A garden boardwalk anti-slip and drainage structure

By designing a combined structure of a pretreatment layer, a gravel drainage layer, and a boardwalk base on the garden boardwalk, the problems of anti-slip and drainage of boardwalks in rainy southern regions have been solved. This achieves anti-slip safety and efficient drainage in high-humidity environments, meets the needs of children, and protects the ecology.

CN224954938UActive Publication Date: 2026-11-10ZHENGZHOU XINXIN ECOLOGICAL ENVIRONMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522623073.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-10
Publication Date
2026-11-10
Estimated Expiration
2035-12-10

AI Technical Summary

Technical Problem

The existing garden boardwalks have flaws in their anti-slip and drainage design in rainy southern regions, failing to balance anti-slip safety with drainage efficiency. In particular, their anti-slip performance decreases and drainage becomes poor in high-humidity environments, affecting children's use and ecological protection.

Method used

The system adopts a combined structure of a pretreatment layer, a gravel diversion layer, and a boardwalk base. The pretreatment layer is equipped with inverted trapezoidal slots for inserting anti-slip strips and is coated with polytetrafluoroethylene. The gravel diversion layer is embedded with PE diversion pipes. The concealed trench is equipped with HDPE geomembrane and rectangular filter screen. Combined with permeable non-woven fabric and buffer filter components, it forms a synergistic design for anti-slip and drainage.

Benefits of technology

With a slip resistance coefficient of over 0.6 in wet conditions, it meets the safety standards for children's activities. The retention time of water during heavy rain is reduced to within 25 minutes, reducing maintenance costs. It also balances the synergistic efficiency of slip resistance and drainage, protecting the ecological environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224954938U_ABST
    Figure CN224954938U_ABST
Patent Text Reader

Abstract

This utility model discloses an anti-slip and drainage structure for garden boardwalks, relating to the field of garden engineering facilities technology. The structure comprises a pretreatment layer, a gravel drainage layer, and a boardwalk base. The pretreatment layer has inverted trapezoidal grooves with embedded anti-slip strips coated with polytetrafluoroethylene (PTFE). The anti-slip strips are fixed with sealant and countersunk screws. A permeable non-woven fabric is laid between the pretreatment layers. A PE drainage pipe is embedded in the gravel drainage layer. A concealed ditch is opened on the lakeside side of the boardwalk base, with a cover plate with a narrow drainage slot. A pull-out rectangular filter screen is installed inside the ditch. A buffer filter assembly is installed on the lakeside side of the boardwalk base, comprising wet vegetation, geotextile, and pebble modules. HDPE geomembrane is attached to the bottom of each module. An inclined connecting channel connects the concealed ditch and the pebble modules within the base. This utility model solves the problems of existing technologies such as the contradiction between anti-slip and child safety, low drainage efficiency, ecological damage, and functional fragmentation, achieving a synergistic effect of anti-slip safety, efficient drainage, base stability, and ecological protection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of garden engineering facilities technology, and in particular to a garden boardwalk anti-slip and drainage structure. Background Technology

[0002] The main tour boardwalk in the lakeside environment of the rainy southern region needs to meet the needs of children's high-frequency activities; Currently, lakeside boardwalks made of natural stone have become mainstream due to their aesthetic appeal and durability, but they have significant shortcomings in anti-slip and drainage design: Firstly, regarding slip resistance, although existing surface physical treatment technologies offer good aesthetics, the high humidity environment near lakes in the south easily forms a water film, causing the slip resistance coefficient to drop from 0.7-0.8 when dry to 0.4-0.5, which is lower than the safety standard of ≥0.6 for children's activity areas. Furthermore, frequent footsteps can easily wear down the texture. Meanwhile, among the additional anti-slip components, the metal anti-slip strips, with their 8-12mm protrusions, are prone to tripping children, while the plastic anti-slip stickers, though low-protrusion, age and fall off after 6-12 months due to high humidity. However, in terms of drainage, the side-mounted concealed ditches and other cross-sectional designs are unsuitable for the 0.5%-1% gentle slope of the lakeside boardwalk. During heavy rains, water can stagnate for more than 30 minutes, and the lack of an impermeable layer can easily lead to base settlement. Drainage through the slab joints is easily blocked by fallen leaves and silt, requiring frequent disassembly and cleaning. Furthermore, the drainage flows directly into the lake without filtration, causing siltation and ecological damage to the lake shore. In addition, existing technology separates anti-slip and drainage designs; anti-slip strips can easily block drainage paths, and the grooves in the stone texture trap rainwater, fostering moss growth and further reducing anti-slip properties. In summary, existing technologies cannot simultaneously address both slip resistance and drainage efficiency, nor are they suitable for the lakeside environment and the needs of children. There is an urgent need to develop new slip-resistant and drainage structures to solve these problems. Utility Model Content

[0003] The purpose of this utility model is to at least solve one of the technical problems existing in the prior art, and to provide a garden boardwalk anti-slip and drainage structure that can solve the above-mentioned problems.

[0004] To achieve the above objectives, this utility model provides the following technical solution: a garden boardwalk anti-slip and drainage structure, comprising a pretreatment layer, a gravel guide layer, and a boardwalk base layer, wherein the gravel guide layer is fixedly connected below the pretreatment layer, and the boardwalk base layer is fixedly connected below the gravel guide layer; The upper surface of the pretreatment layer is provided with a set of parallel inverted trapezoidal slots, and each inverted trapezoidal slot is fitted with an anti-slip strip. The contact gap between the anti-slip strip and the inverted trapezoidal slot is fixedly filled with sealant. The anti-slip strip has countersunk holes at both ends on its upper surface, and screws for reinforcing the anti-slip strip are fixedly installed in each countersunk hole. A permeable nonwoven fabric is fixedly connected to the upper surface of the pretreatment layer and between adjacent anti-slip strips. The upper surface of the permeable nonwoven fabric is flush with the upper surface of the pretreatment layer, and the lower surface is flush with the upper surface of the gravel guide layer. A set of PE guide pipes parallel to the anti-slip strips are embedded in the gravel guide layer. A hidden ditch is opened on the upper surface of the boardwalk base layer and near the lake. An HDPE geomembrane is fixedly attached to the inner wall of the hidden ditch. A cover plate of the same material as the pretreatment layer is covered on the hidden ditch. A rectangular filter screen is set inside the hidden ditch and below the cover plate. A handle is fixedly connected to one end of the rectangular filter screen.

[0005] Preferably, the lakeside side of the boardwalk base is provided with a buffer filtration component, which includes wet vegetation, geotextile and pebble module from top to bottom, and an HDPE geomembrane is fixedly attached to the lower surface of the pebble module.

[0006] Preferably, the base layer of the walkway has a set of inclined connecting channels, one end of each connecting channel is connected to the hidden ditch, and the other end extends into and contacts the pebble module.

[0007] Preferably, the pretreatment layer is composed of granite or marble, and its surface is lightly flamed.

[0008] Preferably, the outer wall of the anti-slip strip is completely coated with a polytetrafluoroethylene coating, and the top of the screw in the countersunk hole is flush with the upper surface of the anti-slip strip.

[0009] Preferably, the PE guide pipe has holes in its wall, the axis of the PE guide pipe is parallel to the axis of the hidden ditch, and the end of each PE guide pipe away from the lakeside is connected to the hidden ditch.

[0010] Preferably, the concealed ditch has a variable cross-section structure, extending from the top to the bottom of the slope along the boardwalk. A set of drainage slits is provided on the cover plate, and the arrangement direction of the drainage slits is perpendicular to the extension direction of the concealed ditch.

[0011] Preferably, the handle extends outward from one end of the concealed groove.

[0012] Compared with the prior art, the beneficial effects of this utility model are: 1. The anti-slip and drainage structure of this garden boardwalk provides a basic anti-slip texture through a pre-treatment layer, ensuring an anti-slip coefficient of ≥0.6 even in wet conditions, meeting the safety standards for children's activities. It avoids the tripping risk of existing metal anti-slip strips. The anti-slip strips are fixed by inverted trapezoidal grooves, sealant, and countersunk screws, preventing loosening and falling off. The polytetrafluoroethylene coating can also resist corrosion in the high humidity of southern regions, extending the service life from 6-12 months of existing plastic anti-slip stickers to more than 5 years, reducing the maintenance cost of the main tour route.

[0013] 2. The garden boardwalk features an anti-slip and drainage structure with a variable cross-section hidden ditch, adaptable to the 0.5%-1% gentle slope of the lakeside boardwalk. This reduces the retention time of rainwater during heavy rain to within 25 minutes, solving the water accumulation problem of existing uniform cross-section hidden ditches. The inner wall of the hidden ditch is lined with an HDPE geomembrane, and permeable non-woven fabric is installed at the joints between the boards. This not only prevents rainwater from seeping in and causing the base layer to settle, but also uses a double barrier of permeable non-woven fabric and rectangular filter screen. Cleaning only requires pulling out the filter screen, without disassembling the stone, thus avoiding the defects of frequent disassembly and repair of existing board joint drainage systems.

[0014] 3. The anti-slip and drainage structure of this garden boardwalk has anti-slip strips arranged longitudinally along the boardwalk, avoiding the joints between the boards. The PE drainage pipes in the gravel drainage layer are connected to the hidden ditch, avoiding the problem of anti-slip strips blocking the drainage path in existing technologies. The texture depth of the pretreatment layer is controllable, reducing rainwater retention and moss growth, breaking the vicious cycle of anti-slip - water accumulation - anti-slip failure. Attached Figure Description

[0015] The present invention will be further described below with reference to the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of an anti-slip and drainage structure for a garden boardwalk according to the present invention; Figure 2 This is a schematic diagram of the internal cross-section of a garden boardwalk anti-slip and drainage structure according to the present invention; Figure 3 This is a side internal sectional view of an anti-slip and drainage structure for a garden boardwalk according to the present invention. Figure 4 This utility model Figure 2 Enlarged view of point A in the middle; Figure 5 This utility model Figure 3 Enlarged diagram of point B in the middle.

[0016] Attached reference numerals: 1. Pretreatment layer; 2. Gravel diversion layer; 3. Boardwalk base layer; 4. Wet vegetation; 5. Pebble module; 6. Countersunk hole; 7. Screw; 8. PTFE coating; 9. Handle; 10. Rectangular filter screen; 11. Cover plate; 12. HDPE geomembrane one; 13. Hidden trench; 14. Connecting channel; 15. Anti-slip strip; 16. Sealant; 17. Inverted trapezoidal groove; 18. PE diversion pipe; 19. Permeable non-woven fabric; 20. HDPE geomembrane two. Detailed Implementation

[0017] This section will describe in detail the specific embodiments of the present utility model. The preferred embodiments of the present utility model are shown in the accompanying drawings. The purpose of the drawings is to supplement the textual description with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present utility model, but they should not be construed as limiting the scope of protection of the present utility model.

[0018] In the description of this utility model, it should be understood that the directional descriptions, such as up, down, front, back, left, right, etc., indicate the directional or positional relationship based on the directional or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0019] In the description of this utility model, terms such as greater than, less than, and exceeding are understood to exclude the stated number, while terms such as above, below, and within are understood to include the stated number. The use of terms like "first" and "second" is merely for distinguishing technical features and should not be construed as indicating or implying relative importance, or implicitly indicating the quantity or sequence of the indicated technical features.

[0020] In the description of this utility model, unless otherwise explicitly defined, terms such as "setting," "installation," and "connection" should be interpreted broadly, and those skilled in the art can reasonably determine the specific meaning of the above terms in this utility model in conjunction with the specific content of the technical solution.

[0021] Please see Figure 1-5 This utility model provides a technical solution: a garden boardwalk anti-slip drainage structure, including a pretreatment layer 1, a gravel guide layer 2, and a boardwalk base layer 3. The gravel guide layer 2 is fixedly connected above the polytetrafluoroethylene coating 8, and the pretreatment layer 1 is fixedly connected above the gravel guide layer 2. The pretreatment layer 1 forms an initial anti-slip interface through surface rough texture. The pretreatment layer 1 is composed of a lightly flamed granite surface, which increases the friction between the sole of the pedestrian's shoe and the surface layer, reducing the risk of slipping in dry environments. It is fixed above the gravel guide layer 2, providing a stable load-bearing foundation for the overall anti-slip structure. A set of inverted trapezoidal slots 17 are provided on the upper surface of the pretreatment layer 1. Anti-slip strips 15 are inserted into each of the inverted trapezoidal slots 17. The outer side of the anti-slip strips 15 is completely coated with polytetrafluoroethylene coating 8. A sealant 16 is fixedly connected between the anti-slip strips 15 and the inverted trapezoidal slots 17 to prevent the anti-slip strips 15 from shifting laterally. Countersunk holes 6 are provided at both ends of the anti-slip strip 15, and screws 7 are fixedly installed in the countersunk holes 6. The outer side of the anti-slip strip 15 is completely coated with polytetrafluoroethylene coating 8, which improves the surface roughness of the anti-slip strip 15 and resists the corrosion of the high humidity environment near the lake in the south, thus extending the service life of the anti-slip strip 15. The sealant 16 at the contact between the anti-slip strip 15 and the inverted trapezoidal groove 17 not only fills the gap to prevent rainwater from seeping into the groove and causing the stone to become hollow, but also further fixes the anti-slip strip 15 to prevent it from loosening after long-term foot traffic. The screws 7 in the countersunk holes 6 vertically reinforce the anti-slip strip 15 to ensure that it will not fall off under the foot traffic of thousands of people every day. At the same time, the countersunk structure prevents the protrusion from tripping children. One side of the pretreatment layer is fixedly connected to a permeable non-woven fabric 19, and the upper surface of the permeable non-woven fabric 19 is flush with the pretreatment layer 1, and the lower surface is flush with the upper surface of the gravel diversion layer 2. It can quickly receive rainwater and intercept impurities such as mud, sand and fallen leaves on the surface of the pretreatment layer to prevent them from clogging the gravel diversion layer 2, ensuring that rainwater can penetrate without obstruction and without affecting pedestrian passage. The other part of the rainwater that has not penetrated flows along the natural slope of the surface of the pretreatment layer 1 towards the lakeside and finally collects into the hidden ditch 13 opened on the upper surface of the boardwalk base layer 3. The hidden ditch 13 is designed with a phased variable cross section, which can adaptively expand its capacity according to the rainwater flow rate to avoid surface water accumulation. A set of PE guide pipes 18 are embedded in the gravel guide layer 2; The upper surface of the boardwalk base 3 is provided with a hidden ditch 13, and the hidden ditch 13 is a staged ditch. The inner wall of the hidden ditch 13 is fixedly connected with an HDPE geomembrane 12. A cover plate 11 is provided above the hidden ditch 13. A rectangular filter screen 10 is provided inside the hidden ditch 13 and below the cover plate 11. A handle 9 is fixedly connected to the front end of the rectangular filter screen 10. A buffer filter assembly is provided on the right side of the boardwalk base layer 3, which includes wet vegetation 4, geotextile and pebble module 5 from top to bottom. The upper surface of the buffer filter assembly is lower than the upper surface of the boardwalk base layer 3. HDPE geomembrane 20 is fixedly connected to the bottom of the pebble module 5. The trestle base 3 has a set of connecting channels 14 inside. The connecting channels 14 are inclined and the left end of the connecting channels 14 connects to the hidden ditch 13, and the right end contacts the cobblestone module 5. The connecting channels 14 are designed with an inclined structure to ensure smooth flow of rainwater by using gravity and to avoid water accumulation in the channels. The left end of the connecting channels connects to the hidden ditch 13 and the right end contacts the cobblestone module 5, so as to realize the unobstructed transportation of rainwater from the hidden ditch 13 to the buffer component.

[0022] Working principle: The pretreatment layer 1 forms an initial anti-slip interface through the surface rough texture. The pretreatment layer 1 is composed of a lightly flamed granite surface, which increases the friction between the pedestrian's shoe sole and the surface layer, reduces the risk of slipping in dry environments, and is fixed above the gravel guide layer 2, providing a stable load-bearing foundation for the overall anti-slip structure. The anti-slip strip 15 is inserted into the surface of the pretreatment layer 1 through the inverted trapezoidal slot 17. The inverted trapezoidal structure is precisely matched with the slot to prevent the anti-slip strip 15 from shifting laterally. The polytetrafluoroethylene coating 8 completely coated on the outside of the anti-slip strip 15 improves the surface roughness of the anti-slip strip 15 and resists the corrosion of the high humidity environment near the lake in the south, thus extending the service life of the anti-slip strip 15. The sealant 16 at the contact point between the anti-slip strip 15 and the inverted trapezoidal slot 17 not only fills the gap to prevent rainwater from seeping into the slot and causing the stone to become hollow, but also further fixes the anti-slip strip 15 to prevent it from loosening after long-term foot traffic. The screw 7 in the countersunk hole 6 vertically reinforces the anti-slip strip 15 to ensure that it does not fall off under the foot traffic of thousands of people every day. At the same time, the countersunk structure prevents the protrusion from tripping children. The height difference between the top of the anti-slip strip 15 and the surface of the pretreatment layer 1 is controlled within a reasonable range. Combined with the flush design of the countersunk hole 6, there is no obvious protruding structure, which can effectively avoid the risk of tripping when children run and jump. The smoothness of the polytetrafluoroethylene coating 8 is moderate, which is not uncomfortable to the feet and can ensure the anti-slip effect, taking into account the comfort of adults and children. Rainwater falling on the surface of the pretreatment layer 1 partially seeps into the gravel guide layer 2 below through the permeable nonwoven fabric 19 on one side of the countersunk hole 6. The permeability coefficient of the permeable nonwoven fabric 19 is ≥1×10⁻³m / s, which can quickly receive rainwater and at the same time intercept impurities such as mud, sand and fallen leaves on the surface of the pretreatment layer to prevent them from clogging the gravel guide layer 2. The design of the upper surface of the permeable nonwoven fabric 19 being flush with the pretreatment layer 1 and the lower surface being flush with the gravel guide layer 2 ensures that rainwater can seep in without obstruction and does not affect pedestrian passage. The other part of the rainwater that does not seep in flows towards the lakeside along the natural slope of the surface of the pretreatment layer 1 and eventually collects into the hidden ditch 13 opened on the upper surface of the boardwalk base layer 3. The hidden ditch 13 is designed with a phased variable cross-section and can adaptively expand its capacity according to the rainwater flow rate to avoid surface water accumulation. Rainwater seeping into the gravel drainage layer 2 flows through the gaps between gravel particles with a diameter of 5-10mm, and is eventually collected by a set of PE drainage pipes 18 embedded in the gravel layer. The PE drainage pipes 18 have an opening rate of ≥15%, efficiently receiving rainwater from the surrounding gravel layer. The PE drainage pipes 18 are distributed longitudinally along the boardwalk, guiding rainwater to the concealed ditch 13, achieving centralized drainage of infiltrated rainwater and preventing rainwater stagnation in the gravel layer from causing dampness in the boardwalk base layer 3. Rainwater collected in the concealed ditch 13, influenced by the variable cross-section design of the concealed ditch 13, flows naturally along the ditch towards lower areas. The HDPE waterproofing on the inner wall of the concealed ditch 13... The infiltration membrane 12 prevents rainwater from seeping from the ditch wall into the interior of the boardwalk base 3, avoiding settlement and cracking of the base concrete due to excessive moisture content, and ensuring the structural stability of the boardwalk. The cover plate 11 above the concealed ditch 13 has a reserved drainage slit, which allows surface rainwater to flow in while blocking impurities and maintaining the integrity of the boardwalk landscape. The rectangular filter screen 10 inside the concealed ditch 13 and under the cover plate 11 can intercept impurities carried by rainwater a second time, preventing them from clogging the bottom of the concealed ditch 13 or the subsequent connecting channel 14. The handle 9 at the front end of the rectangular filter screen 10 makes it easy to pull the filter screen from one side of the concealed ditch 13 for regular cleaning. Rainwater in the concealed ditch 13 flows to the buffer and filter components on the right through a set of inclined connecting channels 14 opened inside the boardwalk base layer 3. The connecting channels 14 are designed with an inclined structure to ensure smooth flow of rainwater by using gravity and to avoid water accumulation in the channels. The left end of the connecting channel is connected to the concealed ditch 13 and the right end is in contact with the cobblestone module 5, so as to realize the unobstructed transport of rainwater from the concealed ditch 13 to the buffer components. After entering the buffer and filtration components, rainwater permeates from top to bottom along the path of wet vegetation 4 → geotextile → pebble module 5. Wet vegetation 4 first intercepts floating impurities on the surface of rainwater, and at the same time, plant roots can adsorb some pollutants, thus initially purifying the rainwater. The middle layer of geotextile further filters small particles of silt in the rainwater, preventing them from entering the pebble module below and clogging the gaps. The bottom pebble module 5 achieves the final filtration and buffering of rainwater through the gaps between the pebbles, slowing down the flow rate of rainwater and preventing direct erosion of the lake shore soil. The HDPE geomembrane 20 at the bottom of pebble module 5 prevents purified rainwater from seeping into the lakeside soil below the buffer component, avoiding shoreline subsidence caused by excessive soil moisture content. The clean rainwater, after three-stage filtration, eventually collects at the bottom of pebble module 5 and slowly seeps into the lakeside waters. This not only avoids siltation caused by rainwater being directly discharged into the lake, but also provides a supplementary water source for the lakeside ecosystem, achieving a synergy between drainage and ecological protection.

[0023] Structural Description: Pretreatment layer 1: Composed of lightly flamed granite surface, fixedly connected above the gravel diversion layer 2. A set of parallel inverted trapezoidal slots 17 are opened on the upper surface, and permeable non-woven fabric 19 is fixedly connected between adjacent anti-slip strips 15. The surface rough texture forms an initial anti-slip interface, providing a stable load-bearing foundation for the overall anti-slip structure. It can increase the friction between the sole of the pedestrian's shoe and the surface layer, reduce the risk of slipping in dry environments, and at the same time, it adapts to the inverted trapezoidal slots 17 to install anti-slip strips 15 and reserves positions for permeable non-woven fabric 19, realizing the initial integration of anti-slip and drainage structures. The gravel diversion layer 2 is fixedly connected below the pretreatment layer 1 and above the boardwalk base layer 3. It has a set of PE diversion pipes 18 embedded inside, parallel to the anti-slip strips 15, and is filled with gravel. It receives rainwater that seeps in from the permeable non-woven fabric 19 and guides the rainwater to the PE diversion pipes 18 through the gaps in the gravel. This can both temporarily store rainwater to prevent it from directly seeping into the boardwalk base layer 3 and achieve centralized drainage of rainwater through the PE diversion pipes 18, preventing rainwater from stagnating and causing the boardwalk base layer 3 to become damp. Boardwalk base layer 3: It is fixedly connected to the bottom of the gravel diversion layer 2. The upper surface near the lakeside has a hidden ditch 13. The lakeside is equipped with a buffer filter component. An inclined connecting channel 14 is opened inside, which serves as the load-bearing foundation of the entire boardwalk. At the same time, it provides installation space for the hidden ditch 13 and the connecting channel 14, which can support the upper pretreatment layer 1, gravel diversion layer 2 and other structures, ensuring the overall stability of the boardwalk. In addition, by opening the hidden ditch 13 and the connecting channel 14, rainwater is collected and transported to the buffer filter component, which is suitable for the functional requirements of the lakeside scene. Wet vegetation 4: Located on the top layer of the buffer filter component, set on the lakeside of the boardwalk base 3, it intercepts floating impurities on the surface of rainwater. At the same time, it absorbs some pollutants through plant roots, which can initially purify the rainwater entering the buffer component. The vegetation form can be integrated into the lakeside landscape, taking into account both ecological protection and landscape harmony. Pebble Module 5: Located at the bottom of the buffer filter assembly, it is fixedly connected above the HDPE geomembrane 20 and contacts the right end of the connecting channel 14 inside the boardwalk base layer 3. It is filled with pebbles with a particle size of 20-30mm. It receives rainwater after being filtered by wet vegetation 4 and geotextile. The gaps between the pebbles achieve the final filtration and buffering of rainwater. It can further filter small particulate impurities in the rainwater, slow down the rainwater flow rate, and prevent rainwater from directly eroding the lake shore soil. At the same time, it is adapted to the connecting channel 14 to receive rainwater and complete the end treatment of drainage. Countersunk holes 6: These are located at both ends of the upper surface of the anti-slip strip 15 and are used to fix and install screws 7. They provide mounting holes for screws 7 and allow the top of screws 7 to be flush with the upper surface of the anti-slip strip 15 through the countersunk design. This prevents children from tripping over the protruding structure and ensures that screws 7 can stably fix the anti-slip strip 15, making it suitable for high-frequency stepping scenarios. Screw 7: Installed in countersunk hole 6, penetrating through anti-slip strip 15 to pretreatment layer 1, vertically reinforcing anti-slip strip 15 to prevent it from loosening and falling off. It can withstand the pressure of thousands of people stepping on it every day, ensuring that anti-slip strip 15 is fixed in place for a long time and avoiding the anti-slip effect from falling off. Polytetrafluoroethylene coating 8: Completely coated on the outside of the anti-slip strip 15, improving the surface roughness of the anti-slip strip 15, while resisting the corrosion of the high humidity environment near the lake in the south. It can not only enhance the friction between the anti-slip strip 15 and the sole of the shoe, improve the anti-slip performance, but also extend the service life of the anti-slip strip 15, solving the problem of existing plastic anti-slip stickers aging and falling off easily in high humidity environments. Pull handle 9: It is fixedly connected to the front end of the rectangular filter screen 10 and extends out of the outer side of one end of the concealed groove 13. It provides a pull-out operation component for the rectangular filter screen 10, which makes it convenient for staff to regularly pull out the filter screen from one side of the concealed groove 13 for cleaning without disassembling the cover plate 11, reducing maintenance difficulty and improving maintenance efficiency. Rectangular filter screen 10: installed inside the concealed ditch 13 and below the cover plate 11, with a handle 9 fixedly connected to one end. The mesh size is adapted to intercept impurities, and it intercepts the mud, sand, fallen leaves and other impurities carried by rainwater in a secondary manner, preventing impurities from clogging the bottom of the concealed ditch 13 or the connecting channel 14. This can reduce the probability of blockage in the concealed ditch 13 and the connecting channel 14, ensure smooth drainage, and avoid water accumulation due to blockage. Cover plate 11: Covers the concealed ditch 13, is made of the same material as the pretreatment layer 1, and has a set of drainage slits. The drainage slits are arranged perpendicular to the extension direction of the concealed ditch 13, which covers the internal structure of the concealed ditch 13, while allowing surface rainwater to flow into the concealed ditch 13 through the drainage slits. This can maintain the integrity of the boardwalk surface landscape, prevent impurities from falling directly into the concealed ditch 13, and ensure that surface rainwater can smoothly enter the concealed ditch 13, thereby improving drainage efficiency. HDPE geomembrane 12: It is fixedly attached to the inner wall of the concealed ditch 13 to block rainwater from seeping from the inner wall of the concealed ditch 13 into the interior of the boardwalk base 3. It can prevent rainwater from seeping into the concrete of the boardwalk base 3, avoid settlement and cracking of the base concrete due to excessive moisture content, and ensure the structural stability of the boardwalk base 3. Hidden Ditch 13: Located on the upper surface of the boardwalk base layer 3 near the lakeside, it has a phased variable cross-section structure. The inner wall is fitted with HDPE geomembrane 12, and a rectangular filter screen 10 is installed inside. The top is covered with a cover plate 11 and connected to the left end of the connecting channel 14. It collects rainwater flowing along the surface of the pretreatment layer 1 towards the lakeside, as well as rainwater discharged by the PE diversion pipe 18. The variable cross-section design can adaptively expand its capacity according to the rainwater flow rate to avoid surface water accumulation. At the same time, the HDPE geomembrane 12 and the rectangular filter screen 10 respectively achieve seepage prevention and anti-clogging, ensuring that rainwater flows smoothly through the connecting channel 14 to the buffer filter component. Connecting channel 14: It is opened inside the base layer 3 of the boardwalk and is inclined. The left end connects to the hidden ditch 13 and the right end extends into and contacts the pebble module 5. It guides the rainwater in the hidden ditch 13 to the pebble module 5 of the buffer filter component. The inclined structure can use gravity to ensure the smooth flow of rainwater, avoid water accumulation in the channel, realize the unobstructed transportation of rainwater from the hidden ditch 13 to the buffer component, and complete the intermediate conduction of drainage. Anti-slip strip 15: Inserted into the inverted trapezoidal slot 17 of the pretreatment layer 1, coated with polytetrafluoroethylene coating 8 on the outside, with countersunk holes 6 at both ends of the upper surface, and the gap between the strip and the inverted trapezoidal slot 17 is filled with sealant 16 to enhance the anti-slip performance of the pretreatment layer 1 and form a reinforced anti-slip structure. The inverted trapezoidal structure and the slot are precisely matched to avoid lateral displacement. The polytetrafluoroethylene coating 8 is corrosion resistant, the sealant 16 prevents rainwater from seeping in, and the countersunk holes 6 are reinforced with screws 7. The overall design takes into account anti-slip effect, stability and durability, and can avoid the risk of children tripping. Sealant 16: Fills the contact gap between the anti-slip strip 15 and the inverted trapezoidal groove 17, seals the gap between the anti-slip strip 15 and the groove, and helps to fix the anti-slip strip 15. It can prevent rainwater from seeping into the groove from the gap, causing the stone to become hollow, and avoid rainwater from eroding the base layer of the pretreatment layer 1. At the same time, it further enhances the fixing effect of the anti-slip strip 15 and prevents it from loosening after long-term foot traffic. Inverted trapezoidal slot 17: It is formed on the upper surface of the pretreatment layer 1 and matches the cross section of the anti-slip strip 15. It provides an installation positioning slot for the anti-slip strip 15. The inverted trapezoidal structure can form a hook-like fit with the anti-slip strip 15 to prevent the anti-slip strip 15 from falling upward and to ensure the accurate installation position of the anti-slip strip 15. At the same time, it reserves filling space for the sealant 16 to achieve a tight fit between the anti-slip strip 15 and the pretreatment layer 1. PE diversion pipe 18: Embedded in the gravel diversion layer 2, parallel to the anti-slip strip 15, with a pipe wall porosity ≥15%, and the end away from the lakeside is connected to the hidden ditch 13. It collects rainwater in the gravel diversion layer 2 and diverts the rainwater to the hidden ditch 13. The pipe wall porosity can efficiently receive rainwater in the surrounding gravel layer. The arrangement parallel to the anti-slip strip 15 can adapt to the longitudinal structure of the boardwalk. The connection with the hidden ditch 13 realizes the convergence of infiltrated rainwater and surface rainwater, improving the concentration of drainage. Permeable nonwoven fabric 19: The upper surface is flush with the pretreatment layer 1, and the lower surface is flush with the upper surface of the gravel diversion layer 2. It guides rainwater from the surface of the pretreatment layer 1 into the gravel diversion layer 2, while intercepting impurities such as mud, sand, and fallen leaves. The flush design does not affect pedestrian passage. The high permeability coefficient ensures that rainwater infiltrates quickly. The impurity interception function can prevent the gravel diversion layer 2 from becoming clogged, thus achieving anti-clogging and smooth permeable drainage. HDPE geomembrane 20: It is fixedly attached to the lower surface of the pebble module 5 and extends 20cm into the lake shore soil. It blocks the purified rainwater from seeping from the bottom of the pebble module 5 into the lake shore soil, which can prevent rainwater from seeping in and causing the lake shore soil to become too wet, thus avoiding shoreline subsidence. At the same time, it ensures that the purified rainwater is concentrated and flows into the lakeside water area, without being lost or damaging the lake shore soil structure.

[0024] The embodiments of the present utility model have been described in detail above with reference to the accompanying drawings. However, the present utility model is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present utility model.

Claims

1. A garden plank road anti-skid drainage structure, comprising a pretreatment layer (1), a gravel flow guide layer (2) and a plank road base layer (3), characterized in that: The rubble diversion layer (2) is fixedly connected below the pretreatment layer (1), and the plankway base layer (3) is fixedly connected below the rubble diversion layer (2). A group of inverted trapezoidal clamping grooves (17) are arranged on the upper surface of the pretreatment layer (1) in parallel, and an anti-skid strip (15) is inserted into each inverted trapezoidal clamping groove (17); sealing glue (16) is filled in the contact gap between the anti-skid strip (15) and the inverted trapezoidal clamping groove (17). Sunk holes (6) are formed at the two ends of the upper surface of the anti-skid strip (15), and a screw (7) for reinforcing the anti-skid strip (15) is fixedly installed in each sunk hole (6). Water-permeable non-woven fabric (19) is fixedly connected between the adjacent anti-skid strips (15) on the upper surface of the pretreatment layer (1), the upper surface of the water-permeable non-woven fabric (19) is flush with the upper surface of the pretreatment layer (1), and the lower surface of the water-permeable non-woven fabric (19) is flush with the upper surface of the rubble diversion layer (2). A group of PE diversion pipes (18) parallel to the anti-skid strips (15) are embeddedly installed in the rubble diversion layer (2); a hidden groove (13) is formed on the upper surface of the plankway base layer (3) near the lake side, an HDPE impermeable membrane (12) is fixedly attached to the inner wall of the hidden groove (13), a cover plate (11) made of the same material as the pretreatment layer (1) is covered on the hidden groove (13), a rectangular filter screen (10) is arranged inside the hidden groove (13) below the cover plate (11), and a pull handle (9) is fixedly connected to one end of the rectangular filter screen (10).

2. The garden plank road anti-skid drainage structure according to claim 1, characterized in that: A buffer filtration assembly is arranged on the lake side of the plankway base layer (3), and the buffer filtration assembly comprises, from top to bottom, wet vegetation (4), geotextile and pebble modules (5); the lower surface of the pebble module (5) is fixedly attached to an HDPE impermeable membrane (20).

3. The garden trail anti-skid drainage structure according to claim 2, characterized in that: A group of inclined connecting channels (14) are formed in the plankway base layer (3), one end of each connecting channel (14) is communicated with the hidden groove (13), and the other end of each connecting channel (14) extends into the pebble module (5) and contacts the pebble module (5).

4. The garden trail anti-skid drainage structure according to claim 3, characterized in that: The pretreatment layer (1) is composed of granite or marble, and the surface of the pretreatment layer (1) is subjected to mild fire-burned surface treatment.

5. The garden trail anti-skid drainage structure according to claim 4, characterized in that: The outer wall of the anti-skid strip (15) is completely coated with a polytetrafluoroethylene coating (8), and the top of the screw (7) in the sunk hole (6) is flush with the upper surface of the anti-skid strip (15).

6. The garden trail anti-skid drainage structure according to claim 5, characterized in that: Holes are formed in the pipe wall of the PE diversion pipe (18), the axis of the PE diversion pipe (18) is parallel to the axis of the hidden groove (13), and one end of each PE diversion pipe (18) away from the lake side is communicated with the hidden groove (13).

7. The garden trail anti-skid drainage structure according to claim 6, characterized in that: The hidden groove (13) has a variable cross-section structure and is arranged along the slope of the plankway from the top of the slope to the bottom of the slope. A group of drainage narrow slots are formed on the cover plate (11), and the arrangement direction of the drainage narrow slots is perpendicular to the extension direction of the hidden groove (13).

8. The garden trail anti-skid drainage structure according to claim 7, characterized in that: The pull handle (9) extends out of one end of the hidden groove (13).