Equipment foundation anchor bolt installation auxiliary device
By designing the installation components and stabilizing adjustment components of the anchor bolt installation auxiliary device, the flexible adjustment of the anchor bolt spacing and the horizontality of the installation components are realized, solving the problem that the existing device cannot adjust the spacing, and improving the convenience of installation and the quality of the project.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-03
- Publication Date
- 2026-03-27
AI Technical Summary
Existing auxiliary installation devices can only assist in the installation of anchor bolts with fixed spacing, and cannot adjust the spacing according to actual usage needs, resulting in poor usability.
An auxiliary device for installing foundation anchor bolts was designed. By setting positioning grooves on the mounting components and the laying plate, the spacing of the anchor bolts can be flexibly adjusted. The device is installed on a forklift with a sturdy adjustment component to ensure the horizontality of the mounting components.
It improves the convenience and applicability of anchor bolt installation, making it suitable for different scenarios and avoiding bolt tilting caused by uneven bottom, thus improving project quality.
Smart Images

Figure CN224048152U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the field of anchor bolt installation technology, especially a device foundation anchor bolt installation auxiliary device. BACKGROUND
[0002] Anchor bolt, that is, screw rod used for fastening equipment on concrete foundation. It is generally used in railway, highway, power enterprise, factory, mine, bridge, tower crane, large-span steel structure and large-scale building and other infrastructure. It has strong stability.
[0003] At present, auxiliary devices are needed for assisting installation of anchor bolts during anchor bolt installation, but the existing auxiliary installation devices can only assist installation of anchor bolts with fixed spacing, so that the installation of anchor bolts cannot be adjusted in spacing according to actual use requirements, thereby making the actual usability of the anchor bolt auxiliary installation device poor. Therefore, the device foundation anchor bolt installation auxiliary device is provided to solve the above problems. UTILITY MODEL CONTENTS
[0004] The utility model discloses a device foundation anchor bolt installation auxiliary device, through the use of installation component and the setting of a plurality of positioning grooves on the laying plate, the spacing adjustment between anchor bolts has more selectivity, thereby better adapt to the demand of use in different scenes, thereby improve the convenience of use, solve the problem that the existing auxiliary installation device can only assist installation of anchor bolts with fixed spacing, so that the installation of anchor bolts cannot be adjusted in spacing according to actual use requirements, thereby making the actual usability of the anchor bolt auxiliary installation device poor.
[0005] To solve the above technical problems, the utility model is realized through the following technical schemes: the utility model discloses a device foundation anchor bolt installation auxiliary device, including installation component, the installation component includes pouring pipe, the top of pouring pipe is opened in first notched, and the first notched between two is inserted with positioning plate, the top of positioning plate is opened in second notched, and the second notched between two is inserted with laying plate, the top of laying plate is evenly opened in a plurality of positioning grooves with gradually deepening depth and gradually smaller diameter, the inner bottom of positioning groove is inserted with mounting plate, the top of mounting plate is evenly opened in a plurality of first through holes, the first through hole is slidably inserted with bolt, the circumferential surface of bolt is threadedly connected with nut above mounting plate, and the inner bottom of each positioning groove is opened in a plurality of second through holes with concentric setting of first through hole.
[0006] The utility model further sets up, the installation component still includes the first handle that is fixedly connected on the top of positioning plate symmetry, the top of laying plate is fixedly connected with second handle symmetry.
[0007] The utility model further sets up, the first handle, second handle's circumferential side surface all install anti -skidding rubber cover.
[0008] The utility model further sets up, one outer side of the pouring pipe is fixedly cooperated with stable adjustment component, stable adjustment component includes the L shaped board of fixed connection on one outer side of pouring pipe, one side surface of L shaped board is fixedly connected with lifting plate.
[0009] The utility model further sets up, stable adjustment component still includes U shaped board, the opposite side inner side between U shaped board is penetrated rotationally connected with screw rod, lifting plate is connected on the circumferential surface of screw rod and with U shaped board inner top sliding connection.
[0010] The utility model further sets up, the top of screw rod is fixedly connected with first gear, one outer side of U shaped board is fixedly connected with motor, the output of motor is fixedly connected with second gear, and second gear is engaged with first gear.
[0011] The utility model further sets up, the outer top of U shaped board is fixedly connected with mounting head, and the inner top of U shaped board is set up with the guiding groove of sliding cooperation of lifting plate.
[0012] The utility model has the advantages of 1, the utility model moves to the pit that digs in advance by controlling pouring pipe, makes the bottom of pouring pipe abut at the bottom of pit, then first pours the proper concrete in pouring pipe, then inserts the positioning plate in the first slot, then places the laying plate in the second slot, then according to actual use demand, selects the mounting plate of appropriate size and places in the corresponding positioning groove, then installs the nut on the bolt, then inserts the bolt with nut in the first through -hole on the mounting plate, pours the concrete in pouring pipe again, makes the concrete cover bolt, after the concrete solidification, removes the installation assembly except the bolt, through the use of installation assembly and the setting of multiple positioning grooves on the laying plate, make the spacing adjustment between anchor bolts have more selectivity, so as to be better applicable to the demand of use in different scenes, thereby improve the convenience of use.
[0013] 2, the utility model discloses a mounting is installed on the forklift, through the stable adjustment component is installed on the forklift, so that stable adjustment component has a stable and not easy to have the fulcrum of inclination, thereby through the process of height adjustment of installation component of stable adjustment component, installation component is in the relative horizontal position, thereby effectively avoid the uneven bottom of pre -pit, and influence the foot bolt pouring formation after, occur the inclination, thereby influence the quality of subsequent engineering, through the control motor drive second gear rotation, and then drive the first gear rotation with its meshing, and then drive the rotation of screw rod, make screw rod drive lifting plate move upwards or downwards, and then through L -shaped board drive installation component moves upwards or downwards, thereby complete the height adjustment of installation component, and then improve the convenience of use.
[0014] Of course, it is not necessary for any product embodying the utility model to achieve all the advantages mentioned above simultaneously. BRIEF DESCRIPTION OF DRAWINGS
[0015] In order to more clearly illustrate the technical scheme of the embodiments of the utility model, the following will introduce the drawings needed to be used for the embodiment description, and obviously, the drawings in the following description are only some embodiments of the utility model, and for the ordinary skilled in the art, other drawings can also be obtained according to these drawings without creating labor.
[0016] Figure 1 It is a kind of device foundation foundation bolt installation auxiliary device structure diagram.
[0017] Figure 2 It is the structure diagram of installation component in the utility model.
[0018] Figure 3 It is the structure diagram of pouring pipe in the utility model.
[0019] Figure 4 It is the structure diagram of positioning plate in the utility model.
[0020] Figure 5 It is the structure diagram of the connecting portion between laying plate and mounting plate in the utility model.
[0021] Figure 6 It is the structure diagram of mounting plate in the utility model.
[0022] Figure 7 It is the structure diagram of laying plate in the utility model.
[0023] Figure 8 It is the structure diagram of stable adjustment component in the utility model.
[0024] In the drawings, the component list represented by each sign is as follows:
[0025] 1-mounting assembly, 101-pouring pipe, 102-first notch, 103-positioning plate, 104-second notch, 105-laying plate, 106-positioning groove, 107-mounting plate, 108-first through hole, 109-bolt, 110-nut, 111-second through hole, 112-first handle, 113-second handle, 2-stable adjustment assembly, 201-L-shaped plate, 202-lifting plate, 203-U-shaped plate, 204-screw rod, 205-first gear, 206-motor, 207-second gear, 208-mounting head, 209-guiding groove. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0027] Specific embodiment one, please refer to Figures 1-8 The utility model discloses a device foundation anchor bolt installation auxiliary device, including mounting assembly 1, mounting assembly 1 includes pouring pipe 101, the top of pouring pipe 101 is symmetrically provided with first notch 102, and the positioning plate 103 is inserted between two first notches 102, and the top of positioning plate 103 is symmetrically provided with second notch 104, and the laying plate 105 is inserted between two second notches 104, and the top of laying plate 105 is evenly provided with a plurality of positioning grooves 106 with gradually deepening depth and gradually decreasing diameter, the inner bottom of positioning groove 106 is inserted with mounting plate 107, and the top of mounting plate 107 is evenly provided with a plurality of first through holes 108, and the bolt 109 is slidably inserted in first through hole 108, and the nut 110 is threadedly connected on the side surface of bolt 109 and located above mounting plate 107, and the inner bottom of each positioning groove 106 is provided with a plurality of second through holes 111, which are concentrically arranged with first through hole 108, and mounting assembly 1 further includes first handle 112, which is symmetrically fixedly connected on the top of positioning plate 103, and the top of laying plate 105 is symmetrically fixedly connected with second handle 113, and the anti-skid rubber sleeve is mounted on the side surface of first handle 112 and second handle 113.
[0028] The operation process of the embodiment is as follows: first, control the pouring pipe 101 to move into the pre-excavated pit, so that the bottom of the pouring pipe 101 abuts against the bottom of the pit, then pour an appropriate amount of concrete into the pouring pipe 101, then insert the positioning plate 103 into the first slot 102, then place the laying plate 105 in the second slot 104, then according to the actual use requirement, select the installation plate 107 of appropriate size and place it in the corresponding positioning groove 106, then install the nut 110 on the bolt 109, then insert the bolt 109 with the nut 110 into the first through hole 108 on the installation plate 107, pour concrete into the pouring pipe 101 again, so that the concrete covers the bolt 109, after the concrete solidifies, remove the installation assembly 1 except the bolt 109, through the use of the installation assembly 1 and the setting of the plurality of positioning grooves 106 on the laying plate 105, the spacing adjustment between the anchor bolts has more selectivity, so as to better adapt to the requirements of different scene use, thereby improving the convenience of use.
[0029] Specific embodiment two, please refer to Figures 1-8 On the basis of the specific embodiment one, a stable adjusting assembly 2 is fixedly connected to an outer side of the pouring pipe 101, the stable adjusting assembly 2 comprises an L-shaped plate 201 fixedly connected to an outer side of the pouring pipe 101, one side of the L-shaped plate 201 is fixedly connected with a lifting plate 202, the stable adjusting assembly 2 further comprises a U-shaped plate 203, a lead screw 204 is rotatably connected between opposite inner side surfaces of the U-shaped plate 203, the lifting plate 202 is threadedly connected to the circumferential surface of the lead screw 204 and is slidingly connected to the inner top of the U-shaped plate 203, the top of the lead screw 204 is fixedly connected with a first gear 205, an electric motor 206 is fixedly connected to an outer side of the U-shaped plate 203, an output end of the electric motor 206 is fixedly connected with a second gear 207, the second gear 207 is engaged with the first gear 205, an installation head 208 is fixedly connected to the outer top of the U-shaped plate 203, and a guide groove 209 slidingly connected with the lifting plate 202 is formed in the inner top of the U-shaped plate 203.
[0030] The operation process of the embodiment is as follows: the mounting head 208 is mounted on the forklift, the stable adjusting assembly 2 is mounted on the forklift, so that the stable adjusting assembly 2 has a stable and less inclined fulcrum, so that the mounting assembly 1 is in a relatively horizontal position during the height adjustment of the mounting assembly 1 by the stable adjusting assembly 2, thereby effectively avoiding the uneven bottom of the pre-deep pit from affecting the pouring of the anchor bolt to be formed to be inclined, thereby affecting the quality of the subsequent engineering, the motor 206 drives the second gear 207 to rotate, and then the first gear 205 engaged with the second gear 207 is driven to rotate, and then the screw rod 204 is driven to rotate, so that the screw rod 204 drives the lifting plate 202 to move upward or downward, and then the mounting assembly 1 is driven by the L-shaped plate 201 to move upward or downward, so as to complete the height adjustment of the mounting assembly 1, and then the convenience of use is improved.
[0031] In the description of the present specification, the description of the terms "one embodiment", "example", "specific example" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are contained in at least one embodiment or example of the present application. In the present specification, the illustrative description of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0032] The preferred embodiments of the above disclosed application are only used to help explain the application. The preferred embodiments do not describe all the details, nor limit the application to the specific embodiments described. Obviously, according to the content of the specification, many modifications and changes can be made. The specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the application, so that those skilled in the art can well understand and utilize the application. The application is limited by the claims and their entire scope and equivalents.
Claims
1. An apparatus for assisting in the installation of a foundation anchor bolt, comprising a mounting assembly (1); characterised in that: The installation assembly (1) comprises a pouring pipe (101), first notches (102) are symmetrically formed in the top of the pouring pipe (101), a positioning plate (103) is arranged between the two first notches (102), second notches (104) are symmetrically formed in the top of the positioning plate (103), a laying plate (105) is arranged between the two second notches (104), a plurality of positioning grooves (106) with diameters gradually decreasing and depths gradually deepening are uniformly formed in the top of the laying plate (105), an installation plate (107) is arranged in the inner bottom of the positioning groove (106), a plurality of first through holes (108) are uniformly formed in the top of the installation plate (107), a bolt (109) is slidably arranged in the first through hole (108), a nut (110) is threadedly connected to the outer side surface of the bolt (109) and located above the installation plate (107), and a plurality of second through holes (111) are formed in the inner bottom of each positioning groove (106) and concentrically arranged with the first through hole (108).
2. An equipment foundation anchor installation aid as defined in claim 1, wherein, The installation assembly (1) further comprises first handles (112) symmetrically and fixedly connected to the top of the positioning plate (103), and second handles (113) symmetrically and fixedly connected to the top of the laying plate (105).
3. An apparatus foundation anchor bolt installation aid as claimed in claim 2 wherein, The first handle (112) and the second handle (113) are both provided with anti-skid rubber sleeves on the outer side surfaces thereof.
4. An apparatus for assisting in the installation of foundation bolts according to claim 3, wherein, An outer side surface of the pouring pipe (101) is fixedly connected with a stable adjusting assembly (2), the stable adjusting assembly (2) comprises an L-shaped plate (201) fixedly connected to the outer side surface of the pouring pipe (101), and one side surface of the L-shaped plate (201) is fixedly connected with a lifting plate (202).
5. An apparatus for assisting in the installation of foundation anchor bolts according to claim 4, wherein, The stable adjusting assembly (2) further comprises a U-shaped plate (203), a screw rod (204) is rotatably arranged between the inner side surfaces of the opposite sides of the U-shaped plate (203), and the lifting plate (202) is threadedly connected to the outer side surface of the screw rod (204) and slidably connected to the inner top of the U-shaped plate (203).
6. An apparatus foundation anchor bolt installation aid as claimed in claim 5 wherein, A first gear (205) is fixedly connected to the top of the screw rod (204), a motor (206) is fixedly connected to the outer side surface of the U-shaped plate (203), a second gear (207) is fixedly connected to the output end of the motor (206), and the second gear (207) is in meshing connection with the first gear (205).
7. An apparatus foundation anchor bolt installation aid as claimed in claim 6 wherein, An installation head (208) is fixedly connected to the outer top of the U-shaped plate (203), and a guide groove (209) slidably connected with the lifting plate (202) is formed in the inner top of the U-shaped plate (203).