A construction device for double pile caps with prefabricated berthing components.

By using a double-pile cap construction device with prefabricated berthing components, precise alignment of the berthing components was achieved through a suspension device and a monitoring system. This solved the problem of poor alignment accuracy in traditional construction, improved construction quality and efficiency, and reduced equipment investment and material waste.

CN224281243UActive Publication Date: 2026-05-26THE FIRST CONSTRUCTION COMPANY OF CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
THE FIRST CONSTRUCTION COMPANY OF CCCC SECOND HARBOR ENGINEERING CO LTD
Filing Date
2025-05-19
Publication Date
2026-05-26

AI Technical Summary

Technical Problem

In traditional construction methods, it is difficult to control the alignment accuracy of the ship's components, resulting in poor construction quality, serious material waste, and cumbersome construction steps, which cannot fully utilize the stress characteristics of the supporting structure.

Method used

A double-pile cap construction device with prefabricated berthing components is adopted, including a suspension device, clamps, support beams and monitoring devices. The position of the berthing components is adjusted by the suspension device, and the horizontal state and angle are finely adjusted by the winch and motor. Precise alignment is achieved by combining a laser emitter and a photosensitive plate.

Benefits of technology

It improved construction quality and efficiency, reduced the investment in machinery and equipment, simplified the operation process, enhanced structural stability, and improved alignment accuracy and reusability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224281243U_ABST
    Figure CN224281243U_ABST
Patent Text Reader

Abstract

This utility model provides a construction device for double pile caps with prefabricated berthing components. It includes a concrete pile, a suspension device at the top of the concrete pile, a berthing component on one side of the suspension device, a clamp below the suspension device that fits around the outer circumference of the concrete pile, a connecting rod between the clamp and the suspension device, and a support beam above the clamp. This device is practical, convenient, economical, and significantly improves construction speed and quality. Compared with traditional construction techniques for dock pile caps with berthing components, this method reduces the investment in mechanical equipment during berthing component installation. It is particularly suitable for the construction of pile caps with berthing components, as it is difficult to control the alignment accuracy of the berthing components when using a crane for suspension. The device is easy to operate, highly efficient, and solves the problem of controlling the alignment accuracy of the berthing components when using a crane for suspension.