Ceiling repair hoisting structure
By designing a hoisting storage box and winding assembly, the problem of wire ropes easily getting tangled during unfolding or winding was solved, achieving stable winding of the wire ropes and improving the efficiency of hoisting preparation and finishing work.
Patent Information
- Application Number
- CN202521781496.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-21
- Publication Date
- 2026-08-25
- Estimated Expiration
- 2035-08-21
AI Technical Summary
In existing hoisting structures, wire ropes are prone to tangling when being deployed or retracted, causing inconvenience in hoisting preparation and finishing work.
Design a structure including a hoisting storage box, a winding assembly, a wire rope, and a hook. The wire rope is wound around the winding assembly and coiled inside the hoisting storage box. When in use, the storage box is hoisted by a crane. When unfolding or storing, it is fixed and stored by pulling the wire rope.
This achieved stable cable bundling, avoided tangling, and improved the efficiency of lifting preparation and finishing work.
Smart Images

Figure CN224677615U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of hoisting technology, specifically relating to a ceiling repair hoisting structure. Background Technology
[0002] Toll station roofs are mostly made of steel or concrete, with a certain height and span, and are quite heavy. They are susceptible to damage from long-term exposure to natural environmental factors, necessitating repairs to ensure traffic safety and facility integrity. Repairs involve removing old components and installing new ones. Due to the weight and height of the components, specialized hoisting structures and cranes are required for lifting operations to ensure safe and efficient construction while minimizing disruption to normal traffic flow at the toll station.
[0003] Existing hoisting structures have certain drawbacks in use. The wire ropes used to bind and hook the new components are prone to getting tangled together when being deployed or retracted, making it difficult to connect with the new components and causing inconvenience to the preparation work before hoisting and the follow-up work after hoisting. Therefore, it is necessary to design a new hoisting structure to solve this problem. Utility Model Content
[0004] The purpose of this utility model is to provide a ceiling repair hoisting structure to solve the problem mentioned in the background art that the steel wire ropes of the existing hoisting structures are not easy to unfold or store.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a ceiling repair hoisting structure, comprising... Rectangular hanging storage box; The winding assembly, symmetrically arranged inside both ends of the hoisting storage box, includes a central shaft and three partition plates fixed to the surface of the central shaft. The partition plates extend out from both ends of the central shaft and are rotatably connected to the inner wall of the hoisting storage box. The steel wire rope is wound around the surface of the central shaft and located between the partition plates; the perforation is opened at the bottom of the hoisting and storage box for the bottom end of the steel wire rope to extend out; and the hook is connected to the bottom end of the steel wire rope. The locking assembly includes a fixing rod fixed to one end of the central shaft, a plug-in rod elastically connected to one end of the fixing rod, and a socket formed on the surface of the hoisting storage box and inserted into the plug-in rod.
[0006] Preferably, one end of the central shaft is rotatably embedded into the inner wall of the hoisting storage box, while the other end extends out of the hoisting storage box.
[0007] Preferably, the locking assembly further includes a handle, which is fixed to the outer end of the plug rod.
[0008] Preferably, the locking assembly further includes a fixing post, which is fixed to one end surface of the fixing rod, and the insertion rod slides through the fixing rod and the fixing post.
[0009] Preferably, the locking assembly further includes a spring, which is sleeved on the outside of the fixing post and its two ends are respectively fixedly connected to the fixing rod and the handle.
[0010] Preferably, the top hook assembly further includes a top hook, which is fixed to the top surface of the hoisting storage box.
[0011] Preferably, the top hook assembly further includes reinforcing ribs, which are fixed between the two sides of the top hook and the top surface of the hoisting storage box.
[0012] Compared with the prior art, the beneficial effects of this utility model are: The design incorporates components such as a hoisting and storage box, a winding assembly, wire rope, and hooks. Under normal conditions, the wire rope can be wound around the winding assembly and stored inside the hoisting and storage box. In use, a crane can be used to lift the hoisting and storage box, and then the wire rope can be pulled out from inside the box by pulling. The new component is then hooked and secured with the hook, and finally, the hoisting and storage box is lifted to hoist the new component. After the lifting is completed, the wire rope can be re-stored inside the hoisting and storage box. The advantage of this design is that it can stably store the wire rope, making it less prone to tangling during unfolding or storage, which facilitates quick preparation and completion of lifting work. Attached Figure Description
[0013] Figure 1 This is a three-dimensional schematic diagram of the present invention; Figure 2 This is a three-dimensional schematic diagram of the winding assembly of this utility model; Figure 3 This is a front sectional view of one end of the hoisting storage box of this utility model; Figure 4 This is a top sectional view of one end of the hoisting storage box of this utility model; Figure 5 This utility model Figure 4 Enlarged view of area A in the middle; In the diagram: 100, hoisting and storage box; 200, winding assembly; 201, central shaft; 202, divider; 300, wire rope; 400, hook; 500, top hook assembly; 501, top hook; 502, reinforcing rib; 600, locking assembly; 601, fixing rod; 602, plug-in rod; 603, insertion hole; 604, handle; 605, fixing stake; 606, spring; 700, perforation. Detailed Implementation
[0014] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model. Example
[0015] Please see Figures 1 to 5 This embodiment provides a technical solution: a ceiling repair hoisting structure, comprising... 100 rectangular hoisting storage box; The winding assembly 200, symmetrically arranged inside both ends of the hoisting storage box 100, includes a central shaft 201 and three partition plates 202 fixed to the surface of the central shaft 201. The three partition plates 202 divide the central shaft 201 into two areas. Both ends of the central shaft 201 extend out of the partition plates 202 and are rotatably connected to the inner wall of the hoisting storage box 100. The winding assembly 200 can rotate inside the hoisting storage box 100. The steel wire rope 300 is wound around the surface of the central shaft 201 and located between the partition plates 202; the through hole 700 is opened at the bottom of the hoisting and storage box 100 for the bottom end of the steel wire rope 300 to extend out; and the hook 400 is connected to the bottom end of the steel wire rope 300. The two areas on the central shaft 201 are respectively wound with steel wire rope 300. The hoisting and storage box 100 is symmetrically provided with winding components 200 at both ends. Therefore, there are a total of four steel wire ropes 300. With the help of the hook 400, the new parts can be stably hooked. The locking assembly 600 includes a fixing rod 601 fixed to one end of the central shaft 201, a plug rod 602 elastically connected to one end of the fixing rod 601, and a socket 603 formed on the surface of the hoisting storage box 100 and inserted into the plug rod 602. The sockets 603 are arranged in a ring on the surface of the hoisting storage box 100. When the plug rod 602 and the socket 603 are inserted, the winding assembly 200 can be locked. The winding assembly 200 can be rotated by simply pulling the plug rod 602 out of the socket 603, thereby winding and unwinding the wire rope 300.
[0016] In this embodiment, preferably, one end of the central shaft 201 is rotatably embedded into the inner wall of the hoisting storage box 100, and the other end extends out of the hoisting storage box 100, thereby realizing a rotatable connection between the winding assembly 200 and the hoisting storage box 100.
[0017] In this embodiment, preferably, the locking component 600 further includes a handle 604, which is fixed to the outer end of the insertion rod 602, and the winding component 200 can be rotated by the handle 604.
[0018] In this embodiment, preferably, the locking component 600 further includes a fixing post 605, which is fixed to one end surface of the fixing rod 601. The plug rod 602 slides through the fixing rod 601 and the fixing post 605 to achieve a sliding connection between the plug rod 602 and the fixing rod 601.
[0019] In this embodiment, preferably, the locking component 600 further includes a spring 606. The spring 606 is sleeved on the outside of the fixing post 605, and its two ends are fixedly connected to the fixing rod 601 and the handle 604 respectively. The elastic force of the spring 606 can pull the plug rod 602 to be stably inserted into the socket 603. If the winding component 200 is to be rotated, the handle 604 can be held and pulled outward to pull the plug rod 602 out of the socket 603, and then the winding component 200 can be rotated using the handle 604.
[0020] In this embodiment, preferably, the top hook assembly 500 further includes a top hook 501, which is fixed to the top surface of the hoisting and storage box 100 and can be connected to the steel cable on the crane.
[0021] In this embodiment, preferably, the top hook assembly 500 further includes a reinforcing rib 502, which is fixed between the two sides of the top hook 501 and the top surface of the hoisting storage box 100, thereby strengthening and reinforcing the structure.
[0022] Although embodiments of the present invention have been shown and described (see the detailed description above), it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A ceiling repair hoisting structure, characterized in that: include Rectangular hoisting storage box (100); The winding assembly (200) symmetrically arranged inside both ends of the hoisting storage box (100) includes a central shaft (201) and three partition plates (202) fixed on the surface of the central shaft (201). The two ends of the central shaft (201) extend out of the partition plates (202) and are rotatably connected to the inner wall of the hoisting storage box (100). A wire rope (300) wound around the surface of the central shaft (201) and located between the partition plates (202), a through hole (700) opened at the bottom of the hoisting storage box (100) for the bottom end of the wire rope (300) to extend out, and a hook (400) connected to the bottom end of the wire rope (300). The locking assembly (600) includes a fixing rod (601) fixed to one end of the central shaft (201), a plug rod (602) elastically connected to one end of the fixing rod (601), and a plug hole (603) formed on the surface of the hoisting storage box (100) and inserted into the plug rod (602).
2. The ceiling repair hoisting structure according to claim 1, characterized in that: One end of the central shaft (201) is rotatably embedded into the inner wall of the hoisting storage box (100), and the other end extends out of the hoisting storage box (100).
3. The ceiling repair hoisting structure according to claim 2, characterized in that: The locking assembly (600) also includes a handle (604) fixed to the outer end of the plug rod (602).
4. The ceiling repair hoisting structure according to claim 3, characterized in that: The locking assembly (600) further includes a fixing post (605) fixed to one end surface of the fixing rod (601), and the plug rod (602) slides through the fixing rod (601) and the fixing post (605).
5. The ceiling repair hoisting structure according to claim 4, characterized in that: The locking assembly (600) also includes a spring (606) which is sleeved on the outside of the fixing post (605) and whose two ends are fixedly connected to the fixing rod (601) and the handle (604) respectively.
6. The ceiling repair hoisting structure according to claim 5, characterized in that: The top hook assembly (500) also includes a top hook (501) which is fixed to the top surface of the hoisting storage box (100).
7. The ceiling repair hoisting structure according to claim 6, characterized in that: The top hook assembly (500) also includes a reinforcing rib (502), which is fixed between the two sides of the top hook (501) and the top surface of the hoisting storage box (100).