Control system for wet-method pulverizing production line

By introducing an Ethernet communication and industrial router control system into the quartz sand wet grinding production line, one-click control and real-time monitoring are achieved, solving the problems of operational complexity and high impurity content, and improving production efficiency and finished product quality.

CN224203615UActive Publication Date: 2026-05-05HUNAN YUHUI HEAVY IND MASCH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202520917412.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Priority Date
2024-06-25
Filing Date
2025-05-09
Publication Date
2026-05-05
Estimated Expiration
2035-05-09

AI Technical Summary

Technical Problem

Existing wet quartz sand production lines are complex to operate, have low information display density, are difficult to control with a single button, and have high impurity content in the finished product, requiring skilled operators and involving a large workload.

Method used

Design a control system for a wet milling production line. The system uses Ethernet communication to connect an industrial computer, an industrial router, and the control components of each device, enabling one-button start, stop, and emergency stop. It also monitors the entire line's operating status via internet devices, automatically saves operating data, and adjusts equipment parameters.

Benefits of technology

It simplifies the operation process, improves the automation level of the production line, ensures the quality of finished products, and reduces the skill requirements and workload of operators.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224203615U_ABST
    Figure CN224203615U_ABST
Patent Text Reader

Abstract

The utility model discloses a control system for a wet-method pulverizing production line, which relates to the technical field of mechanical pulverizing equipment and comprises an industrial personal computer and an industrial router connected with the industrial personal computer through Ethernet communication. The jaw crusher control component, the cone crusher control component, the transfer stock bin control component, the double-roller flour mill control component, the vibrating screen control component, the separating tower control component, the magnetic separator control component, the second dewatering screen control component and the first conveying belt control component are connected with the industrial router through Ethernet communication. A first conveying belt control component, a second conveying belt control component, a third conveying belt control component, a fourth conveying belt control component, a first conveying pump control component and a water spraying device control component; the device has the characteristics that the device is convenient to operate and control, one-key start, one-key stop and one-key sudden stop of the whole line can be realized, and the operation data of the whole line can be automatically stored; the device is matched with a wet-method pulverizing production line and is suitable for preparing mineral powder such as quartz sand powder, dolomite powder and calcium carbonate powder.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of mechanical milling equipment technology, and in particular to a control system for a wet milling production line. Background Technology

[0002] Currently, quartz sand production mainly employs two methods: wet grinding and dry grinding. While dry grinding offers significant energy advantages, the resulting powder contains more impurities that are difficult to separate. Wet grinding primarily uses two methods: water milling and ball milling. The former has lower output, while the latter consumes more energy and has higher production costs. Furthermore, in existing production lines, all controls are implemented via control panels with buttons, resulting in low information density, a large operating surface, and a mechanical display layout that is ergonomically inefficient and prone to errors.

[0003] Chinese patent (patent application number 202011461768.0) discloses a "wet preparation method and production line for high-purity quartz sand." This method and production line includes coarse crushing-screening, fine crushing-screening, magnetic separation, scrubbing, flotation, gravity separation, and dewatering. These steps can be connected to form an automated continuous production line, achieving continuous and efficient production of quartz sand. Furthermore, in this application, the fine crushing-screening, magnetic separation, scrubbing, flotation, and gravity separation processes are all carried out in a slurry state, constituting a wet sand-making process. This reduces energy consumption and environmental pollution. In addition, this application controls the slurry concentration in each stage of the wet sand-making process to ensure the treatment effect at each stage. Through multi-stage magnetic separation, multi-stage flotation, and gravity separation, the impurity content of the quartz sand can be reduced to less than 50 ppm, and further reduced to less than 30 ppm.

[0004] Another Chinese patent (patent application number 202021101895.5) discloses a "quartz sand production line," which includes a ore washing and sorting system, a storage system, a sand making system, and a water circulation system. The sand making system includes a fine crushing line, a screening mechanism, a secondary treatment line, and a drying line. The fine crushing line is connected to the ore washing and sorting system. The screening mechanism is equipped with a finished product outlet and a defective product outlet. The defective product outlet is connected to the input end of the secondary treatment line. Both the secondary treatment line and the finished product outlet are connected to the input end of the drying line. The water circulation system includes an acid supply device, a regulating tank, and a sludge treatment unit. The acid supply device is connected to the ore washing and sorting system. The input end of the sludge treatment unit is connected to the regulating tank. The sludge treatment unit supplies purified wastewater to the acid washing line, the rinsing and sorting line, and the secondary treatment line through pipelines. This quartz sand production line can reuse defective minerals and wastewater in the quartz sand production process, reducing production costs.

[0005] Another Chinese patent (patent application number 202022989580.5) discloses a "wet production line for high-purity quartz sand preparation." This production line includes a coarse crushing unit, a rod mill unit, a magnetic separator unit, a scrubbing machine, multiple flotation units, a gravity separation device, and a dewatering treatment device. These devices can be connected in series to form an automated continuous production line, achieving continuous and efficient production of quartz sand. In this production line, the material is processed in a slurry state through the rod mill unit, magnetic separator unit, scrubbing machine, multiple flotation units, and gravity separation device, thus employing a wet sand-making process. This reduces energy consumption and environmental pollution. Furthermore, this application controls the slurry concentration at each stage of the wet sand-making process, ensuring the processing effect at each stage. Through multi-stage magnetic separation, multi-stage flotation, and gravity separation, the impurity content of the quartz sand can be reduced to less than 50 ppm, and further reduced to less than 30 ppm.

[0006] Another Chinese patent (patent application number 202210180677.2) discloses a "Data-Driven Intelligent Production Control System for Quartz Sand," which includes a control module, a weighing module, and an alarm module. The weighing module includes a screening component and a weighing component. The screening component is located at the output port of the discharge conveyor to screen the quartz sand after cold-cold treatment. The weighing component weighs the quartz sand that does not meet the volume requirements and sends the weighing data to the control module. The control module includes a comparison unit that receives the weighing data sent by the weighing component and compares it with a standard value. If the weighing data is greater than the standard value, the control module sends an alarm signal to the alarm module, which then issues an alarm notification upon receiving the alarm signal. This application has the advantage of reducing the probability of poor cold-cold treatment of quartz sand.

[0007] Another Chinese patent (patent application number 202122235314.8) discloses a "novel intelligent control system for a crusher," which employs a technical solution including: a microcontroller unit and a crusher motor control module and a feeder motor control module connected to the microcontroller unit. The crusher motor control module is used to control the rotation of the crusher motor, and the feeder motor control module is used to control the rotation of the feeder motor. The microcontroller unit sends crushing command parameters to the crusher motor control module, and the crusher motor control module sends motor control signals according to the crushing command parameters to control the opening or closing of the first AC contactor and the second AC contactor. The opening or closing of the first AC contactor and the second AC contactor controls the forward or reverse rotation of the crusher motor. Summary of the Invention

[0008] To address the shortcomings of existing technologies, the technical problem this invention aims to solve is to provide a control system for a production line that is easy to operate, capable of one-button start, one-button stop, and one-button emergency stop of the entire production line, automatically saves the entire production line's operating data, can also upload it to a cloud server, and can monitor the entire production line's operating status via internet devices such as mobile phones and computers, and adjust equipment parameters in real time based on production information to ensure the quality and output of the finished powder, greatly reducing the skill requirements and workload of operators, for use in the production of quartz sand powder.

[0009] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is to design a wet milling production line control system: including an industrial control computer and an industrial router connected to it via Ethernet communication, and also including jaw crusher control components, cone crusher control components, transfer hopper control components, double roll mill control components, vibrating screen control components, separation tower control components, magnetic separator control components, second dewatering screen control components, first conveyor belt control components, second conveyor belt control components, third conveyor belt control components, fourth conveyor belt control components, first conveying pump control components, and water spraying device control components connected to the industrial router via Ethernet communication;

[0010] The jaw crusher control component includes a jaw crusher start / stop switch, a jaw crusher signal conversion module, and a jaw crusher conversion switch. The jaw crusher conversion switch is connected to the jaw crusher start / stop switch, the jaw crusher signal conversion module, and the jaw crusher, respectively. The jaw crusher signal conversion module is connected to an industrial router via Ethernet communication.

[0011] The cone crusher control component includes a cone crusher start / stop switch, a cone crusher signal conversion module, and a cone crusher conversion switch. The cone crusher conversion switch is connected to the cone crusher start / stop switch, the cone crusher signal conversion module, and the cone crusher, respectively. The cone crusher signal conversion module is connected to an industrial router via Ethernet communication.

[0012] The transfer hopper control component includes a transfer hopper start / stop switch, a transfer hopper signal conversion module, and a transfer hopper conversion switch. The transfer hopper conversion switch is connected to the transfer hopper start / stop switch, the transfer hopper signal conversion module, and the transfer hopper, respectively. The transfer hopper signal conversion module is connected to an industrial router via Ethernet communication.

[0013] The control components of the double-roll mill include a double-roll mill start / stop switch, a double-roll mill signal conversion module, and a double-roll mill conversion switch. The double-roll mill conversion switch is connected to the double-roll mill start / stop switch, the double-roll mill signal conversion module, and the double-roll mill, respectively. The double-roll mill signal conversion module is connected to an industrial router via Ethernet communication.

[0014] The vibrating screen control component includes a vibrating screen start / stop switch, a vibrating screen signal conversion module, and a vibrating screen conversion switch. The vibrating screen conversion switch is connected to the vibrating screen start / stop switch, the vibrating screen signal conversion module, and the vibrating screen. The vibrating screen signal conversion module is connected to an industrial router via Ethernet communication.

[0015] The separation tower control component includes a separation tower start / stop switch, a separation tower signal conversion module, and a separation tower conversion switch. The separation tower conversion switch is connected to the separation tower start / stop switch, the separation tower signal conversion module, and the separation tower, respectively. The separation tower signal conversion module is connected to an industrial router via Ethernet communication.

[0016] The magnetic separator control component includes a magnetic separator start / stop switch, a magnetic separator signal conversion module, and a magnetic separator conversion switch. The magnetic separator conversion switch is connected to the magnetic separator start / stop switch, the magnetic separator signal conversion module, and the magnetic separator. The magnetic separator signal conversion module is connected to an industrial router via Ethernet communication.

[0017] The second dewatering screen control component includes a second dewatering screen start / stop switch, a second dewatering screen signal conversion module, and a second dewatering screen conversion switch. The second dewatering screen conversion switch is connected to the second dewatering screen start / stop switch, the second dewatering screen signal conversion module, and the second dewatering screen. The second dewatering screen signal conversion module is connected to an industrial router via Ethernet communication.

[0018] The first conveyor belt control component includes a first conveyor belt start / stop switch, a first conveyor belt signal conversion module, and a first conveyor belt conversion switch. The first conveyor belt conversion switch is connected to the first conveyor belt start / stop switch, the first conveyor belt signal conversion module, and the first conveyor belt. The first conveyor belt signal conversion module is connected to an industrial router via Ethernet communication.

[0019] The second conveyor belt control component includes a second conveyor belt start / stop switch, a second conveyor belt signal conversion module, and a second conveyor belt conversion switch. The second conveyor belt conversion switch is connected to the second conveyor belt start / stop switch, the second conveyor belt signal conversion module, and the second conveyor belt. The second conveyor belt signal conversion module is connected to an industrial router via Ethernet communication.

[0020] The third conveyor belt control component includes a third conveyor belt start / stop switch, a third conveyor belt signal conversion module, and a third conveyor belt conversion switch. The third conveyor belt conversion switch is connected to the third conveyor belt start / stop switch, the third conveyor belt signal conversion module, and the third conveyor belt. The third conveyor belt signal conversion module is connected to an industrial router via Ethernet communication.

[0021] The fourth conveyor belt control component includes a fourth conveyor belt start / stop switch, a fourth conveyor belt signal conversion module, and a fourth conveyor belt conversion switch. The fourth conveyor belt conversion switch is connected to the fourth conveyor belt start / stop switch, the fourth conveyor belt signal conversion module, and the fourth conveyor belt. The fourth conveyor belt signal conversion module is connected to an industrial router via Ethernet communication.

[0022] The first delivery pump control component includes a first delivery pump start / stop switch, a first delivery pump signal conversion module, and a first delivery pump changeover switch. The first delivery pump changeover switch is connected to the first delivery pump start / stop switch, the first delivery pump signal conversion module, and the first delivery pump. The first delivery pump signal conversion module is connected to an industrial router via Ethernet communication.

[0023] The water spray device control component includes a water spray device start / stop switch, a water spray device signal conversion module, and a water spray device conversion switch. The water spray device conversion switch is connected to the water spray device start / stop switch, the water spray device signal conversion module, and the water spray device. The water spray device signal conversion module is connected to an industrial router via Ethernet communication.

[0024] It also includes a safety screen control unit, a second conveying pump control unit, a first dewatering screen control unit, and a fifth conveyor belt control unit that are connected to an industrial router via Ethernet communication;

[0025] The safety screen control component includes a safety screen start / stop switch, a safety screen signal conversion module, and a safety screen conversion switch. The safety screen conversion switch is connected to the safety screen start / stop switch, the safety screen signal conversion module, and the safety screen. The safety screen signal conversion module is connected to an industrial router via Ethernet communication.

[0026] The second delivery pump control component includes a second delivery pump start / stop switch, a second delivery pump signal conversion module, and a second delivery pump switch. The second delivery pump switch is connected to the second delivery pump start / stop switch, the second delivery pump signal conversion module, and the second delivery pump. The second delivery pump signal conversion module is connected to an industrial router via Ethernet communication.

[0027] The first dewatering screen control component includes a first dewatering screen start / stop switch, a first dewatering screen signal conversion module, and a first dewatering screen conversion switch. The first dewatering screen conversion switch is connected to the first dewatering screen start / stop switch, the first dewatering screen signal conversion module, and the first dewatering screen. The first dewatering screen signal conversion module is connected to an industrial router via Ethernet communication.

[0028] The fifth conveyor belt control component includes a fifth conveyor belt start / stop switch, a fifth conveyor belt signal conversion module, and a fifth conveyor belt conversion switch. The fifth conveyor belt conversion switch is connected to the fifth conveyor belt start / stop switch, the fifth conveyor belt signal conversion module, and the fifth conveyor belt. The fifth conveyor belt signal conversion module is connected to an industrial router via Ethernet communication.

[0029] It also includes a sixth conveyor belt control component that is connected to an industrial router via Ethernet communication. The sixth conveyor belt control component includes a sixth conveyor belt start / stop switch, a sixth conveyor belt signal conversion module, and a sixth conveyor belt changeover switch. The sixth conveyor belt changeover switch is connected to the sixth conveyor belt start / stop switch, the sixth conveyor belt signal conversion module, and the sixth conveyor belt, respectively. The sixth conveyor belt signal conversion module is connected to the industrial router via Ethernet communication.

[0030] This utility model discloses a wet milling production line control system that includes five separation devices: a vibrating screen, a safety screen, a separation tower, a magnetic separator, and a second dewatering screen. These devices effectively remove most impurities, ensuring the quality of the finished product. Each individual machine is equipped with a control unit including a start / stop switch, a signal conversion module, and a transfer switch. The signal conversion module is connected to an industrial router and an industrial control computer via Ethernet communication, enabling one-button start, one-button stop, and one-button emergency stop for the entire line. Furthermore, the entire line's operating data is transmitted to the industrial control computer via Ethernet communication and the industrial router. This allows for automatic saving of the operating data to the control system and uploading it to a cloud server. Users can then monitor the entire line's operating status via mobile phones, computers, and other internet-connected devices, and adjust equipment parameters in real time based on production information. This ensures both the quality and quantity of the milled product while significantly reducing the skill requirements and workload for operators. Attached Figure Description

[0031] Figure 1 This is a schematic diagram of the block structure of the production line of this utility model;

[0032] Figure 2 This is a schematic diagram of the start-up process of the production line of this utility model;

[0033] Figure 3 This is a schematic diagram of the control signal interaction principle of this utility model. Detailed Implementation

[0034] The present invention will be further described below with reference to the accompanying drawings and embodiments. The following description is by way of example, but the scope of protection of the present invention should not be limited thereto.

[0035] Example:

[0036] The wet milling production line control system in this embodiment involves equipment including a jaw crusher, cone crusher, transfer hopper, double roll mill, vibrating screen, safety screen, separation tower, magnetic separator, first dewatering screen, second dewatering screen, first conveyor belt, second conveyor belt, third conveyor belt, fourth conveyor belt, fifth conveyor belt, sixth conveyor belt, first conveyor pump, second conveyor pump, water spraying device, and finished product silo and tail powder silo (see appendix). Figure 1 As shown in the figure, the water spraying device includes a water washing nozzle, a water pump and a circulating water tank. The water washing nozzle is set on the upper part of the vibrating screen, the water pump is set in the circulating water tank, and the output end of the water pump is connected to the water washing nozzle through a water pipe.

[0037] The jaw crusher and cone crusher are connected by a first conveyor belt; the cone crusher and the transfer hopper are connected by a second conveyor belt; the transfer hopper and the roller mill are connected by a third conveyor belt; the roller mill and the vibrating screen are connected by a fourth conveyor belt; the water washing nozzles of the water spraying device are located above the vibrating screen; the vibrating screen and the safety screen are connected by a first conveyor pump; the safety screen and the separation tower are connected by a second conveyor pump; the separation tower is located above the magnetic separator; the magnetic separator is located above the second dewatering screen; the second dewatering screen and the finished product bin are connected by a sixth conveyor belt; the tail powder bin is located below the separation tower; the first dewatering screen is located below the safety screen, and it is connected to the transfer hopper by a fifth conveyor belt.

[0038] The wet milling production line control system of this embodiment consists of an industrial control computer and an industrial router connected to it via Ethernet communication. It also includes control components for a jaw crusher, cone crusher, transfer hopper, double-roll mill, vibrating screen, safety screen, separation tower, magnetic separator, first dewatering screen, second dewatering screen, first conveyor belt, second conveyor belt, third conveyor belt, fourth conveyor belt, fifth conveyor belt, sixth conveyor belt, first and second conveyor pumps, and a water spray device control component, all connected to the industrial router via Ethernet communication (see appendix). Figure 3 (As shown).

[0039] The jaw crusher control unit consists of a jaw crusher start / stop switch, a jaw crusher signal conversion module, and a jaw crusher selector switch.

[0040] The jaw crusher selector switch is a two-way switch. Its input terminals are connected to both the jaw crusher start / stop switch and the jaw crusher signal conversion module, while its output terminal is connected to the jaw crusher's own control components. When the jaw crusher start / stop switch is selected, it operates in manual control mode; when the jaw crusher signal conversion module is selected, it operates in centralized control mode. The front end of the jaw crusher start / stop switch is connected to the power cord, and the rear end is connected to the jaw crusher's own control components via the jaw crusher selector switch, used for manually starting and stopping the jaw crusher. The jaw crusher signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the jaw crusher's own control components via the jaw crusher selector switch, thereby controlling the jaw crusher's start or stop (i.e., controlling the jaw crusher's start and stop through centralized control mode).

[0041] The cone crusher control unit consists of a cone crusher start / stop switch, a cone crusher signal conversion module, and a cone crusher selector switch.

[0042] The cone crusher selector switch is a two-way switch. Its inputs are connected to both the cone crusher start / stop switch and the cone crusher signal conversion module, while its output is connected to the control components of the cone crusher itself. When the start / stop switch is selected, it operates in manual control mode; when the signal conversion module is selected, it operates in centralized control mode. The start / stop switch connects to the power cord at the front end and to the control components of the cone crusher via the selector switch, used for manually starting and stopping the cone crusher. The cone crusher signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet and further to an industrial control computer via Ethernet. It also connects to the control components of the cone crusher via the selector switch, thereby controlling the start or stop of the cone crusher (i.e., controlling the start and stop of the cone crusher through centralized control mode).

[0043] The transfer hopper control unit consists of a transfer hopper start / stop switch, a transfer hopper signal conversion module, and a transfer hopper changeover switch.

[0044] The transfer hopper selector switch is a two-way switch. Its inputs are connected to both the transfer hopper start / stop switch and the transfer hopper signal conversion module, while its output is connected to the control components of the transfer hopper itself. When the transfer hopper start / stop switch is selected, it operates in manual control mode; when the transfer hopper signal conversion module is selected, it operates in centralized control mode. The front end of the transfer hopper start / stop switch is connected to the power cord, and the rear end is connected to the control components of the transfer hopper itself via the transfer hopper selector switch, used for manually starting and stopping the transfer hopper. The transfer hopper signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control components of the transfer hopper itself via the transfer hopper selector switch, thereby controlling the start or stop of the transfer hopper (i.e., controlling the start and stop of the transfer hopper through centralized control mode).

[0045] The control components of the double-roll mill consist of a double-roll mill start / stop switch, a double-roll mill signal conversion module, and a double-roll mill selector switch.

[0046] The roller mill selector switch is a two-way switch. Its input terminals are connected to both the roller mill start / stop switch and the roller mill signal conversion module. Its output terminal is connected to the control components of the roller mill itself. When the start / stop switch is selected, it operates in manual control mode; when the signal conversion module is selected, it operates in centralized control mode. The start / stop switch is connected to a power cord at its front end and to the roller mill's control components at its rear end via the selector switch, used for manually starting and stopping the roller mill. The roller mill signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the roller mill's control components via the selector switch, thereby controlling the start or stop of the roller mill (i.e., controlling the start and stop of the roller mill through centralized control mode).

[0047] The control components of the vibrating screen consist of a vibrating screen start / stop switch, a vibrating screen signal conversion module, and a vibrating screen selector switch.

[0048] The vibrating screen selector switch is a two-way switch. Its input terminals are connected to both the vibrating screen start / stop switch and the vibrating screen signal conversion module, while its output terminal is connected to the control components of the vibrating screen itself. When the start / stop switch is selected, it operates in manual control mode; when the vibrating screen signal conversion module is selected, it operates in centralized control mode. The start / stop switch is connected to a power cord at its front end and to the vibrating screen's control components at its rear end via the selector switch, used for manually starting and stopping the vibrating screen. The vibrating screen signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the vibrating screen's control components via the selector switch, thereby controlling the start or stop of the vibrating screen (i.e., controlling the start and stop of the vibrating screen through centralized control mode).

[0049] The safety screen control unit consists of a safety screen start / stop switch, a safety screen signal conversion module, and a safety screen changeover switch.

[0050] The safety screen selector switch is a two-way switch. Its inputs are connected to both the safety screen start / stop switch and the safety screen signal conversion module, while its output is connected to the safety screen's own control components. When the safety screen start / stop switch is selected, it operates in manual control mode; when the safety screen signal conversion module is selected, it operates in centralized control mode. The safety screen start / stop switch connects to the power cord at the front end and to the safety screen's own control components at the rear end via the safety screen selector switch, used for manually starting and stopping the safety screen. The safety screen signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the safety screen's own control components via the safety screen selector switch, thereby controlling the safety screen's start or stop (i.e., controlling the safety screen's start and stop through centralized control mode).

[0051] The separation tower control unit consists of a separation tower start / stop switch, a separation tower signal conversion module, and a separation tower changeover switch.

[0052] The tower switching switch is a two-way switch. Its input terminals are connected to both the tower start / stop switch and the tower signal conversion module, while its output terminal is connected to the tower's own control components. When the tower start / stop switch is selected, it operates in manual control mode; when the tower signal conversion module is selected, it operates in centralized control mode. The start / stop switch is connected to a power cord at its front end and to the tower's own control components at its rear end via the switching switch, used for manually starting and stopping the tower. The tower signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the tower's own control components via the switching switch, thereby controlling the tower's start or stop (i.e., controlling the tower's start and stop through centralized control mode).

[0053] The magnetic separator control unit consists of a magnetic separator start / stop switch, a magnetic separator signal conversion module, and a magnetic separator changeover switch.

[0054] The magnetic separator selector switch is a two-to-one switch. Its input terminals are connected to both the magnetic separator start / stop switch and the magnetic separator signal conversion module, while its output terminal is connected to the magnetic separator's own control unit. When the start / stop switch is selected, it operates in manual control mode; when the signal conversion module is selected, it operates in centralized control mode. The start / stop switch connects to the power cord at its front end and to the magnetic separator's own control unit via the selector switch, used for manually starting and stopping the magnetic separator. The magnetic separator signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the magnetic separator's own control unit via the selector switch, thereby controlling the start or stop of the magnetic separator (i.e., controlling the start and stop of the magnetic separator through centralized control mode).

[0055] The first dewatering screen control unit consists of a first dewatering screen start / stop switch, a first dewatering screen signal conversion module, and a first dewatering screen selector switch.

[0056] The first dewatering screen selector switch is a two-way switch. Its input terminals are connected to both the first dewatering screen start / stop switch and the first dewatering screen signal conversion module. Its output terminal is connected to the control component of the first dewatering screen itself. When the first dewatering screen start / stop switch is selected, it is in manual control mode; when the first dewatering screen signal conversion module is selected, it is in centralized control mode. The first dewatering screen start / stop switch is connected to a power cord at its front end and to the control component of the first dewatering screen itself at its rear end via the first dewatering screen selector switch, used to start and stop the first dewatering screen during manual operation. The first dewatering screen signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. It also connects to the control component of the first dewatering screen itself via the first dewatering screen selector switch, thereby controlling the start or stop of the first dewatering screen (i.e., controlling the start and stop of the first dewatering screen through centralized control mode).

[0057] The second dewatering screen control unit consists of a second dewatering screen start / stop switch, a second dewatering screen signal conversion module, and a second dewatering screen conversion switch.

[0058] The second dewatering screen selector switch is a two-to-one switch. Its input terminals are connected to both the second dewatering screen start / stop switch and the second dewatering screen signal conversion module. Its output terminal is connected to the control component of the second dewatering screen itself. When the start / stop switch is selected, it operates in manual control mode; when the signal conversion module is selected, it operates in centralized control mode. The start / stop switch is connected to a power cord at its front end and to the control component of the second dewatering screen itself at its rear end via the selector switch, used for manually starting and stopping the second dewatering screen. The signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. It also connects to the control component of the second dewatering screen itself via the selector switch, thereby controlling the start or stop of the second dewatering screen (i.e., controlling the start and stop of the second dewatering screen through centralized control mode).

[0059] The first conveyor belt control unit consists of a first conveyor belt start / stop switch, a first conveyor belt signal conversion module, and a first conveyor belt selector switch.

[0060] The first conveyor belt selector switch is a two-way switch. Its input terminals are connected to both the first conveyor belt start / stop switch and the first conveyor belt signal conversion module. Its output terminal is connected to the control component of the first conveyor belt itself. When the first conveyor belt start / stop switch is selected, it is in manual control mode; when the first conveyor belt signal conversion module is selected, it is in centralized control mode. The front end of the first conveyor belt start / stop switch is connected to the power cord, and the rear end is connected to the control component of the first conveyor belt itself through the first conveyor belt selector switch, used for manually starting and stopping the operation of the first conveyor belt. The first conveyor belt signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control component of the first conveyor belt itself through the first conveyor belt selector switch, thereby controlling the start or stop of the first conveyor belt (i.e., controlling the start and stop of the first conveyor belt through centralized control mode).

[0061] The second conveyor belt control unit consists of a second conveyor belt start / stop switch, a second conveyor belt signal conversion module, and a second conveyor belt selector switch.

[0062] The second conveyor belt selector switch is a two-way switch. Its input terminals are connected to both the second conveyor belt start / stop switch and the second conveyor belt signal conversion module. Its output terminal is connected to the control component of the second conveyor belt itself. When the second conveyor belt start / stop switch is selected, it operates in manual control mode; when the second conveyor belt signal conversion module is selected, it operates in centralized control mode. The front end of the second conveyor belt start / stop switch is connected to the power cord, and the rear end is connected to the control component of the second conveyor belt itself via the second conveyor belt selector switch. It is used to start and stop the operation of the second conveyor belt manually. The second conveyor belt signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further connects to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control component of the second conveyor belt itself via the second conveyor belt selector switch, thereby controlling the start or stop of the second conveyor belt (i.e., controlling the start and stop of the second conveyor belt through centralized control mode).

[0063] The third conveyor belt control unit consists of a third conveyor belt start / stop switch, a third conveyor belt signal conversion module, and a third conveyor belt selector switch.

[0064] The third conveyor belt selector switch is a two-way switch. Its input terminals are connected to both the third conveyor belt start / stop switch and the third conveyor belt signal conversion module. Its output terminal is connected to the control components of the third conveyor belt itself. When the third conveyor belt start / stop switch is selected, it operates in manual control mode; when the third conveyor belt signal conversion module is selected, it operates in centralized control mode. The front end of the third conveyor belt start / stop switch is connected to the power cord, and the rear end is connected to the control components of the third conveyor belt itself via the third conveyor belt selector switch, used for manually starting and stopping the third conveyor belt. The third conveyor belt signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control components of the third conveyor belt itself via the third conveyor belt selector switch, thereby controlling the start or stop of the third conveyor belt (i.e., controlling the start and stop of the third conveyor belt through centralized control mode).

[0065] The fourth conveyor belt control unit consists of a fourth conveyor belt start / stop switch, a fourth conveyor belt signal conversion module, and a fourth conveyor belt changeover switch.

[0066] The fourth conveyor belt selector switch is a two-way switch. Its input terminals are connected to both the fourth conveyor belt start / stop switch and the fourth conveyor belt signal conversion module. Its output terminal is connected to the control components of the fourth conveyor belt itself. When the fourth conveyor belt start / stop switch is selected, it operates in manual control mode; when the fourth conveyor belt signal conversion module is selected, it operates in centralized control mode. The front end of the fourth conveyor belt start / stop switch is connected to the power cord, and the rear end is connected to the control components of the fourth conveyor belt itself via the fourth conveyor belt selector switch, used for manually starting and stopping the operation of the fourth conveyor belt. The fourth conveyor belt signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control components of the fourth conveyor belt itself via the fourth conveyor belt selector switch, thereby controlling the start or stop of the fourth conveyor belt (i.e., controlling the start and stop of the fourth conveyor belt through centralized control mode).

[0067] The fifth conveyor belt control unit consists of a fifth conveyor belt start / stop switch, a fifth conveyor belt signal conversion module, and a fifth conveyor belt selector switch.

[0068] The fifth conveyor belt selector switch is a two-way switch. Its input terminals are connected to both the fifth conveyor belt start / stop switch and the fifth conveyor belt signal conversion module. Its output terminal is connected to the control unit of the fifth conveyor belt itself. When the fifth conveyor belt start / stop switch is selected, it is in manual control mode; when the fifth conveyor belt signal conversion module is selected, it is in centralized control mode. The front end of the fifth conveyor belt start / stop switch is connected to the power cord, and the rear end is connected to the control unit of the fifth conveyor belt itself through the fifth conveyor belt selector switch, used for manually starting and stopping the operation of the fifth conveyor belt. The fifth conveyor belt signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further connects to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control unit of the fifth conveyor belt itself through the fifth conveyor belt selector switch, thereby controlling the start or stop of the fifth conveyor belt (i.e., controlling the start and stop of the fifth conveyor belt through centralized control mode).

[0069] The sixth conveyor belt control unit consists of a sixth conveyor belt start / stop switch, a sixth conveyor belt signal conversion module, and a sixth conveyor belt changeover switch.

[0070] The sixth conveyor belt selector switch is a two-way switch. Its input terminals are connected to both the sixth conveyor belt start / stop switch and the sixth conveyor belt signal conversion module. Its output terminal is connected to the control components of the sixth conveyor belt itself. When the sixth conveyor belt start / stop switch is selected, it operates in manual control mode; when the sixth conveyor belt signal conversion module is selected, it operates in centralized control mode. The front end of the sixth conveyor belt start / stop switch is connected to the power cord, and the rear end is connected to the control components of the sixth conveyor belt itself via the sixth conveyor belt selector switch, used for manually starting and stopping the operation of the sixth conveyor belt. The sixth conveyor belt signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further connects to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control components of the sixth conveyor belt itself via the sixth conveyor belt selector switch, thereby controlling the start or stop of the sixth conveyor belt (i.e., controlling the start and stop of the sixth conveyor belt through centralized control mode).

[0071] The first delivery pump control unit consists of a first delivery pump start / stop switch, a first delivery pump signal conversion module, and a first delivery pump changeover switch.

[0072] The first pump selector switch is a two-way switch. Its input terminals are connected to both the first pump start / stop switch and the first pump signal conversion module, while its output terminal is connected to the control unit of the first pump itself. When the first pump start / stop switch is selected, it operates in manual control mode; when the first pump signal conversion module is selected, it operates in centralized control mode. The first pump start / stop switch is connected to a power cord at its front end and to the control unit of the first pump itself at its rear end via the first pump selector switch, used for manually starting and stopping the first pump. The first pump signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. Simultaneously, it connects to the control unit of the first pump itself via the first pump selector switch, thereby controlling the start or stop of the first pump (i.e., controlling the start and stop of the first pump through centralized control mode).

[0073] The second delivery pump control unit consists of a second delivery pump start / stop switch, a second delivery pump signal conversion module, and a second delivery pump selector switch.

[0074] The second pump selector switch is a two-way switch. Its input terminals are connected to both the second pump start / stop switch and the second pump signal conversion module. Its output terminal is connected to the control unit of the second pump itself. When the second pump start / stop switch is selected, it is in manual control mode; when the second pump signal conversion module is selected, it is in centralized control mode. The front end of the second pump start / stop switch is connected to the power cord, and the rear end is connected to the control unit of the second pump itself through the second pump selector switch, used to start and stop the operation of the second pump manually. The second pump signal conversion module (which can be an IO controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. It also connects to the control unit of the second pump itself through the second pump selector switch, thereby controlling the start or stop of the second pump (i.e., controlling the start and stop of the second pump through centralized control mode).

[0075] The water spray system control components consist of a water spray system start / stop switch, a water spray system signal conversion module, and a water spray system selector switch.

[0076] The water spray system selector switch is a two-way switch. Its input terminals are connected to both the water spray system start / stop switch and the water spray system signal conversion module. Its output terminal is connected to the control component of the water pump itself. When the start / stop switch is selected, it operates in manual control mode; when the signal conversion module is selected, it operates in centralized control mode. The start / stop switch is connected to a power cord at its front end and to the control component of the water pump itself via the selector switch, used for manually starting and stopping the water spray system. The water spray system signal conversion module (which can be an I / O controller ZLAN6802 or other signal conversion modules) connects to an industrial router via Ethernet communication and further to an industrial control computer via Ethernet communication. It also connects to the control component of the water pump itself via the selector switch, thereby controlling the start or stop of the water spray system (i.e., controlling the start and stop of the water spray system through centralized control mode).

[0077] The start-up process of the equipment involved in the wet milling production line control system of this embodiment (i.e., the order of start-up) is shown in the appendix. Figure 2 As shown, the sequence is as follows: water spray device → sixth conveyor belt → second dewatering screen → magnetic separator → separation tower → second conveyor pump → safety screen → first conveyor pump → vibrating screen → fourth conveyor belt → roller mill → third conveyor belt → transfer silo → second conveyor belt → cone crusher → first conveyor belt → jaw crusher → fifth conveyor belt → first dewatering screen. The stopping process (i.e., the order of stopping) is the reverse of the starting process (i.e., the opposite order).

[0078] When using manual control, first switch all device switches to the start / stop position, then follow the start procedure described above, pressing the start / stop switches of the corresponding devices in sequence. To stop, press the start / stop switches of the corresponding devices in reverse order.

[0079] When using centralized control, all devices must first be switched to the signal conversion module position via their selector switches. Then, operation can be performed directly on the industrial control computer. For touchscreen devices, the start button can be clicked directly on the interface; for non-touchscreen devices, a mouse click is used. The industrial control computer, following a pre-programmed start procedure, sends start commands sequentially to the signal conversion modules of each device via the industrial router. Each device's control unit is then activated via its selector switch, initiating the start-up process and achieving one-button start for the entire line. Similarly, to stop, the stop button is clicked. The industrial control computer, following a pre-programmed stop procedure, sends stop commands sequentially to the signal conversion modules of each device via the industrial router. Each device's control unit is then deactivated via its selector switch, initiating the stop process and achieving one-button stop or emergency stop for the entire line. When a single device on the line needs to be paused, the industrial control computer can select the device to be stopped. The industrial router then sends a stop command to the selected device's signal conversion module, which is transmitted to the device's control unit via its selector switch, cutting off the device's power supply and stopping that single device. During the entire production line process, the operating data of each piece of equipment is transmitted to the industrial control computer through its signal conversion module and industrial router, and is automatically saved in the storage component of the industrial control computer.

[0080] The following section uses a jaw crusher as an example to explain in detail the working process of starting and stopping a jaw crusher independently.

[0081] When using manual control, first switch the jaw crusher selector switch to the jaw crusher start / stop switch position. Then, press the jaw crusher start / stop switch (i.e., the start button). At this time, the jaw crusher start / stop switch sends a start signal to the jaw crusher's own control unit through the jaw crusher selector switch. Upon receiving the signal, the jaw crusher's own control unit immediately controls the jaw crusher to start. When it is necessary to stop, press the jaw crusher start / stop switch (i.e., the stop button). At this time, the jaw crusher start / stop switch sends a stop signal to the jaw crusher's own control unit. Upon receiving the signal, the jaw crusher's control unit immediately controls the jaw crusher to stop.

[0082] When using centralized control mode, first switch the jaw crusher selector switch to the jaw crusher signal conversion module position. Then, select the single-device (jaw crusher control interface) control interface on the industrial control computer's control panel. After clicking the start button on the jaw crusher control interface, the industrial control computer immediately sends a jaw crusher start signal, which is transmitted to the jaw crusher signal conversion module via the industrial router. The jaw crusher signal conversion module receives the start signal (digital signal) from the industrial control computer, converts it into an analog signal, and transmits it to the jaw crusher's own control components via the jaw crusher selector switch. Upon receiving the analog signal, the jaw crusher's control components immediately control the jaw crusher to start. The stopping process is similar and will not be described further.

[0083] The starting and stopping of other devices are similar to those described above, and will not be repeated here.

[0084] In this embodiment, when the wet milling production line control system operates, the ore (such as quartz, dolomite, etc.) raw material enters the jaw crusher for coarse crushing. The coarsely crushed material is conveyed by the first conveyor belt to the cone crusher for fine crushing. The finely crushed material is then conveyed by the second conveyor belt to the transfer silo for temporary storage. The finely crushed material in the transfer silo is conveyed by the third conveyor belt to the roller mill for fine roller milling. The fine powder from the roller mill is conveyed by the fourth conveyor belt to the vibrating screen (equipped with a water washing nozzle) for washing, separating the ore powder from the mud into a mixture. This mixture is then conveyed by the first conveyor pump to the safety screen for coarse and fine separation. Here, the material is divided into two streams: one stream contains coarse material, which falls into the screen under gravity. The first dewatering screen at the bottom of the column dewaters the material. After dewatering, the coarse material is transported to the intermediate storage bin via the fifth conveyor belt. The other path is that the mixture after separating the coarse material is transported to the separation tower by the second conveyor pump for mud-powder separation. The separated mud-water enters the tail powder bin at the bottom of the separation tower for sedimentation under gravity. The separated ore powder enters the magnetic separator at the bottom of the separation tower for magnetic separation under gravity. Magnetic materials (such as iron powder) contained in the ore powder are attracted by the magnets in the magnetic separator (which are removed periodically). After magnetic separation, the ore powder enters the second dewatering screen at the bottom of the magnetic separator for dewatering under gravity. After dewatering, it becomes the finished product and is transported to the finished product bin for storage by the sixth conveyor belt.

[0085] The control system for the wet powder production line of this utility model is matched with the wet powder production line and is suitable for preparing mineral powders including quartz sand powder, dolomite powder and calcium carbonate powder.

Claims

1. A control system for a wet milling production line, comprising an industrial computer and an industrial router connected to it via Ethernet communication, characterized in that: It also includes control components for a jaw crusher, a cone crusher, a transfer hopper, a double roll mill, a vibrating screen, a separation tower, a magnetic separator, a second dewatering screen, a first conveyor belt, a second conveyor belt, a third conveyor belt, a fourth conveyor belt, a first conveyor pump, and a water spraying device, all connected to an industrial router via Ethernet communication. The jaw crusher control component includes a jaw crusher start / stop switch, a jaw crusher signal conversion module, and a jaw crusher conversion switch. The jaw crusher conversion switch is connected to the jaw crusher start / stop switch, the jaw crusher signal conversion module, and the jaw crusher, respectively. The jaw crusher signal conversion module is connected to an industrial router via Ethernet communication. The cone crusher control component includes a cone crusher start / stop switch, a cone crusher signal conversion module, and a cone crusher conversion switch. The cone crusher conversion switch is connected to the cone crusher start / stop switch, the cone crusher signal conversion module, and the cone crusher, respectively. The cone crusher signal conversion module is connected to an industrial router via Ethernet communication. The transfer hopper control component includes a transfer hopper start / stop switch, a transfer hopper signal conversion module, and a transfer hopper conversion switch. The transfer hopper conversion switch is connected to the transfer hopper start / stop switch, the transfer hopper signal conversion module, and the transfer hopper, respectively. The transfer hopper signal conversion module is connected to an industrial router via Ethernet communication. The control components of the double-roll mill include a double-roll mill start / stop switch, a double-roll mill signal conversion module, and a double-roll mill conversion switch. The double-roll mill conversion switch is connected to the double-roll mill start / stop switch, the double-roll mill signal conversion module, and the double-roll mill, respectively. The double-roll mill signal conversion module is connected to an industrial router via Ethernet communication. The vibrating screen control component includes a vibrating screen start / stop switch, a vibrating screen signal conversion module, and a vibrating screen conversion switch. The vibrating screen conversion switch is connected to the vibrating screen start / stop switch, the vibrating screen signal conversion module, and the vibrating screen. The vibrating screen signal conversion module is connected to an industrial router via Ethernet communication. The separation tower control component includes a separation tower start / stop switch, a separation tower signal conversion module, and a separation tower conversion switch. The separation tower conversion switch is connected to the separation tower start / stop switch, the separation tower signal conversion module, and the separation tower, respectively. The separation tower signal conversion module is connected to an industrial router via Ethernet communication. The magnetic separator control component includes a magnetic separator start / stop switch, a magnetic separator signal conversion module, and a magnetic separator conversion switch. The magnetic separator conversion switch is connected to the magnetic separator start / stop switch, the magnetic separator signal conversion module, and the magnetic separator. The magnetic separator signal conversion module is connected to an industrial router via Ethernet communication. The second dewatering screen control component includes a second dewatering screen start / stop switch, a second dewatering screen signal conversion module, and a second dewatering screen conversion switch. The second dewatering screen conversion switch is connected to the second dewatering screen start / stop switch, the second dewatering screen signal conversion module, and the second dewatering screen. The second dewatering screen signal conversion module is connected to an industrial router via Ethernet communication. The first conveyor belt control component includes a first conveyor belt start / stop switch, a first conveyor belt signal conversion module, and a first conveyor belt conversion switch. The first conveyor belt conversion switch is connected to the first conveyor belt start / stop switch, the first conveyor belt signal conversion module, and the first conveyor belt. The first conveyor belt signal conversion module is connected to an industrial router via Ethernet communication. The second conveyor belt control component includes a second conveyor belt start / stop switch, a second conveyor belt signal conversion module, and a second conveyor belt conversion switch. The second conveyor belt conversion switch is connected to the second conveyor belt start / stop switch, the second conveyor belt signal conversion module, and the second conveyor belt. The second conveyor belt signal conversion module is connected to an industrial router via Ethernet communication. The third conveyor belt control component includes a third conveyor belt start / stop switch, a third conveyor belt signal conversion module, and a third conveyor belt conversion switch. The third conveyor belt conversion switch is connected to the third conveyor belt start / stop switch, the third conveyor belt signal conversion module, and the third conveyor belt. The third conveyor belt signal conversion module is connected to an industrial router via Ethernet communication. The fourth conveyor belt control component includes a fourth conveyor belt start / stop switch, a fourth conveyor belt signal conversion module, and a fourth conveyor belt conversion switch. The fourth conveyor belt conversion switch is connected to the fourth conveyor belt start / stop switch, the fourth conveyor belt signal conversion module, and the fourth conveyor belt. The fourth conveyor belt signal conversion module is connected to an industrial router via Ethernet communication. The first delivery pump control component includes a first delivery pump start / stop switch, a first delivery pump signal conversion module, and a first delivery pump changeover switch. The first delivery pump changeover switch is connected to the first delivery pump start / stop switch, the first delivery pump signal conversion module, and the first delivery pump. The first delivery pump signal conversion module is connected to an industrial router via Ethernet communication. The water spray device control component includes a water spray device start / stop switch, a water spray device signal conversion module, and a water spray device conversion switch. The water spray device conversion switch is connected to the water spray device start / stop switch, the water spray device signal conversion module, and the water spray device. The water spray device signal conversion module is connected to an industrial router via Ethernet communication.

2. The control system for a wet milling production line according to claim 1, characterized in that: It also includes a safety screen control unit, a second conveying pump control unit, a first dewatering screen control unit, and a fifth conveyor belt control unit that are connected to an industrial router via Ethernet communication; The safety screen control component includes a safety screen start / stop switch, a safety screen signal conversion module, and a safety screen conversion switch. The safety screen conversion switch is connected to the safety screen start / stop switch, the safety screen signal conversion module, and the safety screen. The safety screen signal conversion module is connected to an industrial router via Ethernet communication. The second delivery pump control component includes a second delivery pump start / stop switch, a second delivery pump signal conversion module, and a second delivery pump switch. The second delivery pump switch is connected to the second delivery pump start / stop switch, the second delivery pump signal conversion module, and the second delivery pump. The second delivery pump signal conversion module is connected to an industrial router via Ethernet communication. The first dewatering screen control component includes a first dewatering screen start / stop switch, a first dewatering screen signal conversion module, and a first dewatering screen conversion switch. The first dewatering screen conversion switch is connected to the first dewatering screen start / stop switch, the first dewatering screen signal conversion module, and the first dewatering screen. The first dewatering screen signal conversion module is connected to an industrial router via Ethernet communication. The fifth conveyor belt control component includes a fifth conveyor belt start / stop switch, a fifth conveyor belt signal conversion module, and a fifth conveyor belt conversion switch. The fifth conveyor belt conversion switch is connected to the fifth conveyor belt start / stop switch, the fifth conveyor belt signal conversion module, and the fifth conveyor belt. The fifth conveyor belt signal conversion module is connected to an industrial router via Ethernet communication.

3. The control system for a wet milling production line according to claim 2, characterized in that: It also includes a sixth conveyor belt control component that is connected to an industrial router via Ethernet communication. The sixth conveyor belt control component includes a sixth conveyor belt start / stop switch, a sixth conveyor belt signal conversion module, and a sixth conveyor belt changeover switch. The sixth conveyor belt changeover switch is connected to the sixth conveyor belt start / stop switch, the sixth conveyor belt signal conversion module, and the sixth conveyor belt, respectively. The sixth conveyor belt signal conversion module is connected to the industrial router via Ethernet communication.

Citation Information

Patent Citations

  • Wet-process preparation method and production line of high-purity quartz sand

    CN112756101A

  • A digital intelligent production control system for quartz sand

    CN114527718B

  • Quartz sand production line

    CN212383850U

  • Wet preparation production line of high-purity quartz sand

    CN214864341U

  • Novel crusher intelligent control system