Scribing equipment for bridge construction
By introducing components such as hydraulic shock absorbers, handlebars, handbrakes, foot brakes, paint cans, spray nozzles, and obstacle clearing plates into the bridge construction marking equipment, the problems of equipment slippage, uneven spraying, and insufficient obstacle clearing during bridge construction have been solved, achieving safe, uniform spraying and efficient obstacle clearing.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SUZHOU YUHAO ENG TECH CO LTD
- Filing Date
- 2025-05-16
- Publication Date
- 2026-04-24
AI Technical Summary
The existing bridge construction marking equipment lacks warning devices and obstacle removal measures, and does not consider the impact of bridge slope on spraying and the problem of vehicle slippage.
A bridge construction marking device was designed, equipped with components such as a hydraulic shock absorber, handlebars, handbrake, foot brake, paint can, spray nozzle, obstacle clearing plate, and warning lights, to solve problems such as vehicle slippage, uneven spraying, and obstacle clearing.
It effectively prevents equipment slippage, ensures uniform coating, improves equipment safety and work efficiency, enhances adaptability to bridge slopes, provides obstacle removal and warning functions, and improves endurance.
Smart Images

Figure CN224160960U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of road marking technology, and in particular to a bridge construction marking device. Background Technology
[0002] Road marking machines are a type of road construction machinery widely used on roads, highways, parking lots, squares and runways to mark different rules and restrictions such as constraints, guidance and warnings on flat ground. However, bridges, as a special type of road surface, may require a different marking machine to suit the specific needs of the environment.
[0003] A search revealed Chinese patent application CN 202410194875.3, which discloses a bridge construction marking device, including a vehicle body, a material box, a slide bar, and nozzles. The bridge construction marking device described in the aforementioned document has the following shortcomings:
[0004] 1. Lack of warning equipment.
[0005] 2. The device lacks obstacle removal measures, so the road surface needs to be cleared in advance.
[0006] 3. The device does not take into account issues such as bridge slope, and does not provide corresponding solutions for problems such as vehicle slippage and spraying caused by slope. Utility Model Content
[0007] The purpose of this invention is to address the shortcomings of existing technologies by proposing a bridge construction marking device.
[0008] To achieve the above objectives, the present invention adopts the following technical solution:
[0009] A bridge construction marking device includes a chassis. A pair of hydraulic shock absorbers are installed at both ends of the front side of the chassis bottom, with a front wheel mounted on the outward-facing side of each shock absorber. A rear wheel is bolted to the rear side of the chassis bottom, and a handlebar is connected to the rear wheel. The handlebar controls the rotation of the rear wheel, and a grip is located at the top end of the handlebar. A handbrake is located on one side of the grip. A foot brake is also installed behind the rear wheel; both the foot brake and the handbrake control the rear wheel. A paint tank is fixed to the top of the chassis with screws. The paint tank has an exhaust port away from the handlebar, and a feed port is located on the top of the paint tank. The feed port has a handle for easy opening. A discharge port is installed on the lower side of the paint tank.
[0010] As a further embodiment of this utility model: a cover plate is installed on the outside of the discharge port by a hinge, the cover plate is connected to a lifting iron bar, and a discharge gate is installed on the other end of the lifting iron bar by bolts.
[0011] As a further embodiment of this utility model: a fixing rod is fixedly installed on the bottom side of the chassis at the discharge port, and a funnel is fixedly connected to the fixing rod. The funnel and the outlet of the discharge port are aligned. A cantilever is installed on the funnel in a swingable manner. A nozzle is installed on the cantilever. A row of nozzles is provided on the bottom surface of the nozzle. The nozzle is flexibly connected to the output end of the funnel through a hose.
[0012] As a further improvement of this utility model: a detachable connector is installed on the front side of the chassis, a telescopic rod is fixedly installed on the connector, and a clearing plate is installed on the other end of the telescopic rod.
[0013] As a further improvement of this utility model: a power supply mechanism is installed on the upper surface of the chassis, and the power supply mechanism is connected to a heating pad via a wire and installed below the paint tank. A spare material tank is detachably installed on the power supply mechanism.
[0014] As a further improvement of this utility model: a warning light bracket is installed on one side of the chassis, and a warning light is provided on the top of the warning light bracket.
[0015] As a further improvement of this utility model, the paint tank is provided with several protective bars on its outer side.
[0016] As a further improvement of this utility model, a stirring rod penetrating the interior of the paint tank is also provided at the top of the paint tank.
[0017] The beneficial effects of this utility model are as follows:
[0018] 1. By installing hydraulic shock absorbers, the impact of the road surface on the device can be reduced during driving. The handlebars and grips can control the direction of the rear wheel. The handbrake can assist the staff in manually braking. The foot brake serves as a parking device to prevent the device from slipping on the bridge surface and causing accidents. The paint tank can store the marking paint. The vent can promptly dissipate the heat generated in the paint tank. The feed port facilitates the addition of paint.
[0019] 2. By setting a discharge port, the heated and melted paint can be guided out of the paint tank; the cover plate can be closed by manually pulling the discharge gate to drive the lifting iron bar, so that the paint will not flow out of the paint tank.
[0020] 3. By setting a fixing rod, the funnel can be fixed on the device. The paint is fed into the spray head through the hose by the funnel, and then sprayed onto the construction surface by the nozzle. The cantilever can keep the spray head facing the construction surface under the action of gravity, so as to avoid the slope of the bridge from affecting the spraying of the device.
[0021] 4. By setting up a clearing plate, debris on the travel route can be cleared before spraying, ensuring the normal operation of the line marking work. The sharp corners of the clearing plate can also serve as guide markers, allowing workers to position the line marking device in advance by using the sharp corners. At the same time, the telescopic rod can adjust the height of the clearing plate according to the road surface to adapt to different road conditions. Furthermore, if the clearing facility is not needed, the mechanism can be removed from the device by removing the connecting parts.
[0022] 5. By setting up a power supply mechanism, electricity can be transmitted to the heating pad, which heats the paint can. At the same time, the spare material tank set above the power supply mechanism can store excess paint, increasing the total amount of paint carried and thus improving the endurance of the marking process.
[0023] 6. By setting warning lights, the device can serve as a warning during operation, alerting surrounding vehicles and pedestrians to avoid it.
[0024] 7. By installing protective bars, it is possible to effectively prevent personnel from accidentally coming into contact with the tank and avoid burns.
[0025] 8. The stirring rod can stir the added paint in the tank, allowing it to be heated evenly. Attached Figure Description
[0026] Figure 1 This is an isometric schematic diagram of a bridge construction marking device proposed in this utility model;
[0027] Figure 2 This is a side view of a bridge construction marking device proposed in this utility model;
[0028] Figure 3 This is a front view of a bridge construction marking device proposed in this utility model.
[0029] In the diagram: 1-Chassis, 101-Hydraulic shock absorber, 102-Front wheel, 103-Rear wheel, 104-Handlebar, 105-Grip handle, 106-Handbrake, 107-Pedal brake, 2-Paint tank, 201-Guard bar, 202-Exhaust port, 203-Feeding port, 204-Agitator rod, 205-Discharge port, 206-Cover plate, 207-Lifting iron bar, 208-Discharge gate, 3-Function hopper, 301-Cantilever, 302-Sprayer assembly, 303-Nozzle, 304-Fixing rod, 4-Connector, 401-Telescopic rod, 402-Clearing plate, 5-Power supply mechanism, 501-Heating pad, 6-Spare material tank, 7-Warning light, 701-Warning light bracket. Detailed Implementation
[0030] The technical solution of this utility model will be further described in detail below with reference to specific embodiments.
[0031] The embodiments of this utility model are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this utility model, and should not be construed as limiting this utility model.
[0032] Example 1
[0033] A bridge construction marking device, such as Figure 1-3 As shown, the device includes a chassis 1. A pair of hydraulic shock absorbers 101 are installed at both ends of the front bottom of the chassis 1. A front wheel 102 is mounted on the outward-facing side of the hydraulic shock absorbers 101. A rear wheel 103 is bolted to the rear bottom of the chassis 1. The rear wheel 103 is connected to a handlebar 104, which controls the rotation of the rear wheel 103. A grip 105 is located at the top end of the handlebar 104, and a handbrake 106 is located on one side of the grip 105. A foot brake 107 is also installed behind the rear wheel 103. Both the pressure brake 107 and the handbrake 106 can control the rear wheel 103; a paint tank 2 is fixedly installed on the top of the chassis 1 by screws, and several protective rods 201 are provided on the outside of the paint tank 2. An exhaust port 202 is provided on the paint tank 2 away from the handle 105. A feed port 203 is provided on the top of the paint tank 2, and the feed port 203 has a handle for easy opening; a stirring rod 204 is also provided at the top of the paint tank 2, penetrating the inside of the paint tank 2, and a discharge port 205 is installed on the lower side of the paint tank 2.
[0034] In this embodiment, the hydraulic shock absorber 101 can reduce the impact of the road surface on the device during driving. The handlebars 104 and grips 105 can control the direction of the rear wheel 103. The handbrake 106 can assist the staff in manually braking. The foot brake 107 serves as a parking device to prevent the device from slipping on the bridge surface and causing accidents. The paint tank 2 can store the paint for marking lines. The protective rod 201 can effectively prevent personnel from accidentally contacting the tank and avoiding burns. The vent 202 can promptly dissipate the heat generated in the paint tank 2. The feed port 203 facilitates the addition of paint. The stirring rod 204 can stir the added paint in the tank to ensure even heating.
[0035] Specifically, a cover plate 206 is installed on the outside of the discharge port 205 via a hinge, and a lifting iron bar 207 is connected to the cover plate 206. A discharge gate 208 is installed at the other end of the lifting iron bar 207 via bolts.
[0036] In this embodiment, the discharge port 205 can guide the heated and melted paint to be discharged from the paint tank 2; the cover plate 206 can be closed by manually pulling the discharge gate 208 to drive the lifting iron bar 207, so that the paint will not flow out of the paint tank 2.
[0037] Specifically, a fixing rod 304 is fixedly installed on the bottom side of the discharge port 205 of the chassis 1. The fixing rod 304 is fixedly connected to the funnel 3. The funnel 3 is aligned with the outlet of the discharge port 205. The funnel 3 is swayably mounted with a cantilever 301. The cantilever 301 is equipped with a nozzle 302. A row of nozzles 303 is provided on the bottom surface of the nozzle 302. The nozzle 302 is flexibly connected to the output end of the funnel 3 through a hose.
[0038] In this embodiment, by setting a fixing rod 304, the funnel 3 can be fixed on the device. The paint is fed into the spray head 302 through the hose by the funnel 3, and then sprayed onto the construction surface by the nozzle 303. The cantilever 301 can keep the spray head 302 facing the construction surface under the action of gravity, so as to avoid the slope of the bridge from affecting the spraying of the device.
[0039] Specifically, a detachable connector 4 is installed on the front side of the chassis 1, and a telescopic rod 401 is fixedly installed on the connector 4. A clearing plate 402 is installed on the other end of the telescopic rod 401.
[0040] In this embodiment, by setting up a clearing plate 402, debris on the walking route can be cleared before spraying, ensuring the normal operation of the line marking work. The sharp corner of the clearing plate 402 can also serve as a guide marker, allowing workers to position the line marking device in advance by using the sharp corner. At the same time, the telescopic rod 401 can adjust the height of the clearing plate 402 according to the road surface to adapt to different road conditions. Furthermore, if the clearing facility is not needed, the mechanism can be removed from the device by removing the connecting piece 4.
[0041] Specifically, a power supply mechanism 5 is installed on the upper surface of the chassis 1. The power supply mechanism 5 is connected to a heating pad 501 via a wire and is installed below the paint tank 2. A spare material tank 6 is detachably installed on the power supply mechanism 5.
[0042] In this embodiment, by setting a power supply mechanism 5, electricity can be transmitted to the heating pad 501, which heats the paint tank 2. At the same time, the spare material tank 6 set above the power supply mechanism 5 can store excess paint, increasing the total amount of paint carried, thereby improving the endurance of the line drawing process.
[0043] Specifically, a warning light bracket 701 is installed on one side of the chassis 1, and a warning light 7 is provided on the top of the warning light bracket 701.
[0044] In this embodiment, by setting a warning light 7, a warning function can be provided during the operation of the device to remind surrounding vehicles and pedestrians to pay attention and avoid the device.
[0045] Working principle: First, the paint is poured into the paint tank 2 through the feed port 203. Then, the power supply mechanism 5 is activated, and the paint tank 2 is heated by the heating pad 501 to melt the hot melt paint. Then, by lifting the discharge gate 208, the cover plate 206 is opened, allowing the paint to flow from the paint tank 2 into the funnel 3 through the discharge port 205. Then, the funnel 3 flows the paint into the spray head 302 through the hose, and the nozzle 303 sprays the paint onto the construction surface. The operation is simple.
[0046] For the parts of this utility model not disclosed in detail, those skilled in the art can ensure the smooth implementation of the solution of this utility model based on common sense, normal thinking logic and existing technology.
[0047] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.
Claims
1. A bridge construction marking device, comprising a chassis (1), characterized in that, A pair of hydraulic shock absorbers (101) are provided at both ends of the front side of the bottom of the chassis (1), and a front wheel (102) is installed on the outside of the hydraulic shock absorber (101); a rear wheel (103) is installed on the rear side of the bottom of the chassis (1) by bolts, and a handlebar (104) is connected to the rear wheel (103). The handlebar (104) can control the rotation of the rear wheel (103). A grip (105) is provided at the top end of the handlebar (104), and a handbrake (106) is provided on one side of the grip (105); the rear A foot brake (107) is also installed on the rear side of the wheel (103). Both the foot brake (107) and the handbrake (106) can control the rear wheel (103). A paint tank (2) is fixedly installed on the top of the chassis (1) by screws. An exhaust hole (202) is provided on the paint tank (2) away from the handle (105). A feed port (203) is provided on the top of the paint tank (2). The feed port (203) has a handle for easy opening. A discharge port (205) is installed on the lower side of one side of the paint tank (2).
2. The bridge construction marking equipment according to claim 1, characterized in that, A cover plate (206) is installed on the outside of the discharge port (205) by a hinge. The cover plate (206) is connected to a lifting iron bar (207). The other end of the lifting iron bar (207) is installed with a discharge gate (208) by bolts.
3. The bridge construction marking equipment according to claim 2, characterized in that, The chassis (1) has a fixed rod (304) fixedly installed on the bottom side of the discharge port (205). The fixed rod (304) is fixedly connected to the funnel (3). The funnel (3) and the outlet of the discharge port (205) are aligned. The funnel (3) is swayably mounted with a cantilever (301). The cantilever (301) is mounted with a nozzle (302). The bottom surface of the nozzle (302) is provided with a row of nozzles (303). The nozzle (302) is flexibly connected to the output end of the funnel (3) through a hose.
4. The bridge construction marking equipment according to claim 3, characterized in that, A detachable connector (4) is installed on the front side of the chassis (1), and a telescopic rod (401) is fixedly installed on the connector (4). A clearing plate (402) is installed on the other end of the telescopic rod (401).
5. A bridge construction marking device according to claim 1, characterized in that, A power supply mechanism (5) is installed on the upper surface of the chassis (1). The power supply mechanism (5) is connected to a heating pad (501) via a wire and is installed below the paint tank (2). A spare material tank (6) is detachably installed on the power supply mechanism (5).
6. The bridge construction marking equipment according to claim 1, characterized in that, A warning light bracket (701) is installed on one side of the chassis (1), and a warning light (7) is provided on the top of the warning light bracket (701).
7. A bridge construction marking device according to claim 1, characterized in that, The paint can (2) is provided with several protective bars (201) on the outside.
8. A bridge construction marking device according to claim 1, characterized in that, The top of the paint tank (2) is also provided with a stirring rod (204) that penetrates the interior of the paint tank (2).