Modularized integrated box house floor convenient to install
By combining the upper and lower fixed frame components, utilizing reinforced steel pipes and rebar mounting holes, and combining bolt connection components and hoisting components, the problem of easy damage to cement blocks fixed by steel pipes is solved, thereby improving the connection strength and structural stability of the cement base plate.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-09
- Publication Date
- 2026-04-10
AI Technical Summary
In existing technologies, cement blocks fixed with steel pipes are susceptible to damage from shear forces, leading to the problem of cement block damage.
The structure adopts a combination of upper and lower fixed frame components. The connection strength of the cement base plate is enhanced by the design of reinforced steel pipes and steel bar installation holes. The fixing and hoisting are carried out using bolt connection components and hoisting components.
It enhances the connection strength between the cement base plate and the fixed frame components, resists shear forces, prevents damage to cement blocks, and improves structural stability.
Smart Images

Figure CN224106793U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of integrated box room, more particularly, the utility model relates to a convenient installation modular integrated box room floor. BACKGROUND
[0002] Integrated box room is a modular and convenient installation building form. It divides the building space into multiple independent box modules. These modules are usually prefabricated in the factory, and after the installation of internal decoration, water and electricity and other facilities is completed, they are transported to the construction site for rapid splicing and assembly. Integrated box room has the characteristics of energy saving and environmental protection, reusability, convenient installation and disassembly, and flexible combination into different layouts, and is widely used in temporary buildings, construction dormitories, mobile homes, emergency shelters and other scenes, meeting the needs of people for convenient, efficient and environmentally friendly buildings.
[0003] After searching, the existing patent (publication number: CN215212081U) discloses a modular floor that can be quickly installed, which comprises a floor outer frame, a plurality of rectangular horizontal steel pipes are bolted inside the floor outer frame, a plurality of first rectangular vertical steel pipes are bolted between the floor outer frame and the rectangular horizontal steel pipes, and a plurality of second rectangular vertical steel pipes are bolted between two rectangular horizontal steel pipes; the utility model realizes the modularization of the steel structure integrated box room floor structure, facilitates the quick lapping of the floor module, is convenient for factory production, has high integration degree, is convenient for transportation and reduces cost, changes the floor structure into two identical modules, hoists and places them on the floor outer frame, ensures that the gap between the floor module and the top frame is small, the bearing capacity of the module meets the design and use requirements, and in addition, when secondary utilization is needed, the floor module only needs to be disassembled and handled by using a suction cup.
[0004] The device only uses steel pipes to fix the cement blocks, and this fixing method has certain defects. When the cement blocks are subjected to shear force, the steel pipes are difficult to effectively resist the force, causing the cement blocks to be easily damaged. UTILITY MODEL CONTENTS
[0005] In order to overcome the above-mentioned defects of the prior art, the utility model provides a convenient installation modular integrated box room floor to solve the problem of easy damage of steel pipe fixed cement block.
[0006] To solve the above technical problems, the utility model provides technical scheme as follows: A convenient installation modularization integrated box room floor, include: cement bottom plate, the upper fixed frame assembly of assembly on the cement bottom plate, the upper fixed frame assembly is used for fixing cement bottom plate, the lower fixed frame assembly of assembly on the bottom of the upper fixed frame assembly, the lower fixed frame assembly is used for fixing cement bottom plate with upper fixed frame assembly, the bolt connection assembly of assembly on the upper fixed frame assembly, the bolt connection assembly is used for connecting upper fixed frame assembly and lower fixed frame assembly, the hoisting assembly of assembly on the upper fixed frame assembly, the hoisting assembly is used for hoisting whole.
[0007] Preferably, the upper fixed frame assembly comprises: an upper fixed frame body assembled on the cement bottom plate, a reinforcing steel pipe one is fixedly installed inside the upper fixed frame body, a reinforcing steel pipe one is provided with a reinforcing steel installation hole two, and the upper fixed frame body is provided with a reinforcing steel installation hole one.
[0008] Preferably, the lower fixed frame assembly comprises: a lower fixed frame body arranged at the bottom of the upper fixed frame body, a reinforcing steel pipe two is fixedly installed on the lower fixed frame body, the lower fixed frame body is provided with a reinforcing steel installation hole three, the reinforcing steel pipe two is provided with a reinforcing steel installation hole four, and the lower fixed frame body is provided with a threaded hole.
[0009] Preferably, the bolt connection assembly comprises: a bolt installation hole provided on the upper fixed frame body, an installation bolt is threadedly connected in the bolt installation hole, and the bottom of the installation bolt is threadedly connected with the threaded hole.
[0010] Preferably, the hoisting assembly comprises: an extension block fixedly installed on the upper fixed frame body, and the extension block is provided with a hoisting hole.
[0011] Preferably, the reinforcing steel installation hole one and the reinforcing steel installation hole two are provided with multiple groups, and the multiple groups of reinforcing steel installation hole one and reinforcing steel installation hole two are equidistantly provided on the upper fixed frame body.
[0012] Preferably, the reinforcing steel installation hole three and the reinforcing steel installation hole four are provided with multiple groups, and the multiple groups of reinforcing steel installation hole three and reinforcing steel installation hole four are equidistantly provided on the lower fixed frame body and the reinforcing steel pipe two.
[0013] Preferably, the bolt connection assembly and the hoisting assembly are provided with four groups, and the four groups of bolt connection assembly and hoisting assembly are respectively arranged on the four corners of the upper fixed frame body.
[0014] Compared with the prior art, the utility model has the beneficial effects that:
[0015] This invention involves transporting a cement slab to the site, placing the upper fixing frame on top, and initially securing the slab with internal reinforcing steel pipes. Reinforcing bars are then inserted through the first and second reinforcing bar installation holes on the upper fixing frame and the first reinforcing steel pipe to enhance the connection strength. Next, the lower fixing frame is assembled, and reinforcing bars are inserted again through the third and fourth reinforcing bar installation holes on it and the second reinforcing steel pipe, further securing the cement slab in conjunction with the upper fixing frame assembly. Finally, the bolts in the bolt connection assembly are threaded into the threaded holes of the lower fixing frame to complete the fastening of the fixing frame assembly. During hoisting, the extension blocks and hoisting holes of the hoisting assembly are used for the hoisting operation. Inserting reinforcing bars into the respective reinforcing bar installation holes greatly enhances the connection strength between the cement slab and the fixing frame assembly, resists shear forces, prevents damage to the cement blocks, and improves structural stability. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the overall structure of this utility model;
[0017] Figure 2 This is a schematic diagram of the upper fixed frame assembly structure of this utility model;
[0018] Figure 3 This is a schematic diagram of the lower fixed frame assembly structure of this utility model;
[0019] Figure 4 This is a schematic diagram of the bolt connection assembly and hoisting assembly of this utility model.
[0020] [Figure Labels]
[0021] 1. Cement base slab; 2. Upper fixed frame assembly; 3. Lower fixed frame assembly; 4. Bolt connection assembly; 5. Lifting assembly; 201. Upper fixed frame body; 202. Reinforcing steel pipe one; 203. Rebar installation hole one; 204. Rebar installation hole two; 301. Lower fixed frame body; 302. Reinforcing steel pipe two; 303. Rebar installation hole three; 304. Rebar installation hole four; 305. Threaded hole; 401. Bolt installation hole; 402. Installation bolt; 501. Extension block; 502. Lifting hole. Detailed Implementation
[0022] The technical solutions of this utility model will be clearly and completely described below with reference to the embodiments of this utility model. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this utility model.
[0023] Example 1
[0024] A preferred embodiment of the conveniently installed modular integrated container room floor provided by this utility model is, for example... Figures 1 to 4 As shown, it includes: a cement base slab 1; an upper fixing frame assembly 2 assembled on the cement base slab 1, the upper fixing frame assembly 2 being used to fix the cement base slab 1; a lower fixing frame assembly 3 assembled at the bottom of the upper fixing frame assembly 2, the lower fixing frame assembly 3 being used to cooperate with the upper fixing frame assembly 2 to fix the cement base slab 1; a bolt connection assembly 4 assembled on the upper fixing frame assembly 2, the bolt connection assembly 4 being used to connect the upper fixing frame assembly 2 and the lower fixing frame assembly 3; and a lifting assembly 5 assembled on the upper fixing frame assembly 2, the lifting assembly 5 being used to lift the entire assembly.
[0025] In this embodiment, the upper fixed frame assembly 2 includes: an upper fixed frame body 201 assembled on a cement base plate 1, a first reinforcing steel pipe 202 fixedly installed inside the upper fixed frame body 201, a first reinforcing bar installation hole 203 opened on the upper fixed frame body 201, and a second reinforcing bar installation hole 204 opened on the first reinforcing steel pipe 202.
[0026] In this embodiment, the lower fixed frame assembly 3 includes: a lower fixed frame body 301 disposed at the bottom of the upper fixed frame body 201, a second reinforcing steel pipe 302 fixedly installed on the lower fixed frame body 301, a third reinforcing bar installation hole 303 opened on the lower fixed frame body 301, a fourth reinforcing bar installation hole 304 opened on the second reinforcing steel pipe 302, and a threaded hole 305 opened on the lower fixed frame body 301.
[0027] Example 2
[0028] Based on Embodiment 1, a preferred embodiment of the conveniently installed modular integrated container house floor provided by this utility model is as follows: Figures 1 to 4 As shown: The bolt connection assembly 4 includes: a bolt mounting hole 401 opened on the upper fixed frame body 201, a mounting bolt 402 is threadedly connected inside the bolt mounting hole 401, and the bottom of the mounting bolt 402 is threadedly connected to the threaded hole 305.
[0029] In this embodiment, the hoisting component 5 includes an extension block 501 fixedly installed on the upper fixed frame body 201, and the extension block 501 has a hoisting hole 502.
[0030] In this embodiment, multiple sets of rebar installation holes 1 203 and rebar installation holes 204 are provided, and the multiple sets of rebar installation holes 1 203 and rebar installation holes 204 are equidistantly provided on the upper fixed frame body 201.
[0031] In the embodiment, the steel bar mounting hole three 303 and the steel bar mounting hole four 304 are provided in multiple groups, and the multiple groups of steel bar mounting hole three 303 and the steel bar mounting hole four 304 are equidistantly provided on the lower fixed frame body 301 and the reinforcing steel pipe two 302.
[0032] In the embodiment, the bolt connecting assembly 4 and the hoisting assembly 5 are provided in four groups, and the four groups of bolt connecting assembly 4 and the hoisting assembly 5 are respectively arranged on four corners of the upper fixed frame body 201.
[0033] The cement bottom plate 1 is transported to the site, the upper fixed frame body 201 is placed on the cement bottom plate 1, the cement bottom plate 1 is preliminarily fixed by the internal reinforcing steel pipe one 202, and the steel bars are inserted into the steel bar mounting hole one 203 on the upper fixed frame body 201 and the steel bar mounting hole two 204 on the reinforcing steel pipe one 202 to enhance the connection strength. Then, the lower fixed frame body 301 is assembled, the steel bars are inserted into the steel bar mounting hole three 303 on the lower fixed frame body 301 and the steel bar mounting hole four 304 on the reinforcing steel pipe two 302 again, and the upper fixed frame assembly 2 is cooperated to further fix the cement bottom plate 1. Then, the bolt mounting hole 401 and the mounting bolt 402 in the bolt connecting assembly 4 are used for threaded connection with the threaded hole 305 of the lower fixed frame body 301, and the fastening of the fixed frame assembly is completed. During hoisting, the extension block 501 and the hoisting hole 502 of the hoisting assembly 5 are used for hoisting operation. The steel bars inserted into the steel bar mounting holes can greatly enhance the connection strength of the cement bottom plate 1 and the fixed frame assembly, resist the shearing force, avoid damage of the cement block, and improve the structural stability.
[0034] Finally, it should be pointed out that: first, in the description of the application, it should be pointed out that, unless otherwise specified and limited, the terms "mounting", "connection" and "connection" should be understood broadly, which can be mechanical connection or electrical connection, or the communication between two elements, or direct connection, "up", "down", "left", "right" and the like are only used to indicate the relative positional relationship, when the absolute position of the described object changes, the relative positional relationship may change;
[0035] Secondly: the utility model discloses the embodiment in the drawing, only relate to the structure involved in the embodiment of the present disclosure, other structures can refer to the usual design, under the condition of no conflict, the same embodiment and different embodiments of the utility model can be combined with each other;
[0036] Finally: the above only for the preferred embodiment of the utility model, and does not limit the utility model, any modification, equivalent replacement, improvement etc. made within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A modular integrated cabin floor for easy installation, characterized in that, The utility model relates to a cement bottom plate fixing frame assembly, including: Cement bottom plate (1); The upper fixed frame assembly (2) of being assembled on cement bottom plate (1), the upper fixed frame assembly (2) is used to fix cement bottom plate (1); The lower fixed frame assembly (3) of being assembled in the bottom of upper fixed frame assembly (2), the lower fixed frame assembly (3) is used to cooperate upper fixed frame assembly (2) and fix cement bottom plate (1); The bolt connection assembly (4) of being assembled on upper fixed frame assembly (2), the bolt connection assembly (4) is used to connect upper fixed frame assembly (2) and lower fixed frame assembly (3); Hoisting assembly (5) of being assembled on upper fixed frame assembly (2), hoisting assembly (5) is used to hoist the whole.
2. A modular integrated portable housing floor as claimed in claim 1, wherein, The upper fixed frame assembly (2) includes: The upper fixed frame body (201) of being assembled on cement bottom plate (1), the inside fixed mounting of upper fixed frame body (201) has reinforced steel pipe no.
3. A modular integrated portable housing floor as claimed in claim 2, wherein, The lower fixed frame assembly (3) includes: The lower fixed frame body (301) of being arranged in the bottom of upper fixed frame body (201), the lower fixed frame body (301) is fixedly installed with reinforced steel pipe no.
4. A modular integrated portable housing floor as claimed in claim 3, wherein, The bolt connection assembly (4) includes: The bolt mounting hole (401) of being set up on upper fixed frame body (201), the inside threaded connection of bolt mounting hole (401) has installation bolt (402), the bottom of installation bolt (402) is threadedly connected with threaded hole (305).
5. A modular integrated portable housing floor as claimed in claim 4, wherein, The hoisting assembly (5) includes: The extension block (501) of being fixedly installed on upper fixed frame body (201), the hoisting hole (502) of being set up on extension block (501).
6. A floor for a modular integrated portable building according to claim 2, wherein, The steel bar mounting hole no.
7. A modular integrated portable housing floor as claimed in claim 4, wherein, The steel bar mounting hole no.
8. The modular integrated portable housing floor of claim 2, wherein, The bolt connection assembly (4) and hoisting assembly (5) are provided with four groups, and four groups of bolt connection assembly (4) and hoisting assembly (5) are respectively arranged on the four corners of upper fixed frame body (201).
Citation Information
Patent Citations
Modularized floor capable of being rapidly installed
CN215212081U