A device for in-situ recovery of precious metals from tailings
The device, which integrates isolation, liquid injection, extraction, and refining systems, solves the problems of liquid diffusion and uneven liquid injection, and achieves efficient in-situ recovery and low-cost recovery of precious metals.
Patent Information
- Application Number
- CN202522618953.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-10
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-10
AI Technical Summary
In existing technologies, the leaching agent solution tends to spread widely when injected into the precious metal tailings soil layer, leading to solution loss and pollution, and uneven injection, which affects the precious metal recovery efficiency.
The device integrates an isolation system, a liquid injection system, a pumping system, and a refining system. It forms an isolated reaction zone through sealed side walls and a sealed bottom wall, uses a liquid injection core tube and a rubber isolation ring to prevent liquid loss, and achieves controllable injection depth and uniform distribution of liquid through the liquid injection core tube and a rubber one-way valve. Combined with the pumping system and refining equipment, it realizes the recycling of liquid.
It achieves effective sealing and uniform distribution of the liquid medicine, improves the recovery efficiency of precious metals, reduces reagent waste and environmental pollution, and lowers costs.
Smart Images

Figure CN224954670U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of resource recycling and environmental engineering, specifically to a device for in-situ recovery of precious metals from tailings. Background Technology
[0002] For the recovery of tailings containing a certain grade of precious metals, a common method is to soak the tailings in a leaching agent solution to separate the precious metals into the solution. Then, the solution containing the precious metals (precious solution) is adsorbed and enriched to extract high-grade precious metal products.
[0003] To achieve in-situ recovery of precious metal tailings, two key technical challenges need to be addressed: first, how to effectively inject leaching agent into the deep tailings soil layer to fully soak the tailings, and then smoothly extract the precious metal-containing solution; second, the tailings are mainly composed of fine sand and silt, which have high permeability. When the leaching agent is injected into the tailings soil layer, it spreads everywhere due to the high permeability of the tailings soil, failing to confine and maintain it within the tailings area where the precious metals are to be recovered. This results in wasted leaching agent, loss of precious metal solution, and potential pollution of the surrounding soil.
[0004] Commonly used injection systems typically employ a single-tube structure, with several outlet holes on the tube wall, allowing external pump pressure to inject the chemical into the soil. However, this method has significant drawbacks in practical engineering applications: due to the lack of effective longitudinal sealing, the injected chemical, under pressure, easily flows back up along the gap between the tube wall and the soil, or even directly within the tube, resulting in a large concentration of chemical in the shallow soil layer. This not only leads to severe waste of chemical but also insufficient distribution in the medium and deep layers, creating treatment blind spots and seriously affecting the overall remediation or recovery effect.
[0005] Therefore, it is necessary to develop a device for in-situ recovery of precious metals from tailings that has a reasonable structure, can prevent the loss of reagents, and can achieve efficient in-situ recovery of precious metals. Summary of the Invention
[0006] The purpose of this invention is to solve the aforementioned key technical problems and provide a device for in-situ recovery of precious metals from tailings that has a reasonable structure, can prevent the loss of the reagent, and can achieve efficient in-situ recovery of precious metals. Furthermore, the device achieves controllable injection depth and uniform distribution of the reagent through a novel injection structure, thereby effectively improving the recovery efficiency of precious metals.
[0007] The technical solution of this utility model is as follows: An apparatus for in-situ recovery of precious metals from tailings, comprising: The isolation system includes a sealing sidewall surrounding the mining area and a sealing bottom wall at the bottom of the area, wherein the sealing sidewall and the sealing bottom wall enclose an isolation reaction zone. The injection system includes a liquid tank for storing leaching agent solution, an injection pump, an injection pipe with an inlet connected to the liquid tank, an injection outer pipe inserted into the tailings soil, and an injection core pipe nested inside each injection outer pipe for delivering the leaching agent solution to soil at different depths. The pumping system includes a pumping pipe for collecting liquid in the mining area, a pumping pump, a return liquid pool assembly, and a drainage plate inserted into the tailings soil; the pumping pipe leads to the inlet of the pumping pump and the outlet of the pumping pump is provided with a return pipe leading to the return liquid pool assembly. The refining system includes refining equipment connected in parallel on the reflux pipeline.
[0008] A preferred device for in-situ recovery of precious metals from tailings, wherein: a plurality of isolation spray devices are spaced apart along the length of the injection core tube; the isolation spray device includes a core tube section with multiple discharge holes in the tube wall, and rubber isolation rings disposed at the upper and lower ends of the core tube section, the rubber isolation rings being tightly fitted to the inner wall of the injection outer tube.
[0009] A preferred in-situ recovery device for precious metals from tailings, wherein: on the wall of the injection outer pipe, corresponding to each of the isolation spray devices, a rubber one-way valve is provided that only allows liquid to be discharged outward.
[0010] A more preferred device for in-situ recovery of precious metals from tailings, wherein: the length of each isolation spray device ranges from 40 to 50 cm, and two rubber isolation rings are installed at both ends of the core tube section.
[0011] A preferred in-situ recovery device for precious metals from tailings, wherein: the sealing sidewall is formed by continuous interlocking of a single row of steel sheet piles, or by interlocking of two rows of mud mixing piles; the sealing bottom wall is a mud wall formed by interlocking high-pressure jet grouting piles throughout the entire area.
[0012] For a more preferred in-situ tailings precious metal recovery device, the sealing sidewall needs to penetrate 0.8~1.5m through the bottom of the tailings recovery area. When the sealing sidewall is a single row of continuously interlocking steel sheet piles, U-shaped Larssen steel sheet piles can be selected, and different steel sheet pile models are selected according to the tailings soil thickness: (i) when the tailings thickness is ≤8m, model SP-II is selected; (ii) when 8m≤tailings thickness is ≤12m, model SP-III is selected; (iii) when 12m≤tailings thickness is ≤18m, model SP-IV is selected.
[0013] A more preferred in-situ recovery device for precious metals from tailings, when the sealing sidewall is a mud mixing pile wall, has a diameter A of 600~800mm for a single mud mixing pile, an overlap size of ≥200mm between adjacent mixing piles, and a width B of 1.0m~1.2m for the sealing sidewall.
[0014] A more preferred in-situ tailings precious metal mining device uses high-pressure jet grouting piles to form a sealing wall at the bottom of the mining area. The triple-pipe construction process is adopted, with overlapping arrangement, pile spacing G=1.5~2.0m, overlap size of adjacent jet grouting piles ≥300mm, and actual pile length 0.8~1.5m.
[0015] A preferred in-situ recovery device for precious metals from tailings, wherein: the return pool assembly includes return pool A and return pool B, the outlet of the return pipe leads to return pool A, return pool A is connected to return pool B via a first pumping pipeline, and return pool B is connected to a chemical solution pool via a second pumping pipeline.
[0016] More preferably, the return liquid pool A, return liquid pool B and chemical liquid pool are all located on the same side outside the mining area.
[0017] A preferred device for in-situ recovery of precious metals from tailings, wherein: the injection pipeline is connected to the injection core tubes inside each injection outer pipe via a tee joint, the tee joint being a T-shaped structure, with its lower port connected to the injection core tube via a connecting fitting, and its upper two ports connected to the injection pipeline.
[0018] A preferred in-situ recovery device for precious metals from tailings, wherein: the refining equipment is connected in parallel with the return pipeline via a refining pipeline, and both the refining pipeline and the return pipeline are equipped with control valves on the downstream pipe sections near the parallel connection point to control the flow of the pumped liquid to the refining equipment or the return pool assembly.
[0019] A preferred device for in-situ mining of precious metals from tailings, wherein: multiple drainage boards are arranged in rows at equal intervals along the longitudinal direction of the mining area, multiple injection pipes are arranged in rows at equal intervals along the longitudinal direction of the mining area, and the width direction of each drainage board is set along the longitudinal direction; multiple rows of drainage boards and multiple rows of injection pipes are arranged alternately at equal intervals along the transverse direction.
[0020] A preferred in-situ recovery device for precious metals from tailings, wherein: geotextile and sealing membrane are sequentially laid upwards on the surface of the recovery area, and the injection pipe and extraction pipe pass through the sealing membrane in a sealed manner via a membrane exit device.
[0021] A preferred apparatus for in-situ recovery of precious metals from tailings, wherein the refining equipment is an activated carbon adsorption column, an ion exchange column, or a resin adsorption column.
[0022] This utility model has the following significant advantages: 1. This utility model integrates the isolation system, liquid injection system, pumping system, and refining system into a single structure, forming a complete in-situ recovery device. This structural design allows the entire process, from liquid injection, precious metal leaching, precious liquid collection to final refining, to be completed on-site at the tailings dam, forming a closed loop for resource recovery. It eliminates the need for tailings excavation and transportation, structurally ensuring high efficiency and low cost in the recovery process.
[0023] 2. This utility model forms a physical isolation barrier through an isolated reaction zone enclosed by sealed side walls and a sealed bottom wall. This structure effectively isolates the intended mining area from the surrounding environment, physically preventing the leaching agent and precious metal-containing solutions from diffusing and leaking to the surroundings and bottom, thus ensuring the reaction concentration and avoiding environmental pollution.
[0024] 3. The injection core tube of this utility model, along with the isolation spray device and rubber isolation ring installed on it, cooperates with the corresponding rubber one-way valve on the wall of the injection outer tube to form an anti-backflow injection structure. Through physical isolation and one-way flow, the liquid is forced to be injected into the soil from a predetermined depth, effectively solving the problems of liquid backflow, uneven injection, and soil particle backflow blockage that exist in traditional open-hole injection pipes. This ensures the uniform distribution of liquid and the long-term stable operation of the system throughout the entire depth range.
[0025] 4. In this utility model's extraction and drainage system, the return pipeline and the refining pipeline are connected in parallel, and a control valve is provided to achieve controllable liquid flow. Combined with the circulation loop consisting of return tank A, return tank B, chemical tank, and connecting pipelines, this structure can return liquid that has not reached the preset concentration for reprocessing and reuse, thereby significantly saving chemical costs and improving overall processing efficiency.
[0026] In summary, this invention can simultaneously and extensively recover precious metals from deep tailings soil layers in gold tailings ponds without the need for digging and transporting tailings. It has low unit costs, significant economies of scale, and is of great value for the secondary development and utilization of precious metal tailings. Attached Figure Description
[0027] Figure 1 This is a schematic diagram of the overall device of this utility model (vertical). Figure 2 Schematic diagram of the layout of the sealing sidewalls and drainage boards / injection pipes Figure 3 Schematic diagram of steel sheet pile sealing sidewall Figure 4 Schematic diagram of the sealing sidewall structure for mud mixing piles Figure 5 Schematic diagram of the sealing bottom wall structure for jet grouting piles Figure 6 Schematic diagram of the isolation spray device The components are as follows: 1. Mining area; 2. Drainage board; 3. Injection pipe; 4. Extraction pipe; 5. Injection pipe; 6. Injection pump; 7. Drainage pump; 8. Chemical tank; 9. Return tank A; 10. Return tank B; 11. Leaching agent solution; 12. Drainage liquid; 13. Sealed sidewall; 14. Sealed bottom wall; 15. Refining equipment; 16. Steel sheet pile; 17. Control valve; 18. Connecting fittings; 19. T-joint; 21. Injection core pipe; 22. Rubber check valve; 23. Liquid outlet; 24. Rubber isolation ring; 30. Return pipe; 31. First pumping pipeline; 32. Second pumping pipeline; 33. Refining pipeline. Detailed Implementation
[0028] The embodiments of this utility model are described in detail below, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this utility model, and should not be construed as limiting this utility model.
[0029] In the description of this utility model, it should be understood that the terms "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.
[0030] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this utility model, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0031] Example 1 like Figures 1-6 As shown, the device for in-situ mining of precious metals from tailings provided by this utility model is mainly composed of four organically integrated parts: an isolation system, a liquid injection system, a pumping system, and a refining system.
[0032] The isolation system is the basis for implementing in-situ mining. Its function is to form an isolated reaction zone with an open top to prevent the loss of chemical and precious liquids. It consists of a sealing sidewall 13 and a sealing bottom wall 14. The sealing sidewall needs to penetrate 0.8~1.5m through the bottom of the mining tailings area.
[0033] The sealing wall 13 can be formed by continuously interlocking a single row of steel sheet piles 16 to create a water-stopping sealing wall, or it can be formed by using double rows of mud-mixing piles. The sealing wall 13 is preferably constructed using steel sheet piles 16 because steel sheet piles can be reused and do not occupy tailings resources. Mud-mixing pile sealing walls require tailings soil resources and can be used when the tailings soil is very thick.
[0034] In some preferred embodiments, the sheet pile 16 can be a U-shaped Larssen sheet pile, such as... Figure 3 As shown, different sheet pile models are selected based on the tailings soil thickness: (i) When the tailings thickness is ≤8m, model SP-II (width 400mm, height 100mm, thickness 10.5mm, theoretical weight per meter of single pile 48kg) is selected; (ii) When 8m≤tailings thickness ≤12m, model SP-III (width 400mm, height 125mm, thickness 13mm, theoretical weight per meter of single pile 60kg) is selected; (iii) When 12m≤tailings thickness ≤18m, model SP-IV (width 400mm, height 170mm, thickness 15.5mm, theoretical weight per meter of single pile 76.1kg) is selected. The width D of the sealing sidewall formed by the sheet pile 16 is approximately twice the height C of the selected single sheet pile.
[0035] In some preferred examples, double-row mud mixing piles, such as Figure 4 As shown, the diameter of a single mud mixing pile is A=600~800mm, the overlap size of adjacent mixing piles is ≥200mm, the width of the sealed sidewall is B=1.0m~1.2m, the depth of the mixing pile should enter the bottom of the mining area by 0.8~1.2m, and the permeability coefficient of the pile wall should be less than 10~5cm / s.
[0036] In some preferred embodiments, the sealing bottom wall 14 is formed at the bottom of the mining area using high-pressure jet grouting piles, employing a triple-pipe construction technique with overlapping joints, such as... Figure 5 As shown, the pile spacing G = 1.5~2.0m, the overlap size of adjacent jet grouting piles ≥300mm, and the actual pile length (i.e., the vertical thickness of the wall) 0.8~1.5m, to ensure reliable bottom sealing.
[0037] The injection system is used to precisely and uniformly inject leaching agent solution 11 into tailings soil at different depths. For example... Figure 1 As shown, the injection system includes an off-site chemical tank 8, an injection pump 6, an injection pipeline 5 with its inlet connected to the chemical tank 8, and an injection outer pipe 3 inserted into the tailings soil. Each injection outer pipe 3 contains an independent injection core pipe 21. Figure 6As shown, multiple isolation spray devices are spaced along the length of the outer wall of the injection core tube 21. Each isolation spray device includes a core tube section with multiple discharge holes 23 in its wall, and rubber isolation rings 24 at both ends of the core tube section. These rubber isolation rings 24 fit tightly against the inner wall of the injection outer tube 3, dividing the annular cavity between the injection outer tube 3 and the injection core tube 21 into multiple independent compartments that are sealed to each other in the longitudinal direction. On the wall of the injection outer tube 3, at positions corresponding to each isolation spray device, mounting holes are provided and fitted with rubber one-way valves 22. These valves only allow liquid to be discharged from the inside of the tube to the outside in one direction, effectively preventing soil particles from flowing back in.
[0038] In some preferred embodiments, each isolation spray device has a vertical length of 40-50 cm, and the isolation spray devices are installed starting at a depth of 2-6 m above the ground, with a spacing of 0.4-0.6 m between adjacent isolation spray devices. The outlet holes 23 are arranged in rows at intervals along the length of the pipe, with multiple outlet holes 23 spaced circumferentially along the pipe wall. In some preferred embodiments, two rubber sealing rings are installed at each of the upper and lower ends of the core pipe section, enhancing the sealing reliability of the isolation spray device through the double sealing rings at both ends. Multiple rubber one-way valves 22, corresponding to each isolation spray device, can be arranged circumferentially on the wall of the injection outer pipe 3.
[0039] The injection pipeline 5 connects to the top of each injection core tube 21 via a tee connector 19 on the surface of the mining area 1. The tee connector 19 has a T-shaped structure, with its lower end connected to the injection core tube 21 via a connecting fitting 18 (such as a steel wire hose), and its upper two ends connected to the injection pipeline 5. In some preferred embodiments, the injection outer pipe 3 is open at the top and closed at the bottom; the upper end of the injection core tube 21 is connected to the connecting fitting 18, and the lower end is either open or closed.
[0040] The extraction and drainage system is used to extract precious metal-containing liquids (precious solutions) from the reaction zone and transport them to a designated location. For example... Figure 1 As shown, the drainage system includes a drainage pipe 4, a drainage pump 7, a return liquid pool assembly, and a drainage plate 2 inserted into the tailings soil. The drainage pipe 4 connects to the top of the drainage plate 2 at the surface of the mining area 1. Preferably, the top of the drainage plate 2 is wrapped and tied to the drainage pipe 4. The outlet end of the drainage pipe 4 leads to the inlet of the drainage pump 7. The outlet of the drainage pump 7 is provided with a return pipe 30 leading to the return liquid pool assembly. The return liquid pool assembly includes a return liquid pool A9 and a return liquid pool B10. The chemical pool 8, return liquid pool A9, and return liquid pool B10 are preferably located on the same side outside the mining area 1 for easy management. The outlet of the return pipe 30 leads to the return liquid pool A9. The return liquid pool A9 leads to the return liquid pool B10 via a first pumping pipe 31. The return liquid pool B10 leads to the chemical pool 8 via a second pumping pipe 32, thus forming a complete chemical liquid circulation loop.
[0041] by Figure 2The vertical direction of the mining area 1 is considered longitudinal, while the horizontal direction is considered transverse. The arrangement of the drainage boards 2 and injection pipes 3 is as follows: multiple drainage boards 2 are arranged in rows at equal intervals along the longitudinal direction of the mining area 1, and multiple injection pipes 3 are also arranged in rows at equal intervals along the longitudinal direction. The multiple rows of drainage boards 2 and multiple rows of injection pipes 3 are arranged alternately at equal intervals along the transverse direction. The width of each drainage board 2 is set along the longitudinal direction. This arrangement helps to uniformly inject liquid and uniformly drain pore liquid from the soil in the plane area of the mining area 1. The drainage boards are plastic drainage boards commonly used in vacuum preloading, with grooves on the surface along the length direction.
[0042] The refining system is used to extract precious metal products from precious liquids. The refining equipment 15 is connected in parallel with the return pipe 30 via a refining pipe 33. Control valves 17 are installed on the downstream sections of both the refining pipe 33 and the return pipe 30 near the parallel connection point. By controlling the opening and closing of these two control valves 17, the pumped liquid 12 can be selectively directed to the refining equipment 15 for gold extraction, or directed to the return liquid pool A9 for recycling. The refining equipment 15 can be selected from existing mature gold extraction equipment such as activated carbon adsorption columns, ion exchange columns, or resin adsorption columns, depending on the occurrence state of precious metals in the tailings and the grade of the precious liquid.
[0043] To maintain the system's operating environment, a layer of woven geotextile is first laid on the surface of the mining area 1 above the injection pipe 5 and the extraction pipe 4 to protect the sealing membrane, and then covered with another layer of sealing membrane. The injection pipe 5 and the extraction pipe 4 can pass through the sealing membrane through a dedicated sealing membrane exit device to ensure the sealing under the membrane.
[0044] Example 2 This embodiment specifically discloses the construction and installation process of the utility model device, including a construction isolation system, a liquid injection system, a pumping system, and an installation and refining system.
[0045] 1) Use sheet piles or mixing piles to construct sealed sidewalls The specific process for constructing the sealed sidewall using steel sheet piles is as follows: A Larssen steel sheet pile wall self-seepage prevention system is adopted, with a seepage prevention grade of not less than P6. Its waterproofing employs a lock-type waterproofing structure. The type of steel sheet pile is determined based on the thickness of the tailings soil layer to be mined: (i) when the tailings thickness is ≤8m, type SP-II is selected; (ii) when 8m≤tailings thickness ≤12m, type SP-III is selected; (iii) when 12m≤tailings thickness ≤18m, type SP-IV is selected. Steel sheet piles are driven to the required depth around the planned tailings mining area according to relevant technical specifications.
[0046] The specific process for constructing a sealed sidewall using mixing piles is as follows: Double-row interlocking mixing piles are used for sealing and water stoppage. Bentonite is used as the mixing material for the slurry, with a slurry specific gravity of 1.30~1.40 and a slurry mixing ratio >20~35% (the ratio of slurry volume to the volume of the reinforced soil). The permeability coefficient of the slurry mixing pile wall is ≤1×10⁻⁶. -5 cm / s. A four-spray, four-mix construction process was adopted, and mud-mixing piles were driven to the design requirements according to relevant specifications.
[0047] 2) Construction of sealed base wall A triple-tube high-pressure jet grouting system is used to inject slurry into the bottom to form a sealed base wall 14. Bentonite is used as the slurry material, with a water-cement ratio of 1:0.8~1.2, and 400~600 kg of bentonite is used per linear meter. The high-pressure jet grouting piles are arranged in an overlapping manner, with a pile spacing G=1.5~2.0m, an effective overlap dimension of ≥300mm between two adjacent high-pressure jet grouting piles, and a solid pile length of 0.8~1.5m.
[0048] 3) Construction drainage board According to the design requirements, drainage boards 2 are installed using a jackhammer; the depth of drainage boards 2 into the soil reaches the bottom of the mining area 1.
[0049] 4) Construction injection into the outer pipe According to the design requirements, a pre-drilling rig is used to drill holes to the bottom of the mining area 1, with the hole diameter being 10-30mm larger than the outer diameter of the injection outer pipe; the injection outer pipe 3 is then inserted; the gap between the drill hole and the injection outer pipe 3 is backfilled with fine sand, and 0.5-1.0m below the ground surface is backfilled with mud. An injection core pipe 21 is installed inside the injection outer pipe 3, and a corresponding isolation spraying device is assembled. The injection core pipe 21 is connected to the upper connecting pipe fitting 18.
[0050] 5) Install pumping pump 7 and injection pump 6 outside the mining site, and excavate chemical solution pool 8, return solution pool A9 and return solution pool B10.
[0051] 6) Connection of the injection system An infusion tube 5 is laid on the ground, with one end connected to the injection core tube 21 inside the injection outer tube 3, and the other end connected to the injection pump 6 through the sealing membrane via the membrane outlet device.
[0052] 7) Connection of the extraction and drainage system A liquid extraction pipe 4 is laid on the ground, and the top of the drainage board 2 is connected to the liquid extraction pipe 4 by a winding method; the liquid extraction pipe 4 passes through the sealing membrane and is connected to the pump 7 via a membrane outlet device.
[0053] 8) Laying the sealing membrane: First, dig a membrane pressing trench around the mining area 1; first, lay a layer of woven geotextile on the ground, then lay the sealing membrane, and step the sealing membrane into the membrane pressing trench and backfill and compact it.
[0054] 9) Install refining equipment and related pipelines Install a return pipe 30 to connect the outlet of the pump 7 to the return liquid pool A9. Install a refining pipe 33 in parallel on the return pipe 30. Install the refining equipment 15 on the refining pipe 33. Install a control valve 17 near the parallel connection point of the return pipe 30 and the refining pipe 33. Install a first pumping pipe 31 to connect the return liquid pool A9 to the return liquid pool B10. Install a second pumping pipe 32 to connect the return liquid pool B10 to the chemical liquid pool 8.
[0055] The working process of this utility model device is as follows: Injection and Drainage: Start the injection pump 6 and inject the standard concentration C0 leaching agent solution 11 from the solution tank 8 into the tailings soil at different depths through the injection core tube 21. For gold tailings, lime-sulfur mixture, potassium perchlorate, or other environmentally friendly leaching agents can be used. The standard concentration C0 is 0.05~0.3 mol / L. Simultaneously, pump 7 is started to pump out the liquid in the soil. If the concentration of the leaching agent in the pumped liquid 12 does not meet the preset requirements (for example, the preset requirements are C1≥90%C0), the liquid is controlled by valve 17 to enter the return liquid tank A9 through the return pipe 30 (i.e., the control valve 17 on the return pipe 30 is opened and the control valve 17 on the refining pipe 33 is closed). Then, it is pumped through the first pumping pipe 31 to the return liquid tank B10 to replenish concentrated leaching agent and adjust the concentration. After the concentration of the solution reaches C0, it is returned to the solution tank 8 through the second pumping pipe 32 for recycling. The above injection and pumping are continued until the concentration of the leaching agent in the pumped liquid 12 from the tailings soil reaches the preset requirements.
[0056] Standing soaking: After the concentration of the medicine solution reaches the standard, stop the injection and drainage, and let it stand soaking.
[0057] Sampling and testing: Start the drainage pump 7 to extract and sample the tailings in the mining area, and test the precious metal grade P of the drainage liquid 12. If P meets the preset requirements, proceed to the next step; otherwise, repeat the previous soaking step until P meets the preset requirements.
[0058] Precious metal extraction: After sampling and testing the drained liquid to ensure the precious metal grade P meets the standard, control valve 17 is switched (i.e., control valve 17 on the return pipe 30 is closed, and control valve 17 on the refining pipe 33 is opened) to introduce the qualified precious metal liquid into the refining equipment 15 for adsorption and enrichment, extracting high-grade precious metal products. The liquid discharged from the refining system is then returned to the return liquid tank A9 and pumped to the return liquid tank B10. An appropriate amount of leaching agent is added to make the solution concentration reach C0, and then it is pumped back to the solution tank 8 as a standard concentration of leaching agent solution to continue to be injected into the tailings soil. The above refining and recovery continues until the precious metal grade P of the drained liquid 12 can no longer effectively extract precious metal products (e.g., P < preset grade lower limit 0.05 g / t).
[0059] Water injection and replacement: Add clean water to the chemical solution pool 8, start the injection pump 6 to inject clean water into the tailings soil in the mining area; at the same time, start the drainage pump 7 to pump the pore liquid of the tailings soil to the return liquid pool A9, and treat the discharged liquid appropriately, continuing until the leaching agent concentration of the drainage liquid 12 is less than the set value M, M=5%~10% C0, then stop water injection and drainage.
[0060] The dismantling of power equipment, injection pumps, drainage pumps, and related construction materials marked the completion of this precious metal recycling project.
Claims
1. An apparatus for in-situ recovery of precious metals from tailings, characterized in that, include: The isolation system includes a sealing sidewall (13) surrounding the mining area (1) and a sealing bottom wall (14) at the bottom of the area, wherein the sealing sidewall (13) and the sealing bottom wall (14) enclose an isolation reaction zone; The injection system includes a liquid tank (8) for storing leaching agent solution, an injection pump (6), an injection pipe (5) with an inlet connected to the liquid tank (8), an injection outer pipe (3) inserted into the tailings soil, and an injection core pipe (21) nested inside each injection outer pipe (3) for delivering leaching agent solution to soil at different depths. The pumping system includes a pumping pipe (4) for collecting liquid in the mining area (1), a pumping pump (7), a return pool assembly, and a drainage plate (2) inserted into the tailings soil; the pumping pipe (4) leads to the inlet of the pumping pump (7) and the outlet of the pumping pump (7) is provided with a return pipe (30) leading to the return pool assembly; The refining system includes refining equipment (15) connected in parallel on the reflux pipe (30).
2. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: The injection core tube (21) is provided with multiple isolation spray devices at intervals along its length; the isolation spray device includes a core tube section with multiple discharge holes (23) on the tube wall, and rubber isolation rings (24) provided at the upper and lower ends of the core tube section, the rubber isolation rings (24) being tightly fitted to the inner wall of the injection outer tube (3).
3. The apparatus for in-situ recovery of precious metals from tailings as described in claim 2, characterized in that: On the wall of the injection outer tube (3), a rubber one-way valve (22) is provided at the location corresponding to each of the isolation spray devices, which only allows liquid to be discharged outward.
4. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: The sealing side wall (13) is formed by continuous interlocking of steel sheet piles (16) or by overlapping of mud mixing piles; the sealing bottom wall (14) is a mud wall formed by interlocking high-pressure jet grouting piles throughout the entire area.
5. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: The return tank assembly includes a return tank A (9) and a return tank B (10). The outlet of the return pipe (30) leads to the return tank A (9). The return tank A (9) leads to the return tank B (10) via a first pumping pipe (31). The return tank B (10) leads to the medicine tank (8) via a second pumping pipe (32).
6. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: The injection pipe (5) is connected to the injection core tube (21) in each injection outer tube (3) through a three-way connector (19). The three-way connector (19) is a T-shaped structure. Its lower port is connected to the injection core tube (21) through a connecting pipe fitting (18), and its upper two ports are connected to the injection pipe (5).
7. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: The refining equipment (15) is connected in parallel with the return pipe (30) through a refining pipe (33). Both the refining pipe (33) and the return pipe (30) are equipped with control valves (17) on the downstream pipe sections near the parallel connection point, which are used to control the flow of the pumped liquid to the refining equipment (15) or the return pool assembly.
8. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: Multiple drainage boards (2) are arranged in rows with the same spacing along the longitudinal direction of the mining area (1), and multiple injection pipes (3) are arranged in rows with the same spacing along the longitudinal direction of the mining area (1). The width direction of each drainage board (2) is set along the longitudinal direction; multiple rows of drainage boards (2) and multiple rows of injection pipes (3) are arranged alternately with equal spacing along the transverse direction.
9. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: The surface of the mining area (1) is covered with woven geotextile and sealing membrane in sequence above the injection pipe (5) and the extraction pipe (4). The injection pipe (5) and the extraction pipe (4) pass through the sealing membrane in a sealed manner through the membrane exit device.
10. The apparatus for in-situ recovery of precious metals from tailings as described in claim 1, characterized in that: The refining equipment (15) is an activated carbon adsorption column, an ion exchange column, or a resin adsorption column.
