Auxiliary tool for mounting attachment frame of construction hoist
By designing an auxiliary tool for installing the attachment frame of a construction hoist with adjustable telescopic rods and stable attachment plates, the safety hazards and resource waste of traditional timber supports have been solved, achieving an efficient, safe, and environmentally friendly installation process.
Patent Information
- Application Number
- CN202520480317.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-18
- Publication Date
- 2026-02-06
- Estimated Expiration
- 2035-03-18
AI Technical Summary
During the installation of the attachment frame for the construction hoist, traditional wooden supports pose safety hazards, are time-consuming and labor-intensive, and waste resources significantly, affecting construction safety and efficiency.
An auxiliary tool for installing the attachment frame of a construction hoist was designed. It adopts an adjustable telescopic rod and a stable attachment plate structure, combined with anti-slip texture and modular connectors, to provide a reliable fulcrum and ensure installation stability and speed.
It significantly reduces the risks of working at heights, improves installation efficiency, reduces resource waste, and ensures construction safety and environmental protection.
Smart Images

Figure CN223880791U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of building equipment installation especially relates to a construction hoist attachment frame installation auxiliary tool. BACKGROUND
[0002] The construction hoist is the important vertical transport equipment in high-rise building construction site, and the installation safety of its attachment frame is very important. The attachment frame is the bridge connecting the construction hoist and the building, and plays the supporting and fixing role. However, there is a certain distance (usually 2.8-3.2m) between the attachment and the connection, and the attachment frame lacks fulcrum support when it is not reliably connected, which has safety hazards.
[0003] At present, in the installation process of the construction hoist attachment frame, the staff usually adopts the way of taking local materials, uses the wooden square to temporarily set up, and provides the fulcrum for the attachment frame. This method has the following problems:
[0004] 1. The strength and stability of the wooden square are difficult to guarantee, and the collapse accident is easy to occur, which causes personnel casualties; 2. The wooden square needs to be processed and installed on site, which is time-consuming and laborious, and affects the construction progress; 3. The wooden square is difficult to recycle after use, which causes resource waste and environmental pollution.
[0005] Therefore, it is of great significance to develop a safe, efficient and environmentally friendly construction hoist attachment frame installation auxiliary tool for improving the construction safety, efficiency and environmental protection level. CONTENT OF THE UTILITY MODEL
[0006] In view of this, the purpose of the utility model is to provide a construction hoist attachment frame installation auxiliary tool to solve the problems pointed out in the background technology.
[0007] In order to achieve the above utility model purpose, and the technical scheme adopted is as follows:
[0008] The construction hoist attachment frame installation auxiliary tool comprises a supporting unit, the supporting unit comprises a telescopic rod, the telescopic rod comprises a first supporting rod and a second supporting rod, one end of the second supporting rod is slidably arranged in one end of the first supporting rod, a plurality of first adjusting holes are formed on the first supporting rod and are uniformly distributed along the length direction of the first supporting rod, a plurality of second adjusting holes are formed on the second supporting rod and are uniformly distributed along the length direction of the second supporting rod, the first supporting rod and the second supporting rod are fixedly connected together by a locking piece which passes through the first adjusting hole and the second adjusting hole in turn, and the other end top of the first supporting rod and the other end top of the second supporting rod are fixedly connected with an attachment plate.
[0009] As a further improvement of the utility model, the locking piece is a pin shaft.
[0010] As a further improvement of the utility model, the bottom of the attachment plate is provided with anti-skid lines, the setting of the anti-skid lines can increase the friction between the attachment plate and the top of the cage, thereby improving the support stability of the auxiliary tool to the attachment frame of the elevator.
[0011] As a further improvement of the utility model, the support unit further comprises an auxiliary plate, the auxiliary plate is vertically installed at the end of the attachment plate, and the auxiliary plate and the attachment plate are fixedly connected or detachably connected.
[0012] As a further improvement of the utility model, the auxiliary plate and the attachment plate are detachably connected, one side of the auxiliary plate connected with the attachment plate is fixedly provided with a U-shaped clamping plate, the opening direction of the U-shaped clamping plate is parallel to the length direction of the attachment plate, the U-shaped clamping plate is clamped at the end of the attachment plate, and first mounting holes and second mounting holes are respectively formed in the U-shaped clamping plate and the attachment plate, and the auxiliary plate is fixedly connected on the attachment plate by a fastening screw sequentially penetrating through the first mounting holes and the second mounting holes.
[0013] As a further improvement of the utility model, the support unit is provided with two parallel support units, and the two support units are fixedly connected through at least one connecting piece.
[0014] As a further improvement of the utility model, the connecting piece comprises a first connecting rod, a second connecting rod and a connecting bolt, one end of the first connecting rod is slidably arranged in the second connecting rod, a plurality of first connecting holes and second connecting holes are respectively formed in the first connecting rod and the second connecting rod, the first connecting rod and the second connecting rod are connected by the connecting bolt sequentially penetrating through the first connecting holes and the second connecting holes, and the ends of the first connecting rod and the second connecting rod are fixedly connected on the two support units.
[0015] As a further improvement of the utility model, the first support rod, the second support rod and the attachment plate are all hollow rectangular tubular structures, and a rust-proof paint layer is arranged on the surfaces of the first support rod, the second support rod and the attachment plate.
[0016] The utility model discloses the following beneficial effects:
[0017] 1. The utility model discloses the installation of construction elevator attachment frame, and through adjustable telescopic rod and stable attachment plate structure, reliable fulcrum is provided for construction elevator attachment frame, avoids the security hidden danger that traditional wood support is easy to collapse, and significantly reduces the risk of high-altitude operation.
[0018] 2. The bottom of the attachment plate is provided with anti-skid lines in the utility model, the friction with the top of the cage is increased, the overall stability of the support structure is further strengthened by the combined design of the auxiliary plate and the connecting piece, and the stress is evenly ensured during the attachment frame installation process.
[0019] 3、The utility model discloses telescopic rod adjusts length through pin shaft quickly, and the installation demand of different interval (such as 2.8-3.2m) is adapted, and the installation step is simplified to the detachable auxiliary board and modularization connecting piece design, and the erection time is saved.
[0020] 4、The utility model discloses telescopic rod telescopic structure's setting is convenient for carrying and transportation, first support rod, second support rod and attached plate are all hollow rectangular tubular structure, reduce weight while guaranteeing the strength, and it is convenient for carrying and reusing, and connecting piece can adjust the spacing between two support units flexibly, and the layout demand of different construction sites is adapted. BRIEF DESCRIPTION OF DRAWINGS
[0021] The accompanying drawings, which form a part of this application, are included to provide a further understanding of the application and are incorporated in and constitute a part of this application. The embodiments of the present application and its contents illustrated in the drawings serve to explain the present application, and do not constitute an improper limitation on the present application. In the drawings:
[0022] Fig. 1 It is structural schematic diagram of the utility model embodiment 1;
[0023] Fig. 2 It is second visual angle structural schematic diagram of the utility model embodiment 1;
[0024] Fig. 3 It is structural schematic diagram of the utility model embodiment 2;
[0025] Fig. 4 It is second visual angle structural schematic diagram of the utility model embodiment 2;
[0026] Fig. 5 It is structural schematic diagram of the utility model embodiment 3;
[0027] Fig. 6 It is structural schematic diagram of the utility model embodiment 4.
[0028] In the drawing: 1, support unit, 2, telescopic rod, 3, first support rod, 4, second support rod, 5, first adjusting hole, 6, second adjusting hole, 7, locking piece, 8, attached plate, 9, auxiliary board, 10, U-shaped clamping plate, 11, fastening screw, 12, connecting piece, 13, first connecting rod, 14, second connecting rod, 15, connecting bolt. DETAILED DESCRIPTION
[0029] It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0030] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort should fall within the scope of protection of the present application.
[0031] Example 1
[0032] like Figs. 1-2 As shown, the auxiliary tool for installing the attachment frame of the construction hoist includes a support unit 1. The support unit 1 includes a telescopic rod 2, which includes a first support rod 3 and a second support rod 4. One end of the second support rod 4 is slidably disposed inside one end of the first support rod 3. The first support rod 3 has a plurality of first adjustment holes 5 evenly distributed along its length direction, and the second support rod 4 has a plurality of second adjustment holes 6 evenly distributed along its length direction. The first support rod 3 and the second support rod 4 are fixedly connected together by locking members 7 passing through the first adjustment holes 5 and the second adjustment holes 6 in sequence. An attachment plate 8 is fixedly connected to the top of the other end of the first support rod 3 and the top of the other end of the second support rod 4.
[0033] The locking component 7 is a pin.
[0034] The bottom of the attachment plate 8 is provided with anti-slip texture (not shown in the figure). The anti-slip texture can increase the friction between the attachment plate 8 and the top of the cage, thereby improving the support stability of the auxiliary tool for the elevator attachment frame.
[0035] Example 2
[0036] Based on the structure of Embodiment 1, in Embodiment 2, as follows: Figs. 3-4 As shown, the support unit 1 also includes an auxiliary plate 9, which is vertically installed at the end of the attachment plate 8, and the auxiliary plate 9 and the attachment plate 8 are fixedly connected or detachably connected.
[0037] Example 3
[0038] Based on the structure of Example 2, in Example 3, as follows: Fig. 5 As shown, the auxiliary plate 9 and the attachment plate 8 are detachably connected. A U-shaped clamping plate 10 is fixed on the side where the auxiliary plate 9 is connected to the attachment plate 8. The opening direction of the U-shaped clamping plate 10 is parallel to the length direction of the attachment plate 8, and the U-shaped clamping plate 10 is clamped to the end of the attachment plate 8. The U-shaped clamping plate 10 and the attachment plate 8 are respectively provided with a first mounting hole and a second mounting hole. The auxiliary plate 9 is fixedly connected to the attachment plate 8 by passing the fastening screw 11 through the first mounting hole and the second mounting hole in sequence.
[0039] Embodiment 4
[0040] Based on the structural basis of Embodiment 1, in Embodiment 4, as shown in the figure, two support units 1 are arranged in parallel, and the two support units 1 are fixedly connected through at least one connecting piece 12. Fig. 6
[0041] The connecting piece 12 comprises a first connecting rod 13, a second connecting rod 14 and a connecting bolt 15, one end of the first connecting rod 13 is slidably arranged in the second connecting rod 14, a plurality of first connecting holes and second connecting holes are respectively formed in the first connecting rod 13 and the second connecting rod 14, the first connecting rod 13 and the second connecting rod 14 are connected by the connecting bolt 15 sequentially penetrating the first connecting holes and the second connecting holes, and the ends of the first connecting rod 13 and the second connecting rod 14 are respectively fixedly connected on the two support units 1.
[0042] In Embodiments 1-4, the first support rod 3, the second support rod 4 and the attachment plate 8 are all hollow rectangular tubular structures, and the surfaces of the first support rod 3, the second support rod 4 and the attachment plate 8 are all provided with a layer of rust-proof paint.
[0043] The above only describes preferred embodiments of the present application and is not intended to limit the present application. For those skilled in the art, the present application can be variously changed and modified. Any modification, equivalent replacement, improvement, component disassembly or combination made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A construction hoist attachment rack installation aid characterised in that: The support unit comprises a telescopic rod, the telescopic rod comprises a first support rod and a second support rod, one end of the second support rod is slidably arranged in one end of the first support rod, a plurality of first adjusting holes are arranged on the first support rod and are uniformly distributed along the length direction of the first support rod, a plurality of second adjusting holes are arranged on the second support rod and are uniformly distributed along the length direction of the second support rod, the first support rod and the second support rod are fixedly connected together by a locking piece which is sequentially threaded through the first adjusting hole and the second adjusting hole, and the other end of the first support rod and the other end of the second support rod are fixedly connected with an attachment plate.
2. The construction elevator hitch mount installation aid of claim 1, wherein: The locking piece is a pin shaft.
3. The construction elevator hitch mount installation aid of claim 1, wherein: The bottom of the attachment plate is provided with anti-skid lines.
4. The construction elevator hitch mount installation aid of claim 1, wherein: The support unit further comprises an auxiliary plate, the auxiliary plate is vertically installed at the end of the attachment plate, and the auxiliary plate and the attachment plate are fixedly connected or detachably connected.
5. The construction elevator hitch mount installation aid of claim 4, wherein: The auxiliary plate and the attachment plate are detachably connected, a U-shaped clamping plate is fixedly connected to one side of the auxiliary plate and the attachment plate, the opening direction of the U-shaped clamping plate is parallel to the length direction of the attachment plate, the U-shaped clamping plate is clamped at the end of the attachment plate, and first mounting holes and second mounting holes are respectively arranged on the U-shaped clamping plate and the attachment plate, and the auxiliary plate is fixedly connected to the attachment plate by a fastening screw which is sequentially threaded through the first mounting holes and the second mounting holes.
6. The construction elevator hitch mount installation aid of claim 1, wherein: The support unit is parallel provided with two, and the two support units are fixedly connected by at least one connecting piece.
7. The construction elevator hitch mount installation aid of claim 6, wherein: The connecting piece comprises a first connecting rod, a second connecting rod and a connecting bolt, one end of the first connecting rod is slidably arranged in the second connecting rod, a plurality of first connecting holes and a plurality of second connecting holes are respectively arranged on the first connecting rod and the second connecting rod, the first connecting rod and the second connecting rod are connected by the connecting bolt which is sequentially threaded through the first connecting holes and the second connecting holes, and the ends of the first connecting rod and the second connecting rod are respectively fixedly connected to the two support units.
8. The construction elevator hitch mount installation aid of claim 1, wherein: The first support rod, the second support rod and the attachment plate are all hollow rectangular tubular structures.