device, including drainage device body, the side surface fixed assembly of drainage device body is equipped with water flow sensor, the water outlet of water flow sensor is fixed with the sleeve of sleeve pipe, the outer edge of sleeve pipe is equipped with the sleeve ring one of sliding sleeve, the side surface fixed assembly of arc type board of sleeve ring one, the fixed assembly of arc type board away from the one end of sleeve ring one is equipped with sleeve ring two, the side surface fixed assembly of water storage bag of sleeve ring two, the inner wall sliding connection of drainage device body is equipped with filter plate, the side surface fixed assembly of fixed frame of drainage device body, the inner wall sliding connection of fixed frame is equipped with baffle, the inner wall screw thread connection of sleeve pipe is equipped with screw thread cylinder, the side surface fixed assembly of drainage pipe of screw thread cylinder.

[0006] As a preferred technical scheme of the utility model, the inner wall screw thread connection of sleeve ring two is equipped with screw thread rod, the outer edge screw thread connection of screw thread rod is equipped with sliding cylinder, the bottom fixed assembly of clamp plate of sliding cylinder, and the side surface of clamp plate is slidingly connected with the inner wall of sleeve ring two, the shape and size of the inner wall of clamp plate are adapted to the shape and size of the outer edge of drainage pipe.

[0007] As a preferred technical scheme of the utility model, the side surface of the fixed frame inner wall is fixedly connected with springs, and the end of the spring away from the fixed frame inner wall is fixedly connected with the side surface of the baffle.

[0008] As a preferred technical scheme of the utility model, the inner wall of the baffle is fixedly assembled with a sealing frame one, the inner wall of the side surface of the drainage device body is fixedly assembled with a sealing frame two, and the shape and size of the side surface of the sealing frame two are completely consistent with the shape and size of the side surface of the sealing frame one.

[0009] As a preferred technical scheme of the utility model, the outer edge of the arc-shaped plate is fixedly assembled with a fixed plate, the top of the fixed plate is fixedly assembled with a sound-light alarm, the inner wall of the arc-shaped plate is fixedly assembled with a contact sensor, and the contact sensor is electrically connected with the sound-light alarm.

[0010] As a preferred technical scheme of the utility model, the number of the threaded rods is eight, four of the eight threaded rods are a group and are respectively threadedly connected with the inner wall of the sleeve ring two and the inner wall of the sleeve ring one, and the connecting structures of the outer edges of the eight threaded rods are completely consistent.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] 1、The building construction drainage device is used in cooperation with the water flow sensor and the filter plate, the water flow sensor is used for detecting the drainage condition inside the drainage device body, the sound-light alarm is used for externally alarming the drainage condition, then the adjusting rod is moved, the adjusting rod drives the baffle to move, until the side surface of the baffle is away from the side surface of the filter plate, then the filter plate is moved away from the drainage device body, so that the filter plate can be cleaned and replaced in time.

[0013] 2、The building construction drainage device is used in cooperation with the sleeve ring one and the sleeve ring two, the threaded rod is used for driving the sliding cylinder to move, the sliding cylinder is used for driving the clamping plate to move, the clamping plate is used for assisting the sleeve ring one and the sleeve ring two to clamp and limit the drain pipe and the sleeve pipe, when water leakage occurs between the sleeve pipe and the threaded cylinder, the water flows to the water storage bag, the water is used for deforming the water storage bag, the outer edge of the deformed water storage bag is used for contacting the contact sensor, and the contact sensor is used for externally alarming through the sound-light alarm. BRIEF DESCRIPTION OF DRAWINGS

[0014] Figure 1 It is a three-dimensional structure schematic view of the utility model;

[0015] Figure 2 It is a sleeve pipe side sectional structure schematic view of the utility model;

[0016] Figure 3 The utility model discloses Figure 2 The enlarged structure schematic diagram of middle A place shows;

[0017] Figure 4 The utility model discloses Figure 2 The enlarged structure schematic diagram of middle B place shows;

[0018] Figure 5 The utility model discloses filter plate structure schematic diagram.

[0019] In the drawing: 1, drainage device body;2, water flow sensor;3, collar one;4, arc plate;5, water storage bag;6, collar two;7, threaded rod;8, sliding cylinder;9, clamping plate;10, threaded cylinder;11, drain pipe;12, fixed plate;13, audible and visual alarm;14, filter plate;15, fixed frame;16, spring;17, baffle;18, adjusting rod;19, sealing frame one;20, sealing frame two;21, sleeve;22, contact sensor. Specific implementation

[0020] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.

[0021] Please refer to Figures 1-5 A kind of building construction drainage device, including drainage device body 1, water flow sensor 2 is fixedly equipped on the side of drainage device body 1, the water outlet of water flow sensor 2 is fixedly sleeved with sleeve 21, sleeve 21 is slidably sleeved with collar one 3 on outer edge, arc plate 4 is fixedly equipped on the side of collar one 3 of collar one 3, sleeve 21 is slidably connected with filter plate 14 in the inner wall of drainage device body 1, fixed frame 15 is fixedly equipped on the side of drainage device body 1, baffle 17 is slidably connected in the inner wall of fixed frame 15, threaded cylinder 10 is screw-connected in the inner wall of sleeve 21, drain pipe 11 is fixedly equipped on the side of threaded cylinder 10, by the cooperation of sleeve 21 and collar one 3, the inner wall of collar one 3 is slidably sleeved on the outer edge of sleeve 21, collar one 3 and collar two 6 are all made of rubber material, to assist the sealing of collar one 3 and collar two 6, by the addition of water flow sensor 2, water flow sensor 2 adopts electromagnetic water flow sensor 2, when the water flow of electric conduction passes through a magnetic field, electromotive force is generated, and electromotive force is measured and quantifies flow.

[0022] In one preferred implementation, the inner wall of the collar two 6 is threadedly connected with a threaded rod 7, the outer edge of the threaded rod 7 is threadedly connected with a sliding cylinder 8, the bottom of the sliding cylinder 8 is fixedly connected with a clamping plate 9, and the side surface of the clamping plate 9 is slidably connected with the side surface of the inner wall of the collar two 6, the inner wall of the clamping plate 9 is adapted in size and shape to the outer edge of the drain pipe 11, and through the cooperation of the threaded rod 7 and the collar two 6, the threaded rod 7 is rotated to drive the sliding cylinder 8 to move, and then the sliding cylinder 8 drives the clamping plate 9 to move, and then the inner wall of the clamping plate 9 clamps and limits the outer edge of the drain pipe 11.

[0023] In one preferred implementation, the side surface of the inner wall of the fixed frame 15 is fixedly connected with a spring 16, one end of the spring 16 away from the inner wall of the fixed frame 15 is fixedly connected with the side surface of the baffle plate 17, the side surface of the baffle plate 17 is fixedly connected with an adjusting rod 18, and the outer edge of the adjusting rod 18 is slidably connected with the inner wall of the fixed frame 15, through the cooperation of the spring 16 and the baffle plate 17, the spring 16 pushes the baffle plate 17 to move on the inner wall of the fixed frame 15, so that the inner wall of the baffle plate 17 assists in limiting the side surface of the filter plate 14, and through the installation of the adjusting rod 18, the adjusting rod 18 drives the baffle plate 17 to conveniently adjust the position.

[0024] In one preferred implementation, the inner wall of the baffle plate 17 is fixedly connected with a sealing frame one 19, the inner wall of the side surface of the drain device body 1 is fixedly connected with a sealing frame two 20, and the size and shape of the side surface of the sealing frame two 20 is completely consistent with the size and shape of the side surface of the sealing frame one 19, through the cooperation of the sealing frame one 19 and the sealing frame two 20, the sealing frame one 19 and the sealing frame two 20 are made of rubber material, the sealing frame one 19 is driven by the baffle plate 17 to move until the side surface of the sealing frame one 19 and the side surface of the sealing frame two 20 are tightly attached, thereby assisting in sealing.

[0025] In one preferred implementation, the outer edge of the arc-shaped plate 4 is fixedly connected with a fixed plate 12, the top of the fixed plate 12 is fixedly connected with a sound-light alarm 13, the inner wall of the arc-shaped plate 4 is fixedly connected with a contact sensor 22, and the contact sensor 22 is electrically connected with the sound-light alarm 13, through the cooperation of the sound-light alarm 13 and the contact sensor 22, the sound-light alarm 13 is electrically connected with the water flow sensor 2, so as to detect the water flow by the water flow sensor 2, and alarm externally by the sound-light alarm 13, and the contact sensor 22 contacts with the outer edge of the water storage bag 5, so as to alarm externally by the sound-light alarm 13 through the contact sensor 22.

[0026] In one preferred embodiment, the number of threaded rods 7 is eight, and four of the eight threaded rods 7 are respectively threadedly connected with the inner wall of the sleeve ring two 6 and the inner wall of the sleeve ring one 3, the connection structures of the outer edges of the eight threaded rods 7 are completely consistent, and the eight threaded rods 7 are installed to drive the eight clamping plates 9 to move, and then the four clamping plates 9 are respectively clamped and limited with the outer edge of the sleeve pipe 21 and the outer edge of the drain pipe 11.

[0027] Working principle, when the device is used, the water flow sensor 2 is used to detect the drainage condition inside the drain device body 1, and then the sound and light alarm 13 is used to alarm the drainage condition, then the adjusting rod 18 is moved, the adjusting rod 18 drives the baffle 17 to move, until the side of the baffle 17 is away from the side of the filter plate 14, and then the filter plate 14 is moved away from the drain device body 1, so that the filter plate 14 can be cleaned and replaced in time, the threaded rod 7 drives the sliding cylinder 8 to move, and the sliding cylinder 8 drives the clamping plate 9 to move, so that the clamping plate 9 assists the sleeve ring one 3 and the sleeve ring two 6 to clamp and limit the drain pipe 11 and the sleeve pipe 21, when the sleeve pipe 21 and the threaded cylinder 10 leak, the water flows into the water storage bag 5, and then the water in the water storage bag 5 drives the water storage bag 5 to deform, the outer edge of the water storage bag 5 deforms and contacts the contact sensor 22, and then the contact sensor 22 alarms externally through the sound and light alarm 13.

[0028] Although the embodiments of the present application have been shown and described, it should be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and spirits of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A construction site drainage device comprising a drainage device body (1), characterised in that: The side of the drainage device body (1) is fixedly provided with a water flow sensor (2), the water outlet of the water flow sensor (2) is fixedly sleeved with a sleeve (21), the outer edge of the sleeve (21) is slidably sleeved with a sleeve ring I (3), the side of the sleeve ring I (3) is fixedly provided with an arc plate (4), the end of the arc plate (4) away from the sleeve ring I (3) is fixedly provided with a sleeve ring II (6), the side of the sleeve ring II (6) is fixedly provided with a water storage bag (5), the inner wall of the drainage device body (1) is slidably connected with a filter plate (14), the side of the drainage device body (1) is fixedly provided with a fixed frame (15), the inner wall of the fixed frame (15) is slidably connected with a baffle (17), the inner wall of the sleeve (21) is threadedly connected with a threaded cylinder (10), and the side of the threaded cylinder (10) is fixedly provided with a drain pipe (11).

2. A construction drainage device according to claim 1, characterised in that: The inner wall of the sleeve ring II (6) is threadedly connected with a threaded rod (7), the outer edge of the threaded rod (7) is threadedly connected with a sliding cylinder (8), the bottom of the sliding cylinder (8) is fixedly provided with a clamping plate (9), and the side of the clamping plate (9) is slidably connected with the inner wall of the sleeve ring II (6), and the shape and size of the inner wall of the clamping plate (9) are matched with the shape and size of the outer edge of the drain pipe (11).

3. A construction drainage device according to claim 1, characterized in that: The side of the inner wall of the fixed frame (15) is fixedly connected with a spring (16), one end of the spring (16) away from the inner wall of the fixed frame (15) is fixedly connected with the side of the baffle (17), the side of the baffle (17) is fixedly provided with an adjusting rod (18), and the outer edge of the adjusting rod (18) is slidably sleeved with the inner wall of the fixed frame (15).

4. A construction drainage device according to claim 1, characterized in that: The inner wall of the baffle (17) is fixedly provided with a sealing frame I (19), the inner wall of the side of the drainage device body (1) is fixedly provided with a sealing frame II (20), and the shape and size of the side of the sealing frame II (20) are completely consistent with the shape and size of the side of the sealing frame I (19).

5. A construction drainage device according to claim 1, characterized in that: The outer edge of the arc plate (4) is fixedly provided with a fixed plate (12), the top of the fixed plate (12) is fixedly provided with an audible and visual alarm (13), the inner wall of the arc plate (4) is fixedly provided with a contact sensor (22), and the contact sensor (22) is electrically connected with the audible and visual alarm (13).

6. A construction drainage device according to claim 2, characterized in that: The number of the threaded rods (7) is eight, and four of the eight threaded rods (7) are threadedly connected with the inner walls of the sleeve ring II (6) and the sleeve ring I (3) respectively, and the connecting structures of the outer edges of the eight threaded rods (7) are completely consistent.