By designing a tower crane foundation with pile foundations and foundation caps at the post-pouring strip location, combined with the bottom structure, the problem of difficult layout of traditional tower crane foundations at the post-pouring strip location is solved, realizing the safe and stable installation and hoisting operation of the tower crane.
Patent Information
- Application Number
- CN202521972722.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-15
- Publication Date
- 2026-08-25
- Estimated Expiration
- 2035-09-15
AI Technical Summary
Traditional tower crane foundations are difficult to place in the post-pouring strip, making it difficult to carry out hoisting operations, especially when the site is limited and tower cranes cannot be effectively installed.
Design a tower crane foundation at the post-cast strip location, with pile foundations set below the base slab. The foundation cap is located at the top view of the post-cast strip and is lower than the bottom of the base slab. Combined with the bottom structure, a stable structure is formed. Through the design of the foundation cap and base slab, the safe installation and hoisting operation of the tower crane are ensured.
This technology enables the safe and effective installation of tower cranes at the post-cast strip location, improving the safety and stability of hoisting operations during construction and solving the problems associated with traditional tower crane foundation layout.
Smart Images

Figure CN224678733U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of building construction technology, specifically relating to a tower crane foundation and bottom structure at the post-pouring strip location. Background Technology
[0002] Traditional tower crane foundations are difficult to position when encountering post-cast strips. The conventional approach is to avoid placing the foundation at the post-cast strip location. However, sometimes site constraints prevent relocation, making placement difficult. A difficult-to-position tower crane foundation means it's difficult to install the required tower crane, hindering hoisting operations. Currently, there is a need to develop a new type of tower crane foundation that can be positioned at the top view of the post-cast strip for tower crane installation during construction. Simultaneously, a new base structure needs to be developed to integrate with the tower crane foundation, forming a stable structure. Utility Model Content
[0003] To address the aforementioned problems in the prior art, this utility model provides a tower crane foundation located at the post-cast strip position, which is arranged at the top view of the post-cast strip and can be used for tower crane installation during the construction period.
[0004] The present invention adopts the following technical solution: A tower crane foundation at the post-cast strip location includes pile foundations and a foundation cap; the pile foundations are located below the base slab; the foundation cap is located on the pile foundations and at the top of the post-cast strip in a top view, and the top of the foundation cap is lower than the bottom of the base slab; the foundation cap is used to mount the tower crane. Furthermore, the pile foundation has several piles; the several piles are used to support the foundation cap.
[0005] Furthermore, the pile foundation consists of four piles; the four piles, viewed from above, are arranged in a square matrix.
[0006] Furthermore, the top of the foundation platform is 250mm to 400mm lower than the bottom of the base plate.
[0007] Another objective of this invention is to provide a bottom structure that, when combined with a tower crane foundation, forms a stable structure.
[0008] A bottom structure includes a base plate, a base plate cushion layer, and a tower crane foundation at a post-cast strip location; the base plate cushion layer is disposed beneath the base plate; and the tower crane foundation is disposed beneath the base plate cushion layer.
[0009] Furthermore, the thickness of the base plate is greater than the thickness of the base plate pad layer.
[0010] Furthermore, the base plate is provided with a first post-pouring strip area; the first post-pouring strip area connects to the area above the foundation cap used for setting up a tower crane.
[0011] Furthermore, the first post-cast strip area is connected to the original first post-cast strip.
[0012] Furthermore, the first post-cast strip area is connected to the original second post-cast strip.
[0013] Furthermore, the first post-pouring strip area, the original first post-pouring strip, and the original second post-pouring strip are used for pouring backfill material after the project is completed.
[0014] Compared with the prior art, the beneficial effects of this utility model are as follows: This utility model discloses a tower crane foundation at the post-cast strip location. The pile foundation is positioned below the base slab, and a foundation cap is placed on the pile foundation. The pile foundation supports the foundation cap, improving its stability. After installation, the foundation cap is located at the top of the post-cast strip in a top-down view, with its top lower than the bottom of the base slab. This design avoids the foundation cap being affected by the grooved area of the post-cast strip. A tower crane can be installed on top of the foundation cap for lifting operations during construction. This utility model provides a tower crane foundation positioned at the top of the post-cast strip in a top-down view, allowing for tower crane installation during construction and improving the safety of tower crane placement.
[0015] This utility model discloses a bottom structure that, when combined with a tower crane foundation, forms a stable structure. Attached Figure Description
[0016] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments: Figure 1 This is a top view of the post-cast strip; Figure 2 This is a top view of the post-cast strip encountered when arranging the tower crane foundation; Figure 3 This is a schematic diagram showing the tower crane foundation layout at the top view of the post-cast strip; Figure 4 This is an elevation view of a standard tower crane section mounted on a foundation platform via a positioning plate. Figure 5 yes Figure 4 A schematic diagram of dismantling a standard section of a tower crane; Figure 6 yes Figure 5 A schematic diagram of a straightened steel bar after a bend in the middle; Figure 7 yes Figure 6 A schematic diagram showing the pre-connection of the left and right reinforcing bars; Figure 8 yes Figure 7 Elevation view of the first post-cast strip area after concrete pouring.
[0017] Figure label: 1-Tower crane foundation; 11-Pile foundation; 12-Foundation cap; 121-Top; C-Elevation difference between the top of the foundation cap and the bottom of the base slab; 2-Base slab; A-Thickness of the base slab; 21-Base slab portion above the top of the foundation cap; 3-Post-cast strip; 31-Original first post-cast strip; 32-Original second post-cast strip; 4- Bottom structure; 5 - Base plate padding; B - Thickness of base plate padding; 6-First post-cast strip area; 61-Reinforcing steel; 62-Horizontal reinforcing steel; 7-Positioning plate; 8-Standard section. Detailed Implementation
[0018] The following will provide a clear and complete description of the concept, specific structure, and technical effects of this utility model in conjunction with the embodiments and accompanying drawings, so as to fully understand the purpose, solution, and effects of this utility model. It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. The same reference numerals used throughout the drawings indicate the same or similar parts.
[0019] It should be noted that, unless otherwise specified, when a feature is referred to as "fixed" or "connected" to another feature, it can be directly fixed or connected to the other feature, or indirectly fixed or connected to the other feature. Furthermore, the descriptions of "upper," "lower," "left," and "right" used in this utility model are only relative to the relative positional relationships of the various components of this utility model in the accompanying drawings.
[0020] Reference Figure 3 and Figure 4 A tower crane foundation 1 at the post-cast strip location includes a pile foundation 11 and a foundation cap 12; the pile foundation 11 is located below the base slab 2; the foundation cap 12 is located on the pile foundation 11, and the foundation cap 12 is located at the top view position of the post-cast strip 3, and the top 121 of the foundation cap 12 is lower than the bottom of the base slab 2; the foundation cap 12 is used to install the tower crane (the tower crane needs to be installed on the tower crane foundation 1 during construction; after the project is completed, the tower crane will be removed from the tower crane foundation 1). Reference Figure 3 and Figure 4 In one embodiment, the pile foundation 11 is provided with a plurality of piles; the plurality of pile foundations 11 are used to support the foundation cap 12.
[0021] Reference Figure 3 In one embodiment, the pile foundation 11 is provided with four piles; the four pile foundations 11, when viewed from above, are arranged in a square matrix (2 rows × 2 columns).
[0022] Reference Figure 3 and Figure 4 In one embodiment, the pile foundation 11 has a circular cross-section.
[0023] Reference Figure 3 and Figure 4 In one embodiment, the top 121 of the foundation platform 12 is 250mm to 400mm lower than the bottom of the base plate 2 (refer to...). Figure 4 (As shown in C). In this embodiment, the top 121 of the foundation platform 12 is 300mm lower than the bottom of the base plate 2 (refer to...). Figure 4 (as shown in C).
[0024] Another objective of this invention is to provide a bottom structure that, when combined with a tower crane foundation, forms a stable structure.
[0025] Reference Figures 3 to 8 A bottom structure 4 includes a bottom plate 2, a bottom plate pad 5, and a tower crane foundation 1 at the location of a post-cast strip; the bottom plate pad 5 is provided under the bottom plate 2; and the tower crane foundation 1 is provided under the bottom plate pad 5.
[0026] In one embodiment, the thickness of the base plate 2 is greater than the thickness of the base plate pad 5.
[0027] In one embodiment, the thickness of the base plate 2 is referenced. Figure 4 As shown in A; the thickness of the base plate pad is as described in reference. Figure 4 As shown in B in the diagram.
[0028] In one embodiment, the base plate 2 is provided with a first post-pouring strip area 6; the first post-pouring strip area 6 connects to the area above the foundation platform 12 where a tower crane is installed.
[0029] Reference Figure 3 and Figure 4 In one embodiment, a positioning plate 7 is provided above the foundation platform 12; the positioning plate 7 is used to connect with the standard section 8 of the tower crane.
[0030] Reference Figure 3 and Figure 4 In one embodiment, the first post-cast strip area 6 is connected to the original first post-cast strip 31.
[0031] Reference Figure 3 and Figure 4 In one embodiment, the first post-cast strip area 6 is connected to the original second post-cast strip 32.
[0032] In one embodiment, the first post-pouring strip area 6, the original first post-pouring strip 31, and the original second post-pouring strip 32 are used for pouring backfill material (such as pouring concrete) after the project is completed.
[0033] In one embodiment, the depth of the original first post-cast strip 31 is less than or equal to the thickness A of the base plate.
[0034] In one embodiment, the depth of the original second post-cast strip 32 is less than or equal to the thickness A of the base plate.
[0035] Reference Figure 1 In one embodiment, the original first post-cast strip 31 and the original second post-cast strip 32 are arranged in a "T" shape when viewed from a top plan.
[0036] Reference Figures 1 to 8 In one embodiment, the application process of the bottom structure of this utility model is as follows: When arranging the tower crane foundation 1, if the location of the post-cast strip 3 cannot be avoided, the top 121 of the foundation platform 12 of the tower crane foundation 1 should be set 300mm lower than the bottom of the base plate 2 (refer to...). Figure 4 (As shown in C in the diagram); When constructing the base slab 2, the area above the foundation cap 12 where the tower crane standard section 8 is installed and the surrounding area are reserved for the first post-pouring strip area 6; Before pouring the base slab 2, a steel bar 61 that needs to be bent is reserved at the first post-pouring strip area 6; When pouring the base slab 2, in addition to "the first post-pouring strip area 6, the original first post-pouring strip 31, and the original second post-pouring strip 32", the corresponding base slab portion 21 above the top of the foundation cap (refer to...) Figure 3 and Figure 4 ), and was cast together with the top of the foundation cap 12.
[0037] Because a tower crane is needed during construction, it will be installed on the foundation pier 12 for hoisting operations. The tower crane will be dismantled after project completion. After dismantling, the top 121 of the foundation pier 12 at the first post-pouring strip area 6 will be roughened with tools to facilitate subsequent concrete pouring at the first post-pouring strip area 6, ensuring a stable connection between the concrete and the top 121 of the foundation pier 12. After dismantling, the bent reinforcing bars 61 on the base plate 2 will be adjusted to be horizontal, and then horizontal reinforcing bars 62 will be used to connect the left and right reinforcing bars 61. Then, concrete will be poured on the first post-pouring strip area 6, the original first post-pouring strip 31, and the original second post-pouring strip 32. The portion where the original first post-pouring strip 31 and the original second post-pouring strip 32 intersect with the first post-pouring strip area 6 will be formed by a single pour of concrete from the first post-pouring strip area 6; therefore, a waterstop steel plate for the post-pouring strip is not required at this location.
[0038] This invention utilizes the elevation difference between the tower crane foundation and the post-cast strip to solve the problem of tower crane layout at the post-cast strip location.
[0039] Other aspects of the tower crane foundation and bottom structure at the post-cast strip location described in this utility model are found in the prior art and will not be repeated here.
[0040] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model in any way. Therefore, any modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present utility model without departing from the technical solution of the present utility model shall still fall within the scope of the technical solution of the present utility model.
Claims
1. A tower crane foundation at the post-cast strip location, characterized in that, It includes pile foundations and foundation caps; the pile foundations are located below the base slab; the foundation caps are located on the pile foundations, and the foundation caps are located at the top view of the post-cast strip, and the top of the foundation caps is lower than the bottom of the base slab; the foundation caps are used to install tower cranes.
2. A tower crane foundation at the post-cast strip location according to claim 1, characterized in that, The pile foundation consists of several piles; these piles are used to support the foundation cap.
3. A tower crane foundation at the post-cast strip location according to claim 2, characterized in that, The pile foundation consists of four piles; the four pile foundations, viewed from above, are arranged in a square matrix.
4. A tower crane foundation at the post-cast strip location according to any one of claims 1 to 3, characterized in that, The top of the foundation platform is 250mm to 400mm lower than the bottom of the base plate.
5. A bottom structure, characterized in that, The foundation includes a base plate, a base plate cushion layer, and a tower crane foundation at the location of a post-cast strip as described in any one of claims 1 to 4; the base plate cushion layer is provided below the base plate; and the tower crane foundation is provided below the base plate cushion layer.
6. A bottom structure according to claim 5, characterized in that, The thickness of the base plate is greater than the thickness of the base plate pad.
7. A bottom structure according to claim 5, characterized in that, The base plate is provided with a first post-pouring strip area; the first post-pouring strip area connects to the area above the foundation cap used for setting up a tower crane.
8. A bottom structure according to claim 7, characterized in that, The first post-cast strip area is connected to the original first post-cast strip.
9. A bottom structure according to claim 8, characterized in that, The first post-cast strip area is connected to the original second post-cast strip.
10. A bottom structure according to claim 9, characterized in that, The first post-pouring strip area, the original first post-pouring strip, and the original second post-pouring strip are used for pouring backfill material after the project is completed.