Construction process display device for building project management
By designing an adjustable construction process display device, the problem of fixed display boards being unable to be flexibly displayed and modified was solved, enabling flexible display of the construction process and meeting minutes, which facilitates construction management.
Patent Information
- Application Number
- CN202520467189.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-17
- Publication Date
- 2026-02-13
- Estimated Expiration
- 2035-03-17
AI Technical Summary
Existing construction project management display devices are fixed and inconvenient to adjust, unable to flexibly display large amounts of information, occupy space, and have high modification costs.
A construction process display device was designed, comprising a base plate, mounting bracket, rotating shaft, display frame, rectangular block, connecting mechanism, limiting mechanism, and locking mechanism. The display frame can be flexibly adjusted through the rotating and locking mechanisms, supporting switching between vertical and horizontal states, which facilitates the display of construction processes and meeting recording.
It enables flexible display of the construction process and convenient meeting minutes, simplifies information updates and space utilization, and improves construction efficiency and safety.
Smart Images

Figure CN223911393U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a display device, especially to a construction process display device for building project management. BACKGROUND
[0002] In building project management, the construction process display device plays a key role in the smooth progress of the project. Clearly and intuitively displaying the construction process can help construction personnel quickly understand the work steps and requirements, improve construction efficiency and quality, and ensure construction safety.
[0003] The existing construction project management construction process display device is mostly a fixed display board, which has many limitations. This fixed display board needs to be manually written, which not only consumes time and effort, but also is inconvenient to modify. Once the information changes, the cost of rewriting is high. In addition, the fixed display board has a fixed volume and cannot be flexibly adjusted according to actual display needs. In a limited space of a construction site, it occupies a lot of space when not in use, affecting the effective use of the site; when a large amount of information needs to be displayed, the insufficient board space cannot fully present complex construction processes, safety warnings, and other content.
[0004] A construction process display device for building project management is developed to solve the above technical problems. Utility model content
[0005] In order to overcome the shortcomings of the existing fixed display board, which has a fixed volume and cannot be flexibly adjusted according to actual display needs, and cannot fully present complex construction processes and other content due to insufficient board space when a large amount of information needs to be displayed, the technical problem is to provide a construction process display device for building project management that is easy to adjust and can be flexibly used.
[0006] The technical solution is as follows: a construction process display device for building project management, comprising a bottom plate, a mounting frame, a rotating shaft, a display frame, a rectangular block, a connecting mechanism, and a limiting mechanism, the mounting frame is symmetrically arranged on the top of the bottom plate, the mounting frame top is symmetrically provided with an arc-shaped slot on the left and right sides, the rotating shaft is symmetrically arranged on the front and rear sidewalls of the display frame, the rotating shaft of the rectangular frame is placed in the arc-shaped slot of the mounting frame, the rectangular block is arranged in the middle of the inner side of the rectangular frame, the connecting mechanism is arranged between the middle of the top of the bottom plate and the rectangular block, and the limiting mechanism is arranged on the middle of the top of the bottom plate and can selectively limit the rotating shaft on the left and right sides.
[0007] In one of the embodiments, the connecting mechanism comprises fixed blocks, a first rotating shaft, first swing rods, second swing rods and a second rotating shaft. The top center of the mounting frame is provided with fixed blocks. The first rotating shaft is rotatably arranged between the two fixed blocks. The first swing rods are arranged at the front and rear ends of the first rotating shaft. The second rotating shaft is rotatably arranged on the front and rear sidewalls of the rectangular block. The second swing rods are arranged on the second rotating shaft. The second swing rods are rotatably connected with the first swing rods.
[0008] In one of the embodiments, the limiting mechanism comprises guide sleeves, moving rods, connecting frames, guide sleeves and sliding blocks. The bottom center of the bottom plate is provided with guide sleeves in left-right symmetry. The moving rods are slidably arranged between the two guide sleeves. The connecting frames are arranged at the two ends of the moving rods. The guide sleeves are arranged on the left and right sides of the top of the mounting frame. The sliding blocks are slidably arranged in the guide sleeves. The two sliding blocks on the same side are connected with the adjacent connecting frames.
[0009] In one of the embodiments, the limiting mechanism is provided with a locking mechanism capable of locking the display frame for display work. The locking mechanism comprises guide sleeves, sliding rods, clamping balls, pressing rods and elastic members. The guide sleeves are symmetrically arranged at the top of the guide sleeves. The sliding rods are slidably arranged between the guide sleeves. The clamping balls are arranged at the top of the sliding rods. The circular holes are formed in the left and right sidewalls of the display frame. The circular holes are matched with the clamping balls. The guide sleeves are provided with a T-shaped slot on the sidewall. The pressing rods are arranged between the two adjacent sliding rods. The elastic members are arranged between the sliding rods and the bottom of the guide sleeves.
[0010] In one of the embodiments, the limiting mechanism is provided with a locking mechanism capable of locking the display frame for display work. The locking mechanism comprises guide sleeves, sliding rods, clamping balls, pressing rods and elastic members. The guide sleeves are symmetrically arranged at the top of the guide sleeves. The sliding rods are slidably arranged between the guide sleeves. The clamping balls are arranged at the top of the sliding rods. The circular holes are formed in the left and right sidewalls of the display frame. The circular holes are matched with the clamping balls. The guide sleeves are provided with a T-shaped slot on the sidewall. The pressing rods are arranged between the two adjacent sliding rods. The elastic members are arranged between the sliding rods and the bottom of the guide sleeves.
[0011] In one of the embodiments, the limiting mechanism is provided with a locking mechanism capable of locking the display frame for display work. The locking mechanism comprises guide sleeves, sliding rods, clamping balls, pressing rods and elastic members. The guide sleeves are symmetrically arranged at the top of the guide sleeves. The sliding rods are slidably arranged between the guide sleeves. The clamping balls are arranged at the top of the sliding rods. The circular holes are formed in the left and right sidewalls of the display frame. The circular holes are matched with the clamping balls. The guide sleeves are provided with a T-shaped slot on the sidewall. The pressing rods are arranged between the two adjacent sliding rods. The elastic members are arranged between the sliding rods and the bottom of the guide sleeves.
[0012] Beneficial effects: 1. The device has remarkable advantages in construction process display. The structure design is ingenious. The staff can quickly adjust the side of the pasted construction process diagram to the vertical state by simply pushing the connecting frame and rotating the display frame, and fix it with the clamping ball. At the same time, the first swing rod and the second swing rod are unfolded to provide support, which facilitates the construction personnel to clearly watch the process diagram, and effectively promotes the display and promotion of the construction process.
[0013] 2. In the meeting discussion record scene, its convenience is also outstanding. When the meeting research is needed, the staff easily presses the left lower pressing rod, which can release the fixation of the display frame, reverse rotate and reset it, and then switch to the right rotating shaft to rotate, so that the writing surface is vertically presented. The whole process is simple and convenient, and the first swing rod and the second swing rod play a buffering role in the resetting process, which can well meet the needs of construction meeting discussion record, realize flexible change and provide great convenience for construction work. BRIEF DESCRIPTION OF DRAWINGS
[0014] Fig. 1 It is a three-dimensional structure schematic view of the utility model.
[0015] Fig. 2 It is a working state structure schematic view of the utility model.
[0016] Fig. 3 It is a three-dimensional structure schematic view of the utility model locking mechanism.
[0017] In the figure: 1_bottom plate, 2_mounting frame, 3_ rotating shaft, 4_display frame, 5_rectangular block, 6_connection mechanism, 61_fixed block, 62_first rotating shaft, 63_first swing lever, 64_second swing lever, 65_second rotating shaft, 7_limiting mechanism, 71_guide sleeve, 72_movable rod, 73_connection frame, 74_guide sleeve, 75_sliding block, 8_locking mechanism, 81_sliding sleeve, 82_sliding rod, 83_clamping ball, 84_pressing rod, 85_elastic member, 9_supporting block, 10_sound. DETAILED DESCRIPTION
[0018] The utility model is described in detail below in combination with the drawings and specific embodiments, but not as the limitation of the utility model.
[0019] Embodiment: as Figs. 1-3The construction process display device for building project management is shown, which comprises a bottom plate 1, a mounting frame 2, a rotating shaft 3, a display frame 4, a rectangular block 5, a connecting mechanism 6, a limiting mechanism 7, a locking mechanism 8, a supporting block 9 and a sound 10, the mounting frame 2 is symmetrically arranged on the top of the bottom plate 1, the arc-shaped grooves are symmetrically arranged on the top of the mounting frame 2, the rotating shaft 3 of the rectangular frame is arranged on the arc-shaped groove of the mounting frame 2, the rectangular block 5 is arranged on the inner side of the rectangular frame, the connecting mechanism 6 is arranged between the top middle side of the bottom plate 1 and the rectangular block 5, the connecting mechanism 6 comprises a fixed block 61, a first rotating shaft 62, a first swing rod 63, a second swing rod 64 and a second rotating shaft 65, the fixed block 61 is arranged on the top center of the mounting frame 2, the first rotating shaft 62 is rotatably arranged between the two fixed blocks 61, the first swing rod 63 is arranged on the front and rear ends of the first rotating shaft 62, the second rotating shaft 65 is rotatably arranged on the front and rear sidewalls of the rectangular block 5, the second swing rod 64 is arranged on the second rotating shaft 65, the second swing rod 64 is rotatably connected with the first swing rod 63, the limiting mechanism 7 capable of selectively limiting the rotating shaft 3 on the left and right sides is arranged on the top middle side of the bottom plate 1, the limiting mechanism 7 comprises a guide sleeve 71, a moving rod 72, a connecting frame 73, a guide sleeve 74 and a sliding block 75, the guide sleeve 71 is symmetrically arranged on the left and right sides of the bottom center of the bottom plate 1, the moving rod 72 is slidably arranged between the two guide sleeves 71, the connecting frame 73 is arranged on the two ends of the moving rod 72, the guide sleeve 74 is arranged on the left and right sides of the top of the mounting frame 2, the sliding block 75 is slidably arranged in the guide sleeve 74, the two sliding blocks 75 on the same side are connected with the adjacent connecting frame 73, the locking mechanism 8 capable of locking the display frame 4 for display work is arranged on the limiting mechanism 7, the locking mechanism 8 comprises a sliding sleeve 81, a sliding rod 82, a clamping ball 83, a pressing rod 84 and a resilient member 85, the sliding sleeve 81 is symmetrically arranged on the top of the guide sleeve 71, the sliding rod 82 is slidably arranged between the sliding sleeves 81, the clamping ball 83 is arranged on the top of the sliding rod 82, the round hole is formed in the left and right sidewalls of the display frame 4, the round hole is matched with the clamping ball 83, the T-shaped slot is formed in the sidewall of the sliding sleeve 81, the pressing rod 84 is arranged between the two adjacent sliding rods 82, the resilient member 85 is arranged between the sliding rod 82 and the inner bottom of the sliding sleeve 81, the resilient member 85 is a compression spring, the supporting block 9 is symmetrically arranged on the bottom of the bottom plate 1, the sound 10 is embeddedly arranged in the display frame 4.
[0020] The construction process diagram can be pasted on one side of the upper and lower sides of the display frame 4, and a writing board is arranged on the other side. When the construction process diagram needs to be displayed during the construction process, the staff directly pushes the connecting frame 73 to move to the right, and the left slider 75 is clamped on the upper part of the left rotating shaft 3. Then the staff rotates the display frame 4 around the left rotating shaft 3, the first swing rod 63 and the second swing rod 64 are correspondingly unfolded, so that the display frame 4 presents a vertical state. At this time, the ball 83 is clamped in the lower hole of the left wall of the display frame 4, and the display frame 4 is fixed. Then the construction personnel can watch. When the meeting research and discussion is needed, the staff presses the lower left pressure rod 84 downward, the elastic member 85 is compressed, the ball 83 is away from the corresponding hole, and the staff reversely rotates the display frame 4 to present a horizontal state, and the first swing rod 63 and the second swing rod 64 are gradually folded and reset, which plays a buffering and supporting role. Then the staff reversely pushes the connecting frame 73 to move to the left, the left slider 75 is away from the upper part of the left rotating shaft 3, and the right slider 75 is clamped on the upper part of the right rotating shaft 3. At this time, the staff rotates the display frame 4 around the right rotating shaft 3, and the writing surface of the display frame 4 presents a vertical state. The construction personnel can write the meeting content. The device has the advantages of simple structure, convenient operation, flexible change, and is conducive to construction process display and promotion and construction meeting discussion record.
[0021] It should be understood that the embodiments are only used to illustrate the present application and not to limit the scope of the present application. In addition, it should be understood that after reading the content taught by the present application, those skilled in the art can make various changes or modifications to the present application, and these equivalent forms also fall within the scope defined by the appended claims of the present application.
Claims
1. A construction process display device for building project management, characterized in that, include: The base plate (1) and the mounting bracket (2) are symmetrically arranged on the top of the base plate (1) at the front and back. The mounting bracket (2) has symmetrical arc grooves on the left and right sides of the top of the mounting bracket (2). Display frame (4), rotating shaft (3), rotating shaft (3) is symmetrically arranged on the front and rear side walls of the display frame (4), and the rotating shaft (3) of the rectangular frame is placed on the arc groove of the mounting bracket (2); A rectangular block (5) is provided in the middle of the inner side of the rectangular frame; A connecting mechanism (6) is provided between the top middle side of the base plate (1) and the rectangular block (5); a limiting mechanism (7) is provided on the top middle side of the base plate (1) to selectively limit the rotation shafts (3) on the left and right sides.
2. The construction process display device for building project management according to claim 1, characterized in that, The connecting mechanism (6) includes: Fixing block (61), the mounting bracket (2) has a fixing block (61) at the top center; The first rotating shaft (62) is rotatably arranged between the two fixed blocks (61); The first swing arm (63) is provided at both the front and rear ends of the first pivot (62); The second rotating shaft (65) is rotatably provided on both the front and rear side walls of the rectangular block (5); The second swing rod (64) is provided on both the second swing rod (64) and the second rotating shaft (65), and the second swing rod (64) is rotatably connected to the first swing rod (63).
3. The construction process display device for building project management according to claim 2, characterized in that, The limiting mechanism (7) includes: Guide sleeves (71) are symmetrically arranged on the left and right sides of the bottom center of the base plate (1); The movable rod (72) is slidably arranged between the two guide sleeves (71); The connecting frame (73) is provided at both ends of the moving rod (72); Guide sleeves (74) are provided on the top left and right sides of the mounting bracket (2); The slider (75) and the guide sleeve (74) are both slidably provided with sliders (75), and the two sliders (75) on the same side are connected to the adjacent connecting frame (73).
4. The construction process display device for building project management according to claim 3, characterized in that, It also includes a locking mechanism (8), and the limiting mechanism (7) is provided with a locking mechanism (8) for locking the display frame (4) for display work. The locking mechanism (8) includes: Sliding sleeve (81) and guide sleeve (71) are symmetrically arranged at the top front and back; The slide rod (82) is slidably disposed between the slide sleeve (81); The top of the ball (83) and the slide bar (82) are both equipped with ball (83), and the left and right side walls of the display frame (4) are all opened with round holes that fit with the ball (83). The pressure rod (84) and the sliding sleeve (81) have a slot on their side walls, and the pressure rod (84) is provided between two adjacent sliding rods (82); An elastic element (85) is provided between the bottom of the slide rod (82) and the inner side of the sliding sleeve (81).
5. A construction process display device for building project management according to claim 4, characterized in that, Also includes: Support blocks (9) are symmetrically arranged on the bottom left and right sides of the base plate (1).
6. A construction process display device for building project management according to claim 5, characterized in that, Also includes: The speaker (10) is embedded in the display frame (4).