Stone material curtain wall mounting structure

CN224717285UActive Publication Date: 2026-09-04CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522045476.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-23
Publication Date
2026-09-04
Estimated Expiration
2035-09-23

AI Technical Summary

Technical Problem

目前的石材幕墙大多只适用于外墙竖向立面,并未适配外墙横向立面(如阳台底面),而且其安装结构的稳定性有进一步提升的空间

Benefits of technology

[0018] The keel assembly includes a first keel and a second keel. The first keel is configured to be installed on the side wall of the wall, and the second keel is configured to be installed at the bottom of the wall. The stone assembly includes a first stone and a second stone. The first stone is vertically positioned on the side of the first keel away from the wall, and the second stone is horizontally positioned on the side of the second keel away from the wall. The connecting assembly includes an angle steel, a bracket, a hanger, a bolt, and a back bolt sleeve. The angle steel is fixed to the keel assembly, the bracket is detachably connected to the angle steel, the hanger is hung on the bracket, the back bolt sleeve is fitted onto the stone assembly, and one end of the bolt passes through the hanger and is installed in the back bolt sleeve. This design allows for stone installation on different wall surfaces and ensures structural stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224717285U_ABST
    Figure CN224717285U_ABST
Patent Text Reader

Abstract

The utility model relates to stone material curtain wall installation technical field discloses a kind of stone material curtain wall installation structures, comprising: keel assembly, including first keel and second keel;Stone assembly, including first stone and second stone, the first stone is vertically arranged in the side of the first keel away from the wall, and the second stone is horizontally arranged in the side of the second keel away from the wall;And multiple connecting components, the connecting component includes angle steel, hanging seat, hanging piece, bolt and back bolt cover, the angle steel is fixed in the keel assembly, the hanging seat is detachably connected in the angle steel, the hanging piece is hung in the hanging seat, the back bolt cover is arranged in the stone assembly, and one end of the bolt is installed in the back bolt cover through hanging piece. The stone material curtain wall installation structure of the utility model is suitable for the installation of different wall stones, and ensures the stability of the installation structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of stone curtain wall installation technology, and in particular to a stone curtain wall installation structure. Background Technology

[0002] Stone curtain walls are building envelope systems composed of natural stone panels and supporting structures (beams, columns, steel structures, etc.). They do not bear the load of the main structure but have the ability to undergo relative displacement or deformation. Stone curtain walls are classified into types based on their connection methods, such as bolted, bracketed, and continuous groove types. The stone thickness is not less than 25mm. The panels are connected to the steel frame via metal hangers. Metal components require hot-dip galvanizing for rust prevention, and construction must comply with the "Technical Specification for Metal and Stone Curtain Wall Engineering" (JGJ133-2001). Currently, most stone curtain walls are only suitable for vertical facades and are not adapted to horizontal facades (such as the base of balconies), and there is room for improvement in the stability of their installation structure. Utility Model Content

[0003] The purpose of this utility model is to provide a stone curtain wall installation structure that is adaptable to the installation of stone on different wall surfaces and ensures the stability of the installation structure.

[0004] To achieve the above objectives, this utility model provides a stone curtain wall installation structure, comprising:

[0005] The keel assembly includes a first keel and a second keel, the first keel being configured to be installed on the side wall of the wall and the second keel being configured to be installed on the bottom of the wall;

[0006] A stone component includes a first stone and a second stone, wherein the first stone is vertically disposed on the side of the first keel away from the wall, and the second stone is horizontally disposed on the side of the second keel away from the wall; and

[0007] Multiple connecting components, each including an angle steel, a bracket, a hanger, a bolt, and a back bolt sleeve, wherein the angle steel is fixed to the keel component, the bracket is detachably connected to the angle steel, the hanger is hung on the bracket, the back bolt sleeve is fitted onto the stone component, and one end of the bolt passes through the hanger and is installed in the back bolt sleeve.

[0008] In some embodiments, the stone assembly includes a first sealing strip, and the first stone is provided with a plurality of first stones, with adjacent two first stones connected by the first sealing strip.

[0009] In some embodiments, the stone assembly includes a second sealing strip, and the lower first stone and the second stone are connected by the second sealing strip.

[0010] In some embodiments, the first stone is a granite slab, and the second stone is a stone honeycomb panel.

[0011] In some embodiments, the connecting assembly includes a connector, and the angle steel and the bracket are detachably connected via the connector.

[0012] In some embodiments, the connecting assembly includes a first gasket disposed between the angle steel and the bracket.

[0013] In some embodiments, the connection assembly includes a second gasket disposed between the hanger and the stone assembly.

[0014] In some embodiments, the connecting assembly includes a limiting member, one end of which is threaded through the hanger and abuts against the bracket.

[0015] In some embodiments, the first stone is spaced apart from the first keel, and the second stone is spaced apart from the second keel.

[0016] In some embodiments, the keel assembly includes chemical anchors, with the first keel being installed on the sidewall of the wall via the chemical anchors, and the second keel being installed on the bottom of the wall via the chemical anchors.

[0017] This utility model provides a stone curtain wall installation structure, which has the following advantages compared with the prior art:

[0018] The keel assembly includes a first keel and a second keel. The first keel is configured to be installed on the side wall of the wall, and the second keel is configured to be installed at the bottom of the wall. The stone assembly includes a first stone and a second stone. The first stone is vertically positioned on the side of the first keel away from the wall, and the second stone is horizontally positioned on the side of the second keel away from the wall. The connecting assembly includes an angle steel, a bracket, a hanger, a bolt, and a back bolt sleeve. The angle steel is fixed to the keel assembly, the bracket is detachably connected to the angle steel, the hanger is hung on the bracket, the back bolt sleeve is fitted onto the stone assembly, and one end of the bolt passes through the hanger and is installed in the back bolt sleeve. This design allows for stone installation on different wall surfaces and ensures structural stability. Attached Figure Description

[0019] Figure 1 A longitudinal sectional view of the stone curtain wall installation structure provided in this embodiment of the utility model.

[0020] Figure 2 for Figure 1 A magnified structural diagram of point A in the middle.

[0021] Figure 3 for Figure 1 A magnified structural diagram at point B in the middle.

[0022] Figure 4 for Figure 1 A magnified structural diagram at point C.

[0023] In the diagram: 1. Keel assembly; 11. First keel; 12. Second keel; 13. Chemical anchor; 2. Stone assembly; 21. First stone; 22. Second stone; 23. First sealing strip; 24. Second sealing strip; 3. Connecting assembly; 31. Angle steel; 32. Hanger; 33. Hanger; 34. Bolt; 35. Back bolt sleeve; 36. Connector; 37. First gasket; 38. Second gasket; 39. Limiting component; 4. Wall. Detailed Implementation

[0024] The technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments.

[0025] It should be understood that in the description of this application, the terms "upper," "lower," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. These terms are used solely for the convenience of describing this application and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application. The terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. That is, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. Furthermore, unless otherwise stated, "a plurality of" means two or more.

[0026] Furthermore, the technical features involved in the different embodiments of this application described below can be combined with each other as long as they do not conflict with each other.

[0027] like Figures 1-4 As shown, the stone curtain wall installation structure of this utility model embodiment includes a keel assembly 1, a stone assembly 2, and multiple connecting assemblies 3. The stone assembly 2 is installed on the keel assembly 1 via the connecting assemblies 3.

[0028] The keel assembly 1 includes a first keel 11 and a second keel 12. The first keel 11 is configured to be installed on the side wall of the wall 4, and the second keel 12 is configured to be installed on the bottom of the wall 4.

[0029] The stone component 2 includes a first stone 21 and a second stone 22. The first stone 21 is vertically arranged on the side of the first keel 11 away from the wall 4, and the second stone 22 is horizontally arranged on the side of the second keel 12 away from the wall 4.

[0030] The connecting component 3 includes an angle steel 31, a bracket 32, a hanger 33, a bolt 34, and a back bolt sleeve 35. The angle steel 31 is fixed to the keel component 1. The bracket 32 ​​is detachably connected to the angle steel 31. The hanger 33 is hung on the bracket 32. The back bolt sleeve 35 is located on the stone component 2. One end of the bolt 34 passes through the hanger 33 and is installed in the back bolt sleeve 35.

[0031] Based on the above structural configuration, the first stone 21 is vertically positioned on the side of the first keel 11 away from the wall 4 and installed via the connecting component 3, while the second stone 22 is horizontally positioned on the side of the second keel 12 away from the wall 4 and installed via the connecting component 3. This configuration can adapt to the installation of stone on different wall surfaces and ensure the stability of the installation structure.

[0032] like Figure 3 As shown, in some embodiments, the stone component 2 includes a first sealing strip 23, and multiple first stones 21 are provided, with adjacent first stones 21 connected by the first sealing strip 23. This ensures a waterproof effect between adjacent first stones 21.

[0033] like Figure 4 As shown, in some embodiments, the stone assembly 2 includes a second sealing strip 24, and the lower first stone 21 and the second stone 22 are connected by the second sealing strip 24. This ensures a waterproof effect between the first stone 21 and the second stone 22.

[0034] In some embodiments, the first stone 21 is a granite slab, and the second stone 22 is a stone honeycomb panel. The stone honeycomb panel is made by bonding a thin natural stone slab with an aluminum honeycomb panel using an adhesive, and the back bolt sleeve 35 is installed within the aluminum honeycomb panel.

[0035] like Figure 2 As shown, in some embodiments, the connecting assembly 3 includes a connector 36, through which the angle steel 31 and the bracket 32 ​​are detachably connected. Exemplarily, the connector 36 employs a bolt and nut structure, with the bolt passing through the angle steel 31 and secured to the bracket 32 ​​by the nut.

[0036] like Figure 2 As shown, in some embodiments, the connecting assembly 3 includes a first gasket 37 disposed between the angle steel 31 and the bracket 32. Thus, the first gasket 37 provides a cushioning effect, maintaining structural stability between the angle steel 31 and the bracket 32.

[0037] like Figure 2As shown, in some embodiments, the connecting component 3 includes a second gasket 38 disposed between the hanger 33 and the stone component 2. Thus, the second gasket 38 provides a cushioning effect, maintaining structural stability between the hanger 33 and the stone component 2.

[0038] like Figure 2 As shown, in some embodiments, the connecting assembly 3 includes a limiting member 39, one end of which is threaded through the hanger 33 and abuts against the bracket 32. Thus, the limiting member 39 keeps the hanger 33 stably mounted on the bracket 32. Specifically, the limiting member 39 is a limiting bolt.

[0039] like Figure 1 As shown, in some embodiments, the first stone 21 is spaced apart from the first keel 11, and the second stone 22 is spaced apart from the second keel 12. Thus, the space between them can be filled with thermal insulation material.

[0040] like Figure 1 As shown, in some embodiments, the keel assembly 1 includes chemical anchors 13. The first keel 11 is installed on the side wall of the wall 4 via the chemical anchors 13, and the second keel 12 is installed on the bottom of the wall 4 via the chemical anchors 13. In this way, the installation structure of the keel assembly 1 is kept stable.

[0041] The above description is only a preferred embodiment of the present utility model. It should be noted that for those skilled in the art, several improvements and substitutions can be made without departing from the technical principles of the present utility model, and these improvements and substitutions should also be considered within the protection scope of the present utility model.

Claims

1. A stone curtain wall installation structure, characterized in that, include: The keel assembly includes a first keel and a second keel, the first keel being configured to be installed on the side wall of the wall and the second keel being configured to be installed on the bottom of the wall; A stone component includes a first stone and a second stone, wherein the first stone is vertically disposed on the side of the first keel away from the wall, and the second stone is horizontally disposed on the side of the second keel away from the wall; and Multiple connecting components, each including an angle steel, a bracket, a hanger, a bolt, and a back bolt sleeve, wherein the angle steel is fixed to the keel component, the bracket is detachably connected to the angle steel, the hanger is hung on the bracket, the back bolt sleeve is fitted onto the stone component, and one end of the bolt passes through the hanger and is installed in the back bolt sleeve.

2. The stone curtain wall installation structure according to claim 1, characterized in that, The stone assembly includes a first sealing strip, and multiple first stones are provided, with adjacent first stones connected by the first sealing strip.

3. The stone curtain wall installation structure according to claim 1, characterized in that, The stone assembly includes a second sealing strip, and the lower first stone and the second stone are connected by the second sealing strip.

4. The stone curtain wall installation structure according to claim 1, characterized in that, The first stone material is a granite slab, and the second stone material is a stone honeycomb panel.

5. The stone curtain wall installation structure according to claim 1, characterized in that, The connecting assembly includes a connector, and the angle steel and the bracket are detachably connected via the connector.

6. The stone curtain wall installation structure according to claim 5, characterized in that, The connecting assembly includes a first gasket, which is disposed between the angle steel and the bracket.

7. The stone curtain wall installation structure according to claim 1, characterized in that, The connecting assembly includes a second gasket disposed between the hanger and the stone assembly.

8. The stone curtain wall installation structure according to claim 1, characterized in that, The connecting assembly includes a limiting member, one end of which is threaded through the hanger and abuts against the bracket.

9. The stone curtain wall installation structure according to claim 1, characterized in that, The first stone is spaced apart from the first keel, and the second stone is spaced apart from the second keel.

10. The stone curtain wall installation structure according to claim 1, characterized in that, The keel assembly includes chemical anchors, with the first keel installed on the side wall of the wall via the chemical anchors, and the second keel installed on the bottom of the wall via the chemical anchors.