Auxiliary fixer for power station erection

CN224931430UActive Publication Date: 2026-11-03CGN NEW ENERGY WUAN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522327375.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-03
Publication Date
2026-11-03
Estimated Expiration
2035-11-03

AI Technical Summary

Technical Problem

The existing outdoor engineering substations or power distribution stations are built on the ground, which makes them prone to damage and water ingress, leading to damage to electrical components, affecting construction progress and posing safety hazards.

Method used

An auxiliary fixing device for power plant construction was designed, including a fixing base, a sliding clamping plate device, and a scissor lift platform. The fixing device is fixed in the concrete below the ground. The height of the clamping plate is adjusted by the scissor lift platform, and the base plate support steel beam is clamped between the upper and lower clamping plates by a clamping device to ensure stability.

Benefits of technology

It improves the fixing strength, prevents water from entering the base plate, reduces the chance of damage to electrical components, ensures that the construction is completed on time, and reduces safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224931430U_ABST
    Figure CN224931430U_ABST
Patent Text Reader

Abstract

The utility model relates to power station building technology field, and specifically is a kind of auxiliary fixer for power station building, including fixed seat, the bottom of fixed seat is provided with fixed device, the top of fixed seat is provided with sliding clamp plate device, fixed seat and sliding clamp plate device between are provided with the shearing fork type lifting platform of driving sliding clamp plate device lifting adjustment, the top of sliding clamp plate device is provided with pressure device.The utility model adjusts the height of lower clamp plate from ground by shearing fork type lifting platform to improve the height of bottom plate support steel beam from ground, and the bottom plate support steel beam is clamped between upper clamp plate and lower clamp plate by pressure device, to ensure that it is more firm to build. Ensure that distribution station or substation built on the bottom plate support steel beam is not easy to enter water, reduce the damage probability of electrical components, ensure that construction progress is completed on time, reduce security risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of power station construction technology, specifically an auxiliary fixing device for power station construction. Background Technology

[0002] Outdoor engineering refers to construction, infrastructure, and other engineering projects carried out in outdoor environments, encompassing roads, landscaping, water supply, power supply, and many other aspects. In the initial stages of construction, outdoor engineering projects often require the construction of substations or power distribution stations to supply power to electrical equipment or tools. Currently, these stations are typically built on the ground surrounding the project site. However, due to uneven ground, the base plates of these stations are prone to damage. Furthermore, the muddy and wet conditions at outdoor construction sites mean that water can easily seep into the substations or power distribution stations, damaging electrical components, hindering construction progress, and posing safety hazards. Utility Model Content

[0003] The purpose of this utility model is to overcome the shortcomings of the existing technology and provide an auxiliary fixing device for power station construction.

[0004] An auxiliary fixing device for power station construction includes a fixing base, a fixing device at the bottom of the fixing base, and a sliding clamping plate device at the top of the fixing base. A scissor lift platform for driving the sliding clamping plate device to rise and fall is provided between the fixing base and the sliding clamping plate device. A clamping device is provided at the top of the sliding clamping plate device. The sliding clamping plate device includes a square slide rail, a lower clamping plate, and an upper clamping plate. The square slide rail is fixedly installed at the four corners of the top of the fixing base. Sliding holes are provided at the four corners of the lower and upper clamping plates. The square slide rail passes through the sliding holes of the lower and upper clamping plates and slides with them. An installation groove is provided between two adjacent square slide rails between the lower and upper clamping plates. The top of the scissor lift platform is fixedly connected to the bottom of the lower clamping plate.

[0005] Furthermore, the clamping device includes a T-shaped clamping seat and clamping bolts. A limiting groove is provided at the center of the top of the upper clamping plate. The bottom of the T-shaped clamping seat is set in the limiting groove. Bolt holes are provided at the four corners of the top of the T-shaped clamping seat. The clamping bolts pass through the bolt holes and are threaded to the top of the square slide rail.

[0006] Furthermore, the fixing device includes side plates fixedly disposed around the bottom of the fixing base, an extension plate extending outwardly fixedly disposed at the bottom of the side plates, a vertical rod fixedly disposed at the bottom of the fixing base, and multiple connecting plates disposed on the outer side of the vertical rod from top to bottom.

[0007] Furthermore, multiple exhaust ports are provided on the side plate.

[0008] In summary, this utility model has the following beneficial effects:

[0009] This utility model's fixing device is installed within the concrete below ground level. By applying force at more angles, it increases the fixing strength and expands the contact area with the concrete, ensuring a more stable foundation for the auxiliary fixing device used in power station construction after the concrete is fixed. The height of the lower clamping plate above the ground is increased by adjusting the height of the base plate support steel beam using a scissor lift platform. A clamping device then clamps the base plate support steel beam between the upper and lower clamping plates, ensuring a more secure construction. This design prevents water from entering the substation or power station built on the base plate support steel beam, reducing the likelihood of damage to electrical components, ensuring timely completion of construction, and minimizing safety hazards. Attached Figure Description

[0010] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments:

[0011] Figure 1 This is a front view of an auxiliary fixing device for power station construction according to the present invention;

[0012] Figure 2 This is a rear view of an auxiliary fixing device for power station construction according to the present invention;

[0013] Figure 3 This is a front sectional view of an auxiliary fixing device for power station construction according to the present invention.

[0014] In the diagram: 1. Fixed base, 2. Side plate, 3. Extension plate, 4. Upright pole, 5. Connecting plate, 6. Exhaust port, 7. Square slide rail, 8. Lower clamping plate, 9. Upper clamping plate, 10. Scissor lift platform, 11. T-shaped clamping seat, 12. Limiting groove, 13. Clamping bolt, 14. Sliding hole, 15. Mounting groove, 16. Bolt hole. Detailed Implementation

[0015] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below in conjunction with the embodiments of this utility model. Obviously, the described embodiments are only some embodiments of this utility model, not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.

[0016] The present invention will be further described below with reference to the accompanying drawings:

[0017] like Figure 1-3As shown, an auxiliary fixing device for power station construction includes a fixing base 1, a fixing device at the bottom of the fixing base 1, a sliding clamping device at the top of the fixing base 1, a scissor lift platform 10 for driving the sliding clamping device to lift and adjust between the fixing base 1 and the sliding clamping device, and a pressing device at the top of the sliding clamping device.

[0018] In this embodiment, according to the power station construction design requirements, multiple pits are first dug at designated locations on the ground, and then an appropriate amount of concrete is filled into the pits. The fixing devices are inserted into the concrete, and the fixing base 1 is leveled using a level. After the concrete has solidified, the height of the sliding clamping devices is adjusted using the scissor lift platform 10 to ensure that the heights of the sliding clamping devices of the multiple power station construction auxiliary fixing devices are consistent. According to the power station construction design requirements, a base plate support steel beam is installed between two mating power station construction auxiliary fixing devices, and then the base plate support steel beam is pressed together using a clamping device. The power station is then constructed on the base plate support steel beam. Preferably, both ends of the base plate support steel beam are fixed between the sliding clamping devices of two mating power station construction auxiliary fixing devices, and each sliding clamping device can fix up to four base plate support steel beams.

[0019] The fixing device includes side plates 2 fixedly installed around the bottom of the fixing base 1. An extension plate 3 extending outward is fixedly installed at the bottom of the side plates 2. A vertical rod 4 is fixedly installed at the bottom of the fixing base 1. Multiple connecting plates 5 are installed on the outer side of the vertical rod 4 from top to bottom. Multiple exhaust ports 6 are opened on the side plates 2.

[0020] In this embodiment, the side plate 2, extension plate 3, upright 4, and connecting plate 5 are inserted into the concrete. The reasonable arrangement of the side plate 2, extension plate 3, upright 4, and connecting plate 5 allows them to bear force at more angles, improving the fixing strength and increasing the contact area with the concrete. This ensures that after the concrete is fixed, the foundation of the auxiliary fixing device for power station construction is more stable below ground. Preferably, the side plate 2 has multiple vents 6 to ensure that the concrete can completely enter and fill the space between the four side plates 2 at the bottom of the fixing base 1.

[0021] The sliding clamp device includes a square slide rail 7, a lower clamping plate 8, and an upper clamping plate 9. The square slide rail 7 is fixedly installed at the four corners of the top of the fixed base 1. Sliding holes 14 are provided at the four corners of the lower clamping plate 8 and the upper clamping plate 9. The square slide rail 7 passes through the sliding holes 14 of the lower clamping plate 8 and the upper clamping plate 9 and slides with them. An installation groove 15 is provided between two adjacent square slide rails 7 between the lower clamping plate 8 and the upper clamping plate 9. The top of the scissor lift platform 10 is fixedly connected to the bottom of the lower clamping plate 8.

[0022] In this embodiment, the lower clamping plate 8 is driven by the scissor lift platform 10 to move along the square slide rail 7 with the cooperation of the sliding hole 14. The height of the lower clamping plate 8 from the ground is adjusted according to the ground conditions around the outdoor project. The end of the base plate support steel beam is placed in the corresponding mounting groove 15 according to the design requirements of the power station construction. Then, the sliding hole 14 of the upper clamping plate 9 is fitted into the corresponding square slide rail 7, so that the bottom of the upper clamping plate 9 contacts the top of the base plate support steel beam. Preferably, the scissor lift platform 10 is a commonly used lifting device in the prior art, and a hydraulic jack can be used instead. After the height of the lower clamping plate 8 from the ground is adjusted, a support block can be placed between the fixed seat 1 and the lower clamping plate 8 for support, replacing the scissor lift platform 10 or the hydraulic jack.

[0023] The clamping device includes a T-shaped clamping seat 11 and a clamping bolt 13. A limiting groove 12 is provided at the center of the top of the upper clamping plate 9. The bottom of the T-shaped clamping seat 11 is set in the limiting groove 12. Bolt holes 16 are provided at the four corners of the top of the T-shaped clamping seat 11. The clamping bolt 13 passes through the bolt holes 16 and is threaded to the top of the square slide rail 7.

[0024] In this embodiment, the bottom of the T-shaped clamping seat 11 is placed in the limiting groove 12 at the top center of the upper clamping plate 9. The clamping bolt 13 is threaded through the bolt hole 16 and connected to the top of the square slide rail 7. Then the clamping bolt 13 is tightened. The T-shaped clamping seat 11 pushes the upper clamping plate 9 to move downward and cooperates with the lower clamping plate 8 to press the bottom plate support steel beam.

[0025] In summary, this utility model is not limited to the specific embodiments described above. Those skilled in the art can make various modifications and alterations without departing from the spirit and scope of this utility model. The scope of protection of this utility model should be determined by the claims of this utility model.

[0026] In the description of this patent, it should be understood that the terms “center,” “upper,” “lower,” “front,” “back,” “left,” “right,” “vertical,” “horizontal,” “top,” “bottom,” “inner,” and “outer,” etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this patent and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this patent.

[0027] In the description of this patent, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "setting" should be interpreted broadly. For example, they can refer to a fixed connection or setting, a detachable connection or setting, or an integral connection or setting. Those skilled in the art can understand the specific meaning of the above terms in this patent according to the specific circumstances.

Claims

1. An auxiliary fixing device for power station construction, characterized in that, The system includes a fixed base (1), a fixing device at the bottom of the fixed base (1), a sliding clamping device at the top of the fixed base (1), a scissor lift platform (10) for driving the sliding clamping device to lift and adjust between the fixed base (1) and the sliding clamping device, a pressing device at the top of the sliding clamping device, and a square slide rail (7), a lower clamping plate (8) and an upper clamping plate (9). The square slide rail (7) is fixedly installed at the four corners of the top of the fixed base (1). Sliding holes (14) are provided at the four corners of the lower clamping plate (8) and the upper clamping plate (9). The square slide rail (7) passes through the sliding holes (14) of the lower clamping plate (8) and the upper clamping plate (9) and slides with them. There are mounting grooves (15) between two adjacent square slide rails (7) between the lower clamping plate (8) and the upper clamping plate (9). The top of the scissor lift platform (10) is fixedly connected to the bottom of the lower clamping plate (8).

2. The auxiliary fixing device for power station construction as described in claim 1, characterized in that, The clamping device includes a T-shaped clamping seat (11) and a clamping bolt (13). A limiting groove (12) is provided at the center of the top of the upper clamping plate (9). The bottom of the T-shaped clamping seat (11) is set in the limiting groove (12). Bolt holes (16) are provided at the four corners of the top of the T-shaped clamping seat (11). The clamping bolt (13) passes through the bolt hole (16) and is threaded to the top of the square slide rail (7).

3. The auxiliary fixing device for power station construction as described in claim 2, characterized in that, The fixing device includes side plates (2) fixedly arranged around the bottom of the fixing base (1), an extension plate (3) extending outward is fixedly arranged at the bottom of the side plates (2), a vertical rod (4) is fixedly arranged at the bottom of the fixing base (1), and multiple connecting plates (5) are arranged on the outer side of the vertical rod (4) from top to bottom.

4. The auxiliary fixing device for power station construction as described in claim 3, characterized in that, The side plate (2) has multiple exhaust ports (6).