A guiding and positioning device for construction of a blowhole drainage hole

CN224931628UActive Publication Date: 2026-11-03GUANGDONG ENERGY GROUP GUIYANG PUMPED STORAGE POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522782739.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-29
Publication Date
2026-11-03
Estimated Expiration
2035-12-29

AI Technical Summary

Technical Problem

在水利水电和交通隧道等地下工程建设中,放空洞排水孔施工存在定位精度低、调整效率差,设备固定不稳、移动不便的问题,影响施工效率和成孔质量。

Method used

The system employs a guiding and positioning device, including an angle positioning mechanism and a fixed support mechanism. It utilizes the cooperation of locking blocks and locking teeth to achieve precise locking of the drilling angle. Through the linkage of bidirectional screws and inclined grooves, it provides a stable operating platform, ensuring the stability and rapid adjustment of the drilling machine.

Benefits of technology

This enabled rapid and precise positioning of the drainage holes in the venting tunnel, improving construction efficiency, reducing drilling deviation and safety hazards, and enhancing the overall construction progress and hole quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224931628U_ABST
    Figure CN224931628U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of guiding and positioning devices for empty hole drainage hole construction, belong to building construction equipment technical field, including base, the top of base is fixedly installed with support plate, the top of support plate is fixedly installed with fixed ring, rotatingly connected with mounting plate in fixed ring, the side of mounting plate is fixedly installed with fixed plate, the side of fixed plate is slidably installed with drilling machine, and sliding slot is set in the side of fixed plate. Through the clamping cooperation of clamping block and multiple clamping teeth inside fixed ring, the relative angle of mounting plate and fixed ring can be accurately locked, the drilling angle of drilling machine is stable and controllable, and angle deviation in construction process is avoided;Jacking rod can automatically drive clamping block and clamping tooth clamping under the jacking action of top spring and positioning plate, without additional locking operation, just need to push push plate to quickly release clamping state, realize the flexible adjustment of drilling angle, greatly improve construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of building construction equipment technology, specifically, it relates to a guiding and positioning device for the construction of drainage holes in venting tunnels. Background Technology

[0002] In the construction of underground engineering projects such as water conservancy and hydropower, and transportation tunnels, drainage tunnels are crucial drainage and safety facilities. To ensure their long-term stable operation, the tunnel body usually needs to be equipped with a systematic drainage system to release water pressure inside the surrounding rock and prevent damage to the lining structure due to excessive water load. Currently, the construction of drainage holes in drainage tunnels (mainly radial or oblique drilling) generally relies on manual operation of simple drilling frames or handheld equipment, which has the following main technical limitations: Low positioning accuracy and poor adjustment efficiency: The position and angle (especially the pitch angle) of the drainage holes require precision, which directly affects the drainage effect. Existing methods mostly use visual inspection combined with simple measuring tools for preliminary positioning, and then manually adjust and tighten multiple bolts to fix the drilling rig angle. This process is cumbersome and time-consuming, and depends on the operator's experience. It is difficult to achieve fast and accurate repeatable positioning, especially when carrying out multi-row and multi-hole sequence construction, where efficiency is low and consistency is difficult to guarantee. Unstable equipment fixation and inconvenient movement: The construction site is usually the tunnel floor, with limited space and potentially uneven ground. Traditional methods often use sandbags, temporary welding supports, or simple tripods to fix the drilling rig, which are not stable enough. Vibration and displacement are easily generated during drilling, causing the drilling axis to deviate and affecting the quality of the hole. At the same time, it is difficult to switch between these fixing methods and the moving state of the equipment. Each hole needs to be fixed again after complex work is carried out, resulting in poor mobility and seriously affecting the overall construction progress. To address the aforementioned issues, this application proposes a guiding and positioning device for constructing drainage holes in venting tunnels. Utility Model Content

[0003] In view of the problems in the related technologies, this utility model proposes a guiding and positioning device for the construction of drainage holes in venting tunnels, so as to overcome the above-mentioned technical problems existing in the existing related technologies.

[0004] To achieve the above objectives, the present invention adopts the following technical solution: A guiding and positioning device for constructing drainage holes in venting tunnels includes a base, a support plate fixedly mounted on the top of the base, a fixing ring fixedly mounted on the top of the support plate, an installation plate rotatably connected inside the fixing ring, a fixing plate fixedly mounted on one side of the installation plate, a drilling machine slidably mounted on one side of the fixing plate, a sliding groove formed on one side of the fixing plate, a moving block slidably connected to the inner wall of the sliding groove, the moving block being fixedly connected to the drilling machine, and a lead screw rotatably connected to the inner wall of the sliding groove, the lead screw being threadedly connected to the moving block, a drive motor fixedly mounted on the top of the fixing plate, the output shaft of the drive motor being fixedly connected to the lead screw, and a handle mounted on one side of the installation plate. An angle positioning mechanism includes a fixed base, which is fixedly installed on one side of the mounting plate, and a push rod is slidably connected to the fixed base, the push rod being engaged with a fixed ring for pushing. The fixed support mechanism includes four support rods, which are slidably mounted on a base. The bottom of the base is rotatably connected to four symmetrically arranged rotating wheels, which cooperate with the support rods.

[0005] Preferably, the angle positioning mechanism further includes two locking blocks, and multiple locking teeth are fixedly installed on the inner side of the fixing ring, with the locking blocks engaging with the locking teeth.

[0006] Preferably, a positioning plate is fixedly installed on the top rod, a top spring is fixedly installed at the bottom of the positioning plate, the bottom end of the top spring is fixedly connected to the fixed seat, and a push plate is fixedly installed at the bottom end of the top rod.

[0007] Preferably, the top of the base is slidably connected to four symmetrically arranged movable plates, which are driven by corresponding support rods. The top of the base is also slidably connected to two drive plates. A bidirectional screw is rotatably connected to the support plate, and the bidirectional screw is threadedly connected to the two drive plates. A connecting rod is fixedly installed on the side of each drive plate that is far apart from each other, and the connecting rod is fixedly connected to the corresponding movable plate.

[0008] Preferably, a sloping groove is provided on one side of the movable plate, and a movable shaft is fixedly installed on one side of the support rod, with the movable shaft slidably connected to the sloping groove.

[0009] Preferably, two guide rails are fixedly installed on one side of the fixing plate, and the guide rails are slidably connected to the drilling machine.

[0010] In summary, the technical effects and advantages of this utility model are as follows: By engaging the locking blocks with multiple locking teeth on the inner side of the fixing ring, the relative angle between the mounting plate and the fixing ring can be precisely locked, ensuring that the drilling angle of the drilling machine is stable and controllable, and avoiding angle deviation during construction. Under the pushing action of the top spring and the positioning plate, the push rod can automatically drive the locking blocks and locking teeth to engage, without the need for additional locking operations. Simply push the push plate to quickly release the locking state, realizing flexible adjustment of the drilling angle and greatly improving construction efficiency.

[0011] Through the transmission action of the bidirectional screw, the drive plate moves in the opposite direction. Then, through the linkage of the connecting rod and the moving plate, and the sliding cooperation of the inclined groove and the movable shaft, the four support rods move downward synchronously, quickly and firmly supporting the device on the construction ground. This effectively avoids the shaking and slippage of the rotating wheel caused by uneven ground or construction vibration, providing a stable operating platform for drilling operations and reducing drilling deviations and construction safety hazards caused by device displacement. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a schematic diagram of the rear view structure of this utility model; Figure 3 This is an exploded view of the fixing plate and drilling machine of this utility model; Figure 4 This is an exploded view of the support rod and the movable plate of this utility model; Figure 5 This utility model Figure 2 Schematic diagram of part A in the middle.

[0013] In the picture: 1. Base; 2. Support plate; 3. Fixing ring; 4. Mounting plate; 5. Fixing plate; 6. Drilling machine; 7. Angle positioning mechanism; 71. Fixed seat; 72. Top rod; 74. Clamping tooth; 75. Clamping block; 76. Positioning plate; 77. Top spring; 78. Push plate; 8. Fixed support mechanism; 81. Support rod; 82. Moving plate; 83. Drive plate; 84. Double-acting screw; 86. Inclined groove; 87. Movable shaft; 9. Rotary wheel; 10. Sliding groove; 11. Lead screw; 12. Moving block; 13. Drive motor; 14. Guide rail; 15. Handle. Detailed Implementation

[0014] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.

[0015] Reference Figure 1-5A guide and positioning device for constructing drainage holes in venting tunnels includes a base 1, a support plate 2 fixedly installed on the top of the base 1, a fixing ring 3 fixedly installed on the top of the support plate 2, an installation plate 4 rotatably connected inside the fixing ring 3, a fixing plate 5 fixedly installed on one side of the installation plate 4, a drilling machine 6 slidably installed on one side of the fixing plate 5, a sliding groove 10 opened on one side of the fixing plate 5, a moving block 12 slidably connected to the inner wall of the sliding groove 10, the moving block 12 being fixedly connected to the drilling machine 6, and a lead screw 11 rotatably connected to the inner wall of the sliding groove 10, the lead screw 11 being threadedly connected to the moving block 12, a drive motor 13 fixedly installed on the top of the fixing plate 5, the output shaft of the drive motor 13 being fixedly connected to the lead screw 11, and a handle 15 installed on one side of the installation plate 4. Angle positioning mechanism 7 includes a fixed seat 71, which is fixedly installed on one side of the mounting plate 4, and a push rod 72 is slidably connected to the fixed seat 71. The push rod 72 is engaged with the fixed ring 3. The fixed support mechanism 8 includes four support rods 81, which are slidably mounted on the base 1. The bottom of the base 1 is rotatably connected to four symmetrically arranged rotating wheels 9, which cooperate with the support rods 81.

[0016] Reference Figure 2 and Figure 5 The angle positioning mechanism 7 also includes two locking blocks 75. Multiple locking teeth 74 are fixedly installed on the inner side of the fixing ring 3. The locking blocks 75 and the locking teeth 74 are engaged. A positioning plate 76 is fixedly installed on the top rod 72. A top spring 77 is fixedly installed at the bottom of the positioning plate 76. The bottom end of the top spring 77 is fixedly connected to the fixing seat 71. A push plate 78 is fixedly installed at the bottom end of the top rod 72. Through the engagement of the locking blocks 75 and the multiple locking teeth 74, the angle between the mounting plate 4 and the fixing ring 3 can be fixed. At the same time, under the push of the positioning plate 76 and the top spring 77, the top rod 72 can automatically drive the locking blocks 75 and the locking teeth 74 to engage. The locking state can be released by the push plate 78.

[0017] Reference Figure 1Four symmetrically arranged movable plates 82 are slidably connected to the top of the base 1. The movable plates 82 are connected to the corresponding support rods 81. Two drive plates 83 are slidably connected to the top of the base 1. A bidirectional screw 84 is rotatably connected to the support plate 2. The bidirectional screw 84 is threadedly connected to the two drive plates 83. A connecting rod is fixedly installed on the side of the two drive plates 83 that is far apart from each other. The connecting rod is fixedly connected to the corresponding movable plate 82. A slanted groove 86 is opened on one side of the movable plate 82. A movable shaft 87 is fixedly installed on one side of the support rod 81. The movable shaft 87 is slidably connected to the slanted groove 86. The rotating bidirectional screw 84 is threadedly connected to the two drive plates 83, thereby driving the two drive plates 83 to move in opposite directions. The drive plates 83 drive the four movable plates 82 to move through the connecting rod. The movable plates 82 are slidably connected to the movable shaft 87 through the slanted groove 86, thereby driving the support rod 81 to move downward, thereby fixing and supporting the device and preventing the rotating wheel 9 from shaking back and forth.

[0018] Reference Figure 1 Two guide rails 14 are fixedly installed on one side of the fixed plate 5. The guide rails 14 are slidably connected to the drilling machine 6. By sliding with the drilling machine 6, the guide rails 14 can limit the drilling machine 6, thereby making the drilling machine 6 drill holes stably.

[0019] Working principle: During operation, rotating the bidirectional screw 84, which is threadedly connected to two drive plates 83, causes the two drive plates 83 to move in opposite directions. The drive plates 83, through connecting rods, drive four moving plates 82 to move. The moving plates 82 are slidably connected to the movable shaft 87 via inclined grooves 86, thereby causing the support rod 81 to move downwards. This provides fixed support for the device, preventing the rotating wheel 9 from wobbling back and forth, and pushing the push plate 78 downwards. This causes the push rod 72 to disengage the locking block 75 from the locking teeth 7. The mounting plate 4 is in the clamping state, and the mounting plate 4 is rotated. The mounting plate 4 drives the drilling machine 6 to align with the drilling position through the fixing plate 5. Then the push plate 78 is released. Under the pushing action of the top spring 77 and the positioning plate 76, the push rod 72 drives the clamping block 75 and the clamping tooth 74 to clamp again, so as to fix the angle of the adjusted mounting plate 4. Then the drive motor 13 switch is turned on. The output shaft of the drive motor 13 drives the lead screw 11 to rotate. The lead screw 11 is connected to the moving block 12 by a thread, so as to drive the drilling machine 6 to perform drilling operation on the target.

[0020] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A guiding and positioning device for constructing drainage holes in venting tunnels, comprising a base (1), characterized in that, A support plate (2) is fixedly installed on the top of the base (1). A fixing ring (3) is fixedly installed on the top of the support plate (2). An installation plate (4) is rotatably connected inside the fixing ring (3). A fixing plate (5) is fixedly installed on one side of the installation plate (4). A drilling machine (6) is slidably installed on one side of the fixing plate (5). A sliding groove (10) is opened on one side of the fixing plate (5). A moving block (12) is slidably connected on the inner wall of the sliding groove (10). The moving block (12) is fixedly connected to the drilling machine (6). A lead screw (11) is rotatably connected on the inner wall of the sliding groove (10). The lead screw (11) is threadedly connected to the moving block (12). A drive motor (13) is fixedly installed on the top of the fixing plate (5). The output shaft of the drive motor (13) is fixedly connected to the lead screw (11). A handle (15) is installed on one side of the installation plate (4). Angle positioning mechanism (7) includes a fixed seat (71), which is fixedly installed on one side of the mounting plate (4), and a push rod (72) is slidably connected on the fixed seat (71), which pushes and cooperates with the fixed ring (3); The fixed support mechanism (8) includes four support rods (81), which are slidably mounted on the base (1). The bottom of the base (1) is rotatably connected to four symmetrically arranged rotating wheels (9), which cooperate with the support rods (81).

2. The guiding and positioning device for constructing drainage holes in venting tunnels according to claim 1, characterized in that, The angle positioning mechanism (7) also includes two locking blocks (75), and multiple locking teeth (74) are fixedly installed on the inner side of the fixing ring (3). The locking blocks (75) and the locking teeth (74) are engaged in a locking fit.

3. The guiding and positioning device for constructing drainage holes in venting tunnels according to claim 2, characterized in that, A positioning plate (76) is fixedly installed on the top rod (72), and a top spring (77) is fixedly installed at the bottom of the positioning plate (76). The bottom end of the top spring (77) is fixedly connected to the fixed seat (71), and a push plate (78) is fixedly installed at the bottom end of the top rod (72).

4. The guiding and positioning device for constructing drainage holes in venting tunnels according to claim 1, characterized in that, The top of the base (1) is slidably connected to four symmetrically arranged movable plates (82). The movable plates (82) are connected to the corresponding support rods (81) in a transmission connection. The top of the base (1) is slidably connected to two drive plates (83). A bidirectional screw (84) is rotatably connected to the support plate (2). The bidirectional screw (84) is threadedly connected to the two drive plates (83). A connecting rod is fixedly installed on the side of the two drive plates (83) that is far away from each other. The connecting rod is fixedly connected to the corresponding movable plate (82).

5. The guiding and positioning device for constructing drainage holes in venting tunnels according to claim 4, characterized in that, The movable plate (82) has a sloping groove (86) on one side, and a movable shaft (87) is fixedly installed on one side of the support rod (81). The movable shaft (87) is slidably connected to the sloping groove (86).

6. The guiding and positioning device for constructing drainage holes in venting tunnels according to claim 1, characterized in that, Two guide rails (14) are fixedly installed on one side of the fixed plate (5), and the guide rails (14) are slidably connected to the drilling machine (6).