Novel temporary fence protective fence for municipal construction

By designing new adjustment and installation components for temporary municipal construction site fencing, the problems of long installation time and ineffective obstruction in existing technologies have been solved, achieving rapid installation and effective obstruction isolation, thereby improving construction efficiency and equipment safety.

CN224244576UActive Publication Date: 2026-05-15XINJIANG SHIYI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
XINJIANG SHIYI CONSTR ENG CO LTD
Filing Date
2025-05-26
Publication Date
2026-05-15

AI Technical Summary

Technical Problem

Existing temporary construction site fencing for municipal projects lacks a quick-fixing function, resulting in long installation times, high costs, and an inability to effectively block debris, thus affecting construction progress and equipment safety.

Method used

A novel temporary construction site fencing for municipal projects has been designed, comprising an adjustment mechanism and installation components. It utilizes components such as rotating rods, bearings, support frames, rollers, and pressure-bearing mechanisms to achieve rapid and stable installation. Furthermore, it isolates debris and protects equipment and the environment through components such as cover plates, interlocking rods, springs, locking blocks, and connectors.

Benefits of technology

It enables rapid and stable installation of fencing, reduces construction preparation time and costs, effectively isolates debris, protects equipment, and keeps the construction area clean.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224244576U_ABST
    Figure CN224244576U_ABST
Patent Text Reader

Abstract

The utility model discloses a novel municipal construction temporary fence protective guard, including main part, adjusting mechanism and mounting subassembly, the adjusting mechanism includes rotating rod, bearing, support frame, rolling shaft and pressure bearing mechanism, the pressure bearing mechanism includes cover plate, bite rod, first spring, fixture block and connecting piece, the mounting subassembly includes the main part, adjusting mechanism includes the rotating rod, bearing, support frame, rolling shaft and pressure bearing mechanism, pressure bearing mechanism includes cover plate, bite rod, first spring, fixture block and connecting piece. The installation assembly comprises a baffle, a fixing block and a threaded sleeve, under the mutual cooperation effect of the mechanisms, the fence can be rapidly and stably fixed to the ground, the preparation time before construction is shortened, in addition, in the construction process of the device, sundries may damage equipment, the fence can effectively isolate the sundries, and the construction efficiency is improved. Other on-site devices and mechanical equipment are protected, and normal operation of the equipment is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of construction protection technology, specifically a new type of temporary protective fence for municipal construction. Background Technology

[0002] The design and application of new temporary construction site fencing and protective barriers are usually aimed at improving safety, environmental protection, and aesthetics.

[0003] If the guardrail does not have a quick-fix function, the fence requires more time and effort to install securely, increasing the management and construction costs of the construction site.

[0004] Secondly, if debris is not blocked in time, it may fall onto the machinery, causing damage, affecting the construction progress and increasing maintenance costs.

[0005] Finally, without the function of quickly fixing the baffle, a lot of time and manpower are required every time the baffle is adjusted or replaced, which may result in less flexible operation on the construction site and thus affect the construction progress. Utility Model Content

[0006] (a) Technical problems to be solved

[0007] To address the shortcomings of existing technologies, this utility model provides a novel temporary construction site fencing for municipal projects, thereby resolving the technical problems mentioned in the background section.

[0008] (II) Technical Solution

[0009] To achieve the above objectives, this utility model provides the following technical solution: a novel temporary construction site fencing for municipal projects, comprising a main body, an adjustment mechanism, and an installation assembly. The adjustment mechanism includes a rotating rod, a bearing, a support frame, a roller, and a pressure-bearing mechanism. The rotating rod is mounted on the main body, and the bearing is fixedly mounted on the main body. The rotating rod is rotatably connected to the bearing. The support frame is installed inside the main body and is slidably connected to the main body and mates with the rotating rod. The first roller is installed in the support frame and rotatably connected to the support frame. The pressure-bearing mechanism includes a cover plate, a biting rod, a first spring, a locking block, and a connecting piece. The cover plate is mounted on the main body and mates with the support frame. The biting rod is mounted on the support frame and mates with the support frame. The first spring is installed inside the biting rod, and its other end is fixedly connected to the locking block. The locking block is installed in the biting rod and slidably connected to the biting rod. The connecting piece is installed on the biting rod and is fixedly connected to the locking block and rotatably connected to the biting rod.

[0010] Preferably, the mounting assembly includes a baffle, a fixing block, and a threaded sleeve. The baffle is mounted on the support frame and is connected to the support frame in a cooperative manner. The fixing block is mounted on the baffle and is connected to the support frame in a cooperative manner. The threaded sleeve is mounted on the baffle and is rotatably connected to the fixing block and in a cooperative manner with the baffle, respectively.

[0011] In a further preferred embodiment, a water tank is provided at the bottom of the main body, and a water inlet pipe is provided on the water tank to facilitate the stability of the device.

[0012] In a further preferred embodiment, the rotating rod is provided with a screw, the main body is provided with a sliding groove, the roller is slidably connected to the sliding groove, and the support frame is threadedly engaged with the screw, which facilitates the stable sliding of the support frame.

[0013] In a further preferred embodiment, the support frame is provided with a locking hole, the locking block is provided with a connecting rope spring, the locking block is connected to the locking hole, and the connecting rope is fixedly connected to the connecting piece, which facilitates the fixing of the biting rod to the support frame.

[0014] In a further preferred embodiment, a push plate and a second spring are installed inside the support frame, with the other end of the second spring fixedly connected to the push plate. The push plate is installed in the support frame and slidably connected to the support frame, facilitating the removal and placement of the biting rod.

[0015] In a further preferred embodiment, the cover plate is provided with an insertion hole, and the biting rod is connected to the insertion hole to facilitate the cover plate being fixedly installed on the support frame and to facilitate the installation of the baffle.

[0016] In a further preferred embodiment, the baffle is provided with an installation rod, the support frame is provided with an embedding groove, the threaded sleeve is connected to the installation rod, and the fixing block is connected to the embedding hole, which facilitates the installation and fixing of the baffle.

[0017] (III) Beneficial Effects

[0018] Compared with the prior art, this utility model provides a new type of temporary construction site fencing for municipal projects, which has the following advantages:

[0019] By setting an adjustment mechanism, this device can quickly and stably fix the fence to the ground through the cooperation of components such as rotating rod, bearing, support frame, roller and pressure bearing mechanism, reducing the preparation time before construction.

[0020] In this utility model, by setting up the pressure-bearing mechanism, under the mutual cooperation of components such as the cover plate, the biting rod, the first spring, the locking block and the connecting parts, this device can effectively isolate debris that may damage the equipment during construction, protect other devices and mechanical equipment on site, and ensure the normal operation of the equipment.

[0021] In this utility model, by setting up installation components, with the cooperation of components such as baffles, fixing blocks and threaded sleeves, this device can block debris through the protective railing, thereby reducing the pollution of the surrounding environment by garbage and debris generated during construction and keeping the construction area clean. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of the overall structure of a novel temporary construction site guardrail for municipal projects according to this utility model.

[0023] Figure 2 This is a schematic diagram of the overall structure of this utility model from another angle;

[0024] Figure 3 This is a schematic diagram of the pressure-bearing mechanism in this utility model;

[0025] Figure 4 This is an exploded view of the mounting components in this utility model;

[0026] Figure 5 This is an exploded view of the pressure-bearing mechanism in this utility model;

[0027] Figure 6 This is an exploded view of the pressure-bearing mechanism from another angle in this utility model.

[0028] In the diagram: 1. Main body; 2. Rotating rod; 3. Bearing; 4. Support frame; 5. Roller; 6. Cover plate; 7. Engaging rod; 8. First spring; 9. Locking block; 10. Connecting piece; 11. Baffle; 12. Fixing block; 13. Threaded sleeve; 14. Water tank; 15. Water inlet pipe; 16. Screw; 17. Sliding groove; 18. Locking hole; 19. Connecting rope; 20. Second spring; 21. Push plate; 22. Insertion hole; 23. Mounting rod; 24. Embedding groove. Detailed Implementation

[0029] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0030] Example 1:

[0031] Please see Figures 1-6A novel temporary construction site fencing for municipal engineering includes a main body 1, an adjustment mechanism, and installation components. The adjustment mechanism includes a rotating rod 2, a bearing 3, a support frame 4, a first roller 5, and a pressure-bearing mechanism. The rotating rod 2 is mounted on the main body 1, and the bearing 3 is fixedly mounted on the main body 1. The rotating rod 2 and the bearing 3 are rotatably connected. The support frame 4 is installed inside the main body 1 and is slidably connected to the main body 1 and cooperates with the rotating rod 2. The first roller 5 is installed in the support frame 4 and is rotatably connected to the support frame 4. The pressure-bearing mechanism includes a cover plate 6, a biting rod 7, a first spring 8, a locking block 9, and a connecting piece 10. The cover plate 6 is mounted on the main body 1 and cooperates with the support frame 4. The biting rod 7 is mounted on the support frame 4 and cooperates with the support frame 4. The first spring 8 is installed inside the biting rod 7, and its other end is fixedly connected to the locking block 9. The locking block 9 is installed in the biting rod 7 and is slidably connected to the biting rod 7. The connecting piece 10 is installed on the biting rod 7 and is fixedly connected to the locking block 9 and rotatably connected to the biting rod 7.

[0032] In this embodiment, the adjustment mechanism includes a rotating rod 2, a bearing 3, a support frame 4, a first roller 5, and a pressure-bearing mechanism. In use, the rotating rod 2, which is mounted on the main body 1, is rotated so that the screw 16 on the rotating rod 2 engages with the support frame 4, thereby allowing the support frame 4 to slide inside the main body 1. When the support frame 4 slides, the first roller 5 slides in the first groove. Under the action of the bearing 3, the rotating rod 2 rotates more smoothly. In order to increase the stability of the device, water can be injected into the water inlet pipe 15 of the water tank 14 at the bottom of the main body 1 during use.

[0033] In this embodiment, the pressure-bearing mechanism includes a cover plate 6, a biting rod 7, a first spring 8, a locking block 9, and a connecting piece 10. During use, to prevent the connection between the screw 16 inside the main body 1 and the support frame 4 from being affected by debris that may appear on the construction site, after the support frame 4 is fixed, the cover plate 6 can be installed onto the main body 1. Then, the biting rod 7 is inserted into the support frame 4. The biting rod 7 passes through the insertion hole 22 of the cover plate 6 and contacts the push plate 21, thereby compressing the second spring 20. When the biting rod 7 is fixed on the support frame 4, the connector 10 can be rotated so that the connector 10 can stretch the connecting rope 19. After the connecting rope 19 is stretched, it begins to wrap around the connector 10, thereby retracting the locking block 9 into the biting rod 7 and compressing the first spring 8. When the biting rod 7 is fully inserted into the support frame 4, the connector 10 is released, so that the locking block 9 is directly ejected by the action of the first spring 8 and engages with the locking hole 18, thereby fixing the biting rod 7 installed in the support frame 4.

[0034] In this embodiment, the mounting assembly includes a baffle 11, a fixing block 12, and a threaded sleeve 13. In use, the baffle 11 is mounted on the support frame 4, and the mounting rod 23 on the baffle 11 slides on the support frame 4. After the baffle 11 is installed into the support frame 4, the fixing block 12 can be mounted on the mounting rod 23, and the threaded sleeve 13 is threaded into the mounting rod 23. The fixing block 12 is subjected to force and enters the embedding groove 24 of the support frame 4, thereby fixing the baffle 11 in the support frame 4.

[0035] Example 2:

[0036] In summary, during use, firstly, the rotating rod 2 installed on the main body 1 is rotated, causing the screw 16 on the rotating rod 2 to engage with the support frame 4, allowing the support frame 4 to slide inside the main body 1. While the support frame 4 slides, the first roller 5 slides in the first groove, and under the action of the bearing 3, the rotating rod 2 rotates more smoothly. To increase the stability of the device, water can be injected into the water inlet pipe 15 of the water tank 14 at the bottom of the main body 1. Furthermore, to prevent the connection between the screw 16 inside the main body 1 and the support frame 4 from being affected by debris that may appear on the construction site, after the support frame 4 is fixed, the cover plate 6 can be installed onto the main body 1. Then, the biting rod 7 is inserted into the support frame 4. The biting rod 7 passes through the insertion hole 22 of the cover plate 6 and contacts the push plate 21, thereby compressing the second spring 20. When the engaging rod 7 is fixed on the support frame 4, the connecting piece 10 can be rotated to stretch the connecting rope 19. After the connecting rope 19 is stretched, it begins to wrap around the connecting piece 10, thereby retracting the locking block 9 into the engaging rod 7 and compressing the first spring 8. When the engaging rod 7 is fully inserted into the support frame 4, the connecting piece 10 is released, allowing the locking block 9 to pop out directly under the action of the first spring 8 and engage with the locking hole 18, thereby fixing the engaging rod 7 installed in the support frame 4. After the main body 1 is prepared, the baffle 11 is installed on the support frame 4, and the mounting rod 23 on the baffle 11 slides on the support frame 4. After the baffle 11 is installed into the support frame 4, the fixing block 12 can be installed on the mounting rod 23, and the threaded sleeve 13 is threadedly engaged with the mounting rod 23. The fixing block 12 is forced into the embedding groove 24 of the support frame 4, thereby fixing the baffle 11 in the support frame 4.

[0037] Of all the solutions mentioned above, those involving the connection between two components can be selected according to the actual situation, such as welding, bolt and nut connection, bolt or screw connection, or other known connection methods, which will not be elaborated here. For all the fixed connections mentioned above, welding is preferred. Although embodiments of this utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of this utility model. The scope of this utility model is defined by the appended claims and their equivalents.

Claims

1. A novel temporary construction site fencing for municipal engineering, comprising a main body (1), an adjustment mechanism, and installation components, characterized in that, The adjusting mechanism includes a rotating rod (2), a bearing (3), a support frame (4), a roller (5), and a pressure-bearing mechanism. The rotating rod (2) is mounted on the main body (1), the bearing (3) is fixedly mounted on the main body (1), and the rotating rod (2) is rotatably connected to the bearing (3). The support frame (4) is installed inside the main body (1) and is slidably connected to the main body (1) and cooperates with the rotating rod (2). The roller (5) is installed in the support frame (4) and is rotatably connected to the support frame (4). The pressure-bearing mechanism includes a cover plate (6), a biting rod (7), and a first... A spring (8), a locking block (9), and a connector (10) are provided. The cover plate (6) is installed on the main body (1) and is connected to the support frame (4). The biting rod (7) is installed on the support frame (4) and is connected to the support frame (4). The first spring (8) is installed inside the biting rod (7) and its other end is fixedly connected to the locking block (9). The locking block (9) is installed in the biting rod (7) and is slidably connected to the biting rod (7). The connector (10) is installed on the biting rod (7) and is fixedly connected to the locking block (9) and rotatably connected to the biting rod (7).

2. The novel temporary construction site fencing and protective barrier according to claim 1, characterized in that: The mounting assembly includes a baffle (11), a fixing block (12), and a threaded sleeve (13). The baffle (11) is mounted on the support frame (4) and is connected to the support frame (4). The fixing block (12) is mounted on the baffle (11) and is connected to the support frame (4). The threaded sleeve (13) is mounted on the baffle (11) and is rotatably connected to the fixing block (12) and connected to the baffle (11) respectively.

3. A novel temporary construction site fencing and protective barrier according to claim 2, characterized in that: The main body (1) is provided with a water tank (14) at the bottom, and a water inlet pipe (15) is provided on the water tank (14).

4. A novel temporary construction site fencing and protective barrier according to claim 2, characterized in that: The rotating rod (2) is provided with a screw (16), the main body (1) is provided with a sliding groove (17), the roller (5) is slidably connected to the sliding groove (17), and the support frame (4) is threadedly engaged with the screw (16).

5. A novel temporary construction site fencing and protective barrier according to claim 1, characterized in that: The support frame (4) is provided with a card hole (18), and the card block (9) is provided with a connecting rope (19). The card block (9) is connected to the card hole (18), and the connecting rope (19) is fixedly connected to the connector (10).

6. A novel temporary construction site fencing and protective barrier according to claim 3, characterized in that: The support frame (4) is equipped with a push plate (21) and a second spring (20). The other end of the second spring (20) is fixedly connected to the push plate (21). The push plate (21) is installed in the support frame (4) and is slidably connected to the support frame (4).

7. A novel temporary construction site fencing and protective barrier according to claim 2, characterized in that: The cover plate (6) is provided with an insertion hole (22), and the biting rod (7) is connected to the insertion hole (22) to facilitate the cover plate (6) to be fixedly installed on the support frame (4).

8. A novel temporary construction site fencing and protective barrier according to claim 7, characterized in that: The baffle (11) is provided with an installation rod (23), the support frame (4) is provided with an embedding groove (24), the threaded sleeve (13) is connected to the installation rod (23), and the fixing block (12) is connected to the embedding groove (24).