Building greening curtain wall capable of being rapidly installed

The combination structure of mounting plate, connecting column, pin and compression spring solves the problem of complicated installation of existing green curtain walls, realizes rapid installation and disassembly, enhances safety and provides cushioning protection.

CN224119772UActive Publication Date: 2026-04-14CHINA URBAN CONSTR (FUJIAN) ARCHITECTURAL DESIGN & RES INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-23
Publication Date
2026-04-14

AI Technical Summary

Technical Problem

The installation of existing green curtain walls for buildings is complicated, cannot be done quickly, poses safety hazards, and reduces installation efficiency.

Method used

The device employs a combination structure of mounting plate, connecting post, pin, and compression spring. Quick installation is achieved through the engagement of the pin and connecting hole; the L-shaped connecting bracket and the first connecting slot enable quick connection of the plant box; and the combination of the back plate and T-shaped connecting rod provides a cushioning function.

Benefits of technology

It enables rapid installation and dismantling of green building curtain walls, improving installation efficiency, enhancing safety, and providing cushioning protection when subjected to external impacts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224119772U_ABST
    Figure CN224119772U_ABST
Patent Text Reader

Abstract

The utility model discloses a building greening curtain wall capable of being rapidly installed, and relates to the technical field of curtain walls, the building greening curtain wall comprises a curtain wall main body, a green plant box and an installing plate, the front end of the curtain wall main body is provided with a first connecting groove, the back of the green plant box is provided with an L-shaped connecting frame, the back of the curtain wall main body is provided with a connecting column, and the connecting column is provided with a second connecting groove. A connecting base is arranged on one side of the mounting plate, a second connecting groove is formed in the center of the connecting base, a connecting hole is formed in the side wall of the connecting column, a second mounting cavity is formed in the connecting base, a plug pin is arranged in the second mounting cavity, and a second compression spring is arranged in the second mounting cavity. According to the building greening curtain wall, through mutual cooperative use of the mounting plate, the connecting column and the connecting base, the curtain wall can be quickly mounted and used, follow-up dismounting, maintaining and maintaining of the curtain wall are facilitated, the working intensity of workers is reduced, and the mounting efficiency of the building greening curtain wall is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of curtain wall technology, specifically to a building greening curtain wall that can be quickly installed. Background Technology

[0002] A curtain wall is the exterior cladding of a building. It is non-load-bearing, hanging like a curtain, and is a lightweight, decorative wall commonly used in modern large and high-rise buildings. It consists of a structural frame and inlaid panels, and does not bear the load or action of the main structural element. Green curtain walls, also known as plant walls or green curtain walls, are an innovative form of greening in modern architecture. They create a vertical greening effect by having plants climb, fix, modularly plant, or hang along the building's facade. As an important component of green building, green curtain walls not only possess aesthetic appeal but also functionality and environmental friendliness.

[0003] Chinese Patent Publication No. CN221784746U, authorized on October 1, 2024, describes an ecological building green curtain wall, comprising: greening plant containers, a water-resistant plate, absorbent cotton swabs, a siphon pipe, a drainage spring pipe, an irrigation inlet pipe, and an installation wall. Multiple greening plant containers are stacked and fixed to the installation wall; the containers have identical structures; the absorbent cotton swabs are fixed to the water-resistant plate; the inner bottom surface of each greening plant container has a container drainage pipe and scattering fins; the siphon pipe is fixed to the container drainage pipe; the drainage spring pipe is connected to the drainage pipe; and the drainage spring pipe irrigates the greening plant containers located below. The scattering fins in this technical solution prevent the water temperature inside the greening container from being too high and scalding the plant roots; the absorbent cotton swabs filter the water and keep the soil moist; the siphon tube drains water when the water level is too high, preventing waterlogging of the greening plant due to excessive water volume inside the container; thus providing a stable and suitable growing environment for the greening plants.

[0004] Most existing green building curtain walls are installed using screws, which is a complicated and slow process. Construction workers cannot fully inspect and prepare for the installation details, resulting in safety hazards, reduced installation efficiency, and failure to meet usage requirements. Utility Model Content

[0005] The purpose of this utility model is to provide a building green curtain wall that can be installed quickly, in order to solve the problems mentioned in the background art, that most existing building green curtain walls are installed by screws, which is complicated and cannot be installed quickly. Construction workers cannot fully check and prepare for the installation details, the installed building green curtain wall has safety hazards, reduces the installation efficiency of building green curtain walls, and cannot meet the needs of use.

[0006] To achieve the above objectives, this utility model provides the following technical solution: a quickly installable green building curtain wall, comprising a curtain wall body, a plant box, and a mounting plate. The front end of the curtain wall body is provided with a first connecting groove. Two L-shaped connecting frames are provided on the back of the plant box, and the L-shaped connecting frames are connected to the plant box by screws. The L-shaped connecting frames correspond to the first connecting groove and are snapped into the mounting plate. A connecting column is provided on the back of the curtain wall body, and one end of the connecting column is fixedly connected to the curtain wall body. A connecting seat is provided on one side of the mounting plate, and the connecting seat is fixedly connected to the mounting plate. A second connecting groove is provided at the center of the connecting seat. The other end of the connecting post extends into the interior of the second connecting groove, and the connecting post is slidably connected to the mounting plate. A connecting hole is provided on the side wall of the connecting post. A second mounting cavity is provided inside the connecting seat. There are two second mounting cavities, and the two second mounting cavities are located on both sides of the second connecting groove. The second mounting cavity is connected to the second connecting groove. A pin is provided inside the second mounting cavity, and the pin is slidably connected to the connecting seat. The pin is correspondingly provided with the connecting hole. A second compression spring is provided inside the second mounting cavity, and the second compression spring is located outside the pin. The two ends of the second compression spring are respectively attached to the connecting seat and the pin. One end of the pin is arc-shaped.

[0007] Preferably, mounting bolts are provided on one side of each of the four corners of the mounting plate, and the mounting bolts are connected through the mounting plate. Vibration damping pads are provided on the back of the mounting plate, and the vibration damping pads are in close contact with the mounting plate.

[0008] Preferably, the inner wall of the second connecting groove is provided with a sliding groove, and there are two sliding grooves. Both sides of the connecting column are provided with protruding strips, and there are two protruding strips. The protruding strips are fixedly connected to the connecting column. The protruding strips are correspondingly provided with the sliding grooves, and the protruding strips are slidably connected to the connecting seat.

[0009] Preferably, a first mounting cavity is provided on the back of the curtain wall body, a back plate is provided inside the first mounting cavity, and the back plate is movably connected to the curtain wall body. A first compression spring is provided inside the first mounting cavity, and the two ends of the first compression spring are fixedly connected to the curtain wall body and the back plate, respectively.

[0010] Preferably, the curtain wall body has an internal telescopic cavity that is connected to the first mounting cavity. The telescopic cavity has a T-shaped connecting rod that is slidably connected to the curtain wall body. The T-shaped connecting rod is connected to the back panel by screws.

[0011] Preferably, a sealing strip is provided at the contact point between the back panel and the curtain wall body, and the sealing strip is located on the outside of the back panel.

[0012] Preferably, the green building curtain wall further includes connecting blocks, and reserved grooves are provided at the four corners of the curtain wall body. The connecting blocks are correspondingly provided with the reserved grooves. The connecting blocks are inserted into the curtain wall body. The cross-section of the connecting blocks is I-shaped, and the cross-section of the reserved grooves is T-shaped.

[0013] Compared with the prior art, the beneficial effects of this utility model are:

[0014] 1. This utility model device, through the arrangement of an installation plate, an installation bolt, a connecting column, a connecting seat, a pin, a connecting hole, and a second compression spring, fixes the installation plate to the wall with the installation bolt. The connecting column is inserted into the second connecting groove. The inserted connecting column contacts the pin and applies pressure. Under the action of pressure, the pin is first pressed into the second installation cavity. After the connecting column is fully inserted into the second connecting groove, the second compression spring applies a pushing force to the pin. Under the action of the pushing force, the pin is pushed into the connecting hole, limiting the connecting column inserted into the second connecting groove, thereby realizing the installation of the curtain wall and the building wall.

[0015] 2. The utility model device, through the setting of the first connecting groove and the L-shaped connecting bracket, the L-shaped connecting bracket is aligned with the first connecting groove and inserted to quickly connect the green plant box to the main body of the curtain wall, which facilitates the subsequent removal, cleaning and replacement of the green plant box;

[0016] 3. The utility model device, through the setting of a back plate, a first compression spring and a T-shaped connecting rod, connects the back plate to the main body of the curtain wall, so that the installed curtain wall has a buffering effect. When subjected to external impact, the first compression spring will buffer the impact and improve the performance of the green curtain wall. Attached Figure Description

[0017] Figure 1 This is the main view of the present invention.

[0018] Figure 2 This is a rear view structural diagram of the present invention;

[0019] Figure 3 This is a structural diagram of the connection between the connecting column and the mounting plate of this utility model;

[0020] Figure 4 This is a three-dimensional view of the plant box of this utility model;

[0021] Figure 5 This diagram shows the connection relationship between the main body of the curtain wall, the plant box, and the back panel of this utility model.

[0022] Figure 6 For the present utility model Figure 2 A magnified view of a portion of area A;

[0023] Figure 7 This is a cross-sectional view of the connection between the connecting column and the connecting seat of this utility model;

[0024] Figure 8 This is a diagram showing the connection relationship between the connecting column and the connecting seat of this utility model.

[0025] In the diagram: 1. Curtain wall main body; 2. Green plant box; 3. First connecting groove; 4. Reserved groove; 5. Connecting block; 6. Mounting plate; 7. Mounting bolt; 8. Vibration damping pad; 9. Back plate; 10. Connecting column; 11. Connecting seat; 12. Second connecting groove; 13. Protruding strip; 14. Pin; 15. L-shaped connecting frame; 16. First mounting cavity; 17. Telescopic cavity; 18. T-shaped connecting rod; 19. First compression spring; 20. Sealing strip; 21. Second mounting cavity; 22. Connecting hole; 23. Slide groove; 24. Second compression spring. Detailed Implementation

[0026] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.

[0027] Please see Figure 1-8 This utility model provides an embodiment of a quickly installable green building curtain wall, comprising a curtain wall body 1, a plant box 2, and a mounting plate 6. The front end of the curtain wall body 1 is provided with a first connecting groove 3. Two L-shaped connecting frames 15 are provided on the back of the plant box 2, and the L-shaped connecting frames 15 are connected to the plant box 2 by screws. The L-shaped connecting frames 15 correspond to the first connecting groove 3 and are snapped into the mounting plate 6. A connecting column 10 is provided on the back of the curtain wall body 1, and one end of the connecting column 10 is fixedly connected to the curtain wall body 1. A connecting seat 11 is provided on one side of the mounting plate 6, and the connecting seat 11 is fixedly connected to the mounting plate 6. A second connecting groove 12 is provided at the center of the connecting seat 11. The other end of the connecting column 10 extends into the interior of the second connecting groove 12, and the connecting column 10 is slidably connected to the mounting plate 6. The side wall of the mounting plate 6 is provided with a connecting hole 22. The interior of the connecting seat 11 is provided with a second mounting cavity 21. There are two second mounting cavities 21, which are located on both sides of the second connecting groove 12. The second mounting cavity 21 is connected to the second connecting groove 12. The interior of the second mounting cavity 21 is provided with a pin 14, which is slidably connected to the connecting seat 11. The pin 14 is correspondingly provided with the connecting hole 22. The interior of the second mounting cavity 21 is provided with a second compression spring 24, which is located outside the pin 14. The two ends of the second compression spring 24 are respectively attached to the connecting seat 11 and the pin 14. One end of the pin 14 is arc-shaped. The four corners of the mounting plate 6 are provided with mounting bolts 7, which are connected to the mounting plate 6. The back of the mounting plate 6 is provided with a vibration damping pad 8, which is attached to the mounting plate 6.

[0028] In use: First, use the mounting bolts 7 to fix the mounting plate 6 to the wall. Align the connecting post 10 with the second connecting groove 12 and insert it. The inserted connecting post 10 contacts the pin 14 and applies pressure. Under the pressure, the pin 14 is first pressed into the second mounting cavity 21. After the connecting post 10 is fully inserted into the second connecting groove 12, the second compression spring 24 applies a pushing force to the pin 14. Under the pushing force, the pin 14 is pushed into the connecting hole 22, limiting the connecting post 10 inserted into the second connecting groove 12, thus realizing the installation of the curtain wall and the building wall. Align the L-shaped connecting bracket 15 with the first connecting groove 3 and insert it to connect the green plant box 2 to the curtain wall body 1. Plant the green plants into the green plant box 2, which can realize the rapid installation of the green curtain wall.

[0029] Please see Figure 3 and Figure 7 The inner wall of the second connecting groove 12 is provided with a sliding groove 23. There are two sliding grooves 23. Both sides of the connecting post 10 are provided with protruding strips 13. There are two protruding strips 13. The protruding strips 13 are fixedly connected to the connecting post 10. The protruding strips 13 are correspondingly provided with the sliding grooves 23. The protruding strips 13 are slidably connected to the connecting seat 11. The protruding strips 13 are aligned with the sliding grooves 23 and slide into them to limit the insertion of the connecting post 10 and ensure the connection stability between the connecting post 10 and the connecting seat 11.

[0030] Please see Figure 5 The curtain wall body 1 has a first mounting cavity 16 on its back. A back plate 9 is installed inside the first mounting cavity 16 and is movably connected to the curtain wall body 1. A first compression spring 19 is installed inside the first mounting cavity 16, and its two ends are fixedly connected to the curtain wall body 1 and the back plate 9, respectively. The curtain wall body 1 has a telescopic cavity 17 inside, and the telescopic cavity 17 is connected to the first mounting cavity 16. A T-shaped connecting rod 18 is installed inside the telescopic cavity 17 and is slidably connected to the curtain wall body 1. The T-shaped connecting rod 18 is connected to the back plate 9 by screws. A sealing strip 20 is installed at the contact point between the back plate 9 and the curtain wall body 1, and the sealing strip 20 is located on the outside of the back plate 9. The T-shaped connecting rod 18 and the first compression spring 19 connect the back plate 9 and the curtain wall body 1, so that the installed curtain wall has a buffering effect. When subjected to external impact, the first compression spring 19 is used to buffer the impact, thereby improving the performance of the green curtain wall.

[0031] Please see Figure 2 and Figure 6The green building curtain wall also includes connecting blocks 5. There are reserved grooves 4 at the four corners of the curtain wall body 1, and the connecting blocks 5 are set in correspondence with the reserved grooves 4. The connecting blocks 5 are inserted into the curtain wall body 1. The cross section of the connecting blocks 5 is I-shaped, and the cross section of the reserved grooves 4 is T-shaped. The connecting blocks 5 are aligned with the reserved grooves 4 and inserted into the curtain wall body 1. The connecting blocks 5 can splice two adjacent green building curtain walls into one. This method can splice multiple green building curtain walls together and improve the effect of the installed green building curtain wall.

[0032] Working principle: First, use the mounting bolts 7 to fix the mounting plate 6 to the wall. Then, insert the connecting post 10 into the second connecting groove 12. The inserted connecting post 10 contacts the pin 14, applying pressure. Under this pressure, the pin 14 is first pressed into the second mounting cavity 21. After the connecting post 10 is fully inserted into the second connecting groove 12, the second compression spring 24 applies a pushing force to the pin 14, pushing it into the connecting hole 22. This limits the position of the connecting post 10 inserted into the second connecting groove 12, thus achieving the installation of the curtain wall and the building wall. The L-shaped connecting bracket 15 is aligned with the first connecting groove 3. Insert the greening box 2 to the curtain wall body 1, plant the green plants into the greening box 2, and realize the rapid installation of the green curtain wall; the T-shaped connecting rod 18 and the first compression spring 19 connect the back plate 9 to the curtain wall body 1, so that the installed curtain wall has a buffering effect, and the first compression spring 19 will buffer when subjected to external impact; the connecting block 5 is inserted into the reserved groove 4 and connected to the curtain wall body 1. The connecting block 5 can splice two adjacent green curtain walls into one, and multiple green curtain walls can be spliced ​​together to improve the effect of the installed green curtain wall.

[0033] The contents not described in detail in this specification are existing technologies known to those skilled in the art.

[0034] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A quick-installable green building curtain wall, comprising a curtain wall body (1), a plant box (2), and a mounting plate (6), characterized in that: The front end of the curtain wall body (1) is provided with a first connecting groove (3), and the back of the plant box (2) is provided with an L-shaped connecting frame (15). There are two L-shaped connecting frames (15), and the L-shaped connecting frames (15) are connected to the plant box (2) by screws. The L-shaped connecting frames (15) are correspondingly provided with the first connecting groove (3), and the L-shaped connecting frames (15) are snapped into the mounting plate (6). The back of the curtain wall body (1) is provided with a connecting column (10), and one end of the connecting column (10) is fixedly connected to the curtain wall body (1). One side of the mounting plate (6) is provided with a connecting seat (11), and the connecting seat (11) is fixedly connected to the mounting plate (6). The center of the connecting seat (11) is provided with a second connecting groove (12), and the other end of the connecting column (10) extends into the interior of the second connecting groove (12), and the connecting column (10) slides into the mounting plate (6). The connecting column (10) has a connecting hole (22) on its side wall. The connecting seat (11) has a second mounting cavity (21) inside. There are two second mounting cavities (21), and the two second mounting cavities (21) are located on both sides of the second connecting groove (12). The second mounting cavity (21) is connected to the second connecting groove (12). The second mounting cavity (21) has a pin (14) inside, and the pin (14) is slidably connected to the connecting seat (11). The pin (14) is correspondingly set with the connecting hole (22). The second mounting cavity (21) has a second compression spring (24) inside, and the second compression spring (24) is located outside the pin (14). The two ends of the second compression spring (24) are respectively attached to the connecting seat (11) and the pin (14). One end of the pin (14) is arc-shaped.

2. The building greening curtain wall that can be quickly installed according to claim 1, characterized in that: Mounting bolts (7) are provided on one side of each of the four corners of the mounting plate (6), and the mounting bolts (7) are connected to the mounting plate (6). Vibration damping pads (8) are provided on the back of the mounting plate (6), and the vibration damping pads (8) are attached to the mounting plate (6).

3. The building greening curtain wall that can be quickly installed according to claim 1, characterized in that: The inner wall of the second connecting groove (12) is provided with a sliding groove (23), and there are two sliding grooves (23). Both sides of the connecting column (10) are provided with protruding strips (13), and there are two protruding strips (13). The protruding strips (13) are fixedly connected to the connecting column (10). The protruding strips (13) are correspondingly provided with the sliding grooves (23), and the protruding strips (13) are slidably connected to the connecting seat (11).

4. The building greening curtain wall that can be quickly installed according to claim 1, characterized in that: The back of the curtain wall body (1) is provided with a first mounting cavity (16), and a back plate (9) is provided inside the first mounting cavity (16). The back plate (9) is movably connected to the curtain wall body (1). A first compression spring (19) is provided inside the first mounting cavity (16), and the two ends of the first compression spring (19) are fixedly connected to the curtain wall body (1) and the back plate (9) respectively.

5. A building greening curtain wall that can be quickly installed according to claim 4, characterized in that: The curtain wall body (1) is provided with a telescopic cavity (17) inside, and the telescopic cavity (17) is connected to the first mounting cavity (16). The telescopic cavity (17) is provided with a T-shaped connecting rod (18) inside, and the T-shaped connecting rod (18) is slidably connected to the curtain wall body (1). The T-shaped connecting rod (18) is connected to the back panel (9) by screws.

6. A building greening curtain wall that can be quickly installed according to claim 5, characterized in that: A sealing strip (20) is provided at the contact point between the back panel (9) and the curtain wall body (1), and the sealing strip (20) is located on the outside of the back panel (9).

7. A building greening curtain wall that can be quickly installed according to claim 1, characterized in that: The green building curtain wall also includes a connecting block (5). A reserved groove (4) is provided at each of the four corners of the curtain wall body (1). The connecting block (5) is correspondingly provided with the reserved groove (4). The connecting block (5) is inserted into the curtain wall body (1). The cross section of the connecting block (5) is I-shaped, and the cross section of the reserved groove (4) is T-shaped.

Citation Information

Patent Citations

  • Ecological building greening curtain wall

    CN221784746U