Sliding weight transport trolley for dismounting tuyere sleeve of blast furnace

By designing a trolley for transporting sliding hammers during the disassembly of blast furnace tuyere sleeves, the problems of labor intensity and safety risks during the disassembly of blast furnace tuyere sleeves were solved, and the convenient transportation and disassembly of the sliding hammer device were realized, thereby improving the production efficiency and safety of blast furnaces.

CN223990043UActive Publication Date: 2026-03-13FUJIAN SANGANG MINGUANG +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-05-06
Publication Date
2026-03-13

AI Technical Summary

Technical Problem

In existing technologies, the disassembly of blast furnace tuyeres requires multiple people to work together to move the heavy sliding hammer device, resulting in high labor intensity and high safety risks.

Method used

A trolley for transporting sliding hammers for disassembling blast furnace tuyere sleeves has been designed. It includes a handle assembly, a main frame, a sliding hammer bracket, a detachable wheel assembly, and swivel casters. The height and direction can be adjusted, making it easy for a single person to operate and reducing labor intensity and safety risks.

Benefits of technology

This facilitates the convenient transportation and disassembly of the sliding hammer device, reduces the labor intensity and safety risks for workers, and improves the efficiency and safety of blast furnace tuyeres replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223990043U_ABST
    Figure CN223990043U_ABST
Patent Text Reader

Abstract

The utility model discloses a blast-furnace tuyere sleeve dismounting sliding weight transport trolley and relates to the technical field of blast-furnace ironmaking equipment. The handle assembly is installed on one side of the main frame, a sliding weight support is arranged on the main frame, a sliding weight support is arranged on the top of the sliding weight support, the main frame is of a T-shaped structure, a detachable wheel assembly is arranged at the front end of the main frame, and universal trundles are arranged at the tail end of the main frame. The height adjusting transportation trolley can conveniently adjust the height between the small and medium tuyeres of different types of blast-furnace tuyeres and the tuyere platform, can conveniently transport the tuyere sleeve dismounting sliding weight, is simple in structure and convenient to use, greatly reduces the manual operation intensity, and improves the operation safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a trolley for transporting sliding hammers for disassembling blast furnace tuyere sleeves, and belongs to the technical field of blast furnace ironmaking equipment. Background Technology

[0002] During blast furnace production, when the tuyere sleeve reaches a certain period of use or becomes damaged and leaks, it needs to be disassembled and replaced. Currently, most blast furnaces use sliding hammer devices to disassemble the medium and small sleeves. The sliding hammer devices weigh between 100kg and 150kg, are quite heavy and long, and generally require more than 4 people to carry them together. This not only increases the labor intensity of workers, but also makes it easy for safety accidents to occur during the handling process.

[0003] During the dismantling of the medium and small sleeves of a blast furnace, dismantling a single medium or small sleeve requires the sliding hammer device to be moved at least twice with the combined efforts of multiple people, which greatly consumes the physical strength of the workers. Especially after using the sliding hammer device to pull out the medium or small sleeve, the clamp at the front end of the sliding hammer device is hot to the touch or even red. Moving the sliding hammer device when the workers are almost exhausted undoubtedly increases the safety risk of the operation. Therefore, a sliding hammer transport trolley for dismantling blast furnace tuyeres sleeves is proposed to solve the problems existing in the current technology. Utility Model Content

[0004] The purpose of this utility model is to address the defects or deficiencies in the existing technology by providing a trolley for transporting tuyere sleeve disassembly slide weights. This trolley allows for convenient height adjustment of the tuyere sleeves of different types of blast furnaces, separating them from the tuyere platform, and facilitates the transport of tuyere sleeve disassembly slide weights. It has a simple structure, is easy to use, greatly reduces the intensity of manual operation, and improves operational safety.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: it includes a handle assembly 1 and a main frame 9. The handle assembly 1 is installed on one side of the main frame 9. A sliding hammer bracket 2 is provided on the main frame 9. A sliding hammer support 3 is provided on the top of the sliding hammer bracket 2. The main frame 9 has a T-shaped structure. A detachable wheel assembly 4 is provided at the front end of the main frame 9. A universal caster 5 is provided at the end of the main frame 9.

[0006] Furthermore, the slide weight support 2 includes two support bodies 21 spaced apart, and each support body 21 is provided with a detachable slide weight support 3.

[0007] Furthermore, the sliding hammer support 3 has an arc-shaped structure with the arc-shaped opening facing upwards.

[0008] Furthermore, the handle assembly 1 includes a handle 11 and a handle base 12. The handle 11 has a hollow structure, and the handle base 12 is movably disposed inside the handle 11.

[0009] Furthermore, both the handle 11 and the handle seat 12 are provided with a plurality of through-hole fixing pin holes 13, and a pin 6 is provided in the fixing pin hole 13. A limit hole is provided at the end of the pin 6, and a first cotter pin 7 is provided in the limit hole.

[0010] Furthermore, the detachable wheel assembly 4 includes a wheel axle 41, a solid wheel 42, a first wheel hub 43, and a second wheel hub 44. There are two first wheel hubs 43 symmetrically arranged on the wheel axle 41. There are also two solid wheels 42 and two second wheel hubs 44 symmetrically arranged. The second wheel hub 44 is disposed inside the solid wheel 42 and is connected to the first wheel hub 43 by fastening screws 45.

[0011] Furthermore, four wheel bearings 46 are provided on the wheel axle 41, and the wheel bearings 46 are connected to the first wheel hub 43 and the second wheel hub 44.

[0012] Furthermore, the wheel axle 41 is also provided with two wheel axle nuts 47, which are located on the outside of the second wheel hub 44 and are provided with a second cotter pin 48 connected to the wheel axle 41.

[0013] The beneficial effects of adopting the above technical solution are as follows: the blast furnace tuyere sleeve disassembly sliding hammer transport trolley is lightweight and compact, has low manufacturing cost and can be reused, is easy to adjust the usage height, and can be repaired locally in a targeted manner if there is local damage, effectively reducing the labor intensity and safety risks of operators, improving the efficiency of replacing medium and small tuyere sleeves, creating favorable conditions for restoring the furnace condition after blast furnace shutdown and sleeve replacement, and thus promoting the improvement of blast furnace ironmaking quality and efficiency. Attached Figure Description

[0014] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0015] Figure 1 This is a schematic diagram of the structure of this utility model;

[0016] Figure 2 This is an exploded structural diagram of the present invention;

[0017] Figure 3 This is a schematic diagram of the structure of the first cotter pin 7 in this utility model.

[0018] Explanation of reference numerals in the attached drawings: 1. Handle assembly; 2. Slide hammer bracket; 3. Slide hammer support; 4. Detachable wheel assembly; 5. Universal caster; 6. Pin; 7. First cotter pin; 11. Handle; 12. Handle seat; 13. Fixing pin hole; 21. Bracket body; 41. Wheel axle; 42. Solid wheel; 43. First wheel hub; 44. Second wheel hub; 45. Fastening screw; 46. Wheel bearing; 47. Wheel axle nut; 48. Second cotter pin. Detailed Implementation

[0019] See Figures 1-3 As shown, the technical solution adopted in this specific embodiment is as follows: It includes a handle assembly 1 and a main frame 9. The handle assembly 1 is installed on one side of the main frame 9. A sliding hammer bracket 2 is provided on the main frame 9. A sliding hammer support 3 is provided on the top of the sliding hammer bracket 2. The main frame 9 has a T-shaped structure. A detachable wheel assembly 4 is provided at the front end of the main frame 9, and a universal caster 5 is provided at the end of the main frame 9. When disassembling the tuyeres sleeve, the height of the sliding hammer bracket needs to be adjusted by replacing the detachable wheel assembly according to the height of the blast furnace, so as to better cooperate with the blast furnace and smoothly transport the sliding hammer. Specifically, the base of the transport trolley is the main frame, and the sliding hammer bracket for support is provided on the main frame. When in use, the sliding hammer is lifted to the sliding position. On the hammer stand, the handle assembly can be used to push the trolley to transport the sliding hammer. When it is transported to the air vent or small sleeve to be replaced, the sliding hammer separates from the trolley. The trolley is then pushed away, and the sliding hammer can be used to remove the sleeve. After removing the sleeve, the sliding hammer can be placed back on the stand and transported to the next work station again. During transportation, the transport direction can be easily adjusted by the swivel casters. The swivel casters are also equipped with locking mechanisms, which can be fixed when stopped to prevent the trolley from moving at will. This not only improves convenience but also reduces the workload of the operators. In addition, the use of detachable wheel assemblies not only makes it easy to adjust the height according to actual needs, but also makes it easy to replace the wheel assemblies if they are damaged.

[0020] More specifically, the slide weight support 2 includes two support bodies 21 spaced apart. Each support body 21 is provided with a detachable slide weight support 3. In this embodiment, in order to better support the slide weight and ensure that the slide weight does not move, a slide weight support is provided on the support body. The slide weight support 3 has an arc-shaped structure with the arc opening facing upward, which can stably support the slide weight from the bottom. At the same time, since the support bodies are spaced apart, there is a protruding part in the middle of the slide weight. This part is placed between the two slide weight supports and is constrained by the two slide weight supports, so it will not move, thereby ensuring transportation safety.

[0021] More specifically, the handle assembly 1 includes a handle 11 and a handle base 12. The handle 11 has a hollow structure, and the handle base 12 is movably disposed inside the handle 11. Since the operator is not fixed for a long time, different operators have different heights and operating habits. When pushing the cart, specific adjustments need to be made according to individual circumstances. By setting a movable handle assembly, the fixed position of the handle can be easily adjusted, thereby adjusting its length, which is more in line with the operating habits of different operators.

[0022] More specifically, both the handle 11 and the handle base 12 are provided with several through-hole fixing pin holes 13, and a pin 6 is installed inside the fixing pin holes 13. A limiting hole is provided at the end of the pin 6, and a first cotter pin 7 is provided inside the limiting hole. In order to facilitate the adjustment of the specific length of the handle, fixing pin holes are provided on both the handle and the handle base. The pin can be positioned after adjustment by inserting it into the fixing pin hole. At the same time, a limiting hole is provided on the pin, and a first cotter pin is inserted into the limiting hole. The first cotter pin has its own tension, which can effectively fix the pin after it is inserted. When adjustment is needed, the first cotter pin can be pulled out to pull out the pin for adjustment, making adjustment more convenient.

[0023] More specifically, the detachable wheel assembly 4 includes a wheel axle 41, a solid wheel 42, a first wheel hub 43, and a second wheel hub 44. There are two first wheel hubs 43 symmetrically arranged on the wheel axle 41. There are also two solid wheels 42 and two second wheel hubs 44 symmetrically arranged. The second wheel hub 44 is disposed inside the solid wheel 42 and connected to the first wheel hub 43 by fastening screws 45. In this embodiment, a detachable wheel assembly is provided. When the height needs to be adjusted, only different sizes of practice wheels need to be used. Since the first wheel hub is installed on the wheel axle, it does not need to be replaced. However, since the first wheel hub is installed on the solid wheel, when disassembling, the fastening screws are unscrewed, and the solid wheel and the first wheel hub are replaced together. The required solid wheel is then installed and connected to the first wheel hub. Disassembly is convenient and replacement and maintenance are easier.

[0024] More specifically, the wheel axle 41 is provided with four wheel bearings 46, which are connected to the first wheel hub 43 and the second wheel hub 44. The wheel bearings ensure the smooth rotation of the wheel hub.

[0025] More specifically, the wheel axle 41 is also provided with two wheel axle nuts 47. The wheel axle nuts 47 are located on the outside of the second wheel hub 44, and a second cotter pin 48 is provided on them to connect with the wheel axle 41. In order to better fix and constrain the solid wheel, wheel axle nuts are provided on the wheel axle. The wheel axle nuts that cooperate with the second wheel hub also cooperate with the wheel bearing on it and are embedded in the wheel bearing, so as not to interfere with the rotation of the solid wheel. A through hole and a second cotter pin are also provided on it. The wheel axle nuts can be disassembled and installed by pulling and inserting the second cotter pin, so as to facilitate the replacement of the solid wheel.

[0026] The working principle of this utility model is as follows: In use, the specifications of the solid wheel 42 are selected according to the specific height of the tuyere platform in different types of blast furnace tuyeres (small and medium sizes) to obtain a matching trolley height and load-bearing capacity. When replacing the solid wheel 42, simply pull out the second cotter pin 48 to remove the wheel axle nut 47 and replace the solid wheel 42. Similarly, the universal caster 5 is also replaced with the same specification to ensure that the sliding hammer support 3 remains horizontal. Furthermore, due to differences in operator height and usage habits, the first... Pull out the pin 6 with the cotter pin 7, adjust the specific position of the handle, and then insert the pin 6 back in. This allows operators of different heights and usage habits to push the trolley for operation. Lift the air vent sleeve sliding hammer device and place it on the sliding hammer support 3, with the middle of the sliding hammer placed between the two sliding hammer supports 3. It is restrained by the two sliding hammer supports 3 to prevent it from loosening. After adjustment, push the trolley to transport the sliding hammer to the air vent sleeve that needs to be replaced. The sliding hammer separates from the sliding hammer support 3. Push the trolley away, and you can start using the sliding hammer to remove the sleeve.

[0027] The above description is only used to illustrate the technical solution of this utility model and is not intended to limit it. Any other modifications or equivalent substitutions made by those skilled in the art to the technical solution of this utility model, as long as they do not depart from the spirit and scope of the technical solution of this utility model, should be covered within the scope of the claims of this utility model.

Claims

1. A high furnace tuyere sleeve dismounting slide hammer transport trolley, characterized in that: It includes handle assembly (1), main frame (9), handle assembly (1) is installed on one side of main frame (9), main frame (9) is provided with slide hammer support (2), the top of slide hammer support (2) is provided with slide hammer support (3), main frame (9) is T-shaped structure, main frame (9) front end is provided with detachable wheel assembly (4), main frame (9) end is provided with universal caster (5).

2. The high furnace tuyere sleeve dismounting and sliding hammer transporting trolley according to claim 1, characterized in that: The slide hammer support (2) comprises two support bodies (21) arranged at intervals, and each support body (21) is provided with a detachable slide hammer support (3).

3. The high furnace tuyere sleeve dismounting and sliding hammer transporting trolley according to claim 2, characterized in that: The slide hammer support (3) is an arc structure, and the arc opening is arranged upward.

4. The high furnace tuyere sleeve dismounting and sliding hammer transporting trolley according to claim 1, characterized in that: The handle assembly (1) comprises a handle (11) and a handle seat (12), the handle (11) is a hollow structure, and the handle seat (12) is movably arranged in the handle (11).

5. A high pressure vessel lance nozzle puller transport trolley as claimed in claim 4, wherein: The handle (11) and the handle seat (12) are provided with a plurality of fixed pin holes (13) penetrating each other, and a pin shaft (6) is arranged in the fixed pin hole (13), the end of the pin shaft (6) is provided with a limiting hole, and a first split pin (7) is arranged in the limiting hole.

6. The high furnace tuyere sleeve dismounting and sliding hammer transporting trolley according to claim 1, characterized in that: The detachable wheel assembly (4) comprises a wheel shaft (41), a solid wheel (42), a first hub (43) and a second hub (44), the first hub (43) is symmetrically arranged on the wheel shaft (41), the solid wheel (42) and the second hub (44) are also symmetrically provided with two, and the second hub (44) is arranged in the solid wheel (42) and connected with the first hub (43) through a fastening screw (45).

7. A high pressure vessel lance nozzle puller transport trolley as claimed in claim 6, wherein: The wheel shaft (41) is provided with four wheel bearings (46), and the wheel bearings (46) are connected with the first hub (43) and the second hub (44).

8. The high furnace tuyere sleeve dismounting and sliding hammer transporting trolley according to claim 6, characterized in that: The wheel shaft (41) is also provided with two axle nuts (47), the axle nuts (47) are arranged outside the second hub (44), and a second split pin (48) is arranged on the axle nuts (47) and connected with the wheel shaft (41).