Multifunctional scaffold rapid building device

By using the insertion and bolt connection of the support frame, combined with the fixing of collars and nuts, the stability problem during rapid scaffolding construction is solved, providing a safe operating platform and preventing falls, thus achieving rapid scaffolding construction and stable use.

CN224048616UActive Publication Date: 2026-03-27TIBET MAGATANG CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-10
Publication Date
2026-03-27

AI Technical Summary

Technical Problem

Existing scaffolding lacks stability during rapid erection, and the snap-fit ​​connection method is prone to loosening, affecting safety during use.

Method used

It adopts a symmetrical support frame and side fixing rods, and achieves a quick and stable structural connection through plug-in and bolt connection, combined with collar and nut fixation, and is equipped with mounting components to provide a stable platform.

Benefits of technology

It enables rapid scaffolding erection and structural stability, reduces the risk of loosening, provides a safe operating platform, and prevents items from falling through perforated panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224048616U_ABST
    Figure CN224048616U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of scaffolds, in particular to a multifunctional scaffold rapid building device which comprises a left supporting frame body and a right supporting frame body which are mutually symmetrical, each supporting frame body is composed of a left stand column and a right stand column which are mutually symmetrical, and an upper cross beam rod and a lower cross beam rod which are mutually symmetrical are fixedly installed between the two stand columns. An inserting column is fixedly installed at the bottom end of the stand column, an inserting hole with the top communicated with the outside is formed in a top column body of the stand column, bolt holes communicated with the outside are formed in the top column body of the stand column and the inserting column, and studs are fixedly installed on the top column body and the bottom column body of the stand column. The left stand column and the right stand column are fixed through two side edge fixing rods, lantern rings are fixedly installed at the ends of the side edge fixing rods, studs are sleeved with the lantern rings, nuts are in threaded connection with the studs, and carrying assemblies are arranged on the upper left cross beam rod and the upper right cross beam rod and comprise carrying plates. According to the utility model, rapid building operation is facilitated, and the structure is firm and stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of scaffolding technology, and more specifically, to a multifunctional scaffolding rapid erection device. Background Technology

[0002] As an important piece of equipment in construction, scaffolding plays a crucial role in supporting construction workers, materials, and equipment, ensuring construction safety and improving efficiency. With the continuous advancement of construction technology and the increasing height of buildings, the performance requirements for scaffolding are also rising.

[0003] There are many types of scaffolding on the market. Most scaffolding can be assembled, but during assembly, the multiple supporting beams are often fixed together using snap-fit ​​joints. While this method allows for rapid assembly, it lacks stability, is prone to loosening, and further compromises safety. It fails to guarantee structural stability while enabling rapid assembly. Therefore, we propose a multi-functional rapid scaffolding assembly device. Utility Model Content

[0004] The purpose of this invention is to provide a multifunctional scaffolding rapid erection device to solve the defects mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution:

[0006] A multifunctional scaffolding rapid erection device includes two symmetrical support frames, each composed of two symmetrical uprights. Two symmetrical horizontal beams are fixedly installed between the two uprights. A plug-in post is fixedly installed at the bottom of each upright. A plug-in hole is provided in the top of each upright, connecting it to the outside. Bolt holes connecting to the outside are provided in both the top and bottom of each upright. Studs are fixedly installed on the top and bottom of each upright. The two uprights are fixed together by two side fixing rods. A collar is fixedly installed at the end of each side fixing rod, and the collar is fitted onto the stud. A nut is threaded onto the stud. A mounting assembly, including a mounting plate, is provided on the two upper horizontal beams.

[0007] Preferably, a ladder is fixedly installed between the upper and lower crossbeams, and the side of the ladder is fixedly installed on the corresponding column.

[0008] Preferably, the size of the plug pin is adapted to the size of the plug hole, and the depth of the plug hole is between 10cm and 15cm.

[0009] Preferably, the collar is sized to fit over the stud, and the nut compresses the collar against the stud.

[0010] Preferably, two front and rear symmetrical mounting hooks are fixedly installed on the left and right sides of the mounting plate, and the mounting hooks are clamped on the upper beam rod.

[0011] Preferably, a mesh plate is arranged at the center position of the mounting plate, and the mesh plate is a mesh-shaped plate body structure.

[0012] Preferably, a rectangular frame is fixedly installed on the upper surface of the mounting plate, and the rectangular frame is in a rectangular ring shape.

[0013] Preferably, a rectangular placement chamber is arranged between the rectangular frame and the mounting plate, and a solid plate is clamped and matched in the rectangular placement chamber.

[0014] Compared with the prior art, the utility model has the beneficial effects that:

[0015] 1、The utility model discloses a support frame body is set up and is supported left and right operation, and cooperation side fixed link is drawn and is positioned, and the nut is tightened after the sleeve ring is directly sleeved on the stud, realizes the fixed operation of completion, guarantees the stable effect of structure, has convenient quick erection and guarantees the effect of stable structure.

[0016] 2、The utility model discloses a mounting assembly, can provide the platform of personnel standing, through the mesh plate, is favorable to the effect of reducing weight, when needing, assembles solid plate, can play the effect of preventing the screw falling directly to the ground along the through -hole in the mesh plate during the operation process. DRAWINGS

[0017] Figure 1 It is the whole structure schematic diagram of the utility model;

[0018] Figure 2 It is the explosion structure schematic diagram of the utility model;

[0019] Figure 3 It is the utility model Figure 2 The enlarged view of A in the utility model;

[0020] Figure 4 It is the partial structure schematic diagram of the utility model;

[0021] Figure 5 It is the utility model Figure 4 The enlarged view of B in the utility model;

[0022] The meaning of each reference numeral in the drawing is that:

[0023] 1, support body; 10, stand; 11, plug-in column; 12, cross beam; 13, ladder; 14, plug-in hole; 15, bolt hole; 16, stud;

[0024] 2, side fixed rod; 20, collar; 21, nut;

[0025] 3, carrying assembly; 30, carrying plate; 31, mesh plate; 32, carrying hook; 33, rectangular frame; 34, rectangular placement chamber; 35, solid plate. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0027] Please refer to Figures 1-5 The utility model provides a kind of technical scheme: multifunctional scaffold quick erecting device, including left and right two mutually symmetrical support body 1, support body 1 is made of left and right two mutually symmetrical stand 10, two stands 10 between fixed installation have up and down two mutually symmetrical cross beam 12, the bottom of stand 10 is fixedly installed with plug-in column 11, the top of stand 10 column body is provided with the plug-in hole 14 that top is connected with outside, the top of stand 10 column body and plug-in column 11 are all provided with bolt hole 15 connected with outside, bolt hole 15 part is used for the insertion fixed operation of bolt, when up and down two support body 1 between assembly operation, after plug-in column 11 of upper side is inserted into plug-in hole 14 of lower side, bolt is used again through bolt hole 15 and is fixed using nut, reach the effect of assembly fixed between up and down two support body 1;

[0028] Specifically, the top and bottom column body of stand 10 are all fixedly installed with stud 16, left and right two stands 10 are fixed between by two side fixed rods 2, the end of side fixed rod 2 is fixedly installed with collar 20, collar 20 is sleeved on stud 16, stud 16 is screw-threaded with nut 21, realize convenient quick assembly operation, and nut 21 is tightened, can guarantee the stability of structure;

[0029] Specifically, left and right two cross beams 12 located in upper side are provided with carrying assembly 3, carrying assembly 3 includes carrying plate 30, front and rear two mutually symmetrical carrying hooks 32 are all fixedly installed on the left and right two sides of carrying plate 30, carrying hook 32 is clamped on the cross beam 12 of upper side, realize convenient assembly.

[0030] In this embodiment, a ladder 13 is fixedly installed between the upper and lower crossbeams 12, and the side of the ladder 13 is fixedly installed on the corresponding column 10. Climbing operations can be performed through the ladder 13.

[0031] Specifically, the size of the plug post 11 is adapted to the size of the plug hole 14, and the depth of the plug hole 14 is between 10cm and 15cm, so that the upper plug post 11 can be inserted into the lower plug hole 14 more stably.

[0032] Furthermore, the size of the collar 20 is adapted to the size of the stud 16, and the nut 21 presses the collar 20 onto the column 10 to achieve a stable fixing operation.

[0033] In addition, a perforated plate 31 is provided at the center of the mounting plate 30. The perforated plate 31 has a perforated plate structure, which helps to reduce weight.

[0034] It is worth noting that a rectangular frame 33 is fixedly installed on the upper surface of the mounting plate 30. The rectangular frame 33 is in the shape of a rectangular ring. A rectangular placement chamber 34 is provided between the rectangular frame 33 and the mounting plate 30. A solid plate 35 is snapped into the rectangular placement chamber 34. The solid plate 35 is used to block the through holes in the perforated plate 31, which can prevent screws from falling down and falling to the ground through the through holes in the perforated plate 31 during operation.

[0035] When using the multifunctional scaffolding quick erection device of this utility model, place the two support frames 1 vertically, then put the collar 20 on the two studs 16 on the left and right sides that are on opposite diagonals, then tighten the nut 21 on the stud 16, and finally attach the mounting hook 32 to the upper crossbeam 12 to complete the assembly operation. When needed, the solid plate 35 can be placed into the rectangular placement chamber 34 for use.

[0036] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely preferred examples and are not intended to limit the utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claimed utility model. The scope of protection of this utility model is defined by the appended claims and their equivalents.

Claims

1. A multifunctional scaffold rapid erection device, comprising two left and right symmetrical support frame bodies (1), characterized in that: The support frame body (1) is composed of two left and right symmetrical columns (10), two upper and lower symmetrical cross beams (12) are fixedly installed between the two columns (10), the bottom end of the column (10) is fixedly installed with a plug-in column (11), the top column body of the column (10) is provided with a plug-in hole (14) connected with the outside, the top column body of the column (10) and the plug-in column (11) are provided with bolt holes (15) connected with the outside, the top and bottom column bodies of the column (10) are fixedly installed with threaded columns (16), the left and right two columns (10) are fixed through two side fixed rods (2), the end of the side fixed rod (2) is fixedly installed with a sleeve ring (20), the sleeve ring (20) is sleeved on the threaded column (16), the threaded column (16) is threadedly connected with a nut (21), the left and right two cross beams (12) above are provided with a carrying assembly (3), the carrying assembly (3) comprises a carrying plate (30).

2. The multifunctional scaffold quick-erecting device according to claim 1, characterized in that: Two upper and lower cross beams (12) are fixedly installed between the two columns (10), and the side of the ladder (13) is fixedly installed on the corresponding column (10).

3. The multifunctional scaffold quick-erecting device according to claim 1, characterized in that: The size of the plug-in column (11) is matched with the size of the plug-in hole (14), and the depth of the plug-in hole (14) is 10cm~15cm.

4. The multifunctional scaffold quick-erecting device according to claim 1, characterized in that: The size of the sleeve ring (20) is matched with the size of the threaded column (16), and the nut (21) is pressed on the column (10).

5. The multi-functional scaffolding quick erection device, according to claim 1, wherein: The left and right sides of the carrying plate (30) are fixedly installed with two front and rear symmetrical carrying hooks (32), and the carrying hooks (32) are clamped on the cross beam (12) above.

6. The multi-functional scaffolding quick erection device, according to claim 1, wherein: The center of the carrying plate (30) is provided with a mesh plate (31), and the mesh plate (31) is a mesh plate structure.

7. The multi-functional scaffolding quick erection device according to claim 6, characterized in that: The upper surface of the carrying plate (30) is fixedly installed with a rectangular frame (33), and the rectangular frame (33) is a rectangular ring.

8. The multi-functional scaffolding quick-erecting device according to claim 7, characterized in that: The rectangular frame (33) and the carrying plate (30) are provided with a rectangular placing cavity (34), and the rectangular placing cavity (34) is provided with an entity plate (35).