Hanging basket structure for cast-in-place construction of bridge closure section

The hanging basket structure controlled by the card plate and drive motor solves the problems of complex installation and inaccurate positioning of traditional hanging basket structures in the cast-in-place construction of bridge closure sections, achieving convenient installation and precise positioning, and improving construction efficiency and quality.

CN223907351UActive Publication Date: 2026-02-13SICHUAN JIAOTOU CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520500421.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-20
Publication Date
2026-02-13
Estimated Expiration
2035-03-20

AI Technical Summary

Technical Problem

Traditional hanging basket structures are complex to install, have low positioning accuracy, are inconvenient to move, and require frequent disassembly and assembly during the cast-in-place construction of bridge closure sections, which affects construction efficiency and quality.

Method used

A hanging basket structure including a clamping plate, a translation mechanism, and a positioning mechanism was designed. The hanging basket is connected to the bridge railing through the clamping plate, and the lateral sliding and precise positioning of the hanging basket are achieved by controlling the rotating rod with a drive motor, which simplifies the installation process.

Benefits of technology

This enables convenient installation and precise positioning of the hanging basket structure, reduces the number of repeated installations and disassemblies, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223907351U_ABST
    Figure CN223907351U_ABST
Patent Text Reader

Abstract

The utility model discloses a hanging basket structure for cast-in-place construction of a bridge closure section, which relates to the technical field of hanging basket structures, and comprises a structure main body, the upper side of the structure main body is fixedly connected with a clamping plate, and the outer part of the structure main body is connected with a hanging basket body in a sliding manner; first connecting rods are fixedly connected to the left side and the right side of the exterior of the structure body, first connecting rings are fixedly connected to the exteriors of the first connecting rods, clamping rings are hung to the exteriors of the first connecting rings, a translation mechanism is installed on the inner side of the hanging basket body, and multiple sets of second connecting rods arranged at equal intervals are fixedly connected to the exterior of the structure body. A second connecting ring is fixedly connected to the outer portion of the second connecting rod and located above the hanging basket body, and a positioning mechanism is installed in the hanging basket body. According to the device, the purpose of conveniently adjusting the position of the hanging basket body can be achieved, the effect of completing construction of multiple sections of areas when the structure is installed is achieved, the structure does not need to be installed and disassembled repeatedly, and the construction efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to a hanging basket structure technical field, specifically, relate to a kind of for bridge closure segment cast-in-place construction's hanging basket structure. BACKGROUND

[0002] In the field of bridge construction, especially in the closure segment cast-in-place construction process of large bridge, the hanging basket structure as an important auxiliary construction equipment plays a crucial role. The traditional hanging basket structure often faces problems such as complex installation, low positioning accuracy, inconvenient movement and the need for frequent disassembly and assembly to cover different construction areas during installation and use. These problems not only increase the construction difficulty, but also seriously affect the construction efficiency and engineering quality.

[0003] Specifically, the traditional hanging basket structure usually needs complex fixing devices and a large amount of manpower and material resources during installation to ensure its stability and safety at the edge of the bridge. However, this installation method not only consumes time and effort, but also requires repeated disassembly and assembly operations when facing different construction areas, greatly reducing the construction efficiency. In addition, the traditional hanging basket structure often has difficulty in achieving precise positioning when moving horizontally due to the lack of effective adjustment mechanism, which not only affects the construction progress, but also may cause unnecessary damage to the bridge structure itself. Therefore, in view of the above technical problems, a hanging basket structure for bridge closure segment cast-in-place construction is proposed. SUMMARY

[0004] The purpose of the utility model is to provide a hanging basket structure for bridge closure segment cast-in-place construction, which can realize the purpose of convenient position adjustment of the hanging basket body, achieve the effect of completing the construction of multiple areas during installation of the structure, and greatly improve the construction efficiency without repeated installation and disassembly of the structure.

[0005] The utility model is realized by the following technical solutions:

[0006] A hanging basket structure for bridge closure segment cast-in-place construction, comprising a structure main body, a plurality of equally spaced clamping plates fixedly connected to the upper side of the structure main body, and a hanging basket body slidably connected to the outside of the structure main body.

[0007] The left and right sides of the structure main body are fixedly connected with first connecting rods, the first connecting rods are fixedly connected with first connecting rings outside, the first connecting rings are hung with snap rings outside, the inside of the hanging basket body is provided with a translation mechanism, the outside of the structure main body is fixedly connected with a plurality of equally spaced second connecting rods, the second connecting rods are fixedly connected with second connecting rings outside, and the second connecting rings are located above the hanging basket body, and the inside of the hanging basket body is provided with a positioning mechanism.

[0008] Preferably, the inner side of the structure body is fixedly connected with a cross rod, the outer side of the hanging basket body is fixedly connected with a fixed block, the outer side of the fixed block is fixedly connected with a sliding sleeve, and the sliding sleeve is sleeved on the outer side of the cross rod and is in sliding connection with the cross rod.

[0009] Preferably, the translation mechanism comprises rotating rods and steel wires, the rotating rods are rotationally connected to the inner side of the hanging basket body, the number of the rotating rods is two groups and the two groups are symmetrically arranged, the steel wires are wound on and fixedly connected to the outer side of the rotating rods, and the ends of the steel wires are fixedly connected to the outer side of the clamping ring through one side of the hanging basket body.

[0010] Preferably, the outer side of the hanging basket body is fixedly connected with driving motors, and the driving motors are fixedly connected with the rotating rods, and the number of the driving motors is two groups and the two groups are symmetrically arranged.

[0011] Preferably, the positioning mechanism comprises fixed plates, telescopic rods, connecting discs, tension springs and hooks, the fixed plates are fixedly connected with the hanging basket body, and the number of the fixed plates is two groups and the two groups are symmetrically arranged, and the distance between the two groups of the fixed plates is equal to the distance between the adjacent second connecting rods.

[0012] Preferably, the telescopic rods are fixedly connected to the upper side of the fixed plates, and the connecting discs are fixedly connected to the upper side of the telescopic rods.

[0013] Preferably, the tension springs are fixedly connected between the fixed plates and the connecting discs, the tension springs are sleeved on the outer side of the telescopic rods, the hooks are fixedly connected to the top of the connecting discs, and the hooks are clamped with the second connecting rings.

[0014] The technical scheme of the hanging basket structure for cast-in-place construction of a bridge closure section has at least the following beneficial effects:

[0015] The hanging basket structure for cast-in-place construction of a bridge closure section disclosed by the utility model is convenient and fast to install at the bridge edge guardrail through the clamping plate connecting mechanism, without the need of complicated fixing devices and a large number of manpower investment, meanwhile, the clamping plate can be tightly connected with the bridge guardrail through rivets, further enhancing the stability of the structure, and through the driving of the driving motor, the forward rotation and the reverse rotation of the rotating rod are controlled, so that the winding and releasing of the steel wire are realized, and then the hanging basket body is controlled to slide horizontally under the action of the sliding sleeve, this design not only makes the movement of the hanging basket more flexible and convenient, but also realizes accurate positioning, ensuring the construction quality and progress. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1 It is a whole structure schematic view of the utility model;

[0017] Figure 2 It is a second whole structure schematic view of the utility model;

[0018] Figure 3 For Figure 2 Enlarged view of A;

[0019] Figure 4 For Figure 1 Enlarged view of B;

[0020] Figure 5 For Figure 1 Enlarged view of C;

[0021] Icon: 1, structure main body; 2, card plate; 3, hanging basket body; 4, cross rod; 5, fixed block; 6, sliding sleeve; 7, first connecting rod; 8, first connecting ring; 9, clasp; 10, drive motor; 11, rotating rod; 12, steel cable; 13, second connecting rod; 14, second connecting ring; 15, fixed plate; 16, telescopic rod; 17, connecting disc; 18, tension spring; 19, hook. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0023] Please refer to Figures 1-5 The utility model provides a kind of hanging basket structure for bridge closure section cast-in-place construction, including structure main body 1, the upper side of structure main body 1 is fixedly connected with multiple groups of equidistant arrangement card plate 2, card plate 2 is L-shaped, can be better with bridge guardrail edge is connected, the outside of structure main body 1 is slidably connected with hanging basket body 3;

[0024] The left and right sides of the outside of structure main body 1 are fixedly connected with first connecting rod 7, the outside of first connecting rod 7 is fixedly connected with first connecting ring 8, the outside of first connecting ring 8 is hung with clasp 9, the inside of hanging basket body 3 is installed with translation mechanism, the outside of structure main body 1 is fixedly connected with multiple groups of equidistant arrangement second connecting rod 13, the outside of second connecting rod 13 is fixedly connected with second connecting ring 14, and second connecting ring 14 is located above hanging basket body 3, and the inside of hanging basket body 3 is installed with positioning mechanism.

[0025] The inside of structure main body 1 is fixedly connected with cross rod 4, the outside of hanging basket body 3 is fixedly connected with fixed block 5, the outside of fixed block 5 is fixedly connected with sliding sleeve 6, and sliding sleeve 6 is sleeved on the outside of cross rod 4 and is slidably connected with it.

[0026] The translation mechanism comprises rotating rods 11 and steel wires 12, the rotating rods 11 are rotationally connected to the inner side of the hanging basket body 3, the number of the rotating rods 11 is two groups and they are symmetrically arranged, the steel wires 12 are wound and fixedly connected to the outside of the rotating rods 11, and the ends of the steel wires 12 are fixedly connected to the outside of the clamping ring 9 through one side of the hanging basket body 3.

[0027] The driving motors 10 are fixedly connected to the outside of the hanging basket body 3, and the driving motors 10 are fixedly connected with the rotating rods 11, the number of the driving motors 10 is two groups and they are symmetrically arranged, the operation mode of the driving motors 10 is controlled by an external controller, so that the two groups of the rotating rods 11 can be symmetrically and positively rotated and reversely rotated.

[0028] The positioning mechanism comprises fixed plates 15, telescopic rods 16, connecting discs 17, tension springs 18 and hooks 19, the fixed plates 15 are fixedly connected with the hanging basket body 3, and the number of the fixed plates 15 is two groups and they are symmetrically arranged, the interval between the two groups of the fixed plates 15 is equal to the interval between the adjacent second connecting rods 13.

[0029] The telescopic rods 16 are fixedly connected to the upper side of the fixed plates 15, the connecting discs 17 are fixedly connected to the upper side of the telescopic rods 16, the telescopic rods 16 can limit the hooks 19, so as to avoid the sliding of the hanging basket body 3 caused by the deviation of the hooks 19.

[0030] The tension springs 18 are fixedly connected between the fixed plates 15 and the connecting discs 17, the tension springs 18 are sleeved on the outside of the telescopic rods 16, the hooks 19 are fixedly connected to the top of the connecting discs 17, and the hooks 19 are clamped with the second connecting rings 14.

[0031] Based on the working principle of the embodiment, when the bridge closure section is cast in situ, the hanging basket structure needs to be installed for construction on both sides, the structure can be directly inserted into the bridge edge guardrail through the clamping plate 2, the stable installation is realized through the gravity of the structure itself and the structural characteristics of the clamping plate 2 through the abutting force, or the clamping plate 2 and the bridge guardrail are tightly connected through rivets, then the construction personnel can enter the hanging basket body 3 for construction, when the construction of a region is completed, the hooks 19 on both sides can be pulled up to be completely pulled out from the second connecting ring 14, the tension spring 18 is stretched, then the driving motors 10 on both sides can be operated, a group of rotating rods 11 are controlled to rotate forward, and the other group of rotating rods 11 are controlled to rotate reversely, one side of the steel cable 12 is released, and the other side of the steel cable 12 is wound, the hanging basket body 3 is controlled to slide horizontally under the action of the sliding sleeve 6, until it goes to the next construction region, the hooks 19 are controlled to be located above the second connecting ring 14 corresponding to the region, then the hooks 19 are loosened, the hooks 19 can be automatically clamped into the second connecting ring 14 under the action of the tension spring 18, the positioning is completed, the purpose of conveniently adjusting the position of the hanging basket body 3 is achieved, the construction of multiple regions is completed when the structure is installed, the installation and disassembly of the structure do not need to be repeated many times, and the construction efficiency is greatly improved.

[0032] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, the scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A hanging basket structure for cast-in-place construction of a bridge closure section, characterized in that: Including the structure main body (1), the upper side of the structure main body (1) is fixedly connected with multiple groups of clamping plates (2) arranged at equal intervals, and the outside of the structure main body (1) is slidably connected with a hanging basket body (3); The left and right sides of the structure main body (1) are fixedly connected with first connecting rods (7), the outside of the first connecting rod (7) is fixedly connected with a first connecting ring (8), the outside of the first connecting ring (8) is hung with a clamping ring (9), the inside of the hanging basket body (3) is provided with a translation mechanism, the outside of the structure main body (1) is fixedly connected with multiple groups of second connecting rods (13) arranged at equal intervals, the outside of the second connecting rod (13) is fixedly connected with a second connecting ring (14), and the second connecting ring (14) is located above the hanging basket body (3), and the inside of the hanging basket body (3) is provided with a positioning mechanism.

2. The hanging basket structure for cast-in-place construction of closure section of a bridge according to claim 1, characterized in that: The inside of the structure main body (1) is fixedly connected with a cross rod (4), the outside of the hanging basket body (3) is fixedly connected with a fixed block (5), the outside of the fixed block (5) is fixedly connected with a sliding sleeve (6), and the sliding sleeve (6) is sleeved on the outside of the cross rod (4) and is slidably connected with the cross rod (4).

3. The hanging basket structure for cast-in-place construction of closure section of bridge according to claim 1, characterized in that: The translation mechanism comprises rotating rods (11) and steel wires (12), the rotating rods (11) are rotatably connected to the inside of the hanging basket body (3), and the number of the rotating rods (11) is two groups and is symmetrically arranged, the steel wires (12) are woundly and fixedly connected to the outside of the rotating rods (11), and the ends of the steel wires (12) are fixedly connected to the outside of the clamping ring (9) through one side of the hanging basket body (3).

4. The hanging basket structure for cast-in-place construction of closure section of bridge according to claim 3, characterized in that: The outside of the hanging basket body (3) is fixedly connected with drive motors (10), and the drive motors (10) are fixedly connected with the rotating rods (11), and the number of the drive motors (10) is two groups and is symmetrically arranged.

5. The hanging basket structure for cast-in-place construction of closure section of a bridge according to claim 1, characterized in that: The positioning mechanism comprises fixed plates (15), telescopic rods (16), connecting discs (17), tension springs (18) and hooks (19), the fixed plates (15) are fixedly connected with the hanging basket body (3), and the number of the fixed plates (15) is two groups and is symmetrically arranged, and the distance between the two groups of fixed plates (15) is equal to the distance between the multiple adjacent second connecting rods (13).

6. The hanging basket structure for cast-in-place construction of closure section of bridge according to claim 5, characterized in that: The telescopic rods (16) are fixedly connected to the upper side of the fixed plates (15), and the connecting discs (17) are fixedly connected to the upper side of the telescopic rods (16).

7. The hanging basket structure for cast-in-place construction of closure section of bridge according to claim 6, characterized in that: The tension springs (18) are fixedly connected between the fixed plates (15) and the connecting discs (17), and the tension springs (18) are sleeved on the outside of the telescopic rods (16), the hooks (19) are fixedly connected to the top of the connecting discs (17), and the hooks (19) are clamped with the second connecting rings (14).