Rapid greening structure suitable for plateau slag piled body

By using the outer guard and composite geomembrane planting trough structure of reinforced concrete prefabricated parts on the plateau slag pile, the problems of long construction period and high cost of existing greening measures are solved, and rapid greening and efficient environmental protection are achieved.

CN222603242UActive Publication Date: 2025-03-14POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421172178.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2025-03-14
Estimated Expiration
2034-05-27

AI Technical Summary

Technical Problem

In the slag piles in the southwest plateau area, the existing greening measures have long construction cycles, high cost, and poor adaptability and durability, making it difficult to meet the needs of rapid greening and environmental protection.

Method used

The outer guards are used to splice reinforced concrete prefabricated parts to form a planting groove, and a composite geomembrane is laid on its inner surface to fill the planting soil to plant flowers, climbing plants, shrubs and trees suitable for local flowers and plants.

Benefits of technology

It has achieved rapid construction of greening structures, shortened construction cycles, reduced costs, improved greening effect and structure durability, and is suitable for environmental conditions in plateau areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222603242U_ABST
    Figure CN222603242U_ABST
Patent Text Reader

Abstract

The utility model provides a quick greening structure suitable for a plateau slag piled body, which comprises a protective structure positioned at a slope toe of the slag piled body, an outer side guard formed by splicing reinforced concrete prefabricated members left and right is arranged on the side, close to a river, of the protective structure, and a planting groove is formed by the outer side guard and the top surface of the protective structure; a composite geomembrane is laid on the inner surface of the planting groove, and the composite geomembrane is filled with planting soil; the reinforced concrete prefabricated part comprises a front wall soil retaining section, a rear wall stabilizing section and a middle connecting section used for connecting the front wall soil retaining section and the rear wall stabilizing section. The front wall soil retaining section, the rear wall stabilizing section and the middle connecting section are I-shaped, and the front wall soil retaining section is thin-walled; the front wall soil retaining section is located on the lower side of the slope, and the rear wall stabilizing section is located on the upper side of the slope. At least the rear wall stabilizing section is embedded into the planting soil. The rapid greening structure is high in construction speed, good in greening effect in the plateau area, high in safety, low in investment, durable and reliable in structure and good in greening effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water conservancy engineering, and in particular relates to a rapid greening structure suitable for plateau slag piles. Background Art

[0002] Water conservancy and hydropower projects generally require the establishment of slag dumps. During the construction of slag dumps, the surrounding natural environment will be greatly damaged. The environment of the southwestern plateau is very fragile, so it is necessary to restore vegetation and conserve soil and water in the damaged areas in a timely and rapid manner. Slag dumps are often lumps of stone and slag, which have little soil content and poor water retention.

[0003] For the above-mentioned slag pile located in the southwestern plateau area, when the slag pile is also located by the river, it is necessary to carry out slope foot protection and greening treatment on the slag pile, and the greening measures are located on the slag pile and the slope foot protection, while taking into account the requirements for local species protection. The greening measures need to be combined with the water retention of the slag pile, the moisture retention and freezing depth of the planting soil, the matching of the selected vegetation species and the region, and the location of the slag pile by the river.

[0004] Common greening measures on slag bodies and slope foot protection structures in the prior art include cast-in-place concrete planting troughs covered with soil for greening, finished planting troughs covered with soil for greening, and laying transition cushion materials for covering soil for greening. The cast-in-place reinforced concrete planting trough greening scheme uses cast-in-place concrete, which requires a large number of templates and a certain maintenance period, resulting in a long construction period for the greening project and high overall cost; the finished planting trough covered with soil for greening scheme has high procurement and transportation costs and a long time in the southwestern plateau area, and is placed on irregular terrain such as slag bodies, so it has poor adaptability and durability; the construction process requirements of laying transition cushion materials for covering soil for greening are high, and the requirements for the gradation and thickness of the covering soil are high. It is easy to cause the loss of covering soil due to poor on-site gradation control and construction quality problems, resulting in poor greening effect. In addition, planting soil is scarce in the southwestern plateau area, and this scheme requires a large amount of covering soil. Utility Model Content

[0005] The utility model aims to provide a rapid greening structure suitable for plateau slag heaps.

[0006] To this end, the above-mentioned purpose of the utility model is achieved through the following technical solutions:

[0007] A rapid greening structure suitable for plateau slag piles, comprising a protective structure at the foot of the slag pile, characterized in that: the protective structure is provided with an outer guard formed by splicing reinforced concrete prefabricated parts on the river side, and the outer guard and the top surface of the protective structure form a planting trough;

[0008] The inner surface of the planting trough is paved with a composite geomembrane, the composite geomembrane is covered with planting soil, and flowers, climbing plants, shrubs and trees are planted in the planting soil;

[0009] The reinforced concrete prefabricated part includes a front wall retaining section, a rear wall stabilizing section and an intermediate connecting section for connecting the two; the front wall retaining section, the rear wall stabilizing section and the intermediate connecting section are I-shaped, and the front wall retaining section is thin-walled; the front wall retaining section is located on the lower side of the slope, and the rear wall stabilizing section is located on the upper side of the slope; at least the rear wall stabilizing section is embedded in the planting soil.

[0010] While adopting the above technical solutions, the present invention can also adopt or combine the following technical solutions:

[0011] As a preferred technical solution of the utility model: a drip irrigation pipeline is buried in the planting soil.

[0012] As a preferred technical solution of the utility model: a lifting ring is embedded in the upper edge of the front wall retaining section of the reinforced concrete prefabricated part, and the embedded lifting ring is welded to the steel mesh of the front wall retaining section.

[0013] As a preferred technical solution of the utility model: a lifting ring is embedded in the upper edge of the rear wall stabilizing section of the reinforced concrete prefabricated part, and the embedded lifting ring is welded to the steel mesh of the rear wall stabilizing section.

[0014] As an optimal technical solution of the utility model: the upper edge of the front wall retaining section and the upper edge of the rear wall stabilizing section of the reinforced concrete prefabricated part are pre-embedded with lifting rings, and the pre-embedded lifting rings are welded to the steel mesh of the front wall retaining section and the rear wall stabilizing section.

[0015] As a preferred technical solution of the utility model: the steel mesh is a single-layer steel bar.

[0016] As a preferred technical solution of the utility model: the upper surface of the planting soil is flush with the notch of the planting groove or slightly lower than the notch of the planting groove.

[0017] The utility model provides a rapid greening structure suitable for plateau slag piles, wherein the reinforced concrete prefabricated parts including a front wall retaining section, a rear wall stabilizing section and an intermediate connecting section for connecting the two are spliced ​​together to form an outer retaining, and together with a protective structure at the slope foot of the slag pile, a planting trough is formed, a composite geomembrane is laid on the inner surface of the planting trough, and planting soil is filled on the top, so that flowers, climbing plants, shrubs and trees can be planted, and the reinforced concrete prefabricated parts can be processed into prefabricated products in advance, so that the greening structure can be quickly built, the construction speed is fast, the greening effect is good in plateau areas, the safety is high, and at the same time the investment is low, the structure is durable and reliable, and the greening effect is good. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a cross-sectional diagram of a rapid greening structure suitable for plateau slag piles provided by the utility model.

[0019] Figure 2 This is a plan view of a rapid greening structure suitable for plateau slag piles provided by the utility model.

[0020] Figure 3 It is a cross-sectional diagram of a reinforced concrete precast component;

[0021] In the figure: 1-slag pile; 2-slope foot protection structure; 3-composite geomembrane; 4-planting trough; 5-reinforced concrete prefabricated parts; 6-planting soil; 7-flowers and plants; 8-shrubs; 9-climbing plants; 10-trees; 11-front wall retaining section; 12-rear wall stabilizing section; 13-middle connecting section. DETAILED DESCRIPTION

[0022] The present invention will be further described in detail with reference to the accompanying drawings and specific embodiments.

[0023] A rapid greening structure suitable for plateau slag piles, comprising a protective structure 2 at the foot of a slag pile 1 (that is, a slope foot protective structure, which has the characteristics of high water permeability and poor flatness), the protective structure 2 is provided with an outer retaining guard formed by splicing reinforced concrete prefabricated parts 5 on the river side, and the outer retaining guard and the top surface of the protective structure 2 form a planting trough 4;

[0024] A composite geomembrane 3 is laid on the inner surface of the planting trough 4 (before laying, the surface of the slag pile needs to be cleaned and leveled to prevent the composite geomembrane 3 from being damaged, and to ensure that the reinforced concrete prefabricated parts 3 are neatly and beautifully spliced), and planting soil 6 is filled on the composite geomembrane 3, and flowers and plants 7, climbing plants 9, shrubs 8, and trees 10 are planted in the planting soil 6; the composite geomembrane 3 is laid to improve the water retention and moisture retention effect of the planting soil 6, to ensure that the fine particles in the planting soil and the slag pile are not washed away, which can better ensure that the planted flowers, shrubs, and trees survive in the dry and rainless conditions of the plateau, improve the greening effect, and reduce the difficulty of maintenance.

[0025] The reinforced concrete prefabricated part 5 includes a front wall retaining section 11, a rear wall stabilizing section 12 and an intermediate connecting section 13 for connecting the two; the front wall retaining section 11, the rear wall stabilizing section 12 and the intermediate connecting section 13 are prefabricated together into a whole, which is an I-shape, and the front wall retaining section 11 is thin-walled; the front wall retaining section 11 is on the lower side of the slope, and the rear wall stabilizing section 12 is on the upper side of the slope; at least the rear wall stabilizing section 12 is embedded in the planting soil 6. In this embodiment, the rear wall stabilizing section 12 and the intermediate connecting section 13 are both embedded in the planting soil 6 to prevent the front wall retaining section from tipping over due to lateral soil pressure.

[0026] The reinforced concrete prefabricated parts 5 can be prefabricated in advance in a processing plant for standby use, and the greening construction speed is fast.

[0027] Drip irrigation pipes are buried in the planting soil 6.

[0028] The upper edge of the front wall retaining section 11 and the upper edge of the rear wall stabilizing section 12 of the reinforced concrete prefabricated part 5 are pre-embedded with lifting rings, which are welded to the steel mesh of the front wall retaining section 11 and the rear wall stabilizing section 12. The steel mesh is a single-layer steel bar.

[0029] The upper surface of the planting soil 6 is flush with the notch of the planting groove 4 or slightly lower than the notch of the planting groove 4.

[0030] The above-mentioned specific implementation methods are used to explain the present invention and are only preferred embodiments of the present invention, rather than limiting the present invention. Any modifications, equivalent substitutions, improvements, etc. made to the present invention within the spirit of the present invention and the protection scope of the claims shall fall within the protection scope of the present invention.

Claims

1. A rapid greening structure suitable for plateau slag piles, comprising a protective structure at the foot of the slag pile, characterized in that: The protective structure is provided with an outer guard formed by splicing reinforced concrete prefabricated parts on the left and right sides on the river side, and the outer guard and the top surface of the protective structure form a planting groove; The inner surface of the planting trough is paved with a composite geomembrane, the composite geomembrane is covered with planting soil, and flowers, climbing plants, shrubs and trees are planted in the planting soil; The reinforced concrete prefabricated part includes a front wall retaining section, a rear wall stabilizing section and an intermediate connecting section for connecting the two; the front wall retaining section, the rear wall stabilizing section and the intermediate connecting section are I-shaped, and the front wall retaining section is thin-walled; the front wall retaining section is located on the lower side of the slope, and the rear wall stabilizing section is located on the upper side of the slope; at least the rear wall stabilizing section is embedded in the planting soil.

2. The rapid greening structure suitable for plateau slag heaps according to claim 1 is characterized by: A drip irrigation pipeline is buried in the planting soil.

3. The rapid greening structure suitable for plateau slag heaps according to claim 1 is characterized by: A lifting ring is embedded in the upper edge of the front wall retaining section of the reinforced concrete prefabricated part, and the embedded lifting ring is welded to the steel mesh of the front wall retaining section.

4. The rapid greening structure suitable for plateau slag heaps according to claim 1 is characterized by: A lifting ring is pre-embedded at the upper edge of the rear wall stabilizing section of the reinforced concrete prefabricated part, and the pre-embedded lifting ring is welded to the steel mesh of the rear wall stabilizing section.

5. The rapid greening structure suitable for plateau slag heaps according to claim 1 is characterized by: The upper edge of the front wall retaining section and the upper edge of the rear wall stabilizing section of the reinforced concrete prefabricated part are pre-embedded with lifting rings, and the pre-embedded lifting rings are welded to the steel mesh sheets of the front wall retaining section and the rear wall stabilizing section.

6. The rapid greening structure suitable for plateau slag heaps according to claim 3, 4 or 5, characterized in that: The steel mesh is a single-layer steel bar.

7. The rapid greening structure suitable for plateau slag heaps according to claim 1 is characterized by: The upper surface of the planting soil is flush with the notch of the planting groove or slightly lower than the notch of the planting groove.