Hanging structure of economizer support

By setting a combination structure of support plate and pipe clamp on the economizer hanging device, the problems of large size and poor stability of the existing device are solved, achieving space saving and stability improvement, reducing boiler cost and improving installation efficiency and safety.

CN223895303UActive Publication Date: 2026-02-10HARBIN HAGUO BOILER ENG TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520349846.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-28
Publication Date
2026-02-10
Estimated Expiration
2035-02-28

AI Technical Summary

Technical Problem

The existing economizer hanging device is large in size and, due to the limitation of the ventilation beam installation position, occupies a large space inside the boiler tail flue and has poor stability.

Method used

The base plate is designed with support plates and pipe clamps evenly distributed on its upper surface. The combination of support plates with arc plates or U-shaped plates allows for selection of installation positions and fixing methods based on site conditions, reducing the space occupied by the boiler tail flue and improving stability.

Benefits of technology

It saves space in the boiler tail flue, reduces boiler costs, improves the stability and installation efficiency of the hanging system, facilitates maintenance, and enhances safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223895303U_ABST
    Figure CN223895303U_ABST
Patent Text Reader

Abstract

A hanging structure of an economizer support relates to the technical field of economizer installation. The problems that an existing coal economizer hanging device is large in size, and due to limitation of the installation position of a ventilation beam, large space in a boiler tail flue is occupied, and the hanging stability of a coal economizer is poor are solved. A plurality of supporting plates are evenly arranged at one end of the upper surface of a bottom plate in the width direction, a plurality of pipe clamps are evenly arranged in the middle of the other end of the upper surface of the bottom plate in the length direction, an arc plate is fixedly connected with the upper surface of the bottom plate through the supporting plates, or a U-shaped plate is arranged at one end of the top face of each supporting plate; the structure is compact, a large space is saved in the tail flue of the boiler, a better space is reserved for desulfurization and denitrification, saving and emission reduction are achieved, and the hanging stability of the economizer is improved; the height of the tail flue is reduced, the cost of the boiler can be effectively reduced, the hanging device with the structure is convenient to mount on site, and the mounting efficiency is improved. The coal economizer hoisting device is suitable for hoisting the coal economizer.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to a coal economizer installation technical field, concretely relates to a kind of coal economizer support's hanging structure. BACKGROUND

[0002] At present, the fixed form of more commonly used coal economizer has two kinds: one is that serpentine pipe is connected together by pipe clamp, is fixed by bottom ventilation beam, this structure is limited by ventilation beam installation position, the tail flue of boiler can not have enough space, simultaneously, ventilation beam needs a large amount of steel material, makes the overall weight of boiler rise, and structural cost increases;Another structural form is that the hanging hook is installed on both sides of coal economizer guard plate and both sides of serpentine pipe, and the coal economizer is fixed by the hanging hook connection, this form is compact, reduces space occupancy, but poor stability, simultaneously, every hook needs to be connected, leading to the increase of on-site installation workload, and the work difficulty increases, reduces the installation efficiency of boiler, and there is certain security risk, simultaneously, because two are connected closely, it is inconvenient for the detection and maintenance of boiler later period.

[0003] In summary, the existing coal economizer hanging device is bulky, due to the limitation of ventilation beam installation position, it occupies a larger space inside the tail flue of boiler, thereby leading to the problem of poor stability of coal economizer hanging. UTILITY MODEL CONTENTS

[0004] The utility model discloses a kind of coal economizer support's hanging structure to solve the problem that the existing coal economizer hanging device is bulky, due to the limitation of ventilation beam installation position, it occupies a larger space inside the tail flue of boiler, thereby leading to the problem of poor stability of coal economizer hanging.

[0005] The utility model discloses a kind of coal economizer support's hanging structure, its composition includes bottom plate 1, support plate 2 and pipe clamp 4;

[0006] The upper surface one end of bottom plate 1 is evenly provided with n support plate 2 along width direction, n is positive integer, the upper surface other end of bottom plate 1 is evenly provided with m pipe clamp 4 along length direction in middle part, m is positive integer;

[0007] Further, the number n of the support plate 2 is 2≤n≤10;

[0008] Further, the distance between every two support plate 2 is 5cm~10cm;

[0009] Further, the number m of the pipe clamp 4 is 2≤m≤5;

[0010] Further, the utility model discloses a kind of coal economizer support's hanging structure further includes arc plate 3, the cross section of support plate 2 is L type, and the top surface arc opening end of support plate 2 is equipped with arc plate 3;

[0011] Furthermore, the arc plate 3 is fixedly connected to the upper surface of the base plate 1 by n support plates 2;

[0012] Furthermore, the hanging structure for economizer support also includes a U-shaped plate 5, with a U-shaped plate 5 provided at one end of the top surface of each support plate 2;

[0013] Furthermore, during use, the device can be installed at the top or bottom of the economizer serpentine tube, depending on the on-site installation conditions. When installed at the top of the economizer serpentine tube, the economizer serpentine tube needs to contact the U-shaped plate 5. Then, the number of pipe clamps 4 on the base plate is determined according to the length of the economizer serpentine tube, and the economizer serpentine tube is fixed to the base plate 1 by the pipe clamps 4.

[0014] When installed at the bottom of the economizer serpentine tube, remove the U-shaped plate 5 on the support plate 2, and fix the arc plate 3 to the upper surface of the base plate 1 through multiple support plates 2. The elbow at the bottom of the economizer serpentine tube is directly in contact with the arc plate 3 for fixation. Then, determine the number of pipe clamps 4 on the base plate according to the length of the economizer serpentine tube, and fix the economizer serpentine tube to the base plate 1 through the pipe clamps 4.

[0015] Compared with the prior art, the present invention has the following advantages:

[0016] This invention overcomes the shortcomings of existing technologies by employing a base plate with multiple support plates evenly distributed along the width direction at one end of its upper surface, and multiple pipe clamps evenly distributed along the length direction at the middle of the other end of the base plate. An arc-shaped plate is fixedly connected to the upper surface of the base plate via these support plates, or a U-shaped plate is provided at one end of the top surface of each support plate. The compact structure saves considerable space inside the boiler's tail flue, providing better space for desulfurization and denitrification, thus saving energy and reducing emissions, and improving the stability of the economizer's hanging structure. Lowering the height of the tail flue effectively reduces boiler costs. Currently, the price of ordinary Q235B steel is approximately 5000 RMB / ton, and with processing and installation costs of 10,000 RMB / ton, lowering the tail flue of a typical 130t / h boiler by one meter can save about 10 tons of steel, resulting in a cost of approximately 100,000 RMB. Therefore, this invention effectively reduces boiler costs.

[0017] The economizer hanging device with this structure is easy to install on site, improving installation efficiency. On site, only the arc plate needs to be welded to the guard plate or steel section, and the pipe clamps and support plates need to be welded to the base plate. On-site operation is convenient, saving time and costs, improving work efficiency, and facilitating later maintenance with high safety. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the hanging structure for economizer support described in this utility model, installed at the bottom of the economizer serpentine tube;

[0019] Figure 2 This is a schematic diagram of the hanging structure for economizer support described in this utility model, in the installation state at the bottom of the economizer serpentine tube;

[0020] Figure 3 This is a schematic diagram of the hanging structure for economizer support described in this utility model, installed on the top of the economizer serpentine tube;

[0021] Figure 4 This is a schematic diagram of the hanging structure for economizer support described in this utility model, in the installation state at the top of the economizer serpentine tube;

[0022] Figure 5 This is a side view of the U-shaped plate in the hanging structure of the economizer support described in this utility model. Detailed Implementation

[0023] Specific implementation method one: Combining Figure 1 and Figure 2 This embodiment describes a hanging structure for an economizer support, which comprises a base plate 1, a support plate 2, and a pipe clamp 4.

[0024] On one end of the upper surface of the base plate 1, n support plates 2 are evenly arranged along the width direction, where n is a positive integer. On the other end of the upper surface of the base plate 1, m pipe clamps 4 are evenly arranged along the length direction, where m is a positive integer.

[0025] Specific Implementation Method Two: Combining Figure 1 and Figure 2 This embodiment further defines the suspension structure described in Specific Embodiment 1. In this embodiment, the number of support plates 2, n, is 2≤n≤10.

[0026] Specific implementation method three: Combining Figure 1 and Figure 2 This embodiment further defines the hanging structure described in Specific Embodiment Two. In this embodiment, the distance between every two support plates 2 is 5cm to 10cm.

[0027] In this specific embodiment, the distance between every two support plates 2 is 5cm to 10cm. The distance between every two support plates 2 can be determined according to the width of the economizer serpentine tube, thereby determining the number of support plates 2.

[0028] Specific implementation method four: Combination Figure 1 and Figure 2This embodiment further defines the suspension structure described in Specific Embodiment 1. In this embodiment, the number of pipe clamps 4, m, is 2≤m≤5.

[0029] In this specific embodiment, the number of pipe clamps 4 can be determined according to the length of the economizer serpentine tube.

[0030] Specific Implementation Method Five: Combining Figure 1 and Figure 2 This embodiment further defines the hanging structure described in Specific Embodiment 1. The hanging structure for economizer support described in this embodiment also includes an arc plate 3. The support plate 2 has an L-shaped cross-section, and the arc plate 3 is provided at the arc-shaped opening end of the top surface of the support plate 2.

[0031] In this specific embodiment, when installed at the bottom end of the economizer serpentine tube, the U-shaped plate 5 on the support plate 2 is removed, and the arc plate 3 is fixedly connected to the upper surface of the base plate 1 through multiple support plates 2. The elbow at the bottom end of the economizer serpentine tube is directly contacted and fixed with the arc plate 3. Then, the number of pipe clamps 4 on the base plate is determined according to the length of the economizer serpentine tube, and the economizer serpentine tube is fixed to the base plate 1 through the pipe clamps 4.

[0032] Specific Implementation Method Six: Combination Figure 1 and Figure 2 This embodiment further defines the hanging structure described in Specific Embodiment Five. In this embodiment, the arc plate 3 is fixedly connected to the upper surface of the base plate 1 through n support plates 2.

[0033] Specific implementation method seven: Combination Figure 1 and Figure 2 This embodiment further defines the hanging structure described in Specific Embodiment 1. The hanging structure for economizer support described in this embodiment also includes a U-shaped plate 5, with a U-shaped plate 5 provided at one end of the top surface of each support plate 2.

[0034] In this specific embodiment, when installed at the top of the economizer serpentine tube, the economizer serpentine tube needs to contact the U-shaped plate 5. Then, the number of pipe clamps 4 on the base plate is determined according to the length of the economizer serpentine tube, and the economizer serpentine tube is fixed to the base plate 1 by the pipe clamps 4.

[0035] Working principle

[0036] When in use, the device can be installed at the top or bottom of the economizer serpentine tube, depending on the installation conditions on site. When installed at the top of the economizer serpentine tube, the economizer serpentine tube needs to contact the U-shaped plate 5. Then, the number of pipe clamps 4 on the base plate is determined according to the length of the economizer serpentine tube, and the economizer serpentine tube is fixed to the base plate 1 by the pipe clamps 4.

[0037] When installed at the bottom of the economizer serpentine tube, remove the U-shaped plate 5 on the support plate 2, and fix the arc plate 3 to the upper surface of the base plate 1 through multiple support plates 2. The elbow at the bottom of the economizer serpentine tube is directly in contact with the arc plate 3 for fixation. Then, determine the number of pipe clamps 4 on the base plate according to the length of the economizer serpentine tube, and fix the economizer serpentine tube to the base plate 1 through the pipe clamps 4.

Claims

1. A suspension structure for supporting an economizer, characterized in that: It includes a base plate (1), a support plate (2), and a pipe clamp (4); The upper surface of the base plate (1) is provided with n support plates (2) evenly along the width direction at one end, where n is a positive integer. The upper surface of the base plate (1) is provided with m pipe clamps (4) evenly along the length direction at the middle of the other end, where m is a positive integer.

2. The hanging structure for economizer support according to claim 1, characterized in that: The number of support plates (2) is n, where 2 ≤ n ≤ 10.

3. The hanging structure for economizer support according to claim 2, characterized in that: The distance between each pair of support plates (2) is 5cm to 10cm.

4. The hanging structure for economizer support according to claim 1, characterized in that: The number of the pipe clamps (4) is m, where 2 ≤ m ≤ 5.

5. The hanging structure for economizer support according to claim 1, characterized in that: It also includes an arc plate (3), the cross section of the support plate (2) is L-shaped, and the arc plate (3) is provided at the top arc opening end of the support plate (2).

6. The hanging structure for economizer support according to claim 5, characterized in that: The arc plate (3) is fixedly connected to the upper surface of the base plate (1) through n support plates (2).

7. The hanging structure for economizer support according to claim 1, characterized in that: It also includes a U-shaped plate (5), with a U-shaped plate (5) at one end of the top surface of each support plate (2).